winthrop.towndigital almanac

November 28, 2023 - Greater Lawrence Sanitary District

U.S. Environmental Protection Agency · from the EPA · 4 pages · 233 KB
open the file ↗ · original at the source ↗

Cheri R. Cousens, P.E. 
Executive Director 
ANDOVER 
Christopher Cronin 
LAWRENCE 
Thomas Connors 
Chairman 
Joseph R. Quartarone 
Treasurer 
Jorge Jaime 
William C. Hale III 
Secretary 
METHUEN 
Raymond DiFiore 
Vice chair 
Patrick L. BowerB 
NORTH ANDOVER 
Tim Willett 
SALEM, NH 
Cathy Ann Stacey 
240 Charles St, 
North Andover, MA
01845-1649 
Phone (978) 685-1612 
Fax (978) 685-7790 
info@glsd.org November 28, 2023 
By Email 
Michele Barden 
U.S. Environmental Protection Agency – Region 1 
5 Post Office Square, Suite 100 (06-1) 
Boston, MA 02109-3912 
Telephone: (617) 918-1539 
Email: barden.michele@epa.gov 
Claire Golden 
Massachusetts Department of Environmental Protection 
Surface Water Discharge Program 
150 Presidential Way 
Woburn, MA 01801 
Email: claire.golden@mass.gov 
massdep.npdes@mass.gov 
Re: Greater Lawrence Sanitary District Comments 
Massachusetts Water Resource Authority (MWRA) Dear Island – Draft
National Pollutant Discharge Elimination System (NPDES) Permit No.
MA0103284 
Dear Ms. Barden and Ms. Golden: 
On behalf of the Greater Lawrence Sanitary District (GLSD), I am writing to submit the
following comments regarding the draft NPDES Permit for the MWRA’s Deer Island
Treatment Plant. We thank EPA and MassDEP for the extended public comment period,
which provided the public and interested parties such as GLSD the appropriate time to
consider the draft NPDES Permit. 
About GLSD 
GLSD is a Massachusetts water pollution abatement district that operates a wastewater
treatment facility on behalf of its member communities: the environmental justice
community of Lawrence, the Massachusetts municipalities of Methuen, Andover, North
Andover, and Dracut, and Salem, New Hampshire. The facility is located in North
Andover and discharges into the Merrimack River pursuant to a NPDES permit issued
jointly by the U.S. Environmental Protection Agency (EPA) and the Massachusetts
Department of Environmental Protection (MassDEP). 
GLSD .ORG

Comments 
1) Industrial Pretreatment Program – PFAS Sampling 
The draft NPDES Permit requires the permittee (or the co-permitees) to undertake new
PFAS sampling as part of the Industrial Pretreatment Program. This obligation, which
must begin during the first calendar year after the NPDES Permit becomes effective,
requires the permittee to sample the discharge from certain industrial users (commercial
car washes, platers/metal finishers, paper and packaging manufacturers, tanneries and
leather/fabric/carpet treaters, manufacturers of parts with Polytetrafluoroethylene
(PTFE) or teflon type coatings (i.e., bearings), landfill leachate, centralized waste
treaters, known or suspected PFAS contaminated sites, firefighting training facilities,
airports and any other known or expected sources of PFAS) for PFAS. 
GLSD has concerns with both the cost and scope of the PFAS sampling obligation on
permittees. First, the level of effort necessary to implement such a PFAS sampling
program is potentially significant, although as discussed below, there are many
uncertainties with the number of users potentially implicated. For instance, if GLSD
were subject to such a condition, it would have to identify and sample a substantial
number of users. Without reviewing every potential industrial user that might be
implicated by this condition, there are over 35 car washes in GLSD’s service. These are
in addition to the 34 industrial users permitted to discharge to the facility. Identification
and sampling of such a significant number of users will be a burden on permitees and
goes well beyond the scope of the Clean Water Act. 
Second, and more importantly, although the requirement suggests sampling of certain
industrial users, the broad nature of the users covered, including known or suspected
PFAS contaminated sites and any other known or expected sources of PFAS, burdens
the permittee well beyond current industrial pretreatment program obligations. A
permittee could be required to (1) identify properties or users that are not otherwise
covered by the industrial pretreatment program and undertake sampling; (2) determine
whether a user is potentially a source of PFAS; or (3) determine every contaminated site
within its service area that might be, or could be, PFAS contaminated. This obligation
goes well beyond the industrial pretreatment program currently operated under NPDES
permits and EPA’s authority to require such investigation and sampling. EPA should be
taking the lead on identifying potential PFAS sources and regulating such sources with
Categorical Pretreatment requirements. 
While PFAS is a significant concern to wastewater treatment facilities and the public,
EPA and MassDEP are in a better position than wastewater treatment facilities to
identify and regulate PFAS-containing products and users. EPA and MassDEP should
limit wastewater treatment facilities’ obligation for PFAS sampling to currently (or
future) permitted industrial users where costs can be passed to such users rather than
ratepayers. The identification and regulation of all other potential sources should be
undertaken by EPA and MassDEP through other regulatory mechanisms such as
establishing Categorical Pretreatment requirements through clearly articulated statutory
authority .

2) Resiliency Planning. 
The draft NPDES permit requires significant planning regarding operation and
maintenance of MWRA’s treatment plant and other infrastructure. This includes
development and implementation of a Sewer System Flood Events Plan as an element
of the Operations and Maintenance Plan. The Plan contains three components: (1) an
asset vulnerability evaluation, (2) a systemic vulnerability evaluation of the system and 
(3) a mitigation measures alternatives analysis. The Plan shall include resiliency
planning and implementation informed by an evaluation of all sewer system
vulnerabilities to major storm and flood events. At a minimum, the plan is required to
take future conditions into consideration, specifically midterm (i.e., 20-30 years) and
long-term (i.e., 80-100 years) and, in the case of sea level change, the plan must
consider extreme sea level change. The Plan shall be updated every five years from the
effective date of the Permit. 
While GLSD believes that planning for a changing environment is appropriate, the
long-term nature of this condition (80 years in the future) in a permit that is valid for
only five years is onerous. The study and implementation of resiliency measures is a
costly undertaking due to the complexity of issues to be reviewed, the broad scope of
potential (and often unknown) future impacts and the long-term nature of climate
change and sea level rise. In addition, there is substantial uncertainty on the scope of
operations or actions that must be taken because a facility must address all
infrastructure and plan for potential changes or upgrades based on uncertain data and
unknown future conditions. 
For instance, the permit indicates that in order to determine vulnerabilities to the
facilities from major storm and flood events, the permittee must conduct the evaluation
using, at a minimum, the worst-case data relating to changes in precipitation, sea level
rise, extreme weather events, coastal flooding, inland flooding, sewer flow and inflow
and infiltration and relevant to the facilities from: 1) the data generated by the 13
federal agencies that conduct or use research on global climate change that contributed
to the latest National Climate Assessment produced by the U.S. Global Change
Research Program (USGCRP); 2) climate data generated by the Commonwealth of
Massachusetts; and 3) resiliency planning completed by the municipality in which a
given facility is located (i.e., City of Boston) and incorporate the results of the
evaluation in a manner that demonstrates that the control measures taken are
precautionary and sufficiently protective. Evaluation must be completed by a on a five-
year basis considering: 1) historical observations from all years the Permittee has
operated the facility prior to this permit’s term; 2) set midterm (i.e., 20-30 years); and 3)
long-term (i.e., 80-100 years) ranges. 
Further, the permit uses the term “Major storm and flood events,” which refer to
instances resulting from major storms such as hurricanes, extreme/heavy precipitation
events, and pluvial, fluvial, and flash flood events such as high-water events, storm
surge, and high-tide flooding. “Extreme/heavy precipitation” refers to instances during
which the amount of rain or snow experienced in a location substantially exceeds what
is normal. What constitutes a period of heavy precipitation varies according to location

and season. “Extreme/heavy precipitation” does not necessarily mean the total amount
of precipitation at a location has increased, but just that precipitation is occurring in
more intense or more frequent events. 
The required analysis is a very broad undertaking requiring assumptions on what is
necessary presently versus in the future, and is well outside the validity period of any
permit. While planning is necessary, it is not clear how such long-term planning is
related to EPA and MassDEP’s authority under the Clean Water Act. EPA and
MassDEP should explain how such long-term planning, at great cost to wastewater
treatment facilities and their ratepayers, is authorized by the Clean Water Act. EPA and
MassDEP should limit the scope of such planning to near term impacts and
improvements within the permit cycle that are directly required to meet permit effluent
limits. 
Thank you for your consideration of these comments. Please let me know if you have
any questions or clarifications. 
Cheri Cousens , P.E. 
Executive Director
Greater Lawrence Sanitary District 
Sincerely,