Haverhill Robert E. Ward, Deputy DPW Director
Water/Wastewater Division
Phone: 978-374-2382 Fax: 978-52 1-4083
rward@ haverh iIIwater .com 
November 28, 2023 
By Email 
Michele Barden 
U.S. Environmental Protection Agency - Region 1
5 Post Office Square, Suite 100 (06-1)
Boston, MA 02109-3912
Telephone: (617) 9 18-1 539
Emai I: barden.michele@epa.gov 
Claire Golden
Massachusetts Department of Environmental Protection
Surface Water Discharge Program
150 Presidential Way
Woburn, MA 01801
Ema il: claire.golden@mass.gov; massdep.npdes@mass.gov 
Re: Haverh ill Comments - Massachusetts Water Resource Authority (MWRA) Deer
Island - Draft National Pollutant Discharge Elimination System (NPDES) Permit
No. MA0103284 
Dear Ms. Barden and Ms. Golden: 
The City of Haverhill (City) respectfully submits the enclosed com ments on the draft N PDES
permit (Draft Permit) issued by the United States Enviromnental Protection Agency (EPA) and
Massachusetts Department o f Environmental Protection (MassDEP) for the draft NPD ES Permit
for the MWRA's Deer Island Treatment Plant. The City appreciates the extended public conu11ent
period and supports the additional public involvement that such an extens ion provides. 
The City owns and operates both a wastewater treatment facility and thirteen CSO outfalls w ithin
its service area, which includes the City, which is an environmental justice community, and the
Town of Groveland. As such, the City is interested in conditions and permit obligations imposed
on other treatment faci lities in Massach usetts. 
Comments 
1) Resiliency Planning. 
T he draft N PDES permit requires significant planning regarding operation and maintenance of
MWRA's treatment plant and other infrastructure including development and implementation of
a Sewer System F lood Events Plan as an e lement of the Operations and Maintenance Pl an. T he
plan is required to take future conditions into consideration, including midterm (i.e., 20-30 years)
and long-term (i.e., 80-1 00 years) and extreme sea level change. 
Page 1 of 3

Planning for a changing environment is a necessary obligation; however, City believes that the
scope of such planning should be tailored to the permit cycle. The long-term nature of the
planning (80 years in the future) in a permit that is valid for only five years is onerous and
potentially costly where repeated corrections as more accurate information is developed over
time occurs. Due to the complexity of issues to be reviewed, the broad scope of potential (and
often unknown) future impacts and the long-term nature of climate change and sea level rise, it is
unclear what operations or actions that must be taken because a facility is required to address all
infrastructure and plan for potential changes or upgrades based on uncertain data and unknown
future conditions. Further, the Draft Permit contemplates completion of this planning withing
twelve months of the effective date of the permit. This is insufficient time to undertake costly
and expansive planning. 
A facility must take into account a variety of information and potential vulnerabilities, using
worst case information. This includes evaluating changes in precipitation, sea level rise, extreme
weather events, coastal flooding, inland flooding, sewer flow, inflow, and infiltration and
relevant to the facilities from a plethora of sources. The Draft Permit includes such sources as: 
( 1) the data generated by the thirteen federal agencies that conduct or use research on global
climate change that contributed to the latest National Climate Assessment produced by the U.S.
Global Change Research Program (USGCRP); 2) climate data generated by the Commonwealth
of Massachusetts; and 3) resiliency planning completed by the municipality in which a given
facility is located (i.e., City of Boston) and incorporate the results of the evaluation in a manner
that demonstrates that the control measures taken are precautionary and sufficiently protective.
Evaluation must be completed by a on a five-year basis considering: 1) historical observations
from all years the Permittee has operated the facility prior to this permit's term; 2) set midterm
(i.e., 20-30 years) and 3) long-term (i.e., 80-100 years) ranges. 
The Draft Permit uses also requires evaluation of impacts related to "Major storm and flood
events," which refer to instances resulting from major storms such as hurricanes, extreme/heavy
precipitation events, and pluvial, fluvial, and flash flood events such as high-water events, storm
surge, and high-tide flooding." 
The City believes that although planning is necessary and appropriate, EPA and MassDEP should
limit the scope of such planning to near term impacts and improvements within the permit cycle
and extend the timing to complete the planning. Because the proposed analysis is expansive,
requiring assumptions on what is necessary presently versus in the future, and is well outside the
validity period of any permit. EPA and MassDEP should detail the statutory authority for such
long-term planning and the correlation to compliance with the Clean Water Act during the permit
period. Any explanation should be very clear in explaining why such long-term planning, at
great cost to wastewater treatment facilities and their ratepayers, is authorized by the Clean
Water Act. 
2) Industrial Pretreatment Program - PFAS Sampling 
The Draft Permit requires new PFAS sampling as part of the Industrial Pretreatment Program. 
As guidance, the Draft Permit identifies a broad and uncertain collection of industrial users 
(commercial car washes, platers/metal finishers, paper and packaging manufacturers, tanneries 
and leather/fabric/carpet treaters, manufacturers of parts with Polytetrafluoroethylene (PTFE) or 
teflon type coatings (i.e., bearings), landfill leachate, centralized waste treaters, known or 
suspected PFAS contaminated sites, firefighting training facilities, airports and any other known 
or expected sources of PFAS) that must be sampled for PFAS by the permittee. 
Page 2 of3

The City is concerned about the scope of this obligation, and EPA and MassDEP's autho rity to
require such sam pl ing, as it appears to require a permittee to identify potential PFAS sources
outs ide of current industri al pretreatment program obligations. The cond itio n appears to require a
permittee identify properties o r users that are not otherwise covered by the industrial
pretreatment program but may be sources of PFAS, determine if a user or property is a
potenti ally a source of PFAS, or identify any contam inated s ite with in its service area that might
be, o r could be, PFAS contaminated. This obligation goes well beyond the industrial
pretreatment program currently operated under NPDES permi ts and EPA's a uthority to require
such investigation and sampling. EPA should be taking the lead on identify ing potential PFAS
sources and regu lating such sources with Categorical Pretreatment requi rements. 
The City a lso is concerned about the capacity of laboratories to complete the sampling in as more
fac ilities are required to undertake similar sampling. Few laboratories may be prepared for the
magnitude of such testing in the limited timeframe proposed in the Draft Permit. 
EPA and MassD EP sho uld limit the req uirement for PFAS sampling to currentl y identified and
permitted industrial users. While the Citv has significant concerns abo ut PFAS impacts, EPA and
MassDEP should take the lead in identifying PFAS products and users. and reQulating the same.
The s ignificant cost to undertake investigation and sampling of such users sho uld be borne by the
users rather than ratepayers. EPA and MassDEP sho uld then separately regulate such so urces
using other regulatory means such as Categorical Pretreatment req uirements. 
Thank you for your consideration of these comments. 
Sincerely, 
l(~Z. ~~ 
Robert E. Ward 
DPW Director 
cc: C hief, Environmental Enforcement Section, U .S. DOJ
Joshua S . Levy, Acting U.S. Attorney, MA District
Michael Wagner, USEPA, wagner.michael@epa.gov 
Kevin Brander, DEP, kevin.brander@state.ma.us 
1. Andrew Go ldberg, MA Assistant Attorney Genera l, andy.goldberg@ state.ma.us 
Mayor James J. Fiorentini, City of Haverhill, mayor@ cityofhaverhill.com 
Wi lliam Cox, City Solicitor, [removed] 
Michael Leon, N utter, McClennen & Fish LLP, MLeon@nutter.com 
Matthew Snell , Nutter, McClennen & Fi sh LLP, MSnell@ nutter.com 
Mike Stankovich, DPW Director, mstankovich@cityofhaverhill.com 
Paul Jessel, Wastewater, pjessel@haverhillwater.com 
Isaiah Lewis, WWTP Facility Ma nager, ilewis@haverhillwater.com 
Page 3 of 3