June 6, 2023 Public Notice Extension

U.S. Environmental Protection Agency · from the EPA · 3 pages · 115 KB
open the file ↗ · original at the source ↗

UNITED STATES ENVIRONMENTAL 
PROTECTION AGENCY – REGION 1 (EPA) 
WATER DIVISION 
5 POST OFFICE SQUARE 
BOSTON, MASSACHUSETTS 02109 
MASSACHUSETTS DEPARTMENT OF 
ENVIRONMENTAL PROTECTION (MASSDEP) 
COMMONWEALTH OF MASSACHUSETTS 
100 CAMBRIDGE STREET, SUITE 900 
BOSTON, MASSACHUSETTS 02114 
EPA EXTENSION OF PUBLIC NOTICE OF A DRAFT NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) PERMIT TO DISCHARGE INTO WATERS OF THE UNITED
STATES UNDER SECTION 402 OF THE CLEAN WATER ACT (CWA), AS AMENDED, AND 
MASSDEP PUBLIC NOTICE OF EPA REQUEST FOR STATE CERTIFICATION UNDER SECTION
401 OF THE CWA. 
PUBLIC NOTICE PERIOD: May 31, 2023 - July 31, 2023 
PUBLIC NOTICE EXTENDED TO: August 30, 2023 
NAME AND MAILING ADDRESS OF APPLICANT: 
Massachusetts Water Resources Authority 
Deer Island 
33 Tafts Avenue 
Boston, MA 02128 
NAME AND ADDRESS OF THE FACILITY WHERE DISCHARGE OCCURS: 
Massachusetts Water Resources Authority (MWRA) 
Deer Island Treatment Plant (DITP) 
190 Tafts Avenue 
Winthrop, MA 02152 
RECEIVING WATER AND CLASSIFICATION: 
Massachusetts Bay (Class SA) 
Boston Inner Harbor (Class SB CSO) 
Charles River (Class B, variance) 
Mystic River (Class SB) 
Upper Mystic River (Class B, variance) 
Little River (Class B) 
Alewife Brook (Class B) 
PREPARATION OF THE DRAFT PERMIT AND EPA REQUEST FOR CWA § 401 CERTIFICATION: 
EPA is issuing for public notice and comment the Draft NPDES Permit for the MWRA DITP, which
discharges treated municipal and industrial wastewater. Sludge from this facility is pumped via an
underground harbor tunnel to the MWRA biosolids plant in Quincy, Massachusetts. The effluent limits and
permit conditions have been drafted pursuant to, and assure compliance with, the CWA, including EPA-
approved State Surface Water Quality Standards at 314 CMR 4.00. MassDEP cooperated with EPA in the
development of the Draft NPDES Permit. MassDEP retains independent authority under State law to
publish for public notice and issue a separate Surface Water Discharge Permit for the discharge, not the 
subject of this notice, under the Massachusetts Clean Waters Act, M.G.L. c. 21, §§ 26-53.

In addition, EPA has requested that MassDEP grant or deny certification of this Draft Permit pursuant to
Section 401 of the CWA and implementing regulations. Under federal regulations governing the NPDES
program at 40 Code of Federal Regulations (CFR) § 124.53(e), state certification shall contain conditions
that are necessary to assure compliance with the applicable provisions of CWA sections 208(e), 301, 302,
303, 306, and 307 and with appropriate requirements of State law, including any conditions more stringent
than those in the Draft Permit that MassDEP finds necessary to meet these requirements. Furthermore,
MassDEP may provide a statement of the extent to which each condition of the Draft Permit can be made
less stringent without violating the requirements of State law. 
INFORMATION ABOUT THE DRAFT PERMIT: 
The Draft Permit and explanatory Fact Sheet may be obtained at no cost at https://www.epa.gov/npdes- 
permits/massachusetts-draft-individual-npdes-permits or by contacting: 
Michele Barden 
U.S. Environmental Protection Agency – Region 1 
5 Post Office Square, Suite 100 (06-1) 
Boston, MA 02109-3912 
Telephone: (617) 918-1539 
Email: barden.michele@epa.gov 
Following U.S. Centers for Disease Control and Prevention (CDC) and U.S. Office of Personnel
Management (OPM) guidance and specific state guidelines impacting our regional offices, EPA’s workforce
has been directed to telework to help prevent transmission of the coronavirus. While in this workforce
telework status, there are practical limitations on the ability of Agency personnel to allow the public to
review the administrative record in person at the EPA Boston office. However, any electronically available
documents that are part of the administrative record can be requested from the EPA contact above. 
PUBLIC MEETING AND PUBLIC HEARING: 
The Regional Administrator has determined, pursuant to 40 CFR §124.12, that a significant degree of public
interest exists in the proposed permit and that a public meeting and a public hearing will be held virtually to
consider the permit. This notice serves to announce that a public meeting and public hearing will be held on
the following dates and times: 
Public Informational Meeting: 
DATE: July 12, 2023 
TIME: 7:00pm 
LOCATION: Virtual Meeting Information will be provided on EPA’s website, noted above 
Public Hearing: 
DATE: July 12, 2023 
TIME: 8:00pm 
LOCATION: Virtual Meeting Information will be provided on EPA’s website, noted above 
The following is a summary of the procedures that will be followed at the public informational meeting: 
a. The Presiding Chairperson will have the authority to open and conclude the meeting and to
maintain order. 
b. EPA will make a short presentation describing the NPDES permit process and the draft permit
conditions, and then accept clarifying questions from the audience. 
c. Formal oral comments concerning the draft permit will not be accepted at the public meeting.

Formal oral comments will be accepted at the subsequent public hearing. 
The following is a summary of the procedures that will be followed at the public hearing: 
a. The Presiding Chairperson will have the authority to open and conclude the hearing and to
maintain order. 
b. Any person appearing at such a hearing may submit oral or written statements concerning the
draft permit. 
PUBLIC COMMENT: 
All persons, including applicants, who believe any condition of this Draft Permit is inappropriate must raise 
all reasonably ascertainable issues and submit all reasonably available arguments supporting their position 
by August 30, 2023 , which is the close of the public comment period. Comments, including those
pertaining to EPA’s request for CWA § 401 certification, should be submitted to the EPA contact at the
address or email listed above. Upon the close of the public comment period, EPA will make all comments
available to MassDEP. All commenters who want MassDEP to consider their comments in the state
decision-making processes (i.e., the separate state permit and the CWA § 401 certification) must submit
such comments to MassDEP during the state comment period for the state Draft Permit and CWA § 401
certification. For information on submitting such comments to MassDEP, please follow the instructions
found in the state public notice at: https://www.mass.gov/service-details/massdep-public-hearings- 
comment-opportunities . 
FINAL PERMIT DECISION: 
Following the close of the comment period, and after a public hearing, if such hearing is held, the Regional
Administrator will issue a final permit decision and notify the applicant and each person who has submitted
written comments or requested notice. 
KEN MORAFF, DIRECTOR 
WATER DIVISION 
UNITED STATES ENVIRONMENTAL 
PROTECTION AGENCY – REGION 1 
LEALDON LANGLEY, DIRECTOR 
DIVISION OF WATERSHED MGMT 
MASSACHUSETTS DEPARTMENT 
OF ENVIRONMENTAL PROTECTION