November 28, 2023 
Michele Barden 
U.S. Environmental Protection Agency – Region 1
5 Post Office Square, Suite 100 (06-4)
Boston, MA 02109-3912 
Claire Golden
Massachusetts Department of Environmental Protection
150 Presidential Way
Woburn, MA 01801 
Re: Comments on the draft Deer Island Treatment Plant and Combined Sewer Overflow
NPDES Permit (MA0103284) and Draft Surface Water Discharge Permit: Deer Island
Treatment Plant (MA 0103284) 
Dear Ms. Barden and Ms. Golden: 
The Massachusetts Water Resources Authority (MWRA) appreciates the opportunity to comment
on the U.S. Environmental Protection Agency’s (EPA) draft National Pollutant Discharge
Elimination System (NPDES) permit number MA0103284 for the Deer Island Treatment Plant
and the accompanying fact sheet (Draft Permit), which were noticed on May 31, 2023, and the
Massachusetts Department of Environmental Protection’s draft Surface Water Discharge Permit
MA 0103284. MWRA is providing the following comments in accordance with 40 C.F.R. §124.13.
This letter and its Attachments comprise MWRA’s comments on the Draft Permit, Fact Sheet,
Permit Attachments, and the State Permit. 
MWRA's Deer Island Wastewater Treatment Plant (DITP) is the centerpiece of a $5 billion
program to protect Boston Harbor against pollution from Metropolitan Boston's sewer systems.
The plant removes human, household, business and industrial pollutants from wastewater that
originates in homes and businesses in 43 Greater Boston communities. The Deer Island Treatment
Plant is in compliance with all federal and state environmental standards. It has been 23 years since
DITP first discharged treated wastewater into Massachusetts Bay. In 2022, MWRA earned a
Platinum 16 award from the National Association of Clean Water Agencies for consistently
meeting permit requirements for 16 consecutive years. The health of Boston Harbor has improved
considerably over the last two decades, without harming Massachusetts Bay; monitoring in the
Bay has shown no adverse effects on the water, the sea floor, or the fish and shellfish. 
MWRA has also completed projects to address combined sewer overflows (CSOs); over $900
million in spending on 82 construction contracts, 33 engineering contracts, and 10 planning and
technical assistance contracts necessary to complete 35 separate projects has resulted in an 88%

reduction in CSO discharges, with 94% of those overflows receiving treatment (disinfection and
dechlorination). 
It is important to take a step back to reflect on the improvements that the Boston Harbor Cleanup
and CSO Program have made on the quality of life for the residents of Greater Boston. In the late
1980s, the Boston area had the dubious distinction of having the dirtiest harbor in America. The
urban beaches were frequently closed for days, even after modest rainfall. Much of the harbor floor
was considered virtually dead with a black mayonnaise consistency. Residents living along the
waterfront often had to close their windows because of the foul smell of the harbor. The situation
was a national embarrassment for the region. 
Today, the results of our efforts are an irrefutable success. Our beaches are now considered the
cleanest urban beaches in the country. The Charles and Mystic Rivers have each received a B grade
from the EPA. Waters surrounding the Boston Harbor Islands National & State Park have been
rejuvenated and meet swimming standards, even in rainy weather. Conditions now, in 2023, are
dramatically different from those that existed in 1997-2000, the period when MWRA was issued
its first NPDES permit. 
MWRA has invested billions of dollars into the construction, operation, and ongoing maintenance
of modern wastewater treatment facilities and the ocean outfall. The industrial pretreatment
program continues to effectively prevent toxic contaminants from entering the waste stream. High-
quality sludge is now reused as Class A fertilizer, and the methane generated during digestion is
captured and used to help power DITP. The 35 projects in the CSO Long-Term Control Plan are
completed, and CSO reduction efforts continue in cooperation with our member communities.
Programs for training staff and for operation and maintenance of MWRA’s facilities are well
established. Hundreds of scientific reports document the quality of MWRA discharges, the
recovery of Boston Harbor, and the lack of adverse impacts to Massachusetts Bay. To minimize
excess flow to the treatment plant, MWRA has demonstrated its commitment to work with its
communities to reduce infiltration and inflow (I/I). As of June 2023, MWRA’s I/I Local Financial
Assistance Program has distributed $532 million in grants and interest-free loans to fund 664 I/I
identification & rehabilitation projects within the 43 sewer member communities. 
Each school year, the MWRA School Education Program conducts hundreds of Pre-K through
college-level classroom presentations, educating thousands of students about the importance of a
clean Boston Harbor. In 2022, to highlight the improved conditions of Boston Harbor and to allow
people of all ages to experience this first hand, the School Program partnered with the
Massachusetts Division of Marine Fisheries, national and state park services, Save the
Harbor/Save the Bay, and other local organizations to introduce “Reel Fun Fishing Days” on
Boston Harbor. These programs promote local involvement and understanding of water quality
issues throughout the MWRA service area. 
MWRA’s existing permit was developed years before the treatment plant and outfall were
operational. At that time, there was public concern and scientific uncertainty about the
environmental effects of moving the DITP discharge from the old outfalls in Boston Harbor to a
new outfall in Massachusetts Bay. The renewed permit should reflect an updated understanding of
the performance of DITP and the overall environmental benefits of the Boston Harbor Project. The 
2

comments we provide reflect the shared goals we have to protect the environment, maintain permit
compliance, and provide value for our ratepayers. 
The summary below provides an overview of MWRA’s major comments. In some areas of the
permit MWRA appreciates EPA’s careful consideration of the decades of data that have been
collected and supports changes that are made. In other cases MWRA opposes the draft permit
requirements. These concerns are raised with consideration of how some requirements may affect
our ability to prioritize programs effectively and ensure ongoing high-quality operations. Some
comments are focused on maintaining a successful cooperative engagement with our communities,
and reflect the commitment we have to our ratepayers. 
MWRA appreciates that the Draft Permit is supported by sound science in the following
respects: there is a reasonable limit for Enterococcus, there is no unnecessary nitrogen limit, and
the outdated Contingency Plan is not included. 
Blending is one way MWRA maximizes flow to the treatment plant to reduce CSO
discharges, and it maintains the integrity of the treatment process. As the plant is designed,
flows exceeding 700 million gallons per day (MGD) are diverted around the secondary process
and then blended with the secondary treated flow before disinfection and discharge. These blended
flows meet all permit limits. However, blending is not addressed in the Draft Permit; it is important
that the process of bypassing secondary treatment for flows in excess of the 700 MGD secondary
process limit be considered an authorized bypass. 
MWRA objects to the inclusion of Co-Permittees; this change to communities’ regulatory
obligations exceeds EPA and Massachusetts Department of Environmental Protection authority
and threatens to disrupt the longstanding relationships between MWRA and the communities it
serves. 
The Major Storm Event Plan requirements would impose significant burdens on MWRA
and communities. The proposed mandates in the Operation & Maintenance section would impact
not only MWRA, but all 43 connected communities. MWRA agrees that climate resiliency
planning for wastewater infrastructure is important and, like most major utilities, considers natural
disasters and other emergencies as part of routine facility planning. MWRA has a long history of
considering the effects of climate change; the Deer Island Wastewater Treatment Plant was one of
the first designed with sea-level rise incorporated into its design. More recently, MWRA has
specifically focused on the vulnerability of its other coastal infrastructure to climate change and
proactively taken steps to adapt. However, the implementation, timelines, and level of effort
required to fulfill the Draft Permit requirements are significant and out of sync with other pressing
priorities. 
It is inappropriate to use the Exhibit B Typical Year discharge activations and volumes as
effluent limits in a NPDES permit. The Draft Permit proposes to use the CSO Long Term
Control Plan Typical Year goals for activations and volumes as effluent limitations. This is not
appropriate, premature, inconsistent with the CSO Control Policy and EPA Guidance, and could
create a risk of EPA enforcement action or civil lawsuit despite the completion of the system
improvements required by the Long Term Control Plan. As detailed in MWRA comments, the 
3

Exhibit B activations and volumes (EPA proposed Attachment I to the Draft Permit) were not
meant to be strict, inflexible limits. Moreover, including such activation and volume figures would
upset the schedule in the Boston Harbor Litigation, usurp the role of the District Court, contravene
the requirement for EPA permit writers to use all reasonable available and relevant data and
undermine the core purpose of the NPDES program and Clean Water Act’s permit shield. MWRA
in its comments proposes more appropriate, alternative approaches to achieve EPA’s objectives. 
Rapid-response monitoring of harmful algal blooms would be a significant burden in terms
of cost, coordination and level of effort. Nuisance and harmful algal blooms in Massachusetts
Bay have no clear connection to MWRA’s outfall. While MWRA appreciates EPA’s desire to
collect more information on harmful algal blooms (HABs) and nuisance algae species, in the
absence of a proven outfall effect on these species, MWRA believes the specific monitoring
activities should not be part of MWRA’s NPDES permit. Additionally, expensive weekly rapid-
response surveys might be required at times -- again, without a clear objective. Questions about
HABs and nuisance algae species should at least be aligned with the Massachusetts Division of
Marine Fisheries, but the requested monitoring is inconsistent with, and goes well beyond the
scope of their program. 
MWRA also has concerns with the following: 
The strict Acute Toxicity limit does not recognize the high level of dilution provided by the
location of the outfall and the design of the outfall diffusers. 
The requirement to sample CSO facilities in spring, summer, and fall is not supported by the
existing data, which do not show a seasonal trend. Seasonal sampling requirements will make an
already difficult program even harder to implement. 
The costly outfall tunnel video inspection is unnecessary. Existing continuous monitoring of flow
and head elevations are a much more sensitive indicator of any problems with the outfall and
diffusers. 
The requirement for discharges to “not cause exceedances of water quality standards” is vague,
does not conform to the usual process of identifying technologies that will be in compliance, and
leaves MWRA vulnerable to inadvertent and unknowable non-compliance. 
The language in the pretreatment section of the Draft Permit needs to take into account the size,
complexity, and long-standing effectiveness of MWRA’s pretreatment program. 
The detailed comments attached to this letter are organized by section of the Draft Permit, Draft
Permit attachments, and the Fact Sheet. Comments specific to the Massachusetts Surface Water
Quality Permit follow comments on the EPA permit. 
In conclusion, we at MWRA are proud of our record of environmental stewardship; the recovery
of Boston Harbor is one of the most dramatic environmental success stories ever documented.
Ratepayers have borne the burden of the $5 billion dollar investment in MWRA’s wastewater 
4

system. The cleanup of the Harbor, its tributary rivers and its beaches has brought about a
renaissance of recreational activity and waterfront development. We value our partnership with
EPA, MassDEP and others on these important matters. We will continue our efforts to reduce
combined sewer overflows, and responsibly maintain and operate the Deer Island Treatment
Plant and other facilities to protect invaluable ocean and river resources in Massachusetts. 
We appreciate the opportunity to comment on the Draft Permit issued for the Deer Island
Treatment Plant. Please do not hesitate to contact Dr. Betsy Reilley with any questions, at 
Betsy.Reilley@mwra.com . 
Sincerely, 
Frederick Laskey
Executive Director
Massachusetts Water Resources Authority 
Attachments: 
1. MWRA Detailed Comments on the draft Deer Island Treatment Plant and Combined
Sewer Overflow NPDES Permit (MA0103284) and Draft NPDES Surface Water
Discharge Permit: Deer Island Treatment Plant (MA 0103284) 
2. MWRA Comments on the draft Deer Island Treatment Plant and Combined Sewer
Overflow NPDES Permit (MA0103284) Fact Sheet 
3. MWRA Comments on the Draft Surface Water Discharge Permit: Deer Island Treatment
Plant (MA 0103284) 
4. Blending Stipulation and Order entered and ordered in the Boston Harbor Litigation, U.S. 
v. Metropolitan District Commission et al., Civil Action No. 85-0489-RGS Doc. No.
1707 
5. Corrected version of Attachment I to the Draft Permit: Current (2008) version of “Exhibit
B” to the Second Stipulation in the Boston Harbor Litigation, U.S. v. Metropolitan
District Commission et al., Civil Action No. 85-0489-RGS Doc. Nos. 1691 and 1693 
6. Citations for the Administrative Record for NPDES permit MA0103284 
cc: Ken Moraff, EPA
Lealdon Langley, MassDEP 
5

EPA and MassDEP 
Attachment 1 : MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284 
November 28, 2023
Page 1 of 80 
MWRA Comments on the draft Deer Island Treatment Plant and Combined Sewer
Overflow NPDES Permit (MA0103284) and Draft NPDES Surface Water Discharge
Permit: Deer Island Treatment Plant (MA 0103284) 
Table of Contents entries refer to Parts of the Draft Permit. 
Contents 
Comments on addresses ............................................................................................................................. 4 
Comments on inclusion of Co-permittees ................................................................................................. 4 
Comments on Part I .................................................................................................................................... 5 
Comments on Part I.A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS 5 
I.A.1. Table A.1 . ....................................................................................................................................... 5 
I.A.1. Table A.1. Effluent Characteristic – Flow .................................................................................. 5 
Misapplication of Footnotes Five and Six ........................................................................................ 6 
Content of Footnote Six and Bypass Procedures Stipulated in the Boston Harbor Litigation .......... 6 
I.A.1. Table A.1. Effluent Characteristic – Bacteria ............................................................................. 8 
I.A.1. Footnote 10 – Fecal coliform .............................................................................................. 9 
I.A.1. Footnote 11 – Memorandum of Understanding with Massachusetts Division of Marine 
Fisheries ........................................................................................................................................ 9 
I.A.1. Footnote 12 – Provisional Bacteria Limits ......................................................................... 9 
I.A.1. Table A.1. Effluent Characteristic – Oil and Grease ................................................................ 10 
I.A.1. Table A.1. Effluent Characteristic – Nitrogen .......................................................................... 10 
I.A.1. Table A.1. Effluent Characteristic – PFAS ............................................................................... 11 
I.A.1. Table A.1. Effluent Characteristic – Adsorbable Organic Fluorine monitoring of influent and 
effluent ................................................................................................................................................. 11 
I.A.1. Table A.1. Effluent Characteristic – Whole Effluent Toxicity and Footnotes 17-19 ................. 12 
Acute toxicity ........................................................................................................................... 13 
Chronic toxicity ....................................................................................................................... 15 
Dilution Water for Toxicity Testing with DITP Effluent ......................................................... 15 
I.A.2. Narrative Requirements ..................................................................................................... 16 
I.A.8.a Notice of any new introduction of pollutants ................................................................. 17 
Comments on Part I.B. COMBINED SEWER OVERFLOWS (CSOs) .......................................... 17 
I.B.1 List of CSO outfalls .................................................................................................................. 17 
I.B.2. General Limitations on effluent ............................................................................................. 18

EPA and MassDEP 
Attachment 1 : MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284 
November 28, 2023
Page 2 of 80 
I.B.2.a. & f. Narrative Requirements .......................................................................................... 18 
I.B.2.c.-e. Authorized typical year discharge activations and volumes - Issues Relating to Use 
of Exhibit B (Attachment I) as “Effluent Limits” ...................................................................... 18 
I.B.2.d. and e.: Variances – Issues Relating to the Incorporation of Current Variances as 
Attachments J and K. ................................................................................................................... 32 
I.B.3. Nine Minimum Controls Implementation Levels ................................................................. 33 
I.B.3.j. Signage ............................................................................................................................... 33 
I.B.3.m. Public Notification Plan ................................................................................................. 33 
I.B.5 Nine Minimum Controls Reporting Requirement ................................................................ 33 
I.B.7 CSO Effluent Limitations for CSO Treatment Facilities ..................................................... 36 
I.B.7.b CSO Effluent Limits ......................................................................................................... 36 
Effluent Characteristic Sampling - Somerville Marginal Relief MWR205A ............................... 36 
Effluent Characteristic Sampling - Chlorine Residual Limits .................................................... 37 
Effluent Characteristic Sampling - Measurement Frequency ..................................................... 38 
Effluent Characteristic Sampling - Dilution water for WET tests (Footnotes 32 and 34) .......... 39 
Effluent Characteristic Sampling - Chronic toxicity (marine outfalls) (Footnote 33) ................ 40 
Comments on Part I.C. UNAUTHORIZED DISCHARGES ............................................................ 41 
I.C.2 Unauthorized discharge – public notifications ...................................................................... 41 
I.C.4. Bypassing of wastewater flows is not authorized . ................................................................ 42 
Comments on Part I.E. OPERATION AND MAINTENANCE OF THE TREATMENT AND 
CONTROL FACILITIES .................................................................................................................... 42 
I.E.1.a Wastewater Treatment Facility (WWTF) Major Storm and Flood Events Major Storm 
and Flood Events Plan and I.E.2.e.(2) Sewer System Flood Events Plan .................................... 42 
Comments on “Adaptation Plan” included in recent final Permits ......................................... 45 
I.E.2. Sewer System ........................................................................................................................... 46 
I.E.2.c Infiltration/Inflow ............................................................................................................. 47 
I.E.2.c.(1) Control of I/I .............................................................................................................. 47 
I.E.2.c.(2) I/I Reduction Plan ...................................................................................................... 47 
I.E.2.c.(3) Annual I/I Reduction Report and I.E.4.(f) Annual Reporting Requirement ............... 48 
I.E.2.d. Sewer System Mapping ................................................................................................... 48 
I.E.d.2 Security Concerns related to Sewer System Mapping ..................................................... 48 
I.E.2.e. Sewer System O&M Plan ................................................................................................ 48

EPA and MassDEP 
Attachment 1 : MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284 
November 28, 2023
Page 3 of 80 
Comments on Part I.G. INDUSTRIAL USERS AND PRETREATMENT PROGRAM ............... 49 
I.G.2. Compliance Reports . .............................................................................................................. 49 
I.G.4. and I.G.10. Industrial dischargers to be sampled for PFAS ............................................... 49 
I.G.6.i. Pretreatment Enforcement .................................................................................................. 50 
I.G.7.b. Local Limit Development ................................................................................................... 50 
I.G.8. (and I.A.8.) Notification Requirements ................................................................................ 50 
I.G.9. (and I.J.3.) Annual Report Requirements ............................................................................ 51 
Comments on Part I.I. SPECIAL CONDITIONS ............................................................................. 52 
I.I.2. Pollution Prevention Plan ........................................................................................................ 52 
I.I.3. Outfall BMP ............................................................................................................................. 53 
I.I.4. DMF notification ...................................................................................................................... 53 
I.I.6. Ambient Monitoring Plan ....................................................................................................... 54 
Schedule for revising Ambient Monitoring Plan ........................................................................ 55 
I.I.6.c. Table 1: Water Column Survey Schedule ....................................................................... 56 
I.I.6.d. Monitoring Stations .......................................................................................................... 56 
I.I.6.e. Table 2: Water Column Parameters ............................................................................... 57 
I.I.6.e. Table 3: Water Column Parameters, Cape Cod Bay and Stellwagen NMS ................ 58 
I.I.6.f. Harmful Algal Blooms and nuisance algae ..................................................................... 58 
I.I.6.f(1)(i). Conditions for Alexandrium rapid response surveys ............................................... 63 
I.I.6.f(2). Pseudo-nitzschia spp . .................................................................................................... 64 
I.I.6.f(3) to I.I.6.f(6). General comments on nuisance algae species ......................................... 68 
I.I.6.f(3). Dinophysis spp . ............................................................................................................ 69 
I.I.6.f(4) Phaeocystis pouchetii .................................................................................................. 69 
I.I.6.f(5). Karenia mikimotoi ....................................................................................................... 71 
I.I.6.f(6). Margalefidinium polykrikoides .................................................................................... 73 
I.I.6.k. Modifications to Ambient Monitoring Plan ................................................................... 75 
I.I.6.l. Annual Report .................................................................................................................... 75 
I.I.6.m. Special Studies ................................................................................................................. 76 
Effluent monitoring required by the Ambient Monitoring Plan .............................................. 76 
I.I.7. Dye studies for CSO Treatment Facilities discharge locations ............................................ 76

EPA and MassDEP 
Attachment 1 : MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284 
November 28, 2023
Page 4 of 80 
Comments on Part I.J. REPORTING REQUIREMENTS ............................................................... 77 
I.J.2. Submittal of Reports as NetDMR Attachments .................................................................... 77 
I.J.6. Submittal of Sewer Overflow and Bypass Reports and Notifications ................................. 77 
Comments on Part I.K. STATE 401 CERTIFICATION CONDITIONS ....................................... 78 
I.K.2. pH ............................................................................................................................................. 78 
I.K.3. CSO Public Notification Plans .............................................................................................. 78 
Comments on Permit Attachments ......................................................................................................... 78 
Attachment A : CSO Outfalls and Responsible Party ........................................................................ 78 
Attachment G : Industrial Pretreatment Program Annual Report .................................................. 80 
Attachment I : Authorized Typical Year CSO Discharge Activation and Frequency ..................... 80 
The Massachusetts Water Resources Authority (MWRA) provides the following detailed
comments on the draft U.S. Environmental Protection Agency’s (EPA) draft National Pollutant
Discharge Elimination System (NPDES) permit number MA0103284 for the Deer Island
Treatment Plant (DITP) (Draft Permit). These comments also apply to the Massachusetts
Department of Environmental Protection’s (MassDEP): (1) draft Surface Water Discharge Permit
MA 0103284 (State Permit); and (2) the federal Clean Water Act Section 401 Certification.
Comments on the accompanying fact sheet and additional comments on the State Permit are
contained in Attachments 2 and 3. These comments are provided in accordance with 40 C.F.R.
§124.13. 
Comments on addresses 
(2023 Draft Permit – page 2 of 68) 
The correct mailing address for the City of Chelsea is as follows: 
City of Chelsea
Department of Public Works 
500 Broadway Room 310 
Chelsea, MA 02150 
Comments on inclusion of Co-permittees 
(2023 Draft Permit – page 2 of 68) 
In Section 3.1 of the Draft Permit Fact Sheet, EPA requested comments on the clarity of the Co - 
permittee and CSO-responsible Co-permittee language. Below we provide our comments.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 5 of 80 
The Draft Permit and the draft Surface Water Discharge Permit attempt to regulate 43 separate
sewer communities as “Co-permittees,” including four communities as “CSO-responsible Co - 
permittees,” which up until this point, have been regulated under four separate individual NPDES
permits. The Federal Clean Water Act, 33 U.S.C. § 1251 et seq. (“CWA”), and the Massachusetts
Clean Waters Act, M.G.L. c. 21, §§ 26 through 53 do not provide statutory authorization for EPA
or MassDEP to take such actions in their respective draft permits. Moreover, even if it can be
argued that these statutes provide discretionary authority for EPA and MassDEP to regulate the
identified Co-permittees in a single NPDES or State Surface Water Discharge permit, the
EPA/MassDEP’s actions nevertheless constitute an abuse of that discretion. Further, the MWRA
further adopts and incorporates by reference into these comments the comments and proposed
alternative permit language submitted by the MWRA Advisory Board in Sections II, III, and IV
of their comments dated November 28, 2023. 1 Finally, in accordance with the Draft Permit Fact
Sheet specific request for comments regarding the “…clarity of the several liability for the
Permittee,…” and for the further removal of doubt, MWRA requests that EPA and MassDEP
include the following statements in their respective permits : 
In no event shall the Permittee be liable under the CWA (including, but not limited to, 
any liability arising under 33 U.S.C. §§ 1319, 1321, & 1365), the Massachusetts Clean 
Waters Act, or otherwise be responsible for: (a) any act or failure to act of any CSO- 
responsible Co-permittee or Co-permittee; (b) any failure to properly operate or maintain 
any collection system or portion of a collection system that it does not own or operate; or 
(c) enforcing the terms of this Permit against any CSO-responsible Co-permittee or Co - 
permittee. In the event of any conflict between the above provisions and any other term
or provision of this Permit, the above provisions shall control. 
Comments on Part I 
Comments on Part I.A. EFFLUENT LIMITATIONS AND MONITORING
REQUIREMENTS 
I.A.1. Table A.1. 
I.A.1. Table A.1. Effluent Characteristic – Flow 
(2023 Draft Permit – page 4 of 68) 
Rolling Average Effluent Flow & Effluent Flow 
(2023 Draft Permit – page 4 of 68) 
In Part I.A.1. of the Draft Permit, the table depicting the Effluent Limitations and Monitoring
Requirements for Outfall T01 contains two Effluent Characteristics regarding flow, including: (1) 
1 Comments by MWRA to provisions that include CSO-responsible Co-permittees and Co-permittees are without
prejudice to MWRA’s request that CSO-responsible Co-Permittees and Co-Permittees be deleted from the Permit.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 6 of 80 
the Rolling Average Effluent Flow; and (2) the Effluent Flow. For the Rolling Average Effluent
Flow, the corresponding Effluent Limitation is 361 million gallons per day (MGD) on an Average
Monthly basis. Next, for the Effluent Flow, the corresponding Effluent Limitations are to Report
the MGD on both an Average Monthly and Maximum Daily basis. Footnotes five and six to the
Table, however, are being applied to the wrong effluent characteristics. In addition to being
misapplied, the content of footnote six is incomplete and/or inaccurate. Accordingly, Part I.A.1.
of the Draft Permit requires modifications. 
Misapplication of Footnotes Five and Six
(2023 Draft Permit – page 4, 8, and 9 of 68) 
Part I.A.1. footnote five of the Draft Permit generally does three things: (a) it explains that the 365 - 
calendar day running average “dry day” flow shall not exceed 361 MGD; (b) it defines what a “dry
day” means; and (c) it describes how the flow limit is calculated for purposes of compliance.
Accordingly, it makes sense that footnote five is currently listed in the table next to the Rolling
Average Effluent Flow and the 361 MGD limit, however, the footnote is also listed next to Effluent
Flow. Given the dry-day-flow focus of the footnote language, this appears inappropriate. Likewise,
Part I.A.1. footnote six of the Draft Permit generally deals with the notification and other
requirements for wet weather events where wastewater may be diverted around secondary
treatment facilities. This footnote six is listed next to both Effluent Flow and Rolling Average
Effluent Flow, the latter of which is dry-day-flow. These may be simple typographical errors or
perhaps were intended to require reporting of the monthly average plant flow and the maximum
daily plant flow as in the current permit – not the monthly average dry day flow and the maximum
daily dry day flow. Accordingly, the footnote references should be corrected with the
following redline modifications: 
Effluent Characteristic 
Effluent Limitation 
Average Monthly Average
Weekly Maximum Daily 
Rolling Average Effluent Flow 5 ,6 361 MGD 5 -- - -- - 
Effluent Flow 5, 6 Report MGD -- - Report MGD 
While the Permit includes a dry day rolling average effluent flow limit of 361 MGD, it is important
to note that the Deer Island Treatment Plant has capacity up to 1,270 MGD peak flow; 700 MGD
flow receiving full primary and secondary treatment, and flows over 700 MGD receiving primary
and disinfection treatment. 
Content of Footnote Six and Bypass Procedures Stipulated in the Boston Harbor Litigation
(2023 Draft Permit – page 9 of 68) 
Part I.A.1, footnote six of the Draft Permit describes the requirements when a portion of high flows
are diverted around the secondary treatment process to produce a combination of primary and
secondary treatment effluent. As detailed below, the Draft Permit either ignores or attempts to

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 7 of 80 
rewrite the wet weather “bypass” processes that have been successfully utilized by MWRA, EPA,
and MassDEP since 2008. In so doing, the Draft Permit reverts back to an antiquated case-by-case
bypass process, which is a huge step backwards for all parties involved. 
Wet weather considerations were a part of the design of the DITP, in order to protect the secondary
treatment plant from solids washout and long-term upsets. In particular, during wet weather events,
one of the bedrock tools that MWRA utilizes to reduce combined sewer overflow (CSO)
discharges is to maximize the amount of sewage flow to the DITP for treatment. Maximizing flow
in this fashion is one of the Nine Minimum Controls set forth in EPA’s Combined Sewer Overflow
(CSO) Control Policy, 59 Fed. Reg. 18688 (April 19, 1994) (CSO Control Policy) and the terms
of the existing DITP NPDES permit. 
On September 8, 2008, a Stipulation and Order was entered and ordered in the Boston Harbor
Litigation, U.S. v. Metropolitan District Commission et al. , Civil Action No. 85-0489-RGS Doc.
No. 1707 and attached hereto as Attachment 4 (Order), wherein MWRA has been required to
maintain a “secondary process limit” of at least 700 MGD for the DITP. Order at ¶ 8.a. The term
“secondary process limit” generally refers to the setting in the process control system for the DITP,
which directs flows up to and including that flow rate through secondary treatment. Id at ¶ 8.c. The
Order, however, establishes two excepted conditions: 
(1) Condition A - In the event of a bypass of secondary treatment, both of the conditions
set forth in Part II.B.4.b. of MWRA’s NPDES permit and in 40 C.F.R. §122.41(m)(2)
(“Bypass not exceeding limitations. The permittee may allow any bypass to occur
which does not cause effluent limitations to be exceeded, but only if it also is for
essential maintenance to assure efficient operation.”) are satisfied with respect to all
flows bypassed; 
(2) Condition B - In the event of a bypass of secondary treatment, all three of the conditions
set forth in Part II.B.4.d. of MWRA’s NPDES permit and in 40 C.F.R. §122.41(m)(4)
are satisfied with respect to all flows bypassed. 
Id at ¶ 8.b. 
The Order further provides that MWRA shall notify the EPA by telephone or email within 24
hours after the commencement of any diversion of waste water around secondary treatment
facilities at the DITP, followed by a written report within five days containing a description of the
diversion and its cause and time period. Id at ¶ 9. 
The Order contemplated that the secondary process limit would remain in effect, unless a different
secondary process limit is established in a subsequent NPDES permit. Id at ¶ 8.b. Ultimately,
MWRA’s “…obligations under Paragraphs 8 and 9 of this Order shall terminate when a new
NPDES permit is issued to the MWRA by the EPA relating to DITP and it becomes effective.” Id 
at ¶ 19.b.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 8 of 80 
While on the one hand, Part I.A.1, footnote 6 of the Draft Permit contains reporting requirements
similar to those found in the Order. On the other hand, the Draft Permit makes no mention of the
secondary process limit of 700 MGD. This is problematic for several reasons. 
First, the secondary process limit was and remains important to the Authority because this process
limit has, after extensive experimentation in 2005-2007, been determined to minimize washout in
the secondary clarifiers and flooding in the clarifiers and downstream channels; MWRA has
demonstrated and contemporaneously documented with EPA and MassDEP that at this secondary
process limit the operators can maintain process stability and produce high-quality effluent
compliant with secondary treatment standards and Effluent Limitations. Second, the Draft Permit
is ambiguous insofar as it is unclear whether EPA intends to have the provisions of the Order
continue to govern or if, by omission, is attempting to modify the secondary process limit. Third,
and in any event, paragraph 19.b. of the Order reads such that once a new NPDES permit for DITP
is finalized, the Order obligations terminate. 
As required by the Order, over the last fifteen years, MWRA has been utilizing the 700 MGD
secondary process limit and notifying EPA by telephone or email within 24 hours after the
commencement of any diversion of waste water around secondary treatment facilities at the DITP,
followed by a written report within five days containing a description of the diversion and its cause
and time period. Use of the 700 MGD secondary process limit as the triggering event, has afforded
both MWRA and EPA a clear and consistent notification process. Furthermore, MWRA provides
notification of blending events to the public, EPA, and MassDEP within two hours as required by
state regulation, 314 C.M.R 16.00: Notification Requirements to Promote Public Awareness of
Sewage Pollution . 
Accordingly, MWRA does not object to a permit requirement that continues the existing and
longstanding notification and reporting regime, as long as it is clearly tied to the 700 MGD
secondary process limit. In order to ensure that the process remains clear, however, MWRA
requests Part I.A.1, footnote 6 of the Draft Permit be modified to incorporate the process set
forth in the Order and confirm that bypassing secondary treatment for flows in excess of the
700 MGD secondary process limit is not an unauthorized bypass, which is fully consistent
with the CSO Control Policy and related EPA guidance. See e.g., Combined Sewer Overflows
Guidance for Permit Writers , EPA 832-B-95-008 at section 4.9.1. (September 1995)(“Based on
the technical justification developed and submitted by the permittee, the permit writer should
include in the Permit the conditions under which a CSO-related bypass would be authorized, as
well as specify any required treatment, monitoring, or effluent limitations related to the bypass
event.”). 
I.A.1. Table A.1. Effluent Characteristic – Bacteria 
MWRA appreciates the recognition by EPA that years of Massachusetts Bay monitoring data show
no effect on bacteria levels near the DITP outfall. MWRA also agrees with EPA’s decision to
make the Enterococcus limit a seasonal one, as it relates to recreational use of the receiving water.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 9 of 80 
As Enterococcus is a new permit requirement, MWRA requests that it be monitor-only for
the first year of the Permit, without an effluent limit. 
I.A.1. Footnote 10 – Fecal coliform 
(2023 Draft Permit – page 10 of 68) 
To conform with the current NSSP (2019) classification analytical methods 2 when using fecal
coliform as a bacterial indicator, MWRA requests adding the following text to Footnote 10: 
The maximum daily limit for fecal coliform is expressed as not more than 10% of 
individual sample results collected in a month exceeding the limit of 1,960 
organisms/100 ml. 
I.A.1. Footnote 11 – Memorandum of Understanding with Massachusetts Division of Marine 
Fisheries 
(2023 Draft Permit – page 10 of 68) 
MWRA does not have any objection to adding station N21 to the sampling plan for bacteria
monitoring in Massachusetts Bay. However, Footnote 11 erroneously says that the US Food and
Drug Administration (FDA) is a party to the Memorandum of Understanding (MOU) between the
MWRA and the Massachusetts Division of Marine Fisheries (DMF). Note that the National
Shellfish Sanitation Program regulations require DMF to provide a copy of the final MOU to FDA. 
Therefore this footnote should be modified appropriately. 
I.A.1. Footnote 12 – Provisional Bacteria Limits 
(2023 Draft Permit – page 11 of 68) 
The Draft Permit contains a provision (Footnote 12) for much more stringent fecal coliform limits
in the event DMF and/or the FDA determines this is necessary to protect shellfish resources.
MWRA notes that it may be difficult for DITP to meet these stringent limits without adding
significantly more sodium hypochlorite, with all the resulting environmental harm that may result
from the increased truck traffic and possible formation of disinfection byproducts in the effluent.
Ambient bacteria monitoring conducted under the MOU with DMF over many years has
demonstrated that the current level of disinfection is sufficient to keep fecal coliform values well
within the shellfishing standards in the vicinity of the outfall. 
To conform with the current NSSP (2019) classification analytical methods when using fecal
coliform as a bacterial indicator, MWRA suggests adding the following text to Footnote 12: 
2 U.S. FDA, 2019. National Shellfish Sanitation Program (NSSP) Guide for the Control of Molluscan Shellfish 2019
Revision. Available at https://www.fda.gov/media/143238/download

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 10 of 80 
The maximum daily limit for fecal coliform is expressed as not more than 10% of 
individual sample results collected in a month exceeding the limit of 28 organisms/100 ml. 
I.A.1. Table A.1. Effluent Characteristic – Oil and Grease 
(2023 Draft Permit – page 4 of 68) 
Fats, oil and grease (FOG) sampling currently takes place weekly 3 , in support of the Contingency
Plan. Over twenty years of weekly sampling demonstrates that oil and grease is very seldom
detected in the effluent. 
The MWRA’s industrial pretreatment program strictly limits oil and grease from industries (360
CMR 10.023(10)) including limiting FOG to the collection system via a grease trap program in
accordance with 360 CMR 10.017 and requiring gas/oil separators at garages, parking lots, and
places where petroleum based products are used or stored per 360 CMR 10.016. MWRA staff
inspect about 650 gas/oil separators per year to assure they are properly serviced and maintained. 
MWRA monitoring typically includes testing at over 200 industries each year in addition to the
self-monitoring that is required to be conducted by the industries. Another 300 non-industrial
samples from the collection system and treatment plant are tested each year in support of the
ongoing regulation program. 
The Draft Permit’s requirement for daily effluent sampling is excessive, will strain laboratory
resources, and will add cost to the effluent monitoring, for very little benefit since the FOG levels
have been demonstrated to be consistently negligible. Over the last five years, from 2018-2023,
MWRA has collected nearly 370 weekly effluent FOG samples, one (0.27%) of which measured
FOG above the minimum level of detection. Accordingly, MWRA requests that the oil and
grease sampling frequency be set to weekly in the final Permit. 
I.A.1. Table A.1. Effluent Characteristic – Nitrogen 
(2023 Draft Permit – page 4 of 68) 
MWRA agrees with EPA’s reasoning in section 5.0.1.1 of the Fact Sheet, that there is no basis
for imposing a numerical limit for nitrogen, and does not object to continued monitoring. 
3 See section 2.3.4. of MWRA. 2021. Ambient monitoring plan for the Massachusetts Water Resources Authority
effluent outfall revision 2.1. Boston: Massachusetts Water Resources Authority. Report 2021-08. 107 p. Available at 
https://www.mwra.com/harbor/enquad/pdf/2021-08.pdf .

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 11 of 80 
I.A.1. Table A.1. Effluent Characteristic – PFAS 
(2023 Draft Permit – page 5 and 7 of 68) 
MWRA is pleased to see that the quarterly influent, effluent, and sludge sampling for PFAS calls
for grab samples rather than composite samples, which is consistent with the requirements of
Method 1633. 
I.A.1. Table A.1. Effluent Characteristic – Adsorbable Organic Fluorine monitoring of influent 
and effluent 
(2023 Draft Permit – pages 5, 7, and 12 of 68) 
MWRA is concerned that monitoring of Adsorbable Organic Fluorine (AOF) is untested and the
data may be impossible to interpret. MWRA recognizes the value of a measurement that would
cover all of the thousands of possible PFAS compounds as a class, however, the method is not
ready for use in NPDES monitoring. The justification in the Fact Sheet does not address several
issues with the method (Draft Method 1621). 
Draft Method 1621 (dated April 2022) explicitly states that “[t]his document represents a draft of
an AOF method currently under development by the EPA Office of Water, Engineering and
Analysis Division (EAD). This method is not approved for Clean Water Act compliance
monitoring until it has been proposed and promulgated through rulemaking .” (emphasis supplied) 
Conversely, EPA issued a memo allowing permit writers to include Draft Method 1633 in permits,
even though it has also not been finalized and promulgated. This memo indicates that “The draft
Adsorbable Organic Fluorine CWA wastewater method 1621 can be used in conjunction with draft
method 1633, if appropriate.” MWRA believe that this is not appropriate at this time for the
following reasons. 
AOF in aqueous matrices by combustion ion chromatography (CIC) is a “method-defined
parameter” defined solely by the method used to determine the analyte. Any changes to the method
necessitated by the results of the multi-laboratory validation study or public comments on the
method could invalidate any prior data collected using the draft procedure. 
EPA is adding this method to NPDES permits without having completed the multi-laboratory
validation study. However, in the absence of that study being completed and published, there is no
way for MWRA to know what to expect when multiple labs are employed to meet the permit
required testing in terms of precision, accuracy, comparability, or repeatability. 
By requiring measurement of AOF using Method 1621 in the draft NPDES permit, EPA is side - 
stepping the requirements of the Paperwork Reduction Act, instead of following the information
collection procedures required by that Act. EPA is currently engaged in planning a national
Information Collection Rule (ICR) study to collect the information that adding it to NPDES
permits would accomplish. EPA should complete that process, and properly promulgate Method
1621 prior to requiring it in NPDES permits.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 12 of 80 
The current detection limits are on the order of 5,000 ng/L as F. In addressing concerns about the
presence of PFAS at ng/L levels, the analysis may not produce useful results, even aside from
questions about precision, accuracy, comparability, or repeatability noted above. EPA should
complete the ICR study described above, and demonstrate a benefit associated with requiring AOF
measurements in NPDES permits. 
MWRA estimates a cost for this analysis of about $300 - $400 per sample. Other NACWA
members have been quoted prices as high as $1,200 per sample. The pricing situation may improve
once EPA has fully promulgated Method 1621, but is not likely to improve before the method has
been promulgated. 
Permittees may not be able to find laboratories to do this analysis, as based on inquiries we have
made there is currently a shortage of labs currently able to perform this test. At a minimum, there
would be additional cost related to sample handling and shipping. This cost is an unreasonable
burden to put on permittees, especially because the data generated prior to Method 1621 being
approved are likely to be unusable for decision-making. 
MWRA recommends that the requirement to monitor and report on AOF be removed from
the Permit. At a minimum, it should be deferred until an available approved method is
promulgated. 
Alternatively, MWRA recommends using the language included in the recently issued final
permits for other Massachusetts communities: 
Until there is an analytical method approved in 40 CFR Part 136 for Adsorbable Organic 
Fluorine, monitoring shall be conducted using Method 1621. This reporting requirement 
takes effect the first full calendar quarter following 6 months after EPA notifies the 
Permittee that Method 1621 has been multi-lab validated. 
I.A.1. Table A.1. Effluent Characteristic – Whole Effluent Toxicity and Footnotes 17-19 
(2023 Draft Permit – pages 5 and 12 of 68)
(2023 Draft Permit Fact Sheet – page 87 & 88 of 195) 
In the 2000 permit, acute toxicity limits for whole effluent toxicity (WET) testing with the Inland
Silverside ( Menidia beryllina ) and the Mysid Shrimp ( Mysidopsis bahia ) are, LC50 ≥ 50%. Chronic 
toxicity for M. beryllina and the Sea Urchin ( Arbacia punctulata) are, C- NOEC ≥ 1.5%. 
In the Draft Permit EPA proposes an LC50 ≥ 100 for M . beryllina and M. bahia , while maintaining
the C- NOEC ≥ 1.5 for A. punctulata .

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 13 of 80 
Acute toxicity 
EPA justifies the more stringent LC50 by referring to the MassDEP 1990’s “Massachusetts Water
Quality Standards Implementation Policy for the Control of Toxic Pollutants in Surface Waters”.
This document recommends allowable whole effluent toxicity limitations and testing requirements
based on available dilution at critical conditions. The document acknowledges “…for marine
waters, critical conditions are more difficult to define and must be established case-by-case.”
(Emphasis ours.) Based on the MassDEP document, and applying a dilution factor of 70 for the
Massachusetts Bay outfall, EPA determined that the acute toxicity limit should be greater than or
equal to 100%, as this dilution factor falls between <10 and 100. However, it is clear from the
quote above that the document also gives the regulating agency some leeway for marine
discharges, as critical conditions “… must be established on a case-by-case” basis (again, emphasis
ours). MWRA believes there are a number of factors that should lead to a maintenance of the 2000
permit’s acute toxicity limit of LC50 ≥ 50%. 
First, EPA’s assigned dilution factor of 70 for the Deer Island Treatment Plant is far closer to 100
than <10. Dye studies of the effluent plume in July 2001 indicated even higher real world dilutions,
with dilution factors of at least 94 under worst case, stratified water column conditions (typically
April-October). 4 Using the same July 2001 data, modeling using the NRFIELD (formerly RSB)
software showed that under stratified water column conditions, the minimum dilution factor was 
104. The NRFIELD results are spatially averaged, and so may be more reflective of actual
conditions since the model may capture short term spatial and temporal fluctuations and variability
better than the instantaneous field sampling. Under non-stratified conditions (which occur
approximately half the year), dilution is even greater. 
Second, data collected over more than two decades do not indicate any effect of toxic pollutants
in the vicinity of the Deer Island Treatment Plant outfall. Indeed, the active diffuser cap monitored
as part of MWRA’s benthic monitoring program shows a healthy hard-bottom community, similar
to distant reference sites. Almost by definition, any benthic community directly atop a diffuser cap
and immediately adjacent to the effluent discharge should be affected by the discharge, if there
were any negative effects. The fact that the diffuser community has consistently been similar to
distant reference sites indicates that the effluent has had no negative effect on the benthos. MWRA,
as part of its Ambient Monitoring Plan, has regularly conducted both soft- and hard-bottom benthic
surveys that have shown negligible effects on benthic communities from the discharge. This
evidence has been so convincing that the proposed Ambient Monitoring Plan in this Draft Permit
does not include benthic monitoring. 
Third, throughout the Permit Fact Sheet (and in the reasonable potential calculation, Appendix G),
EPA acknowledges that there is “ no reasonable potential to cause or contribute to an excursion
of water quality standards (WQS) ” from metals and other organic toxicants measured in the
effluent. EPA also acknowledges that “ data collected in 2021 show that contaminant 
4 Hunt CD, Mansfield AD, Mickelson MJ, Albro CS, Geyer WR, Roberts PJW. 2010. Plume tracking and dilution of
effluent from the Boston sewage outfall. Marine Environmental Research (70): 150-161.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 14 of 80 
concentrations were considerably less than contingency warning and threshold levels in the
majority of the baseline data ”, and that the structure and health of benthic and pelagic communities
were not affected by the outfall (Fact Sheet pp. 150-164). 
Finally, the 2000 permit was issued with an acute permit limit of LC50 ≥ 50%. At that time, there 
was considerable uncertainty about the potential environmental effects of the outfall – hence the
Ambient Monitoring and Contingency Plans, which have been pared back over the years (and in
the case of the Contingency Plan, entirely eliminated in the Draft Permit). In 2023, we know a lot
more about the environmental effects of the outfall – which are not a lot, especially when it comes
to toxicity in the environment. There is no environmental reason for this tighter limit. 
Nonetheless, EPA applies the more stringent LC50 in the Draft Permit, stating that WET “testing
is conducted to ensure that the additivity, antagonism, synergism and persistence of the pollutants
in the discharge do not cause toxicity, even when the pollutants are present at low concentrations
in the effluent” (Fact Sheet p 87). The idea is for the EPA to set a conservative (non-time
dependent) acute limit. 
However, MWRA requests EPA retain the more appropriate existing permit limit (or
consider assigning an intermediate limit between 50% and 100%) for the acute toxicity for
the above organisms because the concentrations of most toxicants have been consistently very low
or not detected in the effluent and the environment since the diversion of the outfall to
Massachusetts Bay. EPA concludes in the fact sheet to this permit that there is no reasonable
potential for water quality excursion in the Bay and rightly removes effluent monitoring and permit
limits for these chemicals. Even by applying the conservative dilution factor of 70:1 at the
nearfield, the chemicals will be completely dissipated in the water column after mixing. Therefore,
the more stringent acute limit in the Draft Permit has no rational basis, given that chemical and
biological sampling show no evidence of toxicity and the potential for future water quality
excursion and biological toxicity is negligible to none. 
Acute toxicity tests have a dilution series consisting of 100, 50, 25, 12.5, 6.25, 0 percent effluent
which the test organisms are then exposed to. LC50 results between 100% and 50% (or any
intermediate value between the dilutions) are dependent on partial mortalities of test organisms in
the dilution series and the statistical method chosen to calculate the LC50 based on the number of 
partial mortalities. 5 Unlike a laboratory analysis for chemical parameters such as nutrients or
metals, toxicity testing is depending on the health of the test organisms, which is often is variable.
Although there is a test acceptability clause for both the Mysidopsis and Menidia tests that requires
“90% or greater survival of test organisms in control solution”, that does not fully account for the
potential hardiness (or lack thereof) of the test organisms. The acute limit of LC50 ≥ 50% in the 
2000 permit allows for some variability in test organism health with the risk of permit violations.
There is no leeway with an LC50 permit limit of 100%. 
5 EPA. October 2002. Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater
and Marine Organism, 5 th ed. EPA 821-R-02-012. https://www.epa.gov/sites/default/files/2015-08/documents/acute - 
freshwater-and-marine-wet-manual_2002.pdf

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 15 of 80 
MWRA has analyzed monthly acute toxicity test data submitted since 2001. While MWRA has
never had a violation of the current LC50 permit limit of 50%, there are a number of instances
where the calculated LC50 has been above 50% (the current permit limit) but below 100% (the
proposed limit in the Draft Permit). These LC50 results of <100% do not align with any known
changes in the treatment process or the industrial pretreatment program, or external conditions
such as plant flow, so the lower results are most likely the result of test randomness. This is not
reasonable when it comes to permit compliance and violation of permit limits. 
Reliance on the 1990 MassDEP policy document also raises the questions about the very wide
range of dilutions that require the acute toxicity limit to be greater than or equal to 100%. EPA
should reconsider this “one size fits all” use of the MassDEP policy. For example, MWRA believes
that the current policy of all dischargers with dilution factors of less than or equal to 100 having
an acute toxicity limit of greater than or equal to 100% should have more incremental resolution
between <10 and 100, perhaps with a Toxic Unit value of 1.5 for dilutions >50:1 and 100:1. This
would yield an acute toxicity limit of 66%. As noted above, the document also gives the regulators
leeway when the discharge is to certain environments, so the document does not have to be taken
literally. 
Chronic toxicity 
Further, the MassDEP document mentioned above that EPA uses to justify a more conservative
LC50 assumes that “chronic toxicity is not a concern in mixing zones because swimming and
drifting organisms will not be in the zone long enough for chronic exposure” at the >10-100
dilution range. Yet, EPA proposes chronic testing for the Sea Urchin simply stating that “the Draft
Permit maintains the chronic testing and limitation of C-NOEC > 1.5% from the 2000 Permit for
Sea Urchin” (Fact Sheet, p 88). EPA should remove the requirement for chronic toxicity
testing, as it is inconsistent with the state policy cited above as justification for the stringent
acute toxicity limit. 
Dilution Water for Toxicity Testing with DITP Effluent
(Draft Permit footnotes 17, 18, 19 (p 12); Fact Sheet p. 88; Attachments C and D) 
Footnote 19, referring to Attachments C and D states, “ samples shall be taken from the receiving
water at a point immediately outside of the permitted discharge’s zone of influence at a reasonably
accessible location ”. Moreover, Attachments C and D state that “ samples of receiving water must
be collected from a location in the receiving water body immediately upstream of the permitted
discharge’s zone of influence at a reasonably accessible location ”. 
In the context of Massachusetts Bay, this requirement raises some safety/accessibility concerns.
For an offshore discharge this means just outside the outfall mixing zone; for MWRA’s 9.5 mile
outfall, it would be a location at least six miles offshore. Weather conditions greatly impact
accessibility and such a sampling endeavor can be dangerous, especially during the winter months
where storms create hazardous conditions for navigation and staff safety. Even MWRA’s ambient

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 16 of 80 
monitoring surveys in the area, using a larger (costly) contracted vessel, are frequently postponed
due to weather. 
For the reasons stated above, alternate dilution waters have been used in conducting the bioassay
test for the Deer Island outfall. For example, Enthalpy Analytical, LLC used seawater collected
from the Hampton/Seabrook Estuary (NH), a class SA-1 water that has been used to culture marine
test organisms since 1981. Our current contractor, New England Bioassay, Inc. (NEB) uses the
following diluents: 
• Artificial saltwater for Americamysis bahia and Menidia beryllina 
• Natural seawater (from Narragansett Bay) for Arbacia punctulata 
In September 2022, in anticipation of a new NPDES permit for DITP, MWRA sent a letter 6 to
EPA requesting permission to use alternate dilution water (ADW) for toxicity testing with DITP’s
effluent, given the hazard and difficulty to collect water samples in Massachusetts Bay on a regular
basis as required by the WET protocol. 
MWRA here reiterates this request to use an alternate dilution water while we are waiting for
a response from EPA. If permission for using an ADW as diluent is granted, we would also like to
clarify that MWRA will separately collect at least three seawater samples for metals and total
organic carbon, and submit the results with its next permit application. 
I.A.2. Narrative Requirements 
(2023 Draft Permit – page 14 of 68) 
The Draft Permit’s generic prohibitions against violating water quality standards (see Parts I.A.2, 
I.B.2.a and I.B.2.f (collectively, “Generic Prohibitions”) run afoul of the Clean Water Act, the
CSO Control Policy (codified at 33 U.S.C. § 1342(q)) and EPA’s permitting regulations and
guidance. As such, MWRA requests that such provisions be stricken from the Draft Permit. As
grounds for its request, MWRA adopts and incorporates by reference into these comments the
comments submitted by the MWRA Advisory Board in Section I of their comments dated
November 28, 2023, regarding the Generic Prohibitions. 
With the potential for substantial civil and criminal penalties and injunctive relief, “[t]he CWA is
a potent weapon. It imposes what have been described as ‘crushing’ consequences ‘even for
inadvertent violations.’” Michael Sackett, et ux. v. Environmental Protection Agency et al. , 598 
U.S. 651, 660 (2023), quoting Army Corps of Engineers v. Hawkes Co., 578 U.S. 590, 602 (2016)
(Kennedy, J. concurring). Therefore, MWRA and the communities must have clear and
unequivocal notice of their compliance obligations. Anything short of that will deprive MWRA
and the communities of the protections of the permit shield that Congress expressly granted 
6 September 19, 2022 letter from B. Reilley, MWRA to M. Barden, EPA, re: Renewal of NPDES Permit #:
MA0103284, Request for Alternate Dilution Water (ADW) for Whole Effluent Toxicity Tests for the Deer Island
Wastewater Treatment Plant

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 17 of 80 
permittees under 33 U.S.C. § 1342(k). The Generic Prohibitions fall far short of providing
unambiguous notice of the compliance obligations under the Draft Permit. To preserve the
liability protections of the permit shield the Generic Prohibitions should be removed from
the Permit. 
I.A.8.a Notice of any new introduction of pollutants 
(2023 Draft Permit – page 14 of 68) 
Parts I.A.8. and I.G.8. of the Draft Permit both include provisions that require MWRA to provide
notice to EPA under certain circumstances, including when new or existing indirect dischargers’
( i.e. , Industrial Users) pollutant loadings change. A side-by-side comparison of these two Parts,
however, suggest a significant level of overlap between the two notice provisions. In particular,
Part I.G.8. largely subsumes I.A.8. both in substance and in practical implementation (and includes
far more detailed instructions and requirements depending on the circumstances). Moreover,
everything in the NPDES Permit Writer’s Manual suggests that I.A.8. was included as an
inadvertent drafting error. For example, while Part I.A.8. of the Draft Permit uses the term
“industrial discharger” the NPDES Permit Writer’s Manual clearly explains that an “…indirect
discharger is defined as, ‘a nondomestic discharger introducing pollutants to a POTW.’…. The
National Pretreatment Program controls industrial and commercial indirect dischargers…” See,
NPDES Permit Writer’s Manual , EPA-833-k-10-001 at section 1.3.4 (September 2010). Finally,
as there are enough subtle differences between the two Parts, having both provisions creates
unnecessary compliance ambiguities for MWRA, such that I.A.8. should be removed from the
Permit in its entirety. 
See also comments below regarding Part I.G.8. of the Draft Permit, below, wherein Part I.A.8.a.
is also discussed. 
Comments on Part I.B. COMBINED SEWER OVERFLOWS (CSOs) 
I.B.1 List of CSO outfalls 
(2023 Draft Permit – page 15 of 68) 
Part I.B.1. of the Draft Permit refers to Attachment A as the list of CSO outfalls authorized to
discharge under the NPDES. Attachment A, however, includes only the untreated CSO outfalls,
and is missing the following five outfalls: (1) MWR201; (2) MWR203; (3) MWR205; (4)
MWR205A; and (5) MWR215, which are all associated with treatment facilities. Since
requirements derived from the Nine Minimum Controls and (where applicable) CSO water quality
standards variances apply to these treated CSO outfalls, it would be clearer to include all CSO
outfalls by inserting the five missing outfalls into Attachment A. See additional specific
comments on Attachment A below.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 18 of 80 
I.B.2. General Limitations on effluent 
(2023 Draft Permit – page 15 of 68) 
There appears to be a typographical error in Part I.B.2.b. of the Draft Permit, wherein the
reference to Part I.B.2. should be changed to Part I.B.3 ., as depicted in the following redline
revisions: 
….These Nine Minimum Controls and the Nine Minimum Controls Implementation 
Levels which are detailed further in Part I.B. 2. 3. are requirements of this Permit and 
include:…. 
I.B.2.a. & f. Narrative Requirements 
(2023 Draft Permit – pages 15-16 of 68) 
Please refer to comments above regarding Part I.A.2. of the Draft Permit, which also apply to Parts 
I.B.2.a. and f. 
I.B.2.c.-e. Authorized typical year discharge activations and volumes - Issues Relating to Use
of Exhibit B (Attachment I) as “Effluent Limits” 
(2023 Draft Permit – page 16 of 68) 
EPA should not use Exhibit B to the Second Stipulation as technology-based effluent
limitations in Attachment I, but instead should use narrative technology-based effluent
limitations relying on the Nine Minimum Controls. 
For a variety of reasons, incorporating Exhibit B 7 to the Second Stipulation (“Exhibit B”) as
Attachment I as a stand-in for technology-based effluent limitations (TBELs) is inappropriate,
premature, inconsistent with the CSO Control Policy and EPA Guidance, and could create a risk
of EPA enforcement action or civil lawsuit despite the completion of the system improvements
required by its Long Term Control Plan (LTCP). 8 Each of these reasons, which are set forth more
fully in the sections that follow, justifies removing Attachment I from the permit. Rather than
imposing numerical TBELs, EPA should instead employ narrative TBELs requiring MWRA to
operate its CSO controls consistent with the Nine Minimum Controls. 
7 Based on the description in the Draft Permit fact sheet and a review of the Court filings in the Boston Harbor Case, 
U.S. v. Metropolitan District Commission et al. , Civil Action No. 85-0489-RGS, Doc. No. 1636, Second Stipulation
of the United States and the Massachusetts Water Resources Authority on Responsibility and Legal Liability for
Combined Sewer Overflow Control (March 15, 2006) (“Second Stipulation”), Attachment I to the Draft Permit appears
to be a document taken from Exhibit B to the Second Stipulation. This document, however, was subsequently amended
and superseded through filings with, and ultimately approved by, the Court in April and May 2008. See , Doc. Nos.
1691 and 1693 (attached hereto as Attachment 5). Accordingly, Attachment I to the Draft Permit is out-of-date. 
8 MWRA’s LTCP presently consists of MWRA’s July 31, 1997, Final Combined Sewer Overflow Facilities Plan and
Environmental Impact Report (1997 Facilities Plan), as modified by the planning documents identified in Exhibit A,
to the Second Stipulation, as amended in May 2008.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 19 of 80 
This is not a novel concept. To the contrary, EPA has implemented narrative TBELs in NPDES
permits for other critical metropolitan wastewater plants. Employing narrative TBELs would
acknowledge the successful completion of more than 35 9 CSO control projects over the past
several decades at a combined cost of nearly a billion dollars, which have collectively achieved an
overall CSO volume reduction goal of 88% from 1988 levels. Represented in raw numbers,
MWRA has reduced the Typical Year system-wide total discharge volume to 396 million gallons
(MG), which is 8 MG better than the 404 MG target in its LTCP. Employing narrative TBELs
would also require MWRA to operate and maintain its combined sewer system responsibly and in
compliance with the Nine Minimum Controls, which are already incorporated into the Draft
Permit. 
In the alternative, if EPA declines to adopt this reasoned narrative TBEL approach and
nevertheless chooses to utilize Exhibit B as numerical limits, the figures in Exhibit B must be
adjusted to reflect the most current model outputs. Such modifications to Exhibit B would reflect
the technology-based level of control that MWRA actually achieved following the completion of
the CSO control projects required in the LTCP over the past several decades (and the additional
projects it has proposed). 
It is axiomatic that the effluent reductions achieved by the construction of the required
technologies controls are, by definition, the limits of those technologies. EPA should not hold
MWRA to some imprecise and outdated projection developed in 2008, long before the CSO
control projects were completed. To do so would be facially at odds with the CSO Control Policy,
federal regulations and EPA’s own NPDES permit drafting guidance, which uniformly require that
TBELs incorporate and utilize all reasonably available current information. EPA should not
proceed as though nothing has happened to MWRA’s CSOs in the intervening over 15 years since
Exhibit B was developed. 
Current Status of CSO Outfalls 
As a requirement of the Boston Harbor Litigation, on at least an annual basis, MWRA has been
fastidiously reporting to the District Court and the parties to the Boston Harbor Litigation on the
CSO control efforts of MWRA and others. At the conclusion of 2022, Typical Year discharge
activations and volumes were met, or materially met, at 72 of the 86 CSO outfalls included in
MWRA’s LTCP performance assessment. Among the 72 CSO outfalls are five – BOS013,
BOS057, BOS060, MWR203, and CAM007 – where the difference between performance at the
end of 2022 (Q4-2022) and the LTCP goal is relatively nominal, and the inability to precisely meet
the activation and/or volume goals at these locations is considered immaterial. For the remaining
14 CSO outfalls, there are eight – SOM007A/MWR205A, MWR205, BOS017, CHE008,
BOS009, BOS062, BOS065, and BOS070/DBC – where projects forecasted to enable these
outfalls to meet or materially meet their respective discharge activations and volumes are in design 
9 MWRA’s LTCP required the completion of 35 projects. Those projects were completed as of December of 2021. In
addition, in the Boston Harbor Litigation, MWRA has proposed the completion of other projects by MWRA or other
communities.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 20 of 80 
or construction. The final six outfalls - SOM001A, CAM005, MWR018, MWR019, MWR020,
and MWR201 –are not expected to meet their respective Typical Year discharge activations and/or
volumes by the end of 2024. 10 , 11 CSO outfalls BOS013, BOS057, BOS060, MWR203, CAM007,
SOM007A/MWR205A, MWR205, BOS017, CHE008, BOS009, BOS062, BOS065,
BOS070/DBC, SOM001A, CAM005, MWR018, MWR019, MWR020, and MWR201 are
collectively referred to herein as the “19 CSO Outfalls.” 
It is inappropriate to use the activation and volume figures in Exhibit B as TBELs in the Permit. 
There are obvious practical reasons to jettison Exhibit B. Paramount of these is the fact that Exhibit
B would impose static, immutable effluent limitations. In effect, the Draft Permit (pp. 15-16)
proposes to use Exhibit B as a current TBEL notwithstanding the fact that it includes only modeled 
and predicted “Typical Year” activation and volume limits that were based on data that were
available in 2008, many years before MWRA constructed its suite of court-mandated and EPA-
approved CSO control projects. Said differently, Exhibit B was a forward looking prediction based
on data, modeling, and expectations that were available at the time. 
Indeed, documents dating from the 1980s through 2006 – including contemporaneous documents
from the period when Exhibit B was developed – confirm the inherent uncertainty in the activation
and volume figures and acknowledged that the figures would need to be modified from time to
time to reflect the results of the CSO control technologies that were to be constructed. 
As far back as 1987, the parties to the Boston Harbor Litigation acknowledged the forward-looking
nature of the technology-based controls that were to be constructed by MWRA. The First
Stipulation in the Boston Harbor Litigation confirmed that “[t]he technology-based level of
treatment to be achieved upon completion of the projects for the five CSO project areas is set forth
in the Enforcement Schedule Compliance Letter, which was entered into in conjunction with the
issuance of the old permit and which is attached hereto as Exhibit B.” 12 In 1987, the impacts of
the yet-to-be constructed CSO controls were just theory. That remained true 10 years later when
MWRA, MassDEP and EPA finalized and approved MWRA’s LTCP. The LTCP is replete with
equivocation regarding future conditions. In turn, this equivocation, some examples of which are
quoted below, established that predictions about activation and volume reductions were simply 
10 See AECOM, 2023. MWRA Annual Report for Calendar Year 2022 and CSO Discharge Estimates and Rainfall
Analyses for Calendar Year 2022, Table 3-1 (available at https://www.mwra.com/cso/pcmpa-reports/042823 - 
annualcso.pdf .) 
11 These six outfalls discharge to variance waters. Receiving water modeling demonstrated that the impact to water
quality from these outfalls was minimal; compliance with bacteria standards is 97.9-99.9% during the Typical Year
when CSOs are the only contributor. The most significant impact to water quality was from stormwater, where
modeling showed that standards are met only 47-64% of the time when assessing only stormwater contributions. See
Table 3-12 of AECOM. 2021a. Task 6: Final CSO Post Construction Monitoring Program and Performance
Assessment Report , available at https://www.mwra.com/cso/pcmpa-reports/Final12302021.pdf. 
12 Boston Harbor Case, U.S. v. Metropolitan District Commission et al. , Civil Action No. 85-0489-RGS, First
Stipulation of the United States and the Massachusetts Water Resources Authority on Responsibility and Legal
Liability for Combined Sewer Overflow Control ( February 27, 1987) p. 2 (emphasis supplied).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 21 of 80 
estimates based on modeling and information that the stakeholders had available to them at the
time: 
• “MWRA completed its CSO conceptual plan in December 1994. This plan recommended
varying levels of CSO controls that would address water quality issues in distinct receiving
water segments defined in Boston Harbor and its tributaries. The planning process also 
included technology-based evaluations that demonstrated that the recommended CSO control
alternatives were the best available technology economically achievable (BAT) … Although
the conceptual evaluations had shown that the CSO control goals selected were appropriate
and that greater control of CSO discharges would have little, if any, impact on improving water
quality or increasing beneficial uses, an optimization analysis was performed for the
recommended CSO alternatives to demonstrate that the optimum control would be achieved
based on cost/performance evaluations.” 13 
• “As a result of the recommended CSO control improvements, water quality standards are
predicted to be met greater than 95 percent of the time in all receiving waters assuming other
sources of pollution were controlled.” 14 
• “The [1994] conceptual plan has undergone more rigorous evaluation and refinement as part
of the facilities planning process to produce a long-term CSO control plan that is based on
thorough assessment of receiving waters and impacts of CSO discharges, that provides 
maximum pollution reduction benefits reasonably attainable , and that meets water quality
standards and protects designated uses.” 15 
• “As discussed in response to the federal criteria, modeling results have demonstrated that CSO
discharges will not cause frequent or significant violations of water quality standards .
Considering the impacts from CSO only discharges, the fecal coliform bacteria standards for
swimming and boating are predicted to be met greater than 98 percent of the time on an annual
basis (Table 7.1-4 ). Non-CSO sources are the predominant cause of water quality violations
in most receiving water segments. ” 16 This statement remains true today and has been confirmed
by recent modeling analysis, which specifically concluded that “[f]or both the Charles River
and the Alewife Brook/Upper Mystic River … [l]oadings due to stormwater and upstream
boundaries were the two largest sources of E. coli and Enterococcus in both the 1-year and 3 - 
month design storms and for the Typical Year.” 17 
13 1997 Facilities Plan Vol. I, p. 236 (emphasis supplied). 
14 1997 Facilities Plan Vol. I, p. 240 (emphasis supplied). 
15 1997 Facilities Plan Vol. I, p. 284 (emphasis supplied). 
16 1997 Facilities Plan Vol. I, p. 318 (emphasis supplied). 
17 See AECOM. 2021b. CSO Post Construction Monitoring and Performance Assessment: Task 5.3 Water Quality 
Assessment - Revision 1 . Boston: Massachusetts Water Resources Authority. Report 2021-09. 68 p. plus appendices.
Available at http://www.mwra.com/harbor/enquad/pdf/2021-09.pdf .

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 22 of 80 
• “MWRA's CSO control plan fulfills the requirements of federal and state CSO policies and
complies with water quality regulations. The recommended plan will provide a high level of
CSO control to minimize water quality impacts and protect designated water body uses… The
recommended plan will substantially reduce the annual number of CSO activations over future
planned conditions . Compared to future planned conditions, the total annual volume of CSO
discharges will be reduced by 57 percent. The annual total volume of untreated CSOs will be
reduced by 92 percent. Of the CSO volume remaining after implementation of the
recommended plan, 92 percent will receive treatment at MWRA CSO facilities.” 18 
• “[Chapter 26 of the LTCP], which describes the anticipated impacts of the recommended
CSO control plan , is organized by receiving water segment.” 19 
Contemporaneous correspondence from MassDEP confirmed that the future effluent reductions
that stakeholders anticipated in 1997 would, of course, need to be revised and refined in future
years based on new information developed during implementation of MWRA’s LTCP. In
particular, a 1997 Letter from MassDEP to EPA regarding MassDEP’s Use Attainability Analysis
(“UAA”) confirmed that MassDEP realized that “during the course of project design there is
always the potential that planning-level delineation will require optimization which might affect,
to a limited degree, the nature/extent of activation(s)/discharge(s) ….” 20 
A March 2006 filing from the Department of Justice (DOJ) in the Boston Harbor Litigation in
support of the Second Stipulation confirms that the predicted, modeled activation and volume
figures were developed with the express understanding that changes to the modeled outputs would
occur periodically to reflect new information. As a result of that filing, the parties modified the
activation and volume goals in the LTCP for a specific outfall based on new information gathered
in the nine years since the LTCP was finalized. That filing said, in pertinent part: 
• “In the 1997 Facilities Plan, MWRA predicted that implementation of the LTCP would, in the
typical year, result in 25 CSO activations at the Prison Point facility discharging an estimated
228 million gallons of treated effluent. Since that time, the MWRA developed a more detailed
model of its collection system using more advanced software. The new model predicts that the
Prison Point treatment facility will actually discharge 335 million gallons in as many as 30
activations in a typical year. As reflected in Exhibit B to the Second Stipulation, the United
States and the MWRA are modifying the LTCP to reflect the volume and frequency now
expected at Prison Point following implementation of the LTCP .” 21 
18 1997 Facilities Plan Vol. IV, p. 136 (emphasis supplied). 
19 1997 Facilities Plan Vol. IV, p. 139 (emphasis supplied). 
20 December 31, 1997 Letter from Arleen O’Donnell (MassDEP) to Ron Manfredonia (EPA Region 1), p. 6 (emphasis 
supplied). 
21 Memorandum of the United States of America in Support of Joint Motion to Amend Schedule Six with Respect to
the Charles River, Alewife Brook and East Boston (March 15, 2006), p. 11 (emphasis supplied).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 23 of 80 
Thus, it was understood that the activation and volume figures in the LTCP (and as later modified
in Exhibit B) were modeled predictions that would necessarily change over time during
implementation of the LTCP. It would be inappropriate to now incorporate Exhibit B as strict,
immutable, and enforceable Permit effluent limits against MWRA. 
Including the Exhibit B activation and volume figures as TBELs would upset the parties’ agreed
upon schedule in the Boston Harbor Litigation and usurp the role of the District Court. 
Following MWRA’s filing of an Assented to Motion to Amend Schedule Seven in February of
2022, the District Court and the parties agreed that: 
“In December of 2024, the MWRA will file a supplemental report that contains: (i) the
final Typical Year performance of all 86 outfalls as compared to 1992 system conditions
and the LTCP; and (ii) the MWRA’s final results and conclusions as to the 16 outfalls,
which shall include an alternatives analysis describing what further actions could be taken,
and costs associated with those actions, to further reduce or meet LTCP activation and
volume goals for any of the 16 outfalls [ 22 ] that have not met their respective LTCP goals.
This supplemental report, coupled with the performance assessment report and water
quality assessment report filed in December 2021, will provide information to EPA,
MassDEP, and the Court to make the final determinations as to attainment of the levels of
control in the LTCP and draw any final conclusions.” 23 
In other words, all parties and the District Court agreed to a process by which evaluations of the
effectiveness of the system improvements would be made at the end of 2024 and any
determinations as to what, if anything, else should be done, would not be made until after that date
following the filing of a supplemental report by MWRA. The Draft Permit would disrupt and
undermine that process. EPA has even recognized the critical role of the District Court process in
acknowledging, on page 22 of the Draft Permit, that the activation volumes and frequencies may
be “amended by the court,” 24 and by reciting, in great detail on pages 107-109 of the Fact Sheet,
the history of the “Federal Court-ordered Obligations” applying to CSOs. 25 The District Court has
recently made clear that it was reserving judgment about what to do with any non-compliant
outfalls. 26 Including current Exhibit B in an MWRA NPDES permit would upset the agreement of
the parties and expectations of the Court. 
22 Note that these “16 outfalls” identified in the February 2022 Compliance Order did not include the 5 outfalls for
which the difference between Q4-2022 performance and the LTCP goal is relatively nominal, and the inability to
precisely meet the activation and/or volume goals at these locations is considered immaterial. See 2022 Annual Report
at Section 3.1, Table 3-1. 
23 Fact Sheet p. 109, quoting the Schedule Seven Compliance Order Number 250, February 18, 2022. 
24 MWRA notes that this page of the Draft Permit refers to the “estimates within the MWRA Final CSO Facilities
Plan,” which MWRA assumes to mean the estimated Typical Year activation and volume limits in Exhibit B. 
25 Please see comments in Attachment 2 relating to errors in the Fact Sheet concerning the Boston Harbor Litigation. 
26 Schedule Seven Compliance Order Number 252, dated May 11, 2023, p. 4. (“Recognizing that the history of this 
now decades-long project has not been static nor has every insoluble problem encountered over its course remained
unsolved, the court will reserve judgment on the problem outfalls until the final milestone is reached. I recognize, as

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 24 of 80 
Although MWRA cannot predict what the District Court may do after December of 2024 regarding
the 19 CSO Outfalls, EPA’s inclusion of the activation and volume goals of Exhibit B as TBELs
would moot the carefully negotiated agreement among the parties as to what would happen after
MWRA files its compliance report and may result in inconsistent obligations with any future
revisions to Exhibit B ordered by the District Court. It would also tie the hands of the parties to
the Boston Harbor Litigation and prevent, or at least complicate, any potential agreement
regarding the ultimate fate of the 19 CSO Outfalls. The District Court’s May 11, 2023 Schedule
Seven Compliance Order Number 252 acknowledged what it termed the “incorrigible outfalls”
and reserved judgment on what should be done with them. But, in reserving judgment, the District
Court made clear that it would be the final arbiter. 27 
Significantly, the parties agreed that by the end of 2024, MWRA would complete an “alternatives
analysis describing what further actions could be taken, and costs associated with those actions, to
further reduce or meet LTCP activation and volume goals for any of the 16 outfalls that have not
met their respective LTCP goals.” 28 However, as written, the Permit would, in effect, require
MWRA to immediately design and construct additional CSO control projects necessary to meet
the Exhibit B limitations before the Permit takes effect, which it cannot do, regardless of the level
of water quality improvement and cost or burden to MWRA and its ratepayers. The only alternative
for MWRA would be to accept the risk of an enforcement action or civil lawsuit despite all of the
projects in its LTCP having been completed. That is not the collaborative framework on which the
parties agreed when approving MWRA’s LTCP 26 years ago, and it does not reflect the parties’
agreement in the Boston Harbor Litigation. 
Including the Exhibit B activation and volume figures as TBELs would contravene the requirement
for EPA permit writers to use all reasonably available and relevant data. 
Beyond the clear history of Exhibit B, which confirms that it was never intended to be an
immutable, numerical TBEL, 29 requiring MWRA to comply with the 15 to 26-year-old predictions
would also violate federal law and EPA Guidance. More specifically, incorporating Exhibit B
without modifying the activation and volume figures to reflect the actual technology-based level 
the MWRA posits, that there may come a point of diminishing return at which spending an additional $100 for a $ 1
incremental benefit would make no sense from a public policy view. In the words of a distinguished former Justice:
“The . . . reason that it matters whether the nation spends too much to buy a little extra safety is that the resources
available to combat health risks are not limitless.” Stephen Breyer, Breaking the Vicious Circle: Toward Effective
Risk Regulation 18 (1993).”) 
27 See note 26, supra . See also Fact Sheet p. 109 (noting that “the Court [will] make the final determinations as to
attainment of the levels of control in the LTCP and draw any final conclusion.”) 
28 Id. 
29 To be clear, the Draft Permit proposes to use the Typical Year activation and volume figures in Exhibit B as TBELs,
which are effluent limitations on a point source based on how effectively technology can reduce the pollutant being
discharged. See 33 U.S.C. §§ 1311(b), (e), 1314(b); see also PUD No. 1 of Jefferson Cty. v. Wash. Dep't of Ecology ,
511 U.S. 700, 704 (1994) (holding that, to achieve goals of CWA, EPA is required to “establish and enforce
technology-based limitations on individual discharges into the country's navigable waters from point sources”).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 25 of 80 
of control that MWRA has achieved over the past 15 years would violate the specific direction that
EPA has given its own permit writers. 
Regarding TBELs, section 9.2.3 of the NPDES Permit Writers’ Manual is unambiguous: “Under
the CWA, CSOs must comply with Best Available Technology Economically Achievable (BAT)
for nonconventional and toxic pollutants and Best Conventional Technology (BCT) for
conventional pollutants. However, there are no promulgated BAT or BCT limitations in effluent
guidelines for CSOs. As a result, permit writers must use BPJ [best professional judgment] in
developing technology-based permit requirements for controlling CSOs .” 30 The Permit Writers’
Manual then defines best professional judgment as “[t]he method used by permit writers to develop
technology-based NPDES permit conditions on a case-by-case basis using all reasonably available
and relevant data .” 31 As applied to MWRA’s Permit, this directive is clear – the TBELs in the
Permit must be based on all reasonably available and relevant data, including any relevant data
gathered over the last 15 years. This clear instruction to permit writers finds support in both federal
regulations and EPA’s CSO Control Policy. 32 
The Draft Permit does not explain how Exhibit B reflects “all reasonably available and relevant
data.” EPA lacks discretion to use stale data in fashioning TBELs when more recent and pertinent
data is available. Therefore, EPA should not ignore 15-years’ worth of additional modeling and
data. 
However, that does not mean EPA is without options. To the contrary, there are two clear
alternatives that would not only comply with federal law, but also establish enforceable
technology-based limits on MWRA in operating its optimized combined sewer system: 1) include
narrative TBELs; or 2) modify certain of the activation and volume figures in Exhibit B to reflect
the results actually achieved by the technological controls. 
30 NPDES Permit Writers’ Manual, §9.2.3 (emphasis supplied). 
31 NPDES Permit Writers’ Manual, Exhibit A-2 Glossary (emphasis supplied). 
32 See 40 C.F.R. § 125.3 (“(a) General. Technology-based treatment requirements under section 301(b) of the Act 
represent the minimum level of control that must be imposed in a permit issued under section 402 of the Act. (See §§
122.41, 122.42 and 122.44 for a discussion of additional or more stringent effluent limitations and conditions.) Permits
shall contain the following technology-based treatment requirements in accordance with the following statutory
deadlines; … (2) For dischargers other than POTWs except as provided in § 122.29(d), effluent limitations requiring: 
(i) The best practicable control technology currently available (BPT)—… (B) For effluent limitations established on
a case-by-case basis based on Best Professional Judgment (BPJ) under Section 402(a)(1)(B) of the Act in a permit
issued after February 4, 1987, compliance as expeditiously as practicable but in no case later than three years after the
date such limitations are established and in no case later than March 31, 1989.”); 59 Fed. Reg. 18695 (“All permits
for CSOs should require the nine minimum controls as a minimum best available technology economically achievable
and best conventional technology (BAT/BCT) established on a best professional judgment (BPJ) basis by the
permitting authority (40 CFR 125.3)”).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 26 of 80 
Issuing a Permit with which MWRA cannot comply undermines the core purposes of the NPDES
program and the Clean Water Act’s permit shield. 
If Exhibit B were to be included in the final Permit, these 19 CSO Outfalls could subject MWRA
and the CSO-responsible Co-permittees to a risk of EPA enforcement action or civil lawsuit
despite all of the system improvements required by MWRA’s LTCP having been completed. That
is not how Congress designed the EPA NPDES program to work. Furthermore, it would be
antithetical to the permit shield concept codified in the Clean Water Act (CWA). 33 
Congress initially passed the CWA in 1972 to protect the “integrity of the Nation’s waters.” 34 The
CWA sought to fix a regulatory framework that relied on states setting “ambient water quality
standards specifying the acceptable levels of pollution in a State’s interstate navigable waters” and
using waters’ attainment with those standards as the basis for enforcement against individuals. 35 
However, that system lacked “standards to govern the conduct of individual polluters” and “proved
ineffective.” 36 Thus, Congress amended the CWA and replaced this ineffective scheme with a
requirement that anyone discharging pollutants into navigable waters must obtain a NPDES permit
issued by EPA or an authorized state. 37 Significantly, rather than rely on standards for receiving
waters, these permits must set “effluent limitations.” 38 
In other words, the CWA reflects Congress’s considered decision to adopt a permitting system
whereby regulators must tell permittees exactly what they must do to protect water quality before 
those discharges occur. Indeed, today, the CWA places the burden on permittees to apply for a
permit before discharging and on NPDES permit writers to establish discharger-specific effluent
limitations that are sufficiently precise so that permittees can readily determine whether individual
discharges are compliant. Here, however, Exhibit B undermines the Congressional intent to give
dischargers the opportunity to prevent illegal discharges before they occur; for example, model 
33 See 33 U.S.C § 1342(k) - Compliance with permits. Compliance with a permit issued pursuant to this section shall
be deemed compliance, for purposes of sections 309 and 505 [33 USCS §§ 1319, 1365], with sections 301, 302, 306,
307, and 403 [33 USCS §§ 1311, 1312, 1316, 1317, 1343], except any standard imposed under section 307 [33 USCS
§ 1317] for a toxic pollutant injurious to human health. Until December 31, 1974, in any case where a permit for
discharge has been applied for pursuant to this section, but final administrative disposition of such application has not
been made, such discharge shall not be a violation of (1) section 301, 306, or 402 of this Act [33 USCS § 1311, 1316,
or 1342], or (2) section 13 of the Act of March 3, 1899 [33 USCS § 407], unless the Administrator or other plaintiff
proves that final administrative disposition of such application has not been made because of the failure of the
applicant to furnish information reasonably required or requested in order to process the application. For the 180-day
period beginning on the date of enactment of the Federal Water Pollution Control Act Amendments of 1972 [enacted
Oct. 18, 1972], in the case of any point source discharging any pollutant or combination of pollutants immediately
prior to such date of enactment which source is not subject to section 13 of the Act of March 3, 1899 [33 USCS §
407], the discharge by such source shall not be a violation of this Act [33 USCS §§ 1251 et seq.] if such a source
applies for a permit for discharge pursuant to this section within such 180-day period. 
34 33 U.S.C. § 1251(a). 
35 EPA v. California ex rel. State Water Res. Control Bd., 426 U.S. 200, 202 (1976). 
36 Id. at 202-03. 
37 See 33 U.S.C. §§ 1311(a), 1342(a)-(c). 
38 33 U.S.C. § 1362(11).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 27 of 80 
outputs for several of the outfalls predict Typical Year discharges in excess of the Exhibit B limits,
a situation which could not be rectified within a reasonable time frame or at any reasonable cost. 39 
Far from animating the CWA’s permit shield provision, EPA’s inclusion of Exhibit B as a TBEL
in the final Permit could subject MWRA and CSO-responsible Co-permittees to risk of an EPA
enforcement action or civil lawsuit, rendering the permit shield illusory. Doing so on the heels of
decades of construction and hundreds of millions of ratepayer dollars would be fundamentally at
odds with the “certainty” and “finality” that were purportedly the aims of Congress in 1972. 40 At
bottom, EPA must recognize that incorporating Exhibit B into MWRA’s Permit as a TBEL would
undermine the core policies that breathed life into the NPDES program over 50 years ago. 
Including Exhibit B activation and volume figures as TBELs may disincentivize the undertaking of
further system improvements in certain circumstances. 
As part of its ongoing system improvement analysis and work, MWRA has considered or
implemented projects that would significantly reduce CSO activation and/or volume at one or more
CSO outfalls, while sometimes yielding small and/or temporary increases in CSO activations
and/or volumes at other outfalls. For example, as explained in MWRA’s December 23, 2021
submission to EPA and MassDEP, 41 based on preliminary modeling, the Somerville-Marginal
New Pipe Connection Project MWRA is undertaking showed significant CSO activations and
volume reductions from the Somerville-Marginal Treatment Facility (outfalls
SOM007A/MWR205 and MWR205A), but a corresponding modest increase in the volumes of
treated CSO discharged at MWRA’s Prison Point Treatment Facility (outfall MWR203) and at
outfall BOS017 in a Typical Year. However, work anticipated by the City of Somerville, including
sewer separation in the Union Square area and activation of the Poplar Street Pump Station to
move separated stormwater out of the MWRA interceptor over the next several years is expected
to offset a portion, if not all, of this increased CSO volume at the Prison Point facility. Also,
system modifications within the BOS017 combined sewer system anticipated by the Boston Water
and Sewer Commission is expected to offset the modest discharge increase at BOS017 resulting
from the Somerville-Marginal Project. With significant overall CSO activation and volume
reductions, and associated environmental benefits, MWRA committed in the Boston Harbor
Litigation that it would perform the Somerville-Marginal project. 42 However, including the Exhibit
B activation/volume figures as TBELs may cause MWRA to reconsider projects of this nature in
the future, as environmentally beneficial as they may be, for fear of exceeding these limits and 
39 See Natural Resources Defense Council v. EPA, 808 F.3d 556, 564 (2d Cir. 2015). 
40 See E.I. du Pont de Nemours & Co. v. Train , 430 U.S. 122 (1977) (Permit shield “serves the purpose of giving
permits finality.”) 
41 Task 8.4: Somerville-Marginal CSO Facility Evaluation (December 21, 2021), available at 
https://www.mwra.com/cso/variances/122721-somerville.pdf 
42 MWRA Annual Report for Calendar Year 2022 available at 
https://www.mwra.com/quarterly/bhp/annual/2022.pdf and AECOM, 2023, CSO Annual Report – January 1 to
December 31, 2022: CSO Discharge Estimates and Rainfall Analyses available at 
https://www.mwra.com/cso/pcmpa-reports/042823-annualcso.pdf

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 28 of 80 
being out of compliance with the Permit limitations. At a minimum, the Permit must account for
this type of circumstance and include a provision whereby MWRA and the CSO-responsible Co - 
permittees shall not be in violation of the Permit for any exceedances of the volume and/or
activation limits at certain outfalls caused by system changes that reduce the CSO discharges at
other outfalls. 
The Somerville Marginal New Pipe Connection Project also serves to confirm the inappropriate
use of Exhibit B as TBELs and the shortcomings and potential unintended consequences of such
an approach. First, the Typical Year volume limitation at the Prison Point outfall (MWR203) and
at BOS017 is based on results from a model that will be updated after construction. Thus, past
modeling results should not be the basis of TBELs. Second, utilizing the Exhibit B limits for
MWR203 and BOS017 conflicts with MWRA’s commitment in the Boston Harbor Litigation to
perform the Somerville Marginal New Pipe Connection Project. Potential conflicts or
inconsistencies with the ongoing Boston Harbor Litigation is justification enough to set aside this
approach. And third, but for its commitment in the Boston Harbor Litigation, MWRA would have
had significant reservations about performing the Somerville Marginal New Pipe Connection
Project because, again, it would result in an expected increase of CSO volume at MWR203 and
BOS017, exceeding the fixed effluent limitation proposed. Thus, in some circumstances, Exhibit
B could serve as a roadblock for future system improvements. The Somerville-Marginal New Pipe
Connection Project highlights why inflexible, rigid effluent limitations as proposed in the Permit’s
Attachment I are not advisable. MWRA urges EPA to adopt a different approach for TBELs. 
EPA should impose narrative TBELs. 
EPA should impose narrative TBELs to require that MWRA operate its combined sewer system
in compliance with the Nine Minimum Controls (“NMC”) prescribed in EPA’s CSO Control
Policy. A similar approach was employed by EPA in the NPDES Permit for San Francisco’s
Oceanside Water Pollution Control Plant. That permit is clear: for wet weather, only narrative
TBELs apply: “ During wet weather, the Discharger shall comply with the narrative technology-
based effluent limitations contained in Provision VI.C.5.a (Nine Minimum Controls). ” 43 , 44 
Requiring compliance with the NMC, which already appear as requirements in the Draft Permit,
would be consistent with EPA’s approach elsewhere and in accord with the CSO Control Policy.
It would also be eminently logical here because it would reflect the fact that the technology-based
controls prescribed in MWRA’s LTCP have already been constructed . 
43 Oceanside Permit , p. 7 (emphasis supplied). See also id. at p. F-16 (“During wet weather, the Combined Sewer
Overflow (CSO) Control Policy establishes the minimum technology-based requirements for combined sewer systems
as the implementation of the nine minimum controls based on 40 C.F.R. section 125.3. Provision VI.C.5.a of this
Order contains these requirements.”) and p. F-17 (“ Combined Sewer System. The Westside Transport/Storage
Structure and combined sewer discharge points discharge only during wet weather. As such, the Combined Sewer
Overflow (CSO) Control Policy establishes the minimum technology-based requirements for combined sewer systems
as the implementation of nine minimum controls based on 40 C.F.R. section 125.3. Provision VI.C.5.a of this Order
contains these requirements.”) 
44 We note that, although the Oceanside permit has numerical TBELs for dry weather, none are required here because
EPA has specifically prohibited all dry weather discharges from CSOs in the MWRA system.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 29 of 80 
Using narrative TBELs is also fundamentally equitable because it would credit MWRA’s and the
CSO communities’ diligence in completing these considerable construction projects over the past
several decades. It is self-evident that the technology-based level of control actually achieved
through this programmatic CSO control effort is, of course, the limit of the technologies that
MWRA constructed. EPA, MassDEP and MWRA no longer need to predict those limits – they are
what they are. MWRA should not be required to comply with technology-based limits more
stringent that those actually achieved and narrative TBELs would reflect that equitable principle,
while still imposing meaningful and measurable requirements. 
In the alternative, EPA should modify the activation and volume figures in Attachment I to
reflect the technology-based limits actually achieved for the 19 CSO Outfalls (with two
exceptions). 
If EPA nevertheless desires to use a version of Exhibit B as a stand in for numerical TBELs, then
it should modify the Typical Year activation and volume figures for the 19 CSO Outfalls to reflect
the current output of the system model. More specifically, EPA should modify these figures to
reflect the Q4-2022 Typical Year system conditions, which were included as Table 3-1 of the 2022
CSO Annual Report (Revised May 19, 2023) filed in the Boston Harbor Litigation. 45 For the
reasons set forth above, EPA may not require MWRA to comply with 15-year-old predictions of
the limits of control that might be achieved by certain technologies, when those predictions are
more stringent than the limits of control that were actually achieved post construction. 
The volume figures in Table 3-1 for the 19 CSO Outfalls should also be modified to remove one
significant digit after the decimal point, because the additional digit reflects possible false
precision and fails to acknowledge the computational variability, unrelated to changes in the
physical condition of the system, in MWRA’s complex system model. MWRA recommends
rounding (either up or down, as is customary) to the 100,000 gallons, which is reflected in Table
1 included below: 
Table 1. 19 CSO Outfalls Typical Year Activation Frequencies and Volumes (as rounded),
Based on Q4-2022 Conditions (except MWR203 and BOS017) 
Activation
Frequency 
Volume
(MG) 
BOS013 8 0.3 
BOS057 2 0.6 
BOS060 2 0.4 
MWR203 N/A* N/A * 
CAM007 2 0.5 
45 AECOM, 2023, CSO Annual Report – January 1 to December 31, 2022: CSO Discharge Estimates and Rainfall
Analyses https://www.mwra.com/cso/pcmpa-reports/042823-annualcso.pdf

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 30 of 80 
Activation
Frequency 
Volume
(MG) 
SOM007A/MWR205A 5 4.5 
MWR205 30 100.4 
BOS017 6 0.5** 
CHE008 6 1.9 
BOS009 10 0.7 
BOS062 5 1.2 
BOS065 1 0.5 
BOS070/DBC 7 4.9 
SOM001A 8 4.5 
CAM005 8 0.8 
MWR018 2 0.4 
MWR019 2 0.2 
MWR020 2 0.1 
MWR201 2 7.8 
*Activation Frequency and Volume will not be established until such time as all work 
impacting the activation frequency and volume at Prison Point MWR203 is complete. 
**It is expected that volume discharge from BOS017 will increase to 0.5 MG as a result of 
the Somerville Marginal pipeline improvements but decrease after certain improvement 
work upstream of BOS017 is performed. 
In connection with the Boston Harbor Litigation, MWRA is performing the Somerville Marginal
New Pipe Connection Project that is expected to greatly reduce CSO discharges from
SOM007A/MWR205 and MWR205A but temporarily increase CSO discharges from the Prison
Point outfall, MWR203, and from outfall BOS017 at a level exceeding the Q4-2022 Typical Year
model output and Exhibit B LTCP Typical Year goal. 46 To reconcile this conflict, a limitation
should not be applicable to the Prison Point outfall (MWR203) until all the system improvements
that effect performance at this outfall are complete. With respect to BOS017, the volume limit
should reflect the Q4-2022 model prediction plus the nominal increase expected with the
Somerville New Pipe Connection Project. 47 Moreover, performing system improvements under
the Boston Harbor Litigation should not be a trigger for Permit violations. 
46 MWRA evaluated alternatives for system improvements for the Somerville-Marginal CSO Facility. It ultimately
selected “Option 2” - constructing a new connection from a 42-inch storm drain to the Somerville-Medford Branch
Sewer. Preliminary modeling showed an expected Typical Year 9.9MG increase in volume at Prison Point MWR203 
(263.6 versus 253.66). See supra, footnote 41, at Table 4-3. Utilizing the Q4-2022 model output would result in
expected Typical Year volume at the Prison Point MWR203 outfall of 254.9. The same modeling analysis shows a 
0.11 MG increase in volume at BOS017. Utilizing the Q4-2022 model output would result in expected Typical Year 
volume at BOS017 outfall of 0.5. 
47 MWRA continues to track Somerville’s Union Square, Poplar St. Pump Station project that is expected to offset a
portion, if not all, of the expected increased CSO volume at Prison Point. Also, work by Boston Water and Sewer
Commission is expected to offset a portion, if not all, of the increase at BOS017.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 31 of 80 
Critically, modifying the activation and volume figures in Attachment I for the 19 CSO Outfalls
would not violate EPA’s anti-backsliding rules for NPDES permits, which restrict the relaxation
of final effluent limitations and the relaxation of standards or conditions contained in existing
permits. 48 That is because: 1) Exhibit B has never been incorporated into any prior MWRA NPDES
permit; and 2) as explained in previous sections, the activation and volume figures in Exhibit B
are not “limits” in any sense of the word, but rather modeled, typical year predictions made 15 to
26 years ago. 49 
In addition, if EPA is going to reject MWRA’s request that Exhibit B not be included as effluent
limitations, in order to preserve the integrity of the judicial process and avoid placing MWRA in
an untenable position, the Permit must, at a minimum, include provisions: 1) acknowledging that
compliance for the 19 CSO Outfalls should not be measured until after the District Court makes
its decision following the December 2024 supplemental report; and 2) automatically incorporating
into the Permit any future changes to Exhibit B ordered by the District Court. 
Finally, as EPA is well aware, MWRA’s model is subject to periodic refinements, corrections and
recalibrations that produce different model outputs without any actual change to discharge
activation and volume. As such, if EPA includes numerical limits in Attachment I, it must include
a provision that MWRA and the CSO-responsible Co-permittees shall not be in violation of the
Permit for any exceedances of the volume and/or activation limits caused by model refinements,
corrections or recalibrations (unrelated to changes to physical conditions of the system). 
48 40 C.F.R. 122.44(l)(1). 
49 However, even if modifications to Exhibit B were to trigger the anti-backsliding rule, there are three exceptions to
that rule, at least one of which would apply here. In particular, the exception at 40 C.F.R. 122.44(l)(2)(i)(B)(1) would
permit the proposed changes to be made. It allows a relaxation in the stringency of effluent limits when “[i]nformation
is available which was not available at the time of permit issuance (other than revised regulations, guidance, or test
methods) and which would have justified the application of a less stringent effluent limitation at the time of permit
issuance.” Over the past 15 years, MWRA has gathered a wealth of data about the physical features of its combined
sewer system [ see, e.g. , section 10.3.1 of AECOM. 2021b. CSO Post Construction Monitoring and Performance
Assessment: Task 5.3 Water Quality Assessment - Revision 1 . Boston: Massachusetts Water Resources Authority.
Report 2021-09. 68 p. plus appendices. http://www.mwra.com/harbor/enquad/pdf/2021-09.pdf], which, had such data 
been available in 2008, it would have been incorporated into MWRA’s model and resulted in changes to Typical Year
activation and volume figures for the 19 CSO Outfalls. In other words, the new data that has been used to recalibrate
MWRA’s CSO model – as reflected most recently in the Q4-2022 Typical Year model run – reflects the institutional
learning developed over the past 15 years and would have justified less stringent effluent limitations in 2008. This
change in the model to reflect real-world conditions that were unknown in 2008 would bring the proposed changes to
Exhibit B squarely within the scope of this exception. To be clear, recalibrating or updating the MWRA model to
reflect new information about MWRA’s combined sewer system is not a “change in test method,” and, therefore the
exclusion to the anti-backsliding exception in 40 C.F.R. 122.44(l)(2)(i)(B)(1) does not apply.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 32 of 80 
I.B.2.d. and e.: Variances – Issues Relating to the Incorporation of Current Variances as
Attachments J and K. 
(2023 Draft Permit – page 16 of 68) 
EPA should include unequivocal language in the Permit confirming that compliance with the
conditions in the variances for the Charles River Basin (Attachment J) and Alewife
Brook/Mystic River Basin (Attachment K) means that MWRA and/or CSO-responsible Co - 
permittees are in compliance with the Permit as it relates to the CSO discharges into and
water quality standards for those receiving waters. 
EPA should include the following language as the final sentence in sections I.B.2.d. and 
I.B.2.e. (both appearing on page p. 16 of the Draft Permit): 
“Provided that MWRA and/or CSO-responsible Co-permittees are in compliance with the
conditions of the variance from water quality standards (as it may be extended, amended,
or replaced), or any subsequently issued variance for the same receiving waters, MWRA
and CSO responsible Co-permittees shall be deemed to be in compliance with all aspects
of the Permit relating to the CSO discharges and deviations from water quality standards
for those CSO outfalls that discharge to such waters.” 
Although sections I.B.2.d. and I.B.2.e. acknowledge the existence of the Charles River and
Alewife Brook/Mystic River Basin variances and declare that those variances are “incorporated
into and are enforceable elements of this Permit,” they do not specifically address the compliance
obligations of the Permit related to the variances. The above-described changes to sections I.B.2.d.
and I.B.2.e. are consistent with the approach in the Draft Permit section I.B.2.f and consistent with
the concepts of certainty and finality embodied in the CWA’s permit shield provision. 50 Thus, the
final Permit must make clear that MWRA’s compliance with the variance conditions shall be
deemed compliance with the Permit. Accordingly, MWRA requests adding the above-described,
unambiguous language to make clear that compliance with the variances in Attachments J and K
(as they may be amended or updated), or any subsequently issued variance for the same receiving
waters, means compliance with the Permit with respect to CSO discharges and any deviations from
water quality standards. This streamlined approach would be far less burdensome than requiring
MWRA to seek a future Permit modification to account for new variances. 
EPA should revise Attachment A in order to make clear which CSO outfalls are subject to
the variances. 
In addition, corrections are needed in Attachment A of the Draft Permit, in order to make clear
which CSO outfalls are subject to the Variances. See further comments on Attachment A, below. 
50 33 U.S.C § 1342(k).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 33 of 80 
I.B.3. Nine Minimum Controls Implementation Levels 
(2023 Draft Permit – page 16 of 68) 
In Part I.B.3. of the Draft Permit, there are certain obligations and deliverables assigned to MWRA
and the “CSO-responsible Co-permittees,” including the Boston Water & Sewer Commission
(BWSC), as well as the cities of Cambridge, Chelsea, and Somerville regarding the CSO Nine
Minimum Controls. It is unclear in this Part of the Draft Permit, however, whether MWRA and 
each CSO-responsible Co-permittee is individually responsible for the requirements for its own
permitted CSO outfalls. For example, this Part of the Draft Permit includes the following
requirement: “[w]ithin 1 year of the effective date of the Permit, the Permittee and CSO-
responsible Co-permittees shall submit to EPA and MassDEP through NetDMR an updated NMC
program.” The MWRA believes that EPA intends for each entity to individually submit an updated
NMC program for their respective CSO outfalls. Consistent with this assumption, EPA should
further clarify the deliverables language in this Part of the Draft Permit by inserting the
word “each” into the various deliverables in order to accurately assign the responsibilities 
( i.e., “…the Permittee and CSO-responsible Co-permittees…” would be replaced with “…the
Permittee and each CSO-responsible Co-permittee…”). 
I.B.3.j. Signage 
(2023 Draft Permit – page 18 of 68) 
MWRA requests that EPA provide the “universal wet weather sewage symbol” to be
included on the signs at the CSO outfalls. 
I.B.3.m. Public Notification Plan 
(2023 Draft Permit – page 20 of 68) 
Part I.B.3.m. of the Draft Permit states the Permittee and CSO-responsible Co-permittees must
implement their preliminary and final CSO Public Notification Plans as approved by MassDEP.
MWRA appreciates that the CSO Public Notification requirement in Part I.B.3.m. of the Draft
Permit cites 314 CMR 16.00. MWRA and CSO-responsible Co-permittees have put forth
considerable effort and resources toward developing public notification programs in accordance
with 314 CMR 16.00, and this language will ensure consistency with requirements for public
notification. 
Nevertheless, MWRA recommends that EPA update this Part by striking the word
“preliminary,” because the final CSO Notification Plans, with any revisions required by
MassDEP, supersede the preliminary CSO Public Notification Plans. 
I.B.5 Nine Minimum Controls Reporting Requirement 
(2023 Draft Permit – pages 20-22 of 68) 
Notwithstanding comments made above on Section I.B.2.c.-e., MWRA provides comments on
Part I.B.5. of the Draft Permit, which, while stylized as reporting requirements regarding the NMC,

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 34 of 80 
the requirements are broader CSO-related annual reporting requirements ( e.g. , activation
frequency and discharge volumes, compilation of sampling data, annual precipitation data, etc ).
Accordingly, the Part should be retitled. Further, some of the language in this Part, which appears
to be carried forward from the previous NPDES permits for MWRA or for the CSO-responsible
Co-permittees, is largely outdated. For example, “future planned conditions” is not a clearly
defined term, and in any event all of the CSO control projects in the Final CSO Facilities Plan
were complete by December 2015. 
Moreover, consistent with prior comments made above, this Part should also make clear, that
reporting requirements under the NPDES permit apply to MWRA and to each CSO-responsible
Co-permittee, for only those CSOs for which they are the “Responsible Permittee or Co-permittee”
listed in Attachment A. For example , Part I.B.5.b. should be revised as follows: 
b. Activation frequency and discharge volumes for each CSO outfall for which they
are the “Permittee or CSO-responsible Co-permittee” listed on Attachment A 
during the previous calendar year. For each day of an MWRA CSO discharge
event, the MWRA Report shall include the daily flow at DITP and note whether
there was a bypass of secondary treatment, and the volume bypassed. 
MWRA also recommends reorganizing Parts I.B.5.d. and I.B.5.f. to more clearly distinguish
rainfall analysis and other reporting related to precipitation, from reporting on estimated CSO
discharges for the prior year. In previous annual CSO reports submitted by MWRA, the rainfall
analysis section usually included all rainfall analysis results, including total rainfall, peak and
average intensities, storm recurrence intervals, and comparison to the Typical Year. 
MWRA suggests the following language modifications to Parts I.B.5.d. and I.B.5.f . in order
to clarify these Parts and to align them with existing requirements in the Federal Court Order and
CSO Variances: 
d. Analysis of precipitation during the previous year for each day , including
total rainfall, peak intensity, and average intensity , at rain gauges
representative of CSO tributary areas. 
(1) A comparison between the precipitation for the previous year
and the precipitation in the typical year under future planned
conditions used in the MWRA Final CSO Facilities Plan or
“Notice of Project Change” document, or subsequent document,
whichever is appropriate. This comparison shall include the
number of events and size of events (including recurrence
interval).

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 35 of 80 
(2) For each storm resulting in CSO event discharges from an
outfall for which they are the “Responsible Permittee or Co - 
permittee” listed on Attachment A, an estimate of the
recurrence interval of the storm event, using the rainfall data
collected and the information included in the NOAA Atlas 14 , or
other technical reference for defining storm event recurrence . 
e. Status of the implementation of CSO outfall abatement work for which the
Permittee or each CSO-responsible Co-permittee s is directly responsible in
accordance with the MWRA Final CSO Facilities Plan, the Federal Court
Order, as amended and any related subsequent documents and the
requirements of a CSO Variance. The authorized Typical Year CSO discharge
activations and volumes can be found in Attachment I . 
f. For the outfalls for which they are the Permittee or CSO-responsible Co - 
permittee listed in Attachment A , provide the following information in the
Annual Report for year 3 and every two years thereafter using for comparison 
the updated MWRA model [MWRA, 2021. Task 6: Final CSO Post
Construction Monitoring Program and Performance Assessment Report] 
(or equivalent) for comparison : 
(1) A comparison between the precipitation for the previous year 
and the precipitation in the typical year under future planned
conditions used in the MWRA Final CSO Facilities Plan or
“Notice of Project Change” document, or subsequent document,
whichever is appropriate. This comparison shall include the
number of events and size of events (including recurrence
interval). 
(1) i. For each CSO outfall for which they are the Permittee or CSO-
responsible Co-permittee , a comparison between the activation volume
and frequency for the previous year and the volume and frequency
expected during a for the Typical Year rainfall under future planned
conditions . 
ii. For each CSO event, an estimate of the recurrence
interval of the storm event, using the rainfall data
collected and the information included in the NOAA
Atlas 14, or other technical reference for defining storm
event recurrence.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 36 of 80 
(2) iii. An evaluation of whether the CSO outfall activation volumes and
frequencies for the previous year , for outfalls for which they are the
Permittee or CSO-responsible Co-permittee, are in accordance with
the estimates in the MWRA Final CSO Facilities Plan or as amended by
the Court, given the precipitation which occurred during the year, and
the CSO outfall abatement activities which have been implemented.
Where CSO outfall discharges are determined to be greater than the
activation frequency or volume in either document above, the Permittee
or CSO- responsible Co-permittees shall include their assessment of
such result, a discussion of remaining CSO outfall abatement activities
and an assessment of the impact of those projects on attaining the level
of CSO outfall control identified in the relevant document, or any
amendments thereto. 
I.B.7 CSO Effluent Limitations for CSO Treatment Facilities 
I.B.7.b CSO Effluent Limits 
(2023 Draft Permit – page 24 of 68) 
Effluent Characteristic Sampling - Somerville Marginal Relief MWR205A
(2023 Draft Permit – page 24 & 28 of 68)
(2023 Draft Permit Fact Sheet – page 118 of 195) 
The Draft Permit requires monitoring of MWRA’s treated CSO effluent, including at outfalls
MWR205 and MWR205A. The Somerville Marginal CSO treatment facility primarily discharges
at outfall MWR205, below the Amelia Earhart Dam into the Mystic River. Outfall MWR205A is
a side-outlet relief outfall off outfall MWR205, discharging downstream of the Somerville
Marginal Facility and upstream of the Amelia Earhart Dam. This outfall can activate and discharge
treated flow during storm events when high tides restrict the discharge from outfall MWR205. A
simple diagram of the treatment facility and outfalls is included as Figure 1. 
The volume discharged at MWR205A is a fraction of the flow treated at the Somerville Marginal
facility. As seen in Figure 1 below, it also includes separate stormwater that enters the Somerville
Marginal Conduit downstream of the CSO treatment facility. Under the MWRA’s existing NPDES
permit, flow data (peak flow rate and total volume) reported from the Somerville Marginal CSO
treatment facility are combined for outfalls MWR205 and MWR205A and reported under
MWR205. Activations are reported separately on the individual discharge monitoring reports
(DMRs) for each outfall. MWRA requests that EPA continue to allow MWRA to report combined
flow data for MWR205 and MWR205A, on the MWR205 DMR. 
Some of the monitoring requirements in this Part of the Draft Permit are duplicative, as the
sampling locations for MWR205 and MWR205A are the same, representing effluent from the
treatment facility (Figure 1). The same event composite samples can be used to satisfy permit
requirements for both outfalls, as is the current practice under MWRA’s existing NPDES permit.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 37 of 80 
EPA acknowledges this in the Fact Sheet (Section 5.7.1.4.1) stating, “[e]ffluent data is not
currently required for discharges from MWR205A as it is only used when MWR205 is unavailable
due to tidal conditions.” EPA further indicates this in Footnote 28 observing, “[a]t least one of the
sampled events shall include a period of discharge from MWR205A.” MWRA requests that EPA
continue to approve MWRA reporting of event composite data (biochemical oxygen demand
and total suspended solids) collected from the Somerville Marginal Facility, both for
MWR205, and for MWR205A when tidal conditions restrict discharge of the treated CSO
effluent from MWR205. 
Somerville Marginal CSO 
Sampling Building 
(MWR205 and MWR205A 
chlorine residual samples 
collected here) 
Treated CSO Outfall 
SOM007A/MWR205A 
Somerville Marginal CSO 
Treatment Facility 
(Most MWR205 and MWR205A 
grab and composite samples 
collected here) 
Treated CSO 
Outfall MWR205 
storm 
water 
stormwater 
storm 
water 
Figure 1. Diagram showing the Somerville Marginal CSO Treatment Facility and
outfalls MWR205 and SOM007A/MWR205A. 
Effluent Characteristic Sampling - Chlorine Residual Limits
(2023 Draft Permit – page 24 of 68) 
MWRA notes that some of the monthly average limits for total residual chlorine (TRC) are lower
than the minimum level for the most sensitive EPA-approved Part 136 method. As such, MWRA

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 38 of 80 
requests that EPA add a statement regarding TRC that “For any permit limits below 20 
μg/L, the compliance level for TRC is 20 μg/L” to ensure that values reported as “< ML” will
not be flagged as a permit violation if the ML is greater than the Permit limit, so long as the method
was sufficiently sensitive ( i.e., the “compliance level” for TRC should be set to 20 μg/L, subject 
to adjustment if a new method with a lower ML is approved by EPA). 
Effluent Characteristic Sampling - Measurement Frequency
(2023 Draft Permit – page 28-29 of 68) 
According to Part I.B.7.b. of the Draft Permit, MWRA is required to collect conventional samples
at its CSO treatment facilities four times per year. Footnote 28 in that same section, however, states
that “[s]ampling shall be concentrated during the ‘critical’ use periods.” Critical use periods are
defined as March 1 – April 30 (one sampling event), May 1 – August 31 (two sampling events),
and September 1 – October 31 (one sampling event). MWRA is not aware of any seasonal variation
in CSO effluent quality, and therefore recommends that limiting the sampling period be removed
from the Permit. There is no explanation in the Fact Sheet of how critical use periods were defined,
or why samples collected in November-February would be considered less representative. 
Sampling CSO facilities during storm events, especially those that activate infrequently or only
briefly, is complex and requires full-time, experienced staff in multiple departments working
together. The schedule in the Draft Permit limits the amount of time to capture storm events to
only eight months of the year. Furthermore, two sampling events are required in the summer, which
tends to be the driest season. Obtaining samples from CSO facilities is a challenge to plan,
schedule, and align resources; weather forecasts support these planning activities, but highly
localized weather events makes such planning difficult. Because of the success of the CSO control
program in reducing overflows, discharges may be of short duration, further hindering ability to
collect samples. Adding restrictions on the time of sampling is overly complicated, and
unnecessarily increases the risk of unintentional and unavoidable noncompliance. For these
reasons, MWRA requests that the seasonal restriction on sampling CSOs for conventional
pollutants be removed from the Permit. 
If the seasonal sampling requirement is retained, MWRA requests clarification of how this should
be implemented, as it is unclear what happens if one or more CSO treatment facilities do not
activate during a critical use period. MWRA asks for the same clarity regarding WET testing at
the CSO treatment facilities. Part I.B.7.b. of the Draft Permit requires MWRA to conduct WET
testing two times per year, but Footnotes 31 and 33 state that acute toxicity testing should be
conducted once from April 1 – June 30 and once from July 1 – September 30. As for conventional
samples, MWRA is not aware of any seasonal variation in CSO effluent toxicity, and therefore
recommends that this date restriction on sampling be removed from the Permit. Furthermore, there
is no explanation as to why EPA identified calendar Quarters two and three for WET testing rather
than the critical use periods sampled for other effluent characteristics (March-April, May-August,
September-October). In addition, MWRA points out that should a re-test be required, the first
available opportunity may fall outside the designated quarter. It is unclear how this would be

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 39 of 80 
categorized, and could lead to an unintentional violation. As with conventional sampling targeted
periods , MWRA requests this requirement be removed from the Permit. 
Finally, in the table of effluent characteristic sampling, at the top of page 26, the second column
is labeled “monthly average” and the table requires MWRA to “Report” the monthly average
LC50. This appears to be a typographical error because with two sampling events per year, in
different seasons, reporting the monthly average would be redundant with reporting the daily
maximum value. Note that, MWRA’s existing NPDES permit does not require reporting of
monthly average LC50. MWRA requests EPA to correct this error in the Permit. 
Effluent Characteristic Sampling - Dilution water for WET tests (Footnotes 32 and 34) 
(2023 Draft Permit – page 29 of 68) 
The Draft Permit requires MWRA to follow WET testing protocols, which are Attachments to the
Draft Permit. In addition, Footnote 32 states: 
If toxicity test(s) using the receiving water as diluent show the receiving water to be toxic 
or unreliable, the Permittee shall follow procedures outlined in Attachment E , Section 
IV., DILUTION WATER. Minimum levels and test methods are specified in 
Attachment E , Part VI. CHEMICAL ANALYSIS. 
Footnote 34 explains: 
If toxicity test(s) using the receiving water as diluent show the receiving water to be toxic 
or unreliable, the Permittee shall follow procedures outlined in Attachment C , Section 
IV., DILUTION WATER. Minimum levels and test methods are specified in 
Attachment C , Part VI. CHEMICAL ANALYSIS. 
Draft Permit Attachment E, the freshwater acute toxicity protocol, states that a grab sample of
dilution water shall be collected from the receiving water at a “point immediately upstream of the
permitted discharge’s zone of influence at a reasonably accessible location. Avoid collection near
areas of obvious road or agricultural runoff, storm sewers or other point source discharges and
areas where stagnant conditions exist.” Draft Permit Attachment C, the marine acute toxicity
protocol, says the same. 
Attachments E and C require that “ samples of receiving water must be collected from a location
in the receiving water body immediately upstream of the permitted discharge’s zone of influence
at a reasonably accessible location. Avoid collection near areas of obvious road or agricultural
runoff, storm sewers or other point source discharges and areas where stagnant conditions exist ”.
All of the CSO outfall receiving waters are located in large urban areas and receive stormwater
from different point and non-point sources (such as parking lots, garages, etc ). These episodic
events carry heavy loads of organic and inorganic pollutants to the water, some of which ( e.g. ,
PAHs and PCBs) may persist in the water column and the sediments for a long period of time. It

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 40 of 80 
is not possible for MWRA to ensure that samples of receiving water be collected outside of the
area of influence of those sources. 
Outfalls MWR203, MWR205, and MWR215 do not have upstream locations. Outfall MWR215
discharges into a large combined sewer system some distance from the eventual discharge into
Fort Point Channel. Outfalls MWR203 and MWR205 discharge at dams and there is no marine
water upstream. Sampling locations even some distance away in Boston Inner Harbor are likely to
be impacted by road runoff and storm sewers, as well as by untreated discharges from other
combined sewer overflows. 
For the freshwater outfalls, there is no suitable upstream location at the remaining outfalls,
MWR201 and MWR205A that is free from road runoff, storm sewers and/or stagnant conditions.
Since the issuance of MWRA’s existing NPDES permit in 2000, lab water synthetized according
to EPA’s guidance 51 , 52 has been used as toxic-free dilution water for the WET tests. 
Therefore, MWRA requests that EPA authorize the continuous use of lab water as alternate
dilution water for the marine and freshwater CSO outfalls. If required, MWRA can submit a
request letter to this effect to the email address provided in attachments C and E. 
As an additional comment on these footnotes, there appear to be typographical errors in Footnotes
32 and 34 . Specifically, the references to Part I.B.6. should be to Part I.B.7. in both footnotes. 
Effluent Characteristic Sampling - Chronic toxicity (marine outfalls) (Footnote 33) 
(2023 Draft Permit – page 29 of 68) 
MWRA notes that there is an apparent typographical error in Footnote 33, perhaps from copying
the marine toxicity Footnote 17 from Part I.A.1. The table of b. CSO Effluent Limits includes
acute toxicity tests (LC 50 ) only, as chronic toxicity is not relevant to short-term discharges from
treated CSO outfalls. Therefore, the footnote should not include mention of a chronic toxicity
test, as depicted in the following redline revisions: 
33. The Permittee shall conduct acute toxicity tests (LC50) two times per year, once in
Quarter 2 (April 1 - June 30), and once in Quarter 3 (July 1 - Sep 30). The LC50 is
defined in Part II.E. of this Permit. The Permittee shall perform an acute toxicity test
using the Inland Silverside ( Menidia beryllina ) and Mysid Shrimp ( Mysidopsis bahia )
in accordance with test procedures and protocols specified in Attachment C of this
Permit. The Permittee shall perform a chronic toxicity test using the 1-hour
fertilization test with the Sea Urchin ( Arbacia punctulata ) in accordance with test
procedures and protocols specified in Attachment D of this Permit. Toxicity test 
51 USEPA. Short-term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters to Freshwater 
Organisms Fourth Edition. October 2002. 
52 USEPA. Short-term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters to Marine and
Estuarine Organisms. Third Edition. October 2002

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 41 of 80 
samples shall be collected during the first flush or as a composite over the duration of 
the overflow, not to exceed 24 hours. 
Chronic toxicity testing for CSO outfalls would be contrary to current practice. Moreover, it is
unlikely that relatively brief discharges from treated CSO outfalls will chronically effect aquatic
organisms. Further, MWRA notes that there is no mention of chronic toxicity in section 5.7.1.9 of
the Fact Sheet. Accordingly, MWRA believes that the statement is a typographical error and
perhaps a carryover from Part I.A.1. (footnote 17) of the Draft Permit. In either event, the language
should be removed from Part I.B.7.b. (footnote 33) of the Permit. 
Comments on Part I.C. UNAUTHORIZED DISCHARGES 
I.C.2 Unauthorized discharge – public notifications 
(2023 Draft Permit – page 30 of 68) 
MWRA agrees that public notification of sanitary sewer overflows (SSOs) is important; however,
these reporting requirements should be consistent with recently implemented Massachusetts
regulation 314 CMR 16.00. 
The reason why this is important is that MassDEP has made clear in 314 CMR 16.00, and an
accompanying flowchart of events requiring notification 53 , that the primary driver of public
notification of SSOs is if they reach a surface water. This is also the stated purpose of Chapter 322 
of the Acts of 2020, An Act Promoting Awareness Of Sewage Pollution In Public Waters , now
codified at M.G.L. c. 21, Section 43A (“Notification Act”), which is “to authorize forthwith certain
requirements and procedures to notify the public of sewage discharges into the waters of the
Commonwealth,” so the public may know to avoid recreating in or contact with that water. Public
notification of an SSO that does not reach a surface water is inconsistent with the Notification Act
and MassDEP’s regulations, 314 CMR 16.03(1), and will likely lead to public confusion. 
The required public notifications are generally consistent with requirements permittees must
already meet under the state regulation, 314 CMR 16.00, however, MWRA requests that EPA
further align Part I.B.2 with 314 CMR 16.00, as follows: 
The Permittee must provide notification to the public within 24 hours of becoming aware 
of any unauthorized discharge, except SSOs that do not impact a surface water or the 
public , on a publicly available website, and it shall remain on the website for a minimum 
of 12 months. 
53 https://www.mass.gov/doc/reportable-events-flowchart/download

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 42 of 80 
I.C.4. Bypassing of wastewater flows is not authorized . 
(2023 Draft Permit – page 30 of 68) 
As detailed above in the comments on Part I.A.1, “Content of Footnote Six”, MWRA requests
that the Permit explicitly state that bypassing secondary treatment for flows in excess of the
700 MGD process limit is not an unauthorized bypass . 
Comments on Part I.E. OPERATION AND MAINTENANCE OF THE TREATMENT
AND CONTROL FACILITIES 
I.E.1.a Wastewater Treatment Facility (WWTF) Major Storm and Flood Events Major
Storm and Flood Events Plan and I.E.2.e.(2) Sewer System Flood Events Plan 
(2023 Draft Permit – page 31-44 of 68) 
MWRA, like most major utilities, considers natural disasters and other emergencies as part of
routine facility planning. MWRA believes a critical part of these planning efforts is adapting to
the impacts of climate change, such as installing flood protection measures at its facilities that are
vulnerable to sea level rise. However, as detailed below, the requirements included in both the
WWTF Major Storm and Flood Events Plan and the Sewer System Major Storm and Flood Events
Plan are onerous and go beyond what is needed for useful, pragmatic planning for climate change.
Any new requirements should encourage and support thoughtful development of locally relevant
plans for each Co-permittee, rather than requiring a hasty, expensive, “one size fits all” approach. 
The Draft Permit Fact Sheet section 5.6 on Operation and Maintenance notes that 
The requirements of 40 CFR § 122.41(d) impose a ‘duty to mitigate,’ which requires the
permittee to “take all reasonable steps to minimize or prevent any discharge in violation
of the permit that has a reasonable likelihood of adversely affecting human health or the
environment.” 
MWRA asserts that the steps EPA has required in Part I.E.1.a and I.E.2.e.(2) are not reasonable.
Moreover, EPA has not explained wherefrom it derives the authority to require extensive planning
for extreme events. In addition, the requirements are unduly burdensome, raise serious security
concerns, and represent an expensive, unfunded mandate. Finally, the requirements are also
confusing, inflexible, and not consistent with EPA guidance. An alternative approach similar to
emergency planning for drinking water systems in the American Water Infrastructure Act of 2018
(AWIA) would be more appropriate. 
The requirements for the major storm plans are unduly burdensome and have unreasonable
timelines 
The Wastewater Treatment Facility Major Storm and Flood Events and the Sewer System Major
Storm and Flood Events plan both include requirements for MWRA and its Co-permittees to assess
asset vulnerabilities and systemic asset vulnerabilities, develop comprehensive mitigation

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 43 of 80 
alternatives analysis and schedule, and begin implementation of these measures within 12 months
of the Permit being finalized. The proposed impractical and unreasonable schedule would place
serious burdens on MWRA and its communities, forcing other critical projects to be postponed. 
In addition to the time required to complete the plan, Co-permittees will need time to obtain
funding – which may take a year, even assuming rapid approval by Town Meeting or City Council 
– and then procurement of the professional services would add several more months. If the
requirement is retained, a minimum of 36 months should be provided (24 months for the
asset vulnerability evaluation and another 12 months for the mitigation alternatives analysis)
to complete the Wastewater Treatment Facility Major Storm and Flood Events Plan and the 
Sewer System Major Storm and Flood Events Plan . Additional time will be required to
implement a plan. 
The proposed permit language represent an unfunded mandate 
Unfortunately, since the requirement has been inserted into a Draft Permit rather than promulgated
as a regulation, EPA has not had to calculate the financial burden of the Major Storm and Flood
Events Plan on permittees. MWRA strongly urges EPA to make this calculation, and publish it for
public comment. As written, the development of the plan would require hundreds of staff hours –
thousands, in the case of a large or complex system – and is likely to have significant cost
implications. 
MWRA and the Co-permittees do not have the expertise or resources to develop the extensive
resiliency planning required in the constricted schedule provided. Compliance will require
procuring professional engineering services, at a significant cost, and the number of available firms
with expertise in climate change planning is limited. 
The costs associated with developing such an extensive plan could result in deferring important
projects with more immediate needs. For larger municipalities, these costs may be absorbed, but
for smaller ones the development of a plan on this scale and in the proposed timeframe could have
immediate impacts on a Co-permittee’s ability to fund other projects. Any rate impacts will be felt
by the most vulnerable populations served by MWRA or any Co-permittees. Since about 60% of
MWRA’s service area comprises Environmental Justice communities, this is of particular concern. 
The requirements are confusing, inflexible, and not consistent with EPA guidance 
Wastewater utilities and public works departments consider natural disasters and other
emergencies as part of routine facilities planning. Using local expertise, plans are tailored to the
particular circumstances of their municipality and region. The requirement in the Draft Permit is a
“one size fits all” approach that will result in wasted resources.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 44 of 80 
EPA cites flood resiliency guidance 54 and risk assessment tools in its Creating Resilient Water
Utilities program 55 . The guidance documents cited are significantly narrower and better defined,
than the conditions included in the Draft Permit. They also consider a more reasonable shorter
planning horizon, which would allow for a more realistic capital planning process. 
The language of the requirements is also confusing. In one of the many footnotes, EPA directs
permittees to use “…at a minimum, the worst-case data…” This makes little sense; the same
footnote requires using a variety of climate projection sources, which very likely conflict
(particularly for more distant dates) and are subject to change over time. The same footnote
requires “Evaluation must be completed by a qualified person…” without defining the required
qualifications. 
There is a requirement to revise plans “…as data sources used for such evaluations are revised or
generated…” This is beyond the control of the permittee, and could result in perpetual and costly
re-evaluations. 
Requiring a permitting horizon of 40 years and beyond is unreasonable; there is too much
uncertainty in climate predictions to adequately assess risk and propose mitigation measures in
longer time frames. NPDES permits are five year permits; the Draft Permit requires an entity to
plan out 80-100 years. Meanwhile, the life expectancy of many wastewater assets is closer to 20
years. Accordingly, this exercise is misplaced as part of a 5-year permit. 
Additionally, the requirement to develop a flood events plan and mitigation measures for 80-100
years in the future ignores that adaptation planning for the extremes of climate change possible in
2100 and beyond requires iterative collaboration between the surrounding municipalities. The
decisions a permittee makes to protect against extreme sea level rise, for example, are directly
related to the measures taken by the entire region. A facility might be protected from rising waters,
but if the adjacent communities fail to build adaptive infrastructure, the areas outside the facility
would be flooded, making it inaccessible. While facility-specific mitigation measures like flood
barriers are pragmatic for mid-term planning, long-term planning requires a region-wide approach,
which goes beyond the scope of this permit. 
Annual reporting, besides being subject to the same security concerns mentioned below in
comments on Part I.E.d.2, is excessive for long-term planning. If progress reporting is required, a
five-year cycle seems more appropriate. 
For all these reasons, MWRA requests that Sections I.E.1.a WWTF Major Storm and Flood
Events Major Storm and Flood Events Plan and I.E.2.e.(2) Sewer System Flood Events Plan
be removed from the Permit. 
54 https://www.epa.gov/sites/default/files/2015-08/documents/flood_resilience_guide.pdf 
55 https://www.epa.gov/crwu

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 45 of 80 
MWRA recommends that EPA, before including such language in a permit, provide the MWRA,
Co-permittees, and the public a formal cost-benefit analysis and calculate the cost burden of the
Major Storm and Flood Events Plan. Permittees and the public need the opportunity to weigh the
net environmental and public health benefits of an onerous climate planning mandate versus the
benefits that will be deferred or delayed for other water quality improvement projects. 
Examples of more appropriate regulatory approaches 
Examples of a less prescriptive, more effective approach are available, such as: 
• State Revolving Fund loans require utilities to develop an asset management program. 
• AWIA Risk and Resilience Assessments and ERPs are kept on file at the utilities to protect
security-sensitive information that could be exposed if plans are submitted to EPA. 
• Community water systems may use any standards, methods or tools, provided that risk and
resilience assessment and emergency response plans fully address AWIA requirements. 
Rather than require the same onerous procedures for all municipalities as part of a NPDES permit,
EPA should work collaboratively with those permittees whose systems are at highest risk from
flooding under present and future climate conditions. 
Comments on “Adaptation Plan” included in recent final Permits 
MWRA appreciates many of EPA’s changes to the Operation and Maintenance section of the
recently issued final NPDES Permits for Northampton, Hoosac, Montague, and other
Massachusetts communities. It’s clear that many of the comments EPA received regarding
substantial concerns with the requirements of the Major Storm and Flood Events Plan were taken
into consideration and resulted in a much improved Adaptation Plan. Several of the improvements
directly respond to MWRA’s comments above. For example, MWRA appreciates that the
Adaptation Plan schedule allows for longer time periods, has more reasonable assessments,
removes unclear terms such as “at a minimum, worst–case data”, and “qualified person”, shortened
climate change planning horizons, and has provided guidance materials. 
But even these modified requirements represent an overreach of EPA authority. While EPA has
authority under the CWA over the “discharge of a pollutant” by “any person” from any “point
source” to a “navigable water”, the Adaptation Plan requirements go well beyond these criteria. 
These Adaptation Plan requirements should be removed from the Permit. Furthermore,
these requirements have not undergone a public comment period, and if included in the Final
Permit, must be re-noticed. 
If EPA still adds these requirements, MWRA requests the five year limit on applicability of prior
assessments be dropped. Placing the arbitrary condition of not being able to apply prior
assessments completed more than five years before the effective date to satisfying the requirements
of the Adaptation Plan disregards critical work. As described in our comments on the draft Deer

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 46 of 80 
Island permit, MWRA has been proactive in making our facilities resilient to the impact of climate
change and should not be penalized for completing some assessments more than five years ago. 
MWRA assessed each of its coastal and near-coastal facilities to determine if the facility would be
flooded in a 100-year storm (based on FEMA maps) with 2.5 feet of sea level risk, corresponding
to roughly a 2050 to 2060 sea level rise benchmark. The result was a ranking of 16 facilities that
could be impaired, most of which are part of the wastewater system. MWRA has installed flood
protection measures at most facilities and is completing work at the remaining facilities – including
walls around critical equipment, stop logs at windows and doors, and elevating critical equipment
in facilities undergoing substantial rehabilitation projects. Although the assumption of 2.5 feet of
sea level rise was determined several years ago, this is still in line with the latest projections in
Massachusetts’ Coastal Flood Risk Model and the Greater Boston Research Advisory Group
Report 56 through the middle of the century – significantly mitigating the near- and mid-term risk
to MWRA’s infrastructure. MWRA should be able to use these assessments, which still align with
the latest projections to comply with the relevant requirements of the Adaptation Plan. 
MWRA further adopts and incorporates by reference into these comments the comments on the
Adaptation Plan submitted by the MWRA Advisory Board in Section VI of their comments dated
November 28, 2023. 
I.E.2. Sewer System 
(2023 Draft Permit – page 35 of 68) 
The initial paragraphs of this section should also mention Parts B, I.4, and K.3 of this
permit, as shown below: 
Operation and maintenance (O&M) of the sewer system owned and operated,
respectively, by the Permittee, CSO-responsible Co-permittees: Boston Water and Sewer
Commission (BWSC), City of Cambridge, City of Chelsea and City of Somerville; and
each of the Co-permittee municipalities listed in Attachment B shall be in compliance
with the terms and conditions of Part B, Part C, Part D, Part E, Part F, Part I.4, and Part
J , and Part K.3 of this Permit and the General Requirements of Part II, of this Permit for
only its own infrastructure, activities and required reporting with respect to the portions
of the collection system that it owns or operates. 
No Permittee shall be responsible for violations of Part B, Part C, Part D, Part E, Part F, 
Part I.4, and Part J , and Part K.3 of this Permit and/or the General Requirements of
Part II committed by another Permittee relative to the portions of the collection system
owned and operated by such other Permittee. In the event of any conflict between the
above provisions and any other term or provision of this Permit, the above provisions 
56 Douglas E. and Kirshen, P. 2022. Climate Change Impacts and Projections for the Greater Boston Area: Findings
of the Greater Boston Research Advisory Group Report . Boston: University of Massachusetts, Boston, June 2022.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 47 of 80 
shall control. The Permittee and Co-permittees are required to complete the following 
activities for the respective portions of the collection system which they operate: 
I.E.2.c Infiltration/Inflow 
I.E.2.c.(1) Control of I/I 
(2023 Draft Permit – page 36 of 68) 
MWRA is committed to a continuing effort to work with our communities to reduce
infiltration/inflow (I/I) in MWRA and community sewer systems. Through June 2023, the MWRA
has distributed $532 million in grants and interest-free loans to fund 664 I/I identification &
rehabilitation projects within the 43 sewer member communities through the I/I Local Financial
Assistance Program. Since 1993, a total of $861 million in grant and loan funds has been
authorized by the Board and allocated to member sewer communities through the Program’s 14
funding phases. 
As required by the 2000 NPDES Permit conditions, MWRA I/I reduction plan and program
summaries are currently provided to EPA / MassDEP every September as part of MWRA’s Annual
I/I Reduction Report. Typically, MWRA provides: (1) an overview of I/I identification/
rehabilitation work performed by MWRA Field Operations Department's Technical Inspection
Program. Program work includes internal inspection of MWRA-owned interceptor and inverted
siphon barrels and physical inspection of sewer manholes and tidegates. I/I sources and structural
defects are noted in the MWRA maintenance database and scheduled for prompt repair; (2) a
summary overview of the MWRA’s annual sewer manhole rehabilitation contract; and (3) a status
summary of MWRA’s Interceptor Renewal/Asset Protection Program. This Program includes a
series of twelve interceptor renewal projects to be completed over multiple years. Each project will
provide structural repairs for existing pipelines and reduce I/I entering the MWRA interceptor
system. 
I.E.2.c.(2) I/I Reduction Plan 
(2023 Draft Permit – page 36 of 68) 
Significant progress has been made on I/I reduction and SSO mitigation. MWRA will continue its
aggressive I/I reduction and SSO mitigation efforts under the current plan. There has been
significant progress under the current plan, and MWRA agrees that there are a number of elements
that have been substantially completed and should be revised or removed during a plan update.
However, the 12-month time frame outlined in the Draft Permit is inadequate to appropriately
research, revise and document any useful changes in our approach. MWRA believes that making
any effective plan updates that usefully consider newer technologies and strategies will
require a time frame of 18 to 24 months. 
MWRA believes that the language in Part I.E.2.c.(2) does not adequately delineate MWRA vs Co - 
permittee obligations as they pertain to updating the 2002 Regional I/I Reduction Plan. If EPA
chooses to keep the Co-permittee language in the final Permit, the Permit language must
clearly delineate which planning, implementation and reporting obligations are MWRA’s

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 48 of 80 
and which are those of the Co-permittees. There cannot be ambiguous or overlapping
responsibilities in a legally binding permit. 
I.E.2.c.(3) Annual I/I Reduction Report and I.E.4.(f) Annual Reporting Requirement 
(2023 Draft Permit – page 37 of 68) 
Under the existing 2000 NPDES Permit, MWRA is responsible for reporting on I/I control actions
that sewer member communities had undertaken during the previous FY. If EPA chooses to
include the Co-permittee requirements in the final Permit, the final Permit must make it clear
that MWRA will be relieved of this community reporting task (as Co-permittees, member
communities would be now be self-reporting their own activities). The final Permit should
clearly delineate reporting responsibilities, avoiding duplicative efforts, and providing
clarity on binding obligations. 
I.E.2.d. Sewer System Mapping 
(2023 Draft Permit – page 38 of 68) 
I.E.d.2 Security Concerns related to Sewer System Mapping 
MWRA is pleased that EPA improved the language regarding sewer system mapping compared to
previously issued draft NPDES permits for Holyoke and other municipalities. As mentioned in
MWRA’s comments on Holyoke’s draft NPDES permit, MWRA strongly opposes making
sewer system maps available online due to serious security concerns. Publishing such sensitive
information online puts MWRA’s critical infrastructure at greater risk of attacks by malicious
actors. 
Although the current language is an improvement, it is vague and remains a security concern: the
map “shall be kept up-to-date and available for review by federal, state, or local agencies upon
request.” The frequency of updates is not specified and it implies that MWRA would have to
provide the map to any public agency upon request. This is clearly preferable to the maps being
public, but making them available to any public entity that asks would risk them being shared too
widely. MWRA requests that EPA alter the language to specify that federal, state, and local
agencies would only be able to review sewer maps at MWRA locations. This is in line with the
American Water Infrastructure Act, in which utilities do not have to submit risk assessments and
emergency response plans to EPA, but rather certify that they were developed and made available
to review in person. Additionally, in the past EPA recognized the security issues associated with
sensitive documents and took the added step of destroying or returning these types of files, such
as the Vulnerability Assessments required under the Bioterrorism Act. 
I.E.2.e. Sewer System O&M Plan 
(2023 Draft Permit – page 38 of 68) 
See comments above on “Part I.E.1.a WWTF Major Storm and Flood Events Major Storm and
Flood Events Plan and Part I.E.2.e.(2) Sewer System Flood Events Plan.” As detailed in those

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 49 of 80 
comments, the requirements for the Sewer System Major Storm and Flood Events Plan
exceed EPA’s statutory authority, are vague, unreasonable, and onerous, mandate unfeasible
deadlines, and are financially burdensome. 
Comments on Part I.G. INDUSTRIAL USERS AND PRETREATMENT PROGRAM 
I.G.2. Compliance Reports. 
(2023 Draft Permit – page 45 of 68) 
This section requires that “original” Baseline Monitoring Reports and 90-day Compliance Reports
received by MWRA are to be sent to EPA. In order to maintain the integrity of the Permit record,
MWRA must keep the original documents on file. MWRA requests that EPA allow the
Industrial User filing the Baseline Monitoring Report or 90-day Compliance report to submit
a “copy” to EPA and MassDEP. That would allow MWRA to add the requirement to the Sewer
Use Discharge Permit, making this a permit requirement and enforceable. 
I.G.4. and I.G.10. Industrial dischargers to be sampled for PFAS 
(2023 Draft Permit – pages 46 and 52 of 68) 
Parts I.G.4. and I.G.10. of the Draft Permit each requires MWRA to annually sample several types
of industrial discharges ( e.g ., commercial car washes, platers/metal finishers, etc. ) for PFAS. The
list of the types of discharges also includes “known or suspected PFAS contaminated sites” and
“any other known or expected sources of PFAS.” These broad categories set a near-impossible and
inappropriate standard for any pretreatment program and, in any event, are likely duplicative of
hazardous waste investigations and sampling performed by or under the requirements established
by MassDEP pursuant to the Massachusetts Contingency Plan, 310 CMR 40.000 et seq. , and 
M.G.L. c. 21E. Accordingly, these categories should be removed from the Permit. 
Moreover, given the large service area at issue, some of these categories such as Commercial Car
Washes may have hundreds of sites to be sampled. Accordingly, at a minimum, MWRA requests
that EPA reduce the annual sampling requirement to biennial and thereafter remove the
annual or biennial requirement for known or suspected sources that are proven not to have
PFAS after the first round of sampling . 
Further, please see the comment below on Part I.G.9. regarding the annual report covering a fiscal
year. MWRA requests that EPA align the required PFAS sampling with the MWRA fiscal
year. 
Finally, Parts I.G.4. and I.G.10. are largely identical, except that Part G.4 requires the sampling
information be reported “as an electronic attachment to the March discharge monitoring report due
April 15 of the calendar year following the testing,” while Part G.10 requires that the information
be “included in the annual report.” In light of this duplication, coupled with EPA’s Industrial Users
and Pretreatment Program conditions in other recent publicly owned treatment works NPDES

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 50 of 80 
permits, such as the Town of Montague NPDES Permit No. MA0100137, the Town of Amherst
NPDES Permit No. MA0100218, and Hoosac Water Quality District NPDES Permit No.
MA010051 (which require one but not both types of PFAS sampling information submittals), 
MWRA believes either Part I.G.4. or Part I.G.10. of the Draft Permit was inserted in error
and Part I.G.4. should be removed. This will also clarify that the results are to be submitted in
October. 
I.G.6.i. Pretreatment Enforcement 
(2023 Draft Permit – page 49 of 68) 
Part I.G.6.i. of the Draft Permit sets certain pretreatment enforcement obligations for the MWRA,
including the requirement to “…enforce all applicable Pretreatment Standards and requirements
and obtain remedies for noncompliance by any industrial user.” As EPA is aware, the MWRA has
a long history of successfully enforcing its pretreatment program consistent with the terms of its
EPA-approved enforcement response plan and the terms of its existing NPDES permit. For
example, in Part I.15.a.iii. of MWRA’s existing NPDES permit “…MWRA shall perform the
following activities in implementing and operating its industrial pretreatment program:…obtain 
appropriate remedies for noncompliance by any industrial user with any pretreatment standard
and/or requirement…[emphasis added].” In order to help maintain this success, as well as
ensure consistency with the terms of the existing NPDES Permit, MWRA requests that the
word “appropriate” be added to the referenced clause in Part I.G.6.i., as follows: 
“…enforce all applicable Pretreatment Standards and requirements and obtain appropriate 
remedies for noncompliance by any industrial user” 
I.G.7.b. Local Limit Development 
(2023 Draft Permit – page 49 of 68) 
Part I.G.7. of the Draft Permit requires the development of a technical evaluation of the MWRA’s
current local limits to determine whether or not any specific limits need to be revised within 90
days of the final Permit’s issuance date. In the Metropolitan Sewerage Service Area, there are
approximately 2273 permitted Industrial Users, of which 181 are Significant Industrial Users
(SIUs). In order to adequately conduct a reevaluation of the current local limits for the
Metropolitan Sewerage Service Area, MWRA believes more time is warranted, as was allowed in
the prior permit. Accordingly, MWRA requests that this time be increased to 180 days due to
the complexity of Deer Island’s operations and the extensive Pretreatment Program covering
the Metropolitan Sewerage Service Area. 
I.G.8. (and I.A.8.) Notification Requirements 
(2023 Draft Permit – page 50 of 68) 
As noted above in comments on Part I.A.8., there is a significant level of overlap, but some subtle
inconsistencies, between the notice provisions. Part I.G.8. largely subsumes I.A.8. both in
substance and in practical implementation (and includes far more detailed instructions and

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 51 of 80 
requirements depending on the circumstances). Therefore, since having both provisions creates
unnecessary compliance ambiguities for MWRA, Part I.A.8. should be removed from the
Permit in its entirety. 
Part I.G.8. of the Draft Permit, however, is also not completely clear, as currently written. For
example, sub-Part (a) requires MWRA to notify EPA within 60 days of the introduction of new
pollutants from any industrial user. If the issuance of a permit to a new company is considered the
introduction of new pollutants, reporting will be extremely frequent and perhaps not in accordance
with EPA’s intent. For reference, in FY 2023, MWRA issued over 175 new permits, most of which
were for “Category 10s” (low flow and low pollutant) and “Category D1s” (dental discharges) as
defined in 360 CMR 10.101(2)(g). This would not include the number of permitted industries that
change the processes to include a new pollutant. MWRA requests that the language in sub-Part 
(a) which requires MWRA to notify EPA within 60 days of the introduction of new pollutants
from any industrial user to be rephrased to “MWRA shall notify EPA within 60 days of the
introduction of new pollutants from any new SIUs, new connections at a permitted SIU, or
any amendment to an existing SIU permit. All other new permits will be reported in the
annual pretreatment report.” 
I.G.9. (and I.J.3.) Annual Report Requirements 
(2023 Draft Permit – page 51 of 68) 
Part I.G.9. of the Draft Permit requires the pretreatment annual report to cover a calendar year and
to be submitted by March 31. The Fact Sheet lists the due date for the same report as October 31.
For 20 years, MWRA has submitted its industrial pretreatment report, which covers two NPDES
permits (MA0103284 and MAG590033) on a fiscal year basis (July-June) due October 31.
Changing the due date for one of the permits requires the two permits to be tracked, administered
and reported differently, requiring two Annual Reports. MWRA’s Pretreatment Information
Management System (PIMS) is set up for fiscal year reporting. The EPA monitoring plan and
associated annual fees are based on fiscal year calculating and reporting. 
MWRA requests the deadline be changed to October 31 rather than 60 days after the
reporting period for completion of the annual report in order to provide sufficient time to verify
data reports and allow MWRA to report the two permits together. Accordingly, MWRA requests
the following redline changes to the last paragraph of Part I.G.9.: 
The Permittee shall provide EPA with an annual report describing the Permittee's
pretreatment program activities for the twelve (12) month period ending 60 days prior to
the due date in accordance with required by 40 CFR § 403.12(i) by October 31 st of each
year for the reporting period of July 1 – June 30 . The annual report shall be consistent
with the format described in Attachment G (NPDES Permit Requirement for Industrial
Pretreatment Annual Report) of this Permit and shall be submitted by March 31st of each
year .

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 52 of 80 
Next, MWRA notes that Attachment G to the Draft Permit includes new substantive reporting
requirements regarding items to be included in the Pretreatment Annual Report. Items two, five,
and six of Attachment G all require a more granular detail and summary information concerning
MWRA’s pretreatment compliance and enforcement activities on an annual basis. MWRA does
not object to these enhanced reporting requirements and is proactively taking steps to comply with
these provisions, but they will require changes to MWRA electronic systems and business
practices. Since this is an annual reporting requirement, however, the issuance date and any
modified conditions in any final NPDES permit will affect MWRA’s ability to comply on a
retroactive basis. For example, if a final NPDES permit issues in January 2024, this is already six
months into MWRA’s annual reporting cycle. Accordingly, MWRA is requesting certain revisions
to Attachment G to accommodate this timing and other concerns. 
Finally, under Parts I.G.9. and I.J.3., MWRA notes that beginning on December 21, 2025, all
annual reports submitted in compliance with this section must be submitted electronically by the
POTW Pretreatment Program to EPA or initial recipient, as defined in 40 CFR § 127.2(b).
Electronic submittals shall be in compliance with this section and 40 CFR Part 3 (including, in all
cases, subpart D to Part 3), 40 CFR § 122.22(e), and 40 CFR Part 127 (Part 127 is not intended to
undo existing requirements for electronic reporting). Prior to this date, and independent of 40 CFR
Part 127, EPA may also require POTW Pretreatment Programs to electronically submit annual
reports under this section if specified by a particular permit or if required to do so by state law. 
Consistent with comments submitted on December 10, 2013 RE: Docket ID No. EPA-HQ-OECA - 
2009-0274, MWRA anticipates significant staff time and resources will need to go into developing
the reporting requirements to fit the Annual Report electronic submittal fields and/or requirements.
As such, EPA should share the format of the electronic report by December 15, 2024, or one
year prior to implementation. 
See also comments on Attachment G, below. 
Comments on Part I.I. SPECIAL CONDITIONS 
I.I.2. Pollution Prevention Plan 
(2023 Draft Permit – page 54 of 68) 
MWRA agrees with updating the Household Hazardous Waste (HHW) brochure to address current
issues related to pharmaceuticals and personal care products, PFAS, and microplastics. MWRA
also recognizes that outreach to residents is an important element of pollution prevention. Rather
than making a hard-copy booklet, which is expensive and resource-intensive to produce, MWRA
recommends this information be provided primarily on-line, including as a printable version. 
MWRA requests the following revision to Part I.I.2.a: 
a. The Permittee, MWRA, shall update and continue to make available their
Household Hazardous Waste (HHW) brochure booklet in both hard copy 
and continue to make it available on-line including in a printable format s .

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 53 of 80 
The updates should include information on the sources and proper disposal of
Pharmaceuticals and Personal Care Products (PPCPs), PFAS, and
microplastics. MWRA shall make this information available on their website 
and in hard copy, upon request, to all the sewer member communities . 
I.I.3. Outfall BMP 
(2023 Draft Permit – page 54 of 68) 
The Draft Permit requires outfall inspection by diver or remote-operated submersible. Doing this
is labor intensive, expensive, and provides little value. MWRA’s in-plant monitoring (required by 
I.I.3.e) can detect, via changes in the head height in the outfall drop shaft, if there are any changes
in outfall operation that would be indicative of the intrusion of salt water or damage to the outfall
or risers. A set of algorithms built into the Process Instrumentation and Control System tracks this
on a real time basis, calculating theoretical outfall head based on flow and sea level. A dedicated
tide height sensor at Deer Island collects continuous sea level measurements, and the system
continuously compares theoretical to actual. Except during rough weather or in rare instances of
seawater intrusion in the outfall, the anomaly is small. Thus any damage or occlusion could readily
be detected by the ongoing remote monitoring, and inspection by a diver or remotely operated
submersible is not necessary. Furthermore, the outfall was designed with the possibility that there
could be growth/blockage at the discharge ports or other issues. There are currently 271 open ports,
and 424 total ports available, should adjustments be required. However, flow monitoring continues
to demonstrate no issues within the outfall tunnel or diffusers. The Fact Sheet does not provide
any justification for this requirement, and MWRA requests that I.I.3.b be modified to require
inspection only if the in-plant monitoring of the flow versus hydraulic head relationship
indicates a problem. If an inspection is still required by the Permit, additional time is requested
to design an appropriate inspection program and procure services (36 months). 
I.I.4. DMF notification 
(2023 Draft Permit – page 55 of 68) 
MWRA notes that as this section requires that notification of certain conditions be sent to the
Massachusetts Division of Marine Fisheries within 24 hours, it is not practical to require the
notification to be sent to a postal address. MWRA requests that an email address be provided
in place of the postal address listed, and that email notification be permitted as an alternative
to telephone notification.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 54 of 80 
MWRA proposes the following revision:
…The notification shall be sent to the following electronic mailing address es and
telephone number:
Division of Marine Fisheries
Shellfish Management Program 
30 Emerson Avenue
Gloucester, MA 01930 
shellfish.gloucester@mass.gov 
shellfish.newbedford@mass.gov 
(978) 282-0308 
(978) 491-6244 
I.I.6. Ambient Monitoring Plan 
(2023 Draft Permit – page 55 of 68) 
MWRA has conducted an extensive ambient monitoring program in Massachusetts Bay since
1992. The current Deer Island NPDES Permit, issued in 2000, incorporated this monitoring, as the
Ambient Monitoring Plan, or AMP. Based on the expertise developed over these decades of
monitoring, MWRA has the following comments on the Ambient Monitoring Plan requirement in
the Draft Permit. 
In 1990, the National Research Council (NRC) published a report entitled Managing Troubled
Waters. 57 NRC intended the report to improve the effectiveness of marine monitoring programs
by studying how to best design monitoring programs to meaningfully support environmental
decision-making. Managing Troubled Waters has been the definitive reference for design of
marine environmental monitoring programs for thirty years, and the current MWRA program
followed the recommendations in the report. 
The primary NRC recommendation was that the goals and objectives of the monitoring program
be clearly articulated using questions that were meaningful to the public. These questions would
provide the basis for the design of the monitoring program. Also, the program should be
sufficiently flexible to be modified based on new information. NRC also recommended that data
analysis and interpretation, as well as data management, be part of the program design. 
MWRA’s ambient monitoring program was designed around these principles, and has proven to
be very successful in providing relevant data and in addressing the 33 monitoring questions that
were adopted when developing the monitoring plan. MWRA appreciates that EPA has eliminated
the benthic, as well as the fish and shellfish, monitoring sections of the plan as those questions 
57 National Research Council. 1990. Managing Troubled Waters: The Role of Marine Monitoring . Washington, DC:
National Academy Press. 125 pp.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 55 of 80 
have all been answered. 58 Although the Contingency Plan is separate from the AMP in the current
permit, the two are closely related, and MWRA appreciates EPA’s removal of the Contingency
Plan in the Draft Permit. 
While the continuation of the water column monitoring is easily understood because of the older
monitoring questions, the addition of Harmful Algal Bloom (HAB) and nuisance algae monitoring
is not consistent with the NRC design principles summarized above. The Fact Sheet says “The
AMP requirements has [ sic ] been revised to focus on the potential for nutrient-related impacts with
regard to biological and oceanographic regime change in Massachusetts Bay” with a footnote to
an EPA technical memorandum. 59 , 60 Review of this technical memorandum does not provide any
specific, targeted monitoring questions or any guidance for monitoring program design besides a
few suggested guiding principles. MWRA was unaware of this document until the publication of
the Draft Permit, which suggests it did not undergo any outside peer review. 
While MWRA appreciates EPA’s desire to collect more information on HABs and nuisance algae
species in Massachusetts Bay, in the absence of a proven outfall effect on these species, MWRA
believes these specific monitoring activities should not be part of MWRA’s NPDES permit or
Ambient Monitoring Plan. Questions about HABs and nuisance algae species should be under the
purview of a regional authority, perhaps the “Massachusetts Bay Science Advisory Board”
mentioned in the Fact Sheet, 61 or at least aligned with the Massachusetts Division of Marine
Fisheries program, the organization responsible for such monitoring. 
MWRA requests that EPA reconsider the new HAB and nuisance algae requirements and use the
NRC recommendations to guide their approach. If EPA does not remove the new HAB and
nuisance algae monitoring requirements from the Permit, MWRA provides recommended
modifications below. 
Schedule for revising Ambient Monitoring Plan 
The Draft Permit requires that “Within 30 days of the effective date of the Permit, the Permittee
shall submit a revised Ambient Monitoring Plan to EPA and MassDEP.” 
MWRA requests 180 days to submit the new Ambient Monitoring Plan (AMP) to EPA and
MassDEP. MWRA appreciates that the revised AMP can be based on the current AMP, Revision 
58 MWRA. 2019. Ambient Monitoring Plan and Contingency Plan for the Massachusetts Bay Outfall: Monitoring
Questions Status and 2000-2018 Threshold Test Results . Boston: Massachusetts Water Resources Authority. Report
2019-03. 36 p. http://www.mwra.com/harbor/enquad/pdf/2019-03.pdf 
59 EPA. 2023. MWRA Draft Permit fact sheet, page 167. https://www3.epa.gov/region1/npdes/mwra/pdf/2023/mwra - 
2023-fact-sheet.pdf 
60 Hagy, J., Gleason, T., Oczkowski, A., Tatters, A. and Wan, Y. 2022a. Technical Memorandum: Recommendations
to adapt Ambient Monitoring and Contingency Thresholds to monitor potential ecological risks to Massachusetts Bay
resulting from the Deer Island Discharge . EPA, Washington, DC, EPA/600/R-22/064. 
https://cfpub.epa.gov/si/si_public_record_Report.cfm?dirEntryId=355408&Lab=CEMM 
61 EPA, 2023. Draft Permit fact sheet, p. 168.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 56 of 80 
2.1, 62 but believes that with the additional water column monitoring, and especially the new
harmful algal bloom and nuisance algae requirements more time will be needed to develop the
new AMP. 
I.I.6.c. Table 1: Water Column Survey Schedule 
(2023 Draft Permit – page 56 of 68) 
MWRA requests a change in Table 1, Water Column Survey Schedule. MWRA requests that
the September survey be moved to week 38; assessment of the data collected for over 20 years
demonstrates the original two-week gap between mid-August and September does not provide any
useful differentiation in data. This adjustment would result in more consistent spacing between
surveys through the full calendar year and ease logistical challenges in the current schedule. Per
the current AMP, Revision 2.1, one intention of the September survey is to capture water column
characteristics “prior to overturn” of the water column. Since mixing has typically been observed
after mid-October, moving the September survey to week 38 remains in line with the intentions of
the AMP. 
I.I.6.d. Monitoring Stations 
(2023 Draft Permit – page 56 of 68) 
MWRA requests clarifications and modifications to the tables and associated text regarding
the monitoring as described in the following sections . 
Part I.I.6(d) says “The Plan shall include the existing eleven (11) monitoring stations in
Massachusetts Bay: F22, N04, N01, N21, N18, N07, F23, F15, F13, F10, and F06 and the existing
three (3) monitoring stations in Cape Cod Bay: F29, F02 and F01.” 
MWRA would like to clarify that the eleven monitoring stations in Massachusetts Bay are
administratively distinct from the three monitoring stations in Cape Cod Bay. Unless the Cape Cod
Bay/CCS sampling locations are specifically called out in the comments below, a sampling
“station” or “location” refers only to the eleven MWRA Massachusetts Bay locations, and not the
Cape Cod Bay/CCS locations. 
Scientifically, there is ample evidence that the outfall does not impact water quality in Cape Cod
Bay, offshore, or in Stellwagen Bank National Marine Sanctuary, but monitoring has continued at
these three Cape Cod Bay locations due to the sensitivity of these environments. An MWRA
consultant samples Massachusetts Bay stations while the Center for Coastal Studies (CCS;
Provincetown, MA) samples the Cape Cod Bay stations under a cost-share agreement with
MWRA. CCS does not necessarily have the same resources as MWRA for sample collection and
analysis, and MWRA is appreciative that Tables 2 and 3 in this section of the Draft Permit mostly
reflect that. 
62 MWRA. 2021. Ambient monitoring plan for the Massachusetts Water Resources Authority effluent outfall revision 
2.1 . Boston: Massachusetts Water Resources Authority. Report 2021-08. 107 p. 
http://www.mwra.com/harbor/enquad/pdf/2021-08.pdf

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 57 of 80 
I.I.6.e. Table 2: Water Column Parameters 
(2023 Draft Permit – page 57 of 68) 
In the “Hydro profile” row, MWRA would like to request the deletion of Turbidity from the
list of measured parameters. As transmissometry has been measured as part of the MWRA
program since 1992, turbidity is not necessary (nor as robust) given the current measurement of
beam attenuation/transmissometry. Additionally, Dr. Collin Roesler of Bowdoin College has
analyzed turbidity data from Buoy A01 off Cape Ann and has concluded that turbidity does not
show a strong seasonal pattern and does not show a biological signal. 63 On the “Water Chemistry”
row, MWRA requests that “Particulate carbon” be listed more clearly as “Particulate
organic carbon” . 
“Phytoplankton” and “Zooplankton” should have separate rows to clarify the slight
differences in methodology between the two. 
The zooplankton is collected via net tow, also at all stations except N21. Consistent with the current
AMP, neither phytoplankton nor zooplankton is collected at N21, as nearfield plankton is
adequately characterized by samples collected at the other four nearfield stations. 
Please replace the combined Phytoplankton/Zooplankton row with the following: 
ANALYTE DEPTH PARAMETER 
Phytoplankton Near surface
Plankton will not be
measured at station N21
because nearfield plankton
is adequately characterized
by data collected at the
other four nearfield stations 
Identification
Enumeration 
Zooplankton Net tow
Plankton will not be
measured at station N21
because nearfield plankton
is adequately characterized
by data collected at the
other four nearfield stations 
Identification
Enumeration 
63 Collin Roesler, personal communication. Dr. Roesler is the William R. Kenan Professor of Earth and Oceanographic
Science at Bowdoin College. She specializes in modeling of phytoplankton using bio-optical means, with special
interest in harmful algal blooms.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 58 of 80 
I.I.6.e. Table 3: Water Column Parameters, Cape Cod Bay and Stellwagen NMS 
(2023 Draft Permit – page 58 of 68) 
The “Hydro profile” row, “Depth” column should state only “Downcast data continuous”,
removing “with upcast data at any sampled depth” . Survey vessels used in Cape Cod Bay
monitoring do not have the capability to deploy rosettes with simultaneous multiple depth
sampling and profiling. The conductivity-temperature-depth (CTD) system is lowered by hand
independent of the grab sampler. Grab samples are taken at near-surface and near-bottom depths,
so there is no upcast on which to collect profile data. 
The “Hydro profile” row, “Parameter” column should not include “Transmissometry” .
This is collected routinely at Massachusetts Bay locations but is currently not included in the
monitoring plan for Cape Cod Bay stations, and should not be going forward. Adding the
instrumentation to collect this data would be expensive and nontrivial to add the necessary
equipment to the CTD system. 
The Alexandrium catenella row should be removed from Table 3 of the Permit. Multiple
depth sampling of Alexandrium and testing via gene probe methods at Cape Cod Bay monitoring
locations is not part of the current AMP, as Alexandrium is rarely observed in Cape Cod Bay.
However, Alexandrium is enumerated and identified as part of routine, near-surface,
phytoplankton sampling in Cape Cod Bay. These stations are also not in the list of planned
stations in the Alexandrium Rapid Response Study Survey Plan, Revision 1 , 64 that MWRA is to
follow per Part I.I.6.f(1) of the Draft Permit. As noted in this plan, MWRA may collect
additional samples in Cape Cod Bay when conditions warrant. 
I.I.6.f. Harmful Algal Blooms and nuisance algae 
(2023 Draft Permit – page 58 of 68) 
In the comments below, MWRA requests changes to several threshold limits, elimination of
rapid analysis method for threshold comparison purposes, and elimination of rapid response
surveys for species other than Alexandrium . 
General comments 
MWRA appreciates that HABs can have a major effect on the health and the livelihoods of citizens
in New England, as well as potentially impacting protected marine species. MWRA’s current
monitoring program identifies and enumerates the taxa listed in the Draft Permit. However, the
rationale for adding the additional special monitoring for Pseudo-nitzschia , and especially the
nuisance species, in the Draft Permit is not well supported. 
64 Libby S, Rex AC, Keay KE, Mickelson MJ. 2013. Alexandrium rapid response study survey plan. Revision 1 .
Boston: Massachusetts Water Resources Authority. Report 2013-06. 13 p. 
http://www.mwra.com/harbor/enquad/pdf/2013-06.pdf

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 59 of 80 
As mentioned in the introduction of this section, EPA has not followed the NRC guidelines for
developing a monitoring program when it comes to the new HAB and nuisance algae requirements.
The Draft Permit does not articulate monitoring questions for the new HAB and nuisance algae
requirements, nor link HAB or nuisance algae blooms to MWRA’s outfall. Managing Troubled
Waters explains that the most effective marine monitoring plans are those that ask specific, testable
questions, which stakeholders help develop. EPA has done none of those things in writing the
HAB and nuisance algae requirements into the Draft Permit. 
The EPA report Technical Memorandum: Review of MWRA Water Quality Monitoring Results to
Address Potential for Harmful Effects of the Deer Island Discharge on Threatened and
Endangered Species in Massachusetts Bay 65 finds the effluent discharge “does not create a
eutrophic condition in Massachusetts Bay”. Nor did the report find evidence in the MWRA data
to conclude that the observed increase in HABs is currently affecting North Atlantic right whales
in Massachusetts Bay or that such impacts are likely in the future. 
While MWRA understands that climate change may result in changes in HABs and nuisance algae
presence and some changes have been observed in areas in and around Massachusetts Bay, the
addition of threshold levels, response surveys, and time-sensitive analyses for non- Alexandrium 
species does not appear to be supported at this time. EPA has not documented a link between these
species and the MWRA outfall. Such additional surveys, analyses, back-end data management,
and rapid reporting are time consuming, take up limited resources such as ship time, and do not
have a clear rationale as to how the data relate to the outfall discharge, or otherwise provide
actionable information necessitating the rapid turnaround. 
The permit Fact Sheet does not mention response surveys for the nuisance algae species in their
general discussion of HABs and nuisance algae. Pages 143 and 144 of the Fact Sheet note,
respectively: 
EPA recommends that this question be explored further in a revised ambient monitoring 
program with a focus on HAB species including the continuation of Alexandrium rapid 
response surveys, the addition of rapid response criteria for Pseudo - nitzschia spp. and the 
enumerating and reporting Dinophysis, Phaeocystis, Karenia mikimotoi, and 
Margalefidinium polykrikoides as nuisance species of interest. 66 
Monitoring program [ sic ] should focus on HAB species including the continuation of 
Alexandrium rapid response surveys, enumerating and reporting all Pseudo-nitzschia spp. 
abundance, and adding Karenia mikimotoi, Dinophysis and Margalefidinium 
65 Hagy J, Gleason T, Oczkowski A, Tatters A, and Wan Y. 2022b. Technical Memorandum: Review of MWRA Water
Quality Monitoring Results to Address Potential for Harmful Effects of the Deer Island Discharge on Threatened and
Endangered Species in Massachusetts Bay . U.S. EPA, Washington, DC, EPA/600/R-22/063. Available at 
https://cfpub.epa.gov/si/si_public_record_Report.cfm?dirEntryId=355407&Lab=CEMM 
66 EPA, 2023. Draft Permit factsheet, page 143.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 60 of 80 
polykrikoides as nuisance species of interest. Additional rapid response variables will be 
included for Pseudo-nitzschia. 67 
There is no mention in the Fact Sheet of response surveys for Dinophysis spp., Phaeocystis
pouchetii , Karenia mikimotoi , and Margalefidinium polykrikoides – merely “enumerating and
reporting,” which is inconsistent with the Draft Permit, which does include response surveys for
the latter three species. 
MWRA proposes instead that identification and enumeration for these HAB and nuisance species
continue in the routine monitoring program. The current special response program for Alexandrium 
would continue, as Alexandrium occupies, and should continue to occupy, a special place based
on its historic public health and fishery impacts. Although Pseudo-nitzschia is a potential public
health hazard due to its association with amnesic shellfish poisoning (ASP), the only ASP shellfish
closures in Massachusetts Bay occurred in 2016. This closure was not connected with MWRA’s
outfall. 
The continued identification and enumeration of HAB and nuisance algae species during routine
monitoring at MWRA’s 11 regular monitoring sites, along with other water quality data, will help
develop the trend information to identify whether these species – including Pseudo-nitzschia – are
a concern (e.g., consistently increasing abundances over time), and ensure comparability with
historical data. MWRA and other parties can further evaluate these data to assess shellfish and
other marine impacts due to the presence of toxins or toxin producers. Data on HABs and nuisance
algae species would be reported in the Annual Report required in Part I.I.6(l). 
Furthermore, MWRA could add monitoring for these algal species in any triggered Alexandrium 
Rapid Response Study (ARRS) surveys. While these additional surveys may or may not align
temporally with blooms of other organisms, it will further develop a data set to inform future
decisions. MWRA proposes to report these findings in the required Annual Report, with specific
reporting on each of the new HAB and nuisance species requested by EPA ( Pseudo-nitzschia spp., 
Dinophysis spp., Phaeocystis pouchetti , Karenia mikimotoi , and Margalefidinium polykrikoides ).
As with all data that MWRA collects, it would be available upon request. 
MWRA agrees with the Hagy et al. report when it suggests: 
…a cautious approach is warranted that includes continued monitoring of ecological 
changes near the outfall and in the surrounding areas of Massachusetts and Cape Cod Bays. 
Monitoring should be adjusted to focus on the most pertinent and prospective 
environmental concerns and their potential relationship to the discharge… 68 
MWRA believes the proposed monitoring above is in line with this approach. 
67 EPA, 2023. Draft Permit factsheet, page 144. 
68 Hagy et al, 2022b.

EPA and MassDEP
Attachment 1: MWRA Detailed Comments on 2023 Draft NPDES Permit No. MA0103284
November 28, 2023
Page 61 of