Town of Winthrop
Capital Improvement
Program
FY2009 to FY2013
5 - Year Plan
April 2008
Table of Content:
Fire Department …………………….. 1
Council on Aging ……………………. 2
Management of Information
Systems………………………………. 3
Police Department………………….. 4
Public Works ………………………… 5
Winthrop Public Schools …………… 6
Town of Winthrop
Capital Improvement
Program
Fire Department
FY2009 to FY2013
5 - Year Plan
Town of Winthrop
Capital Improvement Program FY09 to FY 13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Fire Department Date Prepared: January 3, 2008
Contact: Chief Powers
Project Title: Turnout Gear replacement Department Priority #: 1
Project Description:
To replace the turnout (fire) gear worn by the firefighters. Much of the existing gear is
approaching 15 years of use and is showing its age. Since turnout gear is the primary
protective clothing for firefighters it is imperative that it be in good shape. Additionally
the problem we now face is that every member has one set of gear. During the winter
months they have to wear gear, which may be still wet from a fire on other calls, a very
uncomfortable position to be in. The gear can take several days to dry, thus making a
second set invaluable. The plan would be to use the new gear as the primary set with the
older gear as backup.
Affected Interests:
This project will not have a direct impact on any other town department but will allow the
firefighters to better serve the town during times of multiple calls.
Schedule:
The specification for the turnout gear already exists, as does the vendor who has the state
contract for this equipment. The time frame therefore will be around six months, as the
gear is measured and fit for each firefighter then ordered. Delivery from time of order is
usually around 3 to 4 months.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Fire Department Date Prepared: January 3, 2008
Contact: Chief Powers
Project Title: Replacement of doors/windows
in fire stations
Department Priority #: 2
Project Description:
Replacement of the existing windows and four (4) of the existing old overhead doors.
The existing windows, many of which are original to the buildings, are loose fitting,
drafty and far from being energy efficient making the stations extremely costly to heat
and cool. With the cost of energy increasing every year the financial drain on operating
budgets is a major issue. Additionally, although the two main overhead doors at the
Shirley Street station have been replaced in recent years with insulated units, the back
door on the addition on that stations as well as all three doors on the Pauline Street station
are old style, un-insulated doors, which also contribute significantly to the energy costs of
running these stations. It is recognized that there has been some discussion of building a
new centralized fire station, however this project even if started today would be four to
five years before completion, and the reality is that a new facility is not in the near future.
It makes fiscal sense to replace theses windows and doors and begin to see immediate
energy savings to the town.
The Pauline Street station will need the replacement of 40 windows in the main building
and 15 windows in the tower portion, although the tower portion is not a living space it
does have an impact of the rest of the station and is suffering damage due to the condition
of the existing boarded up window openings. Additionally there are four (4) windows in
the lower part of the tower which need to be bricked in as increases over the years in
driveway paving have brought them to ground level.
The Shirley Street station will need the replacement of 44 windows in the main building
as well as 4 windows in the addition, which was added in the 1970’s.
Affected Interests:
Any savings realized by making these two buildings more energy efficient will mean
more town funds available for its other needs.
Schedule:
It is anticipated the development of bid specifications will take four to six weeks, with the
bid process taking six to eight weeks. Delivery and installation of the units can be
expected to take three months after bid award, making the length of the project about six
(6) months.
Yearly increase in costs is based on a 3%/year cost increase.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Fire Department Date Prepared: January 3, 2008
Contact: Chief Powers
Project Title: New Pumping engine Department Priority #: 3
Project Description:
To set aside funding of $100,000.00/year for a five year period to fund the purchase of a
new engine.
Engine 2, which is a 1995 model, is currently 12 years old. Since the average service life
of fire pumpers is 15 to 18 years at the end of this it will need to be replaced in 3 to 6
years. The replacement cost is expected to be at least $500,000.00 at that time and could
well be upwards of $600,000.00 to $650,000.00. The town has the option of doing a BAN
(Bond Anticipation Note) at that time, as they have in the past, however putting funds
aside each year will put the town in the position of having most, if not all, of the
necessary funding without borrowing.
Affected Interests:
The town needs to look at high cost public safety purchases well in advance of the time
they will be necessary. Planning for these purchases will allow better use of limited
financial resources for all town departments and ensure the town has adequate fire
apparatus.
Schedule:
This is a five-year commitment of funds.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Fire Department Date Prepared: January 3, 2008
Contact: Chief Powers
Project Title: Architectural/Engineering study
for new station
Department Priority #: 4
Project Description:
To undertake an engineering/architectural study of the construction of a new centralized
fire station. The existing stations, both built at the turn of the century, are the two oldest
municipal buildings. They were built for a volunteer fire department employing horse
drawn apparatus. Very little in the way of improvements has been done over the ensuing
years. In the 1960’s both buildings had concrete apparatus floors installed over the
existing wooden ones. In the mid 1970’s an addition was added to the Shirley Street
station. Other than some cosmetic and minor repairs nothing else has been done. Both
buildings are in need of significant work to the heating and electrical systems. Several
studies have been done between 1960 and the present on the issue of the fire stations. All
of them have concluded that the town will be more than adequately served by one
centralized facility. The last study, done in the mid 1990’s, put the cost of a new facility
at around 5 to 7 million dollars.
The purpose of the study will be to identify locations that will be adequate and to develop
cost estimates and preliminary architectural drawings.
Affected Interests:
This study will allow the town to seriously look at the issue of the existing stations and
what needs to be done, as well as the cost of doing it. This will allow the town to begin
planning for the longer term to move the project forward. The old station or stations can
then be used for another municipal purpose or sold and the funds used for other projects.
Schedule:
The entire project from developing an RFP to award and final product should take
approximately one year to complete.
Town of Winthrop
Capital Improvement
Program
Council on Aging
FY2009 to FY2013
5 - Year Plan
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Council on Aging Date Prepared: January 4, 2008
Contact: Nancy Williams
Project Title: Van purchase for Elder
Transportation
Department Priority #: 1
Project Description:
Our van which is used to transport elders from the community is now 7 years old and has
approximately 70,000 miles on it. The wheelchair lift no longer is functional and is
rusted and immobile.
When we purchase our passenger converted van from MHQ Municipal Vehicles in 2001,
the cost was approximately $36,000. This included: the Ford E-350 extended length van,
full perimeter window glass, rear A/C and heat, wheelchair package and upgrade to
Eclipse rear mount wheelchair lift.
We would like to purchase a new van that is a safer and totally functional vehicle. More
and more Senior citizens are relying on our transportation services so they can be
transported to doctors appointments, food and mall shopping, physical therapy, radiation,
chemo appointments, personal care appointments, and to-and-from the Senior Center.
The approximate cost for a Ford E series Cutaway Shuttle bus will be between $50,000
and $75,000.
We are awaiting an estimate from York Ford of the actual cost and will forward this
information when available. A new van should be purchased by 2009.
Affected Interests:
A new van will allow elder citizens in our community a safe mode of transportation in a
vehicle that is new and has been updated. It will enhance Senior Center programming as
van transportation will increase. The only department that would be affected directly
would be DPW as they would be servicing the van when needed as they presently do.
Also, the van is put into the DPW garage at the end of the day with other Town vehicles.
Schedule:
The van could be purchased through MHQ Municipal Vehicles or directly from Ford
Motor Company and converted/customized by New England Wheels in Burlington, MA.
The customization usually takes from 3 to 4 weeks.
Town of Winthrop
Capital Improvement
Program
Management of
Information Systems
FY2009 to FY2013
5 - Year Plan
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: M.I.S. Date Prepared: August 11, 2006
Contact: Michele N. Karas
Project Title: Fiber Optic Infrastructure Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects .
Since 1995 the MIS Department has been supporting the INET Loop [Coax Cable Line]
that links all town sites to the Town Hall for technological connectivity to various
servers, to each other and the Internet.
The original INET Loop was installed by Mahon Communication and funded under the
5-Year School Technology Plan. It was part of a negotiation with the then Time Warner
Cable Contract (now Comcast) under the town’s 10-Year Contract. The INET Loop was
installed FREE OF CHARGE and the support would be FREE OF CHARGE. At the
time, the technology was state of the art; so new the cable company technicians assigned
to support the infrastructure did not know how to do so. It was a learning curve for both
the town and the vendor. In addition, no funding was put into the MIS budget to
maintain, replace hardware/software or upgrade.
Since 1995 and to date, the MIS Department has supported the INET Loop and each year
has submitted proposals both within its budget package to the Board of Selectmen and
through Articles to go to our Annual Town Meetings and/or Special Town Meetings. No
funding for this function has ever been considered by either avenue.
Since around 2001, the system – LANCity: head-end and bridges [hardware] are no
longer supported by any vendors – and hardware is getting scarce to find or have rebuilt
when it is needed.
This project will bring in a fiber optic INET Loop that will connect all Town Sites to the
Town Hall [see attached diagram]. The INET Loop [Institutional Loop} or WAN {Wide
Area Network] is an external network that is run either underground in conduit or above
ground using existing phone poles [with permission].
Once the external fiber optic INET Loop is in place, the next phase would encompass the
internal part of the project - fiber optic to be run within each town site, a fiber backbone
with the gigabit L3 switching devices at either end of the fiber drops.
Data Drop Locations [Existing and New]:
Site Location Existing/New # of Drops/Nodes
1.) Town Hall Central HUB Existing Site 80+
2.) Police Existing Site 12 (1)
3.) Fire HQ Existing Site 8 +
4.) Council on Aging Existing Site 3
5.) DPW Existing Site 11+
6.) Fire – Beach Station Existing Site 1
7.) Larsen Rink Existing Site - 1
8.) Parks & Recreation Existing Site 10
9.) Emergency Operations Center [EOC] NEW 14+
10.) Harbor Patrol Landing Office NEW < 12
11.) WCAT [Head End Server] Existing Site 1
______________________________________________________________________________________
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
This will affect how every town department communicates with each other and the
outside world via email and the Internet [residents or vendors]. A secure and stable
technological environment for our users [computer] will allow them to work more
effective and efficient.
Currently, if a site goes down, they could potentially be down for up to one-week or
more, if it is a line issue [outside – currently using COAX Cable – which connectivity is
affected by weather] and Comcast has to be called in. At a minimum it could be
anywhere from 15 minutes to one business day – if MIS is troubleshooting and has the
replacement parts available.
Once a fiber infrastructure is in place, technology projects, like Homeland Security
cameras, Emergency Operations Center, VOIP Phone systems, site security systems, and
other demanding technology projects - where speed and stability - is needed can be put in
place. Currently, the INET Loop that is in place will not support any of those pending
projects.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
August 17, 2006, negotiation with Comcast will be underway were the town is asking for
a fiber optic point-to-point infrastructure and a technology grant for P/E/G [public,
education, government] Access. The town hopes a most that Comcast agrees to put in
place a fiber infrastructure and at least to gain technology money that the town can
choose to choose to administer as needed for a project such as this.
The MIS Department will work with the Grants and Procurement Agent for the Town of
Winthrop to create an RFP to get quotes and solid pricing for this project. Then, MIS
will research with other communities and the Comm-PASS Purchasing Community to
start the processes, ultimately awarding the project to the vendor that specializes in fiber
optic networks and infrastructures.
Town Hall
EOC
Council on Aging
DPW
Public Library
Parks &
Recreation
[w/in EBN]
Larsen Rink
Fire HQ
Police
Fire – Beach
Station
Internet
Public School
Dept.
WAN – Fiber Network 4/28/2008
Town of Winthrop
HEAD END
[WCAT]
Harbor
Patrol
Office
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: M.I.S. Date Prepared: August 11, 2006
Contact: Michele N. Karas
Project Title: Phone System [VOIP] Department Priority #: 2
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
Currently, the Town of Winthrop’s has multiple platforms, software and hardware for
phone technology – software and hardware systems, voicemail systems.
Town Hall, Police & Fire HQ:
Early 1998, a new phone system project for the Town Hall, Fire Department HQ and
Police Department was installed. The Town Hall system differs slightly from the one
that was installed within the Fire HQ and Police Station.
Town Hall:
Software: Merlin Legend Release 6.0
with 4 Port Intuity Voice Mail Messaging System
Hardware:
Phones Lucent Technologies/Avaya
MLX-10DP
MLX-16DP
MLX-20L console phone
Unix Server
Police & Fire HQ:
Software: Merlin Legend Communications System
Merlin Mail Voice Messaging System –Release 3
Hardware:
Phones Lucent Technologies/Avaya
MLX-10DP
MLX-16DP
MLX-20L console phone
Department of Public Works/Cemetery Dept. Facility:
DPW:
The Department of Public Works Facility was built over 10-Years ago. At the time of
construction, a Partner Phone system was installed with a voicemail solution for the DPW
only.
Software: Partner Phone System with Voicemail Messaging System
Hardware:
Phones Partner 18D & console phone
Cemetery:
The Cemetery Department uses a landline with an ordinary phone/answering machine;
they are not part of the DPW automated phone system although in the same site location.
Not part of an automated phone/voicemail system.
Council on Aging:
During a recent survey conducted by the MIS Department, Nancy Williams submitted a
description of her current phone system for her facility. The approximate age of the COA
– Senior Center is just over 10-Years old.
Software: Lucent Phone System with Voicemail Messaging System
Version is N/A
Hardware:
Phones Lucent – Model of phone is N/A
Larsen Rink:
Larsen Rink is now a division of the Parks and Recreation Department, overseen by its
Director, Sean Driscoll. Previous to this, the Larsen Rink was under the Winthrop Public
School System.
Software: N/A
Hardware:
Phones N/A
Fire Beach Station:
Not part of the Fire Department Head Quarter – Dispatch Phone system. Regular phone
line is used with no answering machine. If personnel are out on call when a phone call
comes into the Beach Station is rolls to the Fire HQ Dispatch to be answered after 4
rings. There are three (3) ordinary phones within this site.
EOC:
Currently, this site is up and operational. The site is be used as a communications
command post by emergency responders only in times of emergency. Phones have been
installed but would like to convert these to VOIP with this project .
The phone system [non-emergency – business lines only] that would be put in place
would be able to communicate over the fiber optic network [WAN]. Redundancy will
have already been built in for the WAN; some sites will still have hard-wire phones in
case one of the Internet connections went down. Since VOIP uses data drops much like
our computer data system, the drops for phones would mirror those of our data WAN
with minor deviations.
Data Drop Locations [Existing and New]:
Site Location Existing/New # of Drops/Nodes
1.) Town Hall Central HUB Existing Site 25 to < 50
2.) Police Existing Site 12 to < 25
3.) Fire HQ Existing Site 8 to < 12
4.) Council on Aging Existing Site 3 to < 10
5.) DPW Existing Site 12 to < 20
6.) Fire – Beach Station Existing Site < 6
7.) Larsen Rink Existing Site - < 3
8.) Parks & Recreation Existing Site < 10
9.) Emergency Operations Center [EOC] NEW 14 to < 20
10.) Harbor Patrol Landing Office NEW 6 to < 12
11.) WCAT [Head End Server] Existing Site 1 for server room
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
This will affect how every town department communicates within the organization.
Currently, each department has at least one phone number associated to it and could be
up to as many as 5 to 40+ lines to a location [split between offices].
Most everyone has a phone at his or her desk with voicemail. Virtual voicemail boxes
exist off of the Town Hall, Fire, and Police phones systems for boards & committee
members, personnel that do not have a physical desk/office, and town council members.
99% of our phone numbers are on the CENTREX system. CENTREX is system that
allows a person at one site to pick up an outside line and call another site by dialing the
last four (4) digits of the ten (10)-digit phone number. Not every employee is aware of
this but awareness programs are being conducted on a period basis.
As well as having a physical phone on a majority of our desks, the ability of having
business lines (OUTSIDE CALLING/PICKUP), the use of CENTREX calling through an
outside line (SITE to SITE), a majority of us have phone extensions that allow calling
between departments within the same site.
The systems because they vary are hard to administer and support for numerous reasons:
System upgrades/software no longer supported by vendors;
Training not conducted with current or new staff supporters;
Wide range of system software and hardware platforms;
Town and School separate;
Too many lines (support and pay for – expense) – don’t need as many
lines if a centralized phone system is used.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
August 17, 2006, negotiation with Comcast will be underway were the town is asking for
a fiber optic point-to-point infrastructure and a technology grant for P/E/G [public,
education, government] Access. The town hopes a most that Comcast agrees to put in
place a fiber infrastructure and at least to gain technology money that the town can
choose to choose to administer as needed for a project such as this.
Once the fiber infrastructure is in place, a VOIP phone network can be built.
The MIS Department will work with the Grants and Procurement Agent for the Town of
Winthrop to create an RFP to get quotes and solid pricing for this project. It is in the best
interest of the town to look for technology grant funding through Homeland Security and
other agencies as well as capital improvement funding [Bans, borrowing, etc. through the
CIP}.
Then, MIS will research with other communities and the Comm-PASS Purchasing
Community to start the processes, ultimately awarding the project to the vendor that
specializes in fiber optic networks and infrastructures.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: M.I.S. Date Prepared: August 11, 2006
Contact: Michele N. Karas
Project Title: Technology Infrastructure
Software Upgrade
Department Priority #: 3
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The funding from this project request will be used to provide upgrades to technology
equipment used on the local area networks and wide area networks throughout the town
departments. Also, for the year this project is funded, the request includes additional
funds to upgrade the Microsoft Office licenses from our existing versions. We currently
have end users using Office 97, Office 2000, and Office 2003 as well as some end users
with only Microsoft Word or Excel. The upgrade will bring all users up to one platform,
which will be more efficient when sharing documents, database, and information.
The Windows O/S will be brought up to be one platform for ease of use, training and
support. Currently the majority of users are using XP machines but a good amount, a
little less than a fifth need to migrate from Windows 2000 and Windows 98. This
funding will also cover the licensed software for Anti-Virus Software – Enterprise
Edition (server and clients) to bring all users up to one version and software platform.
Currently, there are 125 administrative computer desktops that need to be maintained, 15
network printers, as well as network equipment but not limited to copiers, scanners,
multi-function machines, hubs, switches, routers, cable modems, bridges, firewalls, and
servers. The locations of the equipment are as follows:
Site/Locations (Current):
Site Location
1.) Town Hall - Central HUB
2.) Police
3.) Fire HQ
4.) Council on Aging
5.) DPW
6.) Fire – Beach Station
7.) Larsen Rink
8.) Parks & Recreation
9.) WCAT [Head End Server]
Site/Locations (Future):
Site Location
1.) Emergency Operations Center [EOC]
2.) Harbor Patrol Landing Office
This project targets the technology needed for common administrative functions in the
various municipal departments. It does not cover all departmental technology needs,
which perform specialized tasks specific to an individual department. Replacement
desktops are included in this plan for computers that are past their lifecycle and will not
meet the MIS support standards.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
Over the past eleven years, the town has developed networks that enable all town
departments to utilize technology in their daily functions. This includes several location-
specific local area networks, as well as a wide area network connecting all town
buildings. The scope of this project includes only the equipment and software and
licenses [Microsoft Office, Anti-Virus, O/S] used for town-wide administrative functions.
It does not include department-specific equipment (i.e. library - circulation, police - IMC,
mobile units, fire - IMC and mobile units, specialized printers, etc.)
All departments are becoming increasingly dependent on up-to-date technology. The
general pubic also benefits from technology, as information is available in a more
comprehensive and timely manner.
Deferring the maintenance/replacement of existing technology results in productivity loss
and a backlog of technology needs that becomes ever more difficult to fund and support.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
This project will need annual appropriation for the five-year period covered under this
Capital Improvement Project Program [FY08 to FY12] for hardware replacement. This
CIP request is written to cover the five-year period, with the need for replacement and
upgrade to be re-evaluated on an annual basis. Resubmitted to FY09-FY13 Capital
Budget Team.
FY09 $75,000 Includes hardware and software replacement.
FY10 $30,000 FY09 to FY12 –
Annual re-evaluated replacement/upgrade to software
FY11 $40,000
FY12 $50,000
FY13 $60,000
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: M.I.S. Date Prepared: August 11, 2006
Contact: Michele N. Karas
Project Title: Security Access Control
Systems
Department Priority #: 4
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The funding from this project request will be used to provide upgrades and maintenance
to existing security access system within the Town Hall and Fire Departments in addition
to a new town sites onto the wide area network security access control system.
In 1999, through ADA grant funding, a KEYSCAN security access control system was
installed. In 2002, through Homeland Security grant funding, the two (2) fire stations
were added. As security issues heightened, so has the need and requests for additional
sites to be added to our current system by the police and department of public works.
This project will bring on in phases the following departments, as well as maintain,
support, and upgrade batteries, software, and technology hardware.
Locations :
Site Location
1.) Department of Public Works Facility
2.) Police
3.) Council on Aging
4.) Larsen Rink
5.) Emergency Operations Center [EOC]
6.) Harbor Patrol Landing Office
In addition, a silent monitory and alarm system will be put into the Tax Collections –
Revenue Collections office and the Treasurer’s Office. Both department handle large
amounts of monies.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
Over the past six years, the town has developed processes to limit the amount of money,
cash that is turned over to or into the Tax Department and the Treasury Department.
Outsourcing collections and going to lock box processing has lessened some handling of
money. In addition, security issues have heightened since the tragic terrorist attack on the
World Trade Centers - 9/11. The centralized collections through the Tax Collector’s
office also at times experience unhappy taxpayers that may create a hostile environment,
one that needs police presence. This security silent alarm system will add security to
both the citizens that come to our offices and the employees that deal with cash
payments.
This project targets and addresses with a solution the security issues of today and of the
future. It gives us a sense of security – protection and safety.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
This project will need annual appropriation for the five-year period covered under this
Capital Improvement Project Program [FY08 to FY12] for hardware replacement. This
CIP request is written to cover the five-year period, with the need for replacement and
upgrade to be re-evaluated on an annual basis to batteries, special key fobs, hardware,
and software. Resubmitted to FY09-FY13 Capital Budget Team.
FY09 $46,000 Add on Sites: DPW, Police, EOC
FY10 $36,000 Add on Sites: COA, Larsen Rink, and Harbor Patrol Office
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: M.I.S. Date Prepared: August 11, 2006
Contact: Michele N. Karas
Project Title: G. I. S. Department Priority #: 5
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The funding from this project request will be used to start to assess the specific needs to
have an intergraded G.I.S. for all town departments.
Through Homeland Security funding, some parts of the G.I.S. initiative has already been
conducted. The MIS Director, Fire Chief, Fire Captain, Police Officer have been trained
regarding the software – Pictometry and ArcView. The database of spatial data needed
as part of a G.I.S. system has already been acquired and currently sits on a hard-drive;
also, funded by Homeland Security.
This project will bring on in phases the following sites, as well as purchasing a G.I.S.
server; connectivity to all need town department, support, training, and maintenance for
all G.I.S. related technology software and hardware.
M.I.S.
DPW
Cemetery
Police
Fire
Engineering
The G.I.S. will expand on an annual basis as interest and requests are reviewed.
G.I.S. [Geographical Information Systems] are steadily being put in place in many
Massachusetts communities and are the preferred way to store information related to the
territory (parcels and lots, streets maintenance, water and sewer, engineering projects,
etc.). This request is based on costs of similar studies done within other communities of
similar size.
G.I.S. proposals have been submitted over the years, since 1999, to both Town Meeting
and the Board of Selectmen through the M.I.S. budget process. The last proposal was a
joint effort between M.I.S. and several other town departments that consist of the G.I.S.
Advisory Group.
Funding of this project will aid in future funding through grants offered to communities
that have implemented a functioning G.I.S. system. The data will be accessible through
the towns’ WAN for employees and limited data will be posted to the town’s website for
residents, banks, mortgage companies and potential new home owners, tourists, etc.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
Site/Locations:
Site Location/Departments:
1.) Department of Public Works Facility –
Water/Sewer, Engineering, Streets/Highways, Tree, Parks & Ground, Cemetery
2.) Police – IMC Dispatch, Detectives, Parking and Enforcement
3.) Fire – IMC Dispatch, Hydrant, Water Lines
4.) Emergency Operations Center [EOC]
5.) Harbor Patrol Landing Office – Harbor area
6.) Building Inspectors/Wiring/Plumbing – flood zones, commercial/residential zones
7.) Assessors – Map and Lots of Parcel data
8.) Town Clerk – Businesses, census data/population
9.) Town Manager – Electric/Cable/Gas utility lines
10.) Boards & Committees:
a. Conservation
b. Planning Board
The above listed departments and functions are just a brief description of where a G.I.S.
system would be beneficial. It is just the beginning. As more departments are using the
system, it will grow. It can then be put up onto the town’s website where residents can
query for information.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
This project will need annual appropriation for the five-year period covered under this
Capital Improvement Project Program [FY08 to FY12] for hardware replacement. This
CIP request is written to cover the five-year period, with the need for replacement and
upgrade to be re-evaluated on an annual basis. Resubmitted to FY09-FY13 Capital
Budget Team.
FY09 $35,000 FY08 - Cover server, connectivity and software.
FY10 $25,000 FY09 to FY12 – additional sites added as well
FY11 $25,000 as maintenance for software and hardware, and training.
FY12 $25,000
FY13 $25,000
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: M.I.S. Date Prepared: August 11, 2006
Contact: Michele N. Karas
Project Title: VTH Department Priority #: 5
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The funding through this project will bring on in phases the following sites, as well as
training and support of each application the following town department technology needs
as part as our on-line web-based solution using our official town website:
Assessing Department Mapping of Assessor’s parcels to GIS web-access
system software application
Parks & Recreation Online Registration System
Town Intranet For internal use of all town departments using a web-
base environment
Citizen Polling Services Online survey system, comment and request
/Customer Service Project application.
These are all requests that can be addressed by our current vendor, VTH, which supports
and houses our current town website.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
Will affect efficiencies of departments by automating their day-to-day administrative
tasks by setting up a web-based online service that the citizen can log into and complete
some if not the entire request.
Will be beneficial to better address non-essential service requests both for the employee
and the citizen.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
This project will be put in place in phases. Some projects can overlap. As training is
completed and goes into to implementation, another department will be trained, etc.
All projects would be funded the first year, FY09 for training and implementation.
Following funding which would cover maintenance, support agreements, upgrades, and
periodical review of training of new staff would be under the $25,000 threshold and
would be incorporated into the MIS Department yearly operating budget.
Town of Winthrop
Capital Improvement
Program
Police Department
FY2009 to FY2013
5 - Year Plan
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Police Date Prepared: January 10, 2008
Contact: Chief David B. Goldstein
Project Title: Replace Radio Console Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The present radio console used by the Winthrop Police Department (WPD) is more than
fourteen (14) years old. In reality, it is at least two, if not three generations behind
present-day radio equipment used for the purpose of sending and receiving routine as
well as emergency radio traffic from Winthrop and surrounding community police units.
At the initiation of the radio interoperability initiatives funded through UASI
approximately 2 years ago, the WPD was assured that after the funding of both portable
and mobile radio units, a station-based radio console would be funded.
Approximately one year ago, the Federal Department of Homeland Security (DHS)
advised the WPD that said funding would not be forthcoming.
All-Comm Technologies, the contracted radio service provider for the WPD, has advised
that the present console is obsolete and that the only available parts are those from similar
consoles kept for just that purpose.
A catastrophic failure of the existing system will nullify all routine and emergency radio
communications. There is no back up system in place.
The unit requested will cost $175,000.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
The radio console requested is required for the development and establishment of a
Combined Dispatch Center for Police and Fire. “The existing console will not support
the required functions and technology changes required for the mutual aid channels for
UASI and BAPERN, creating a communications deficiency for the town in the event of a
major incident. The overall condition and age of the unit make it a priority that it be
replaced.” (All Comm Technologies, January 8, 2008)
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
This project is of such importance that is should be initiated as soon as practicable. It is a
two phase project. The first phase is the installation of the unit for WPD use. The second
phase involves the establishment of a combined dispatch with the Winthrop fire
Department.
Town of Winthrop
Capital Improvement
Program
Public Works
FY2009 to FY2013
5 - Year Plan
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW Facilities Date Prepared: 8/14/2006
Contact: Dave Hickey
Project Title: DPW Building FY08
Maintenance
Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW would like to complete several small building system upgrades or maintenance
programs including the installation of a recycled oil heating system, installation of
electronic igniters for the existing roof hung heaters, sealing of the exterior building face
and the replacement of several non-functioning components of the air monitoring system.
We estimate the cost of this work to be $26,600. More detailed information is outlined
below.
Recycled Oil Heat System : 185,000 BTU/hr furnace with 250-gallon “workbench” tank
installed along the west wall of the main garage. System to include direct pump to
mechanics garage, 55 gallon drum lifting station, roof ventilation and protective bollards.
The system will run on the oil produced in the Town garage (200 gallons +/- annually)
and the DPW Recycling center (after filtering & screening) (250 gallons +/- annually).
The unit will heat the Town Garage during winter months and may save $4-6,000 per
year in heating costs. Installation is estimated at $14,800.
Electronic Igniters : Replace 8 standing pilots with automatic relighting pilots. The
existing ceiling hung units are about 25’ above the floor & the pilots blow out when the
doors are opened. It causes a wintertime situation where the bucket truck must maneuver
around the snow plowing equipment to re-lite the burners. The cost including installation
has been estimated at $2,800.
Seal Concrete Block Building : The DPW building suffers from water intrusion that is
causing interior damage. We have had several experts look at the problem and are
recommending that as a first step that the exterior façade along the north and east most
facing sides be sealed and the flashing be re-calked. The work has been estimated at
$3,500.
Air Monitoring and Circulation System : The air system circulation system has
performed erratically over the last 18 months. The DPW would like to work with a firm
that specializes in this system to maintain and update components. While we have not
obtained an estimate for the work we believe the costs will be between $4,000 and 7,000.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
These improvements can have a significant affect on the Public Works Department and
the residents of the Town by improving our ability to respond to emergencies, by
extending the life cycling of the building and by reducing our operating costs. The project
should improve the quality of the air in the building having a direct impact on all DPW
employees.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
All of these projects could be initiated in FY 2008. Resubmitted to the FY09-FY13
Capital Budget Team for review.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW Equipment Date Prepared: 7/20/2006
Contact: Dave Hickey
Project Title: Equipment Replacement –
Front end Loader
Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW is requesting equipment replacement for unit T-4, a front end wheel loader.
This unit is involved in most of the DPW functions and is critical in times of emergency
operations. Unit T-4 is a 1989 Volvo / Michigan loader. The DPW spends between
$1,000 and $3,000 on repairs annually and last year incurred cost over $12,000 to
replaced the transmission with re-built unit that only has a 1 year warrantee. The unit
continues to have issues with the steering mechanism making it difficult to operate and
the garage has had increased difficulty locating parts
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
A front end loader is used to load nearly every material that goes through the DPW
including all pipe, structures, gravel, sand and salt. It is vital to the operation of the DPW
and is essential during snow and storm emergencies. Loss of a front end loader may have
a catastrophic effect on Safety Operations, effecting Police & Fire, Snow management
operations, effecting schools and local commerce
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW Date Prepared: 7/20/2006
Contact: Dave Hickey
Project Title: Equipment Replacement, W2
extended cab pickup
Department Priority #: 2
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW is requesting replacement of unit W2, a 1992 extended cab pickup truck. The
truck suffered has been primary used by the Water Department for the transport of men
and equipment. It suffer significant damage when it was stolen in 2005. While the unit
was recovered it had issues with the transmission and the electrical system. Based on
costs estimates to repair the unit and its value the unit as surpluses in 2006. The DPW
would like to replace the unit and have it equipped to for snow operations. Current state
bid pricing for and extend cab pickup with snow fighting equipment is $40,000.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
This vehicle is vital to the operation of the DPW Replacement is also a benefit to the
community as more work can b completed.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
The DPW has been trying to replace this since FY04. A replacement pickup is readily
available and can be delivered within 8 weeks of ordering.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW Date Prepared: 7/20/2006
Contact: Dave Hickey
Project Title: Equipment Replacement, Unit
218 Pickup Truck
Department Priority #: 3
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
Unit 218 is a 1993 pickup truck that has required extensive repairs including a
transmission replacement, fuel line and tank replacement and door replacement.
Currently the truck will not pass emissions test for inspection sticker. It has over 100,000
miles and has been used to plow snow every year. The remaining problems are electrical
(fuse box and wiring) and body rot. Replacement parts are become more difficult to
locate. The truck was not reliable last winter.
The DPW estimates that the necessary repairs will cost more than $3,000 and the value of
the truck is less than $1,000. Current state bid pricing for this unit with the necessary
snow fighting equipment is $38,000.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
This truck is assigned to the sewer foreman and is necessary for response 24 hours per
day. The truck is used daily for a variety of DPW tasks and is used extensively for snow
plowing operations. Replacement of this unit will have a large effect on the DPW’s
ability to be effective and productive. Replacement will also affect the residents of the
community, from the standpoint of cost effectiveness and emergency response.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
The DPW has been trying to replace this since FY04. A replacement pickup is readily
available and can be delivered within 8 weeks of ordering.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW - Highway Date Prepared: 9/1/2006
Contact: Dave Hickey
Project Title: Fort Bank Secondary Access
Road
Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW would like to advance the design, permitting and construction of a secondary
access road for the Fort Bank School. Much work has been done to develop a concept for
an emergency road with limited access to facilitate drop off and pick for the school and to
have emergency access to Bell Isle. This project would minimize user frustration and
alleviate the occasional conflicts with the emergency functions of the DPW. A consultant
hired by the school building committee. Has produced a preliminary plan and costs
estimate of $400,000.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
The Fort Banks secondary access road would benefit residents with children in the
elementary thru 2 nd grade level, school department teachers and bus drivers, Police, Fire
and DPW departments.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
Preliminary engineering plans and some draft environmental documents have been
prepared. It has been estimated that the permitting process will take 8 to 10 weeks and
construction will take 3 months.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW - Sewer Date Prepared: 8/28/2006
Contact: Dave Hickey
Project Title: Sewer Main Replacement &
Rehabilitation
Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW is recommending system improvements focusing on projects that will reduce
infiltration and inflow into the sewer collection system. The projects are currently viewed
as main replacement projects but may be modified after the completion of the inspection
and isolated repair project is complete later this year. This work will extend the useful life
of the system and will relieve the operating demand at the Pleasant Park pump station.
The priority projects include replacing the mains on several streets with high water table
and suspected problems. It is the DPW’s intention to complete this work with the
corresponding water system improvements.
Main Replacement : The DPW would like to replace the mains on Lincoln, Walden, Beal
and Read Streets. These streets represent an area where the infrastructure is aged and
requires frequent jetting as well as several previous emergency repairs. The DPW is
preliminarily estimating the work at $250,000. This work can be funded through the
MWRA’s I/I Community Assistance Program from which the Town can be awarded an
increasing grant, starting at 35% and going up to 50%.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
These improvements will reduce I/I from the system, which will decrease operating costs.
Additionally these repairs should mitigate peak flows and reduce backups.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
This project will be driven by the findings of the initial infrastructure assessment and
remedial repair project in the same area. It is the intention of the DPW to start this project
in FY2008. The main replacement program is expected to require a 2 to 3 months to
finalize engineering and construction schedule could last several months. Resubmitted to
Capital Budget Team for FY09-FY13.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW - Sewer Date Prepared: 1/7/2008
Contact: Dave Hickey
Project Title : Sewer Pump Stations Phase 4 Department Priority #: 2
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW would like to initiate a repair project for the Sewer Pump Stations Phase 4.
This would include replacement of deteriorated and non-functioning ventilation and
alarms at 3 locations: Pico Ave, So. Pleasant St. and Revere St.
The estimated cost of assessment and engineering phase including bidding and contract
administration $15k, construction $125k
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
The Sewer Pump Stations are essential to residents of the town primarily, pumping 90%
of the towns’ sewerage and wastewater on a daily basis. Further delays in repairs may
result in the loss of basic utility service. This is a health and safety issue for the foreman
as well as the town’s people. A breach in this system could cause wide spread sewer
backups in to residential homes. The alarm system should be hard wired to the police
station.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
An engineering proposal for the work has been prepared and could be initiated in FY08.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW - Water Date Prepared: 8/25/2006
Contact: Dave Hickey
Project Title: Meter Replacement and Radio
Read System
Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW is recommending water system improvements focusing on projects that will
reduce unaccounted water, improve customer service, department efficiency and extend
the useful life of key system components. The highest priority project is converting to a
radio read meter system and replacing the existing water meters.
Background : The water system consists of approximately 4500 meters with an average
of 19 years of service. Based on published standards for equipment of this age there may
be a loss of up to 10% in meter accuracy. Currently the department replaces between 10
and 15 meters per year for malfunctions. A consulting engineer has been retained to study
the system, compare available technology, recommend a direction for the replacement
program and develop a specification for public bidding. Critical factors in the cost of the
program will be system type (fixed base vs. drive by) and the installation plan. The initial
findings together with a renewed interest in monthly billing are likely to result in a
recommendation for a fixed base system. The preliminary costs estimates for meter
replacement program are $975,000 in meters, $100,000 in hardware/software and
training, and $425,000 in installation. Article 9 of May 2005 Town Meeting approved
$600,000 for the meter replacement program.
FY09 request $1,500,000.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
These improvements can have a significant affect on revenues because a reduction in
unaccounted water. The new technology will include ant-theft mechanisms and other
monitoring features that will enhance customer service capabilities.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
The Town’s consultant has recently submitted a report summarizing options. We
anticipate that a specification can be prepared in 4 to 6 weeks. Installation will take one
to 2 years if completed by the contractor and 5 to 6 years if completed by the Town.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW - Water Date Prepared: 8/25/2006
Contact: Dave Hickey
Project Title: Main Replacement and
Rehabilitation
Department Priority #: 2
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW is recommending system improvements that will reduce loss, improve water
quality and extend the useful life of the system. The projects preliminary replacing and
rehabilitation areas are on mains where there are suspected problems.
Background : The DPW would like to replace the mains on Lincoln, Walden, Beal and
Read Streets. These streets represent an area where the infrastructure is aged and is
suspected of having high loss rates. The mains are between 57 and 81 year old.
Additionally the water department would like to re-route a section of water main from
beneath the harbor to Pico Park, Francis Street area. This main has recently experienced
problems that are very difficult to repair. The DPW would like to eliminate the main and
all services associated with the pipe below the harbor. Preliminary estimates for this work
are as follows;
Lincoln St $290,000
Beal St $200,000
Read St $200,000
Walden St $480,000
Pico Park / Francis St $250,000
Jefferson & Freemont Sts $500,000
Bartlett & Somerset Sts $450,000
Total $2,370,000
An option for funding these projects is the MWRA’s Local Pipeline Assistance Program
(LPAP) from which the Town can borrow up to $4.1m in a no interest 10-year loan.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
These improvements can have a significant affect on the quality of the water provided to
residents of the Town. Additionally this work will improve system dependability to assist
the Fire Department and the Board of Health. Lastly these improvements will increase the
efficiency of the system to that revenues will be increased.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
Engineering for these projects could be initiated in FY2008. Construction at Pico Park
and Francis Street could also begin in FY2008. It would be the DPW’s goal is to begin
work the other work however co-ordination with sewer repairs may result in the work
extending to multiple years.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW – Building & Grounds Date Prepared: 1/7/2008
Contact: Dave Hickey
Project Title : Revere St. Siding Replacement Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW would like to initiate a repair project for the Revere Street Pump Station and
PRV. This would include the removal and replacement of existing deteriorated wood
siding with vinyl siding.
The estimated cost of assessment and engineering phase including bidding and contract
administration $5k, construction $45k
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
This work is essential in nature since damage to the pump station by degradation and
decay of the building can and will lead to the loss of basic utility service. This can be a
health and safety issue. A breach in this system could cause wide spread sewer backups
into residential homes.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
An engineering proposal for the work has been prepared and could be initiated in FY08.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW – Building & Grounds Date Prepared: 1/10/2008
Contact: Dave Hickey
Project Title : Town Hall Cupula Department Priority #: 2
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The DPW would like to initiate a repair project for the Town Hall Copper Gutters/Slate
repair and restoration. Phase 1 would include lining the copper gutters and repair broken
slate on TH roof.
The estimated cost of copper gutter and slate work is $60k. Additionally, to strip the paint
from the original copper cupula would cost $65k.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
The Town Hall is one of the town’s oldest and most cherished buildings. These repairs
are essential to the upkeep of this building.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: DPW – Building & Grounds Date Prepared: 1/10/2008
Contact: Dave Hickey
Project Title : Replenishment of Street Trees Department Priority #: 3
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
Replenishment and commitment to replace inventory of street trees to more successfully
achieve grant opportunities. Reline our main streets and gathering/community areas with
native trees. These would be 2-3” caliper trees; these trees acclimate to their
environment quicker than larger trees.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
The total appraised value for all the inventoried trees in the Town of Winthrop is
estimated at $2,508,700, determined by a 1999 study, with an average tree value of more
than $1,910 per tree. On average, the Town loses between 30 to 50 trees per year
($76,400) and due to limited funds from donations we replace between 5 and 10. The
Town has not financed a street tree-planting program in several years. This investment in
our green infrastructure will enhance the environmental and aesthetic quality of our
community. We are concerned that the rate of loss is accelerating based on our recent
experience and the age of our inventory.
Benefits of trees include: social, community, environmental and economic.
Trees can reduce the erosion of our precious topsoil by wind and water, cut
heating and cooling costs, moderate the temperature, clean the air, produce life-
giving oxygen, and provide habitat for wildlife; and
Trees in our Town increase property values, enhance the economic vitality of
business areas, and beautify our community; and
Trees, whenever they are planted, are a source of joy and spiritual renewal.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
Capital Improvement
Program
Winthrop Public Schools
FY2009 to FY2013
5 - Year Plan
Town of Winthrop
Capital Improvement Program FY09 to FY13
Individual Project Proposal
Project Description and Justification
Instruction: Number projects beginning with #1 for the most important project, regardless of chronological
order. High priority projects may be scheduled later if these projects will not be needed or ready for
action until future years.
Department: Winthrop Public Schools Date Prepared: March 2008
Contact: Kevin C. Meagher
Project Title : Repairs & Renovation of HS &
Miller Field/ADA, HVAC
Department Priority #: 1
Project Description:
Instruction: Provide a factual description of the project. Information should include location, physical
characteristics (e.g. size, distance, acreage, floor area, etc.), operational objectives, date of any approval
by a board, committee, or unit of town government, and any other items that are important to understand
the nature of the project. Indicate whether the project is related in any way to other proposed or ongoing
capital projects.
The is potential bonding for the Towns portion of repairs/renovation of the High School
and Miller Field as part of a Massachusetts School Building Authority (MSBA)
collaborative project.
Affected Interests:
Instruction: Please describe how your Capital Project will impact other Departments, Programs,
Community Groups, etc.
See following statement and scope of work for repair project with proposed budget costs.
Schedule:
Instruction: Identify the important stages or time frames in the project, eg. Project plans, bidding process,
start of construction, projected completion. If applicable, be sure to include work done in prior years,
including studies or other planning. If a project is related to another capital improvement, identify
important linkages in the project schedule.
Potentially project will begin in summer 2008 pending MSBA approval.
LAST PAGE
( -- BLANK PAGE --)
As of April 18, 2008, the Capital Budget Team has submitted to the Town Manager the
following to be reviewed and placed in the FY2009 Town Manager’s Proposed Budget
Package to be presented to the Town Council on or before May 1, 2008:
Priority 1: School - ADA and boiler replacement
The original capital improvement proposal from the School department contemplated a
five-year program appropriation of approximately 7 million dollars. Critical and long
overdue accessibility improvements to the high school middles school, the auditorium
and Miller field were proposed to be funded over a five-year period. Funding was
provided for replacement of boilers at the high school, middle school and at the EB
Newton School. The high school roof and HVAC, grandstands at Miller Field and high
school gym floor and bleachers are in need of replacement and the Auditorium in need of
repairs.
Phasing of this work over a 5-year period will not work for the Town financially. The
phased funding is large enough to have a devastating impact to the annual incremental
increase available to fund operating expenses. Borrowing costs are best minimized by
large issuances. The work needs to be done and breaking the cost down to small amounts
to be completed over a five-year period will only increase the overall cost of the work.
Breaking the project into two three and half million-dollar projects, one funded in the
beginning of the five-year cycle and the other at the end. The impact of the borrowing on
the available incremental revenue available to fund operating budgets can be minimized
by drawing down on the proceeds from the sale of the Dalrymple School.
The Accessibility improvements are intended to bring the Town into compliance with
current federal, state and industry standards. The Town has struggled since 1995 to
comply with the requirements of the American with Disabilities Act. Other needed and
important improvements such as roof and boiler replacement, upgrades to the HVAC
system and other repairs all trigger requirements for the Town to face up to its
obligations, both legal and moral, to provide access to all of its students.
There is potential bonding for the Towns portion of repairs and renovations of the High
School and Miller Field as part of a Massachusetts School Building Authority (MSBA)
Collaborative Project. Schedule of project is to potentially begin in summer 2008
pending MSBA approval. Cost of project: $26,471,850 .
Priority 2: DPW - Water Meter Replacement
The water system consists of approximately 4500 meters with an average of 19 years of
service. Based on published standards for equipment of this age there may be a loss of up
to 10% in meter accuracy. Currently the department replaces between 10 and 15 meters
per year for malfunctions. A consulting engineer has been retained to study the system,
compare available technology, recommend a direction for the replacement program and
develop a specification for public bidding. Critical factors in the cost of the program will
be system type (fixed base vs. drive by) and the installation plan. The initial findings
together with a renewed interest in monthly billing are likely to result in a
recommendation for a fixed base system. The preliminary costs estimates for meter
replacement program are $975,000 in meters, $100,000 in hardware/software and
training, and $425,000 in installation. Article 9 of May 2005 Town Meeting approved
$600,000 for the meter replacement program. This authorization must be rescinded and a
new authorization of $1,500,000 be voted by the Town Council for this project to move
forward.
These improvements can have a significant affect on revenues because a reduction in
unaccounted water. The new technology will include ant-theft mechanisms and other
monitoring features that will enhance customer service capabilities.
Priority 3: DPW - Equipment Replacement, W2 extended cab pickup
The DPW is requesting replacement of unit W2; a 1992 extended cab pickup truck. The
truck suffered has been primary used by the Water Department for the transport of men
and equipment. It suffers significant damage when it was stolen in 2005. While the unit
was recovered it had issues with the transmission and the electrical system. Based on
costs estimates to repair the unit and its value the unit as a surplus in 2006, the DPW
would like to replace the unit and have it equipped to for snow operations. Current state
bid pricing for and extend cab pickup with snow fighting equipment is $40,000.
This vehicle is vital to the operation of the DPW Replacement is also a benefit to the
community as more work can b completed.
The DPW has been trying to replace this since FY04. A replacement pickup is readily
available and can be delivered within 8 weeks of ordering.
Priority 4: DPW - Equipment Replacement, Unit 218 Pickup Truck
Unit 218 is a 1993 pickup truck that has required extensive repairs including a
transmission replacement, fuel line and tank replacement and door replacement.
Currently the truck will not pass emissions test for inspection sticker. It has over 100,000
miles and has been used to plow snow every year. The remaining problems are electrical
(fuse box and wiring) and body rot. Replacement parts are become more difficult to
locate. The truck was not reliable last winter.
The DPW estimates that the necessary repairs will cost more than $3,000 and the value of
the truck is less than $1,000. Current state bid pricing for this unit with the necessary
snow fighting equipment is $38,000 .
This truck is assigned to the sewer foreman and is necessary for response 24 hours per
day. The truck is used daily for a variety of DPW tasks and is used extensively for snow
plowing operations. Replacement of this unit will have a large effect on the DPW’s
ability to be effective and productive. Replacement will also affect the residents of the
community, from the standpoint of cost effectiveness and emergency response.
The DPW has been trying to replace this since FY04. A replacement pickup is readily
available and can be delivered within 8 weeks of ordering.
Priority 5: DPW - Water Main Replacement/Relining
The Towns water system suffers from inconsistent past maintenance practices. The
average age of the infrastructure is over 60 years. Continued schizophrenic improvements
and lack of long range planning puts the DPW is a responsive position and decreases the
systems ability to provide dependable, high quality water over the long range. This will
possibly lead to multiple failures, decreased ability to fight fires or other catastrophic
consequences.
A portion of this proposal is set aside funds to complete an engineered analysis and
assessment of the Town’s water system. The project will be based on an engineering
analysis with the intention of reducing system loss, improving water quality and fire
fighting capability and extending the useful life of the Town’s infrastructure.
In addition, this appropriation recommends water system improvements that will reduce
loss, improve water quality and extend the useful life of the system. The projects
preliminary replacing and rehabilitation areas are on mains where there are suspected
problems.
These funds will be used to replace the mains on Lincoln, Walden, Beal and Read Streets.
These streets represent an area where the infrastructure is aged and is suspected of having
high loss rates. The mains are between 57 and 81 year old. Additionally funds would be
available to re-route a section of water main from beneath the harbor to Pico Park,
Francis Street area. This main has recently experienced problems that are very difficult to
repair. Completion of the project would result in the elimination of the main and all
services associated with the pipe below the harbor. Preliminary estimates for this work
are as follows;
Lincoln St $290,000
Beal St $200,000
Read St $200,000
Walden St $480,000
Pico Park / Francis St $250,000
Jefferson & Freemont Sts $500,000
Bartlett & Somerset Sts $450,000
Total $2,370,000
The Town can borrow up to $4.1m in a no interest 10-year loan from the MWRA’s Local
Pipeline Assistance Program (LPAP).
Priority 6: DPW –Sidewalk Repair and Replacement Project
The Public Works Department began a sidewalk replacement during fiscal year 2007.
$100,000 of MASSPORT funds to replace and repair sidewalks throughout the Town.
The program has been well received by the Town. Public Works staff has developed a
list of sidewalks needing attention based on complaints received over the years. All of the
work has been done through a private contractor. To date 63% of the projected project
has been completed with the expectation the remainder of the project should be
completed by the end of the spring. To date, 1700 squares of sidewalk have been
replaced. We expect to replace 2400 squares of sidewalk with a $100,000 appropriation.
Most of he Town’s major sidewalk issues will be resolved by the end of the fourth year
of the program.
Funding for this program is recommended to come from the Town’s unreserved fund
balance.
FY2009-FY2013 Capital Budget Team:
Michele N. Karas, MIS Director, Chair of CBT
Chief David B. Goldstein, Police
Chief Larry Powers, Fire
Anne Kelty, Engineering Dept., DPW
Kevin Meagher, Business Office, Winthrop Public Schools
Monica Ford, Treasurer/Collector
Michael Bertino, Finance Director
Steven R. Calla, Operations Manager, DPW