November 9, 2023 
Michele Cobban Barden 
Water Division 
United States Environmental Protection Agency 
Region 1 
Boston, MA 02109 
Dear Ms. Barden, 
On behalf of the Massachusetts Rivers Alliance, thank you for the opportunity to comment on 
the National Pollution Discharge Elimination System (NPDES) Permit MA0103284 for the 
Massachusetts Water Resource Authority's (MWRA) Deer Island wastewater treatment plant. 
The Massachusetts Rivers Alliance is a statewide organization with 85 member groups dedicated 
to protecting and restoring the rivers and streams of the Commonwealth. We are deeply 
concerned with the impacts of stormwater and sewage pollution on waterways around the state, 
including the Charles River, Mystic River, Alewife Brook, and Boston Harbor. 
The MWRA has made significant progress in reducing the quantity of its untreated sewage 
discharge, helping to improve water quality, aquatic habitat and recreational opportunities in 
some of the state’s rivers and Boston Harbor. Mass Rivers would like to see more work done by 
the MWRA and Co-Permittees to further reduce sewage pollution. Disappointingly, this Draft 
Permit does not propose nor promote abatement of the permittees’ combined sewer overflows. 
As climate change brings more frequent and intense storms to Massachusetts, greater 
precipitation will mean greater sewage pollution. The Draft Permit accounts for climate 
resilience and mitigation in other ways, like preparing wastewater treatment facilities for 
flooding and major storms, but does not recognize the anticipated increase in CSOs, which 
exclusively discharge in environmental justice communities. 
1

Our comments by section: 
Section A1. We support the quarterly monitoring requirements for PFAS analytes in influent, 
effluent, and sludge. 
Section C2. When the MWRA, and Co-permittees publish public notification of unauthorized 
discharges, that language should be translated into appropriate languages for the communities the 
entities serve, which may require translation to serve environmental justice communities. The 
notifications should also include universal symbols when possible to enhance public 
understanding. 
Section E1.a In addition to the structural hazards a wastewater treatment facility must prepare 
for, we recommend including considerations of pumping ability during a major storm or flood 
event in the WWTF Major Storm and Flood Events Plan. Extreme precipitation elsewhere in the 
system could significantly increase influent to a level that proves difficult for the WWTF to 
pump, potentially causing backups that contribute to CSOs. 
Section E1.a(1). In the list of measures permittees shall consider for mitigation in their Major 
Storm and Flood Events Plan , we recommend including green infrastructure projects. These 
projects allow rain or snowmelt to reenter the water cycle by soaking into the ground, rather than 
collecting on top of pavement and causing flood conditions. These projects, like constructed 
wetlands, permeable pavement, and bioswales, are often less expensive to construct and maintain 
than the already-included flood barriers, and can be constructed at any scale to meet the needs of 
the specific site. 
Section G4. Considering the known toxicity of some of these industries, we recommend 
quarterly sampling, as annual sampling is not sufficient to protect ecological and public health. 
Section E2.c.(2) As part of the MWRA’s update to its I/I Reduction Plan, the MWRA should 
consider climate change and the projected increase and changes to precipitation patterns in order 
to have an accurate picture of future I/I challenges, and ensure that their planned reduction 
actions are commensurate with those precipitation levels. Also in this section, we support the 
enhanced public notification requirements for sanitary sewer overflow events as required in (2) 
iv. 
Outfall Monitoring Advisory Science Panel (OMSAP). In the interest of ensuring 
science-based decision making at the MWRA, Mass Rivers strongly recommends that the 
OMSAP remain intact. The panel’s expertise could prove helpful in interpreting and analyzing 
the new PFAS monitoring data that the Draft Permit proposes, as well as in advising the MWRA 
as the receiving waters and the aquatic life therein adapt to climate change. 
2

Thank you for your consideration of these comments. We are available to further discuss our 
concerns and recommendations. 
Sincerely, 
Katharine Lange 
Policy Director 
Massachusetts Rivers Alliance 