Minutes
Intergovernmental Affairs Committee · from the Town's website · 55 pages · 2.2 MB
open the file ↗ · original at the source ↗
IG A/Finance Joint Meeting June 26 7:30pm Harvey Hearing Room & Zoom Present: Councilors Belcher (HB), Swope (SS), Aiello (JA) , DaRos (JD) Absent: Councilor Tassinari Members of the Public: none 7:33pm – Call to Order by HB Motion by SS to approve two prior sets of meeting minutes ( 04 APR24 & 09JUN24) - 2 nd by JA - Unanimously Approved • MWRA Discussion *Please see included document that contain s a list of questions that t hese minutes refer to* - List of question s developed by JA , sent to MWRA by SS - JA: Does MWRA have air quality monitoring in Winthrop? - HB: Not sure, but ai rport proximity may impact results of any monitoring; can use existing research o n impact of treatment plants on air quality paired with vehicle statistics and known air quality impacts - SS: What type of entity is MWRA? o JA: An a uthority established by legis lature ; consists of various appointees; operates independe nt of the state; should be self -sustaini ng; subject to rules/regs of emissions, envi ronmental considerations, etc. - JA: We should connect with Wig Zamore from MCAC – very up to date on data regarding particulate matter, etc. - SS: MWRA report ed only 2 odor complaints in 2023 - QUESTION: Can we get breakdown of car vs. truck traffic to Deer Island? Amount of we ar and tear/pollutants is different for each o JA: Need to look at emissions data for employee car trips on an average week; asked MWRA about their capital plan to see if there are major project s planned that would increase tra ffic - SS: What is there is a fire on one of the delivery trucks? Can we require additional insurance to co ver potential damage? Minutes are followed by supplementary information provided by the MWRA o HB: That is a main concern of my constituents – we likely can’ t require additional insuranc e, but we should know what the financial management approach w ould be based on the MWRA ’s contracts with the tr ucking companies o JA: As part of their risk management mitigation, we could ask for a significant amount towards Winthrop Fire Department – f unds towards the fire house or a truck - SA: What should Winthrop’ s main negotiation strategy be? What is our biggest need? o JA: water mains and sewer pipes under our roadways should be of interest to M WRA, as climate change continues to compromise our roadways and the pipes below them, access to Deer Island may become compromised o JA: DPW Director Calla should be contacted about urg ent needs - JD : Constituents have mentioned delivery trucks that are NOT being esc orted by WPD per agreement - HB: Response from MWRA mentions that payment for dog officer is “ paid outside of the MOU” – we need a full list of any payments or services MWRA provides Winthrop that are not included in the MOU – anything outs ide of the MOU is a t ri sk of being tak en away - SS: Are water rates the same for all MWRA Communities? o JA: Yes - JA: Need to look at str eam of payments year by year – determine what payments would be in 2024 wh en adjusted for inflation o HB: Will do data analysis - JA: Need to discuss with Paul Flanagan, our representative on the MWRA Board; State del egation will be important in securing fair mitigation agreement - JA: Need to propose that the Cou ncil fill our vacant MWRA CAC seat ASAP - JD: Mitigation needs to have heavy focus on climat e/resiliency Actions Items: - SS to contact Director Calla - JD to discuss capital plan & being an Environmental Justic e community with Manager Marino - HB/JA: to meet with WPD Chief and WFD Chief - JA: Invite Paul Flanagan to upcoming meeting - SS: Send follow up questions to MWRA - HB: do inflation analysis - JA: Reach out to Wig Zamore Nex t Meeting: Friday, July 12 th at Noon Meeting adjourned at 8:59pm Minutes are followed by supplementary information provided by the MWRA. 2018 2019 2020 2021 2022 2023 2024 ‐ to date Jan 0 0 0 0 0 0 0 Feb 0 1 0 0 0 0 0 Mar 0 0 0 0 0 0 1 Apr 0 0 0 0 0 0 0 May 0 0 0 0 0 0 Jun 1 1 1 0 4 0 Jul 6 4 3 0 2 0 Aug 1 3 6 0 2 1 Sep 2 3 2 1 2 0 Oct 0 1 0 2 1 0 Nov 0 0 0 0 1 1 Dec 0 0 0 0 0 0 Total #Calls 10 13 12 3 12 2 1 Number of Odor Complaint Calls Summary of DITP Odor Complaints Calls from the Public (2018 to 2024 ‐ to date) Month 1 6 1 2 1 1 4 3 3 1 1 3 6 2 1 2 4 2 2 2 1 1 1 1 1 0 1 2 3 4 5 6 7 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec # of Odor Complaint Calls # of DITP Odor Complaint Calls Received from the Public (2018 to 2024 ‐ to date) 2018 2019 2020 2021 2022 2023 2024 ‐ to date Type text here MWRA Deer Island Power Plant Monthly Report From: 01-Dec-19 CTG 1 and CTG 2 To: 31-Dec-19 365-DAY ROLLING TOTAL (Both Units Combined) EMISSIONS, TONS Daily DAY Daily Fuel Fuel Hours gal Hours gal NOx PM VOC CO SO2 1-Dec-19 0.00 0 690.1 742,121 6.190 1.102 0.065 1.148 0.054 2-Dec-19 0.00 0 690.1 742,121 6.190 1.102 0.065 1.148 0.054 3-Dec-19 0.00 0 690.1 742,121 6.190 1.102 0.065 1.148 0.054 4-Dec-19 2.10 2,299 692.2 744,420 6.209 1.106 0.065 1.152 0.054 5-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 6-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 7-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 8-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 9-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 10-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 11-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 12-Dec-19 0.00 0 692.2 744,420 6.209 1.106 0.065 1.152 0.054 13-Dec-19 0.48 526 692.6 744,946 6.214 1.106 0.065 1.153 0.054 14-Dec-19 0.00 0 692.6 744,946 6.214 1.106 0.065 1.153 0.054 15-Dec-19 0.00 0 692.6 744,946 6.214 1.106 0.065 1.153 0.054 16-Dec-19 0.00 0 692.6 744,946 6.214 1.106 0.065 1.153 0.054 17-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 18-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 19-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 20-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 21-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 22-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 23-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 24-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 25-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 26-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 27-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 28-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 29-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 30-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 31-Dec-19 0.00 0 690.7 742,626 6.194 1.103 0.065 1.149 0.054 3,881,000 61.4 10.3 2.0 17.0 13.8 Permit Limits - 12 month rolling average 1/13/2020 / CTGs Massachusetts Water Resources Authority Deer Island Power Plant Monthly Report CP-301 GAS FLARES Dec-19 GAS 365 DAY Rolling 365 Day DAY FLARE TOTAL NOx PM VOC CO SO2 kscf kscf tpy tpy tpy tpy tpy 30-Nov-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 1-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 2-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 3-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 4-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 5-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 6-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 7-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 8-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 9-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 10-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 11-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 12-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 13-Dec-19 0.0 49,614 0.87 0.12 0.04 0.34 1.94 14-Dec-19 3.4 49,617 0.87 0.12 0.04 0.34 1.94 15-Dec-19 222.3 49,840 0.88 0.12 0.04 0.35 1.95 16-Dec-19 0.0 49,676 0.87 0.12 0.04 0.35 1.94 17-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 18-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 19-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 20-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 21-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 22-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 23-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 24-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 25-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 26-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 27-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 28-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 29-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 30-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 31-Dec-19 0.0 49,533 0.87 0.12 0.04 0.34 1.93 Note: 1) The gas meter has been sent back to manufacturer due to a failure as of 1/15/97. Reinstalled 3/18/97. 1) Daily Gas Flare = Daily Gas Production - Daily gas to Boilers (adjusted - see report text) 1/13/2020 / FLARE S Minutes are followed by supplementary information provided by theMWRA MWRA Deer Island Power Plant Monthly Report Dec-19 ZURNS Boilers, Units 101 & 201 365-Rolling Total Day No. 2 Oil D. G. Hours PM VOC kgal kscf Operating tpy tpy 30-Nov-19 0.357 4727 8,820.8 2.769 1.605 01-Dec-19 3.205 4020 8,820.8 2.769 1.605 02-Dec-19 2.129 4223 8,820.8 2.768 1.604 03-Dec-19 0.000 4943 8,820.8 2.767 1.603 04-Dec-19 0.000 4752 8,820.8 2.766 1.603 05-Dec-19 0.000 4842 8,820.8 2.767 1.603 06-Dec-19 0.000 5134 8,820.8 2.767 1.604 07-Dec-19 0.000 5247 8,820.8 2.767 1.604 08-Dec-19 0.000 5589 8,820.8 2.767 1.604 09-Dec-19 0.000 4798 8,820.8 2.766 1.603 10-Dec-19 0.000 5204 8,820.8 2.766 1.603 11-Dec-19 0.000 5524 8,820.8 2.768 1.605 12-Dec-19 0.000 4824 8,820.8 2.770 1.607 13-Dec-19 0.000 4949 8,820.3 2.770 1.607 14-Dec-19 0.000 5097 8,812.0 2.769 1.607 15-Dec-19 0.000 5899 8,812.0 2.770 1.607 16-Dec-19 0.000 5041 8,812.0 2.769 1.607 17-Dec-19 0.000 4376 8,812.0 2.767 1.605 18-Dec-19 2.940 4108 8,812.8 2.766 1.604 19-Dec-19 0.115 5218 8,813.5 2.767 1.605 20-Dec-19 0.786 4889 8,813.5 2.767 1.605 21-Dec-19 0.000 5492 8,804.0 2.767 1.605 22-Dec-19 0.000 5376 8,804.0 2.766 1.605 23-Dec-19 0.000 4516 8,804.0 2.764 1.604 24-Dec-19 0.000 4324 8,804.3 2.763 1.604 25-Dec-19 0.000 4447 8,804.3 2.762 1.603 26-Dec-19 0.000 4713 8,804.3 2.762 1.604 27-Dec-19 0.000 4152 8,804.3 2.761 1.604 28-Dec-19 0.000 4131 8,804.3 2.759 1.604 29-Dec-19 0.000 4624 8,804.3 2.758 1.603 30-Dec-19 0.000 4464 8,804.3 2.757 1.603 31-Dec-19 0.000 5842 8,804.3 2.758 1.604 Date: Jan 08 2020 Time: 09:20 MWRA Deer Island, MA Page I of I Begin: Dec 01, 2019 00:00 End: Dec 31, 2019 23:59 ***" MULTl-PARAMETER SUMMARY REPORT**'** 365 Day Emissions - Combined Boilers Start 365 Day 365 Day Total Total S02 NOX tons tons -------- --------- --------- 12/01/19 4.10125 13.54825 12/02/19 4.09466 13.54774 12/03/19 4.09048 13.53874 12/04/19 4.08539 13. 52706 12/05/19 4.08481 13.50429 12/06/19 4.08177 13.49302 12/07/19 4.07510 13.48781 12/08/19 4.06936 13.48095 12/09/19 4.05753 13.46517 12/10/19 4.05044 13.45436 12/11/19 4.05028 13.44083 12/12/19 4.05289 13. 43057 12/13/19 4.04463 13.42294 12/14/19 4.04024 13.40732 12/15/19 4. 03677 13.41401 12/16/19 4.02984 13.41795 12/17/19 4.02045 13.41176 12/18/19 4.01442 13.42714 12/19/19 4.00740 13.43148 12/20/19 4.00403 13.42051 12/21/19 3.99060 13.43065 12/22/19 3.98373 13.43241 12/23/19 3.97749 13. 42159 12/24/19 3.97316 13.42708 12/25/19 3.96698 13.41075 12/26/19 3.96328 13. 39043 12/27/19 3. 96095 13.36373 12/28/19 3.95840 13.34181 12/29/19 3.95127 13. 32764 12/30/19 3.94371 13.32248 12/31/19 3.94625 13. 31150 -------- --------- --------- Re p ort produced by Cirrus 365 Day 365 Day Total Total co HI tons mmBtu --------- --------- 1.13898 1081473.750 1.14006 1081176.750 1.14040 1080861.000 1.14916 1080623.125 1.15214 1080642.750 1.15624 1080833.500 1.15755 1080777.250 1.15815 1080761.125 1.15970 1080327.250 1.15997 1080356.500 1.16142 1080926.625 1.13761 1081391.750 1.13562 1081415.000 1.11082 1081160.875 1.10972 1081299.375 1.10870 1081053.375 1.10871 1080186.250 1.11007 1079997.250 1.11466 1080204.500 1.11555 1080080.625 1. 07293 1080007.500 1.07191 1079856.500 1. 07117 1079133. 000 1. 07064 1078427.750 1. 06256 1077921. 625 1.05959 1077694.250 1. 05976 1077158.000 1. 05702 1076515.875 1. 06158 1076049.875 1.06351 1075469. 625 1.05756 1075759.500 --------- --------- DAS S/N (00000001) l J0i'"'tlV1/\ 5/17/2024, 2:26 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-19 0.000 0.005 0.015 0.145 0 Feb-19 0.000 0.005 0.009 0.142 0 Mar-19 0.000 0.005 0.015 0.147 0 Apr-19 0.000 0.005 0.014 0.152 0 May-19 0.000 0.005 0.024 0.163 0 Jun-19 0.000 0.005 0.013 0.166 0 Jul-19 0.000 0.005 0.009 0.166 0 Aug-19 0.000 0.004 0.009 0.159 0 Sep-19 0.000 0.004 0.009 0.158 0 Oct-19 0.000 0.004 0.009 0.155 0 Nov-19 0.000 0.004 0.010 0.155 0 Dec-19 0.000 0.004 0.009 0.145 0 Emissions Limitations: 0.040 0.230 0.800 5.400 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Massachusetts Water Resources Authority Deer Island Treatment Plant Pumping Odor Control (CP102) - Stack # 1 DEP Conditional Permit No: MBR-91-IND-007A Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) 5/17/2024, 2:26 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-19 0.003 0.048 0.074 1.300 0 Feb-19 0.003 0.047 0.068 1.301 0 Mar-19 0.003 0.047 0.092 1.295 0 Apr-19 0.003 0.047 0.079 1.301 0 May-19 0.003 0.043 0.094 1.271 0 Jun-19 0.003 0.043 0.105 1.251 0 Jul-19 0.003 0.040 0.095 1.208 0 Aug-19 0.003 0.039 0.122 1.210 0 Sep-19 0.007 0.040 0.091 1.128 0 Oct-19 0.004 0.041 0.090 1.092 0 Nov-19 0.004 0.042 0.090 1.085 0 Dec-19 0.003 0.042 0.150 1.150 0 Emissions Limitations: 0.500 4.000 5.600 34.000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Primary A-D, East/West Grit Odor Control (CP103) - Stack # 2 & 3 DEP Conditional Permit No: MBR-91-IND-007B 5/17/2024, 2:26 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-19 0.000 0.005 0.012 0.209 0 Feb-19 0.000 0.005 0.010 0.208 0 Mar-19 0.000 0.005 0.012 0.205 0 Apr-19 0.000 0.005 0.015 0.202 0 May-19 0.000 0.005 0.012 0.185 0 Jun-19 0.000 0.005 0.021 0.187 0 Jul-19 0.000 0.005 0.012 0.166 0 Aug-19 0.000 0.005 0.017 0.159 0 Sep-19 0.000 0.005 0.011 0.155 0 Oct-19 0.000 0.005 0.014 0.158 0 Nov-19 0.000 0.005 0.012 0.159 0 Dec-19 0.000 0.005 0.035 0.183 0 Emissions Limitations: 0.1250 1.0000 0.3600 2.2000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Secondary Odor Control (CP202) - Stack # 5 DEP Conditional Permit No: MBR-92-IND-056 5/17/2024, 2:26 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-19 0.002 0.039 0.047 0.759 0.022 0.276 0 No NH3 data for January 2019. Feb-19 0.002 0.033 0.042 0.755 0.021 0.276 0 Mar-19 0.002 0.033 0.046 0.755 0.023 0.276 0 Apr-19 0.002 0.032 0.045 0.753 0.022 0.275 0 May-19 0.002 0.029 0.047 0.725 0.024 0.276 0 Jun-19 0.002 0.028 0.052 0.692 0.023 0.276 0 Jul-19 0.002 0.027 0.053 0.676 0.024 0.276 0 Aug-19 0.002 0.026 0.051 0.652 0.024 0.276 0 Sep-19 0.004 0.025 0.046 0.604 0.023 0.276 0 Oct-19 0.004 0.027 0.071 0.598 0.024 0.276 0 Nov-19 0.003 0.028 0.046 0.595 0.023 0.276 0 Dec-19 0.002 0.028 0.047 0.594 0.023 0.275 0 Emissions Limitations: 0.250 2.000 3.800 23.300 verify <1 tpy 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 0.25 Massachusetts Water Resources Authority Deer Island Treatment Plant Primary Residuals Odor Control (CP301) - Stack # 4 and Secondary Residuals Odor Control (CP303) - Stack # 4 DEP Conditional Permit No: MBR-91-IND-007C and MBR-91-IND-007D Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Ammonia (NH3) MWRA Deer Island Power Plant Monthly Report From: 01-Dec-20 CTG 1 and CTG 2 To: 31-Dec-20 365-DAY ROLLING TOTAL (Both Units Combined) EMISSIONS, TONS Daily DAY Daily Fuel Fuel Hours gal Hours gal NOx PM VOC CO SO2 1-Dec-20 0.00 0 191.1 184,700 1.523 0.283 0.011 0.287 0.012 2-Dec-20 0.00 0 191.1 184,700 1.523 0.283 0.011 0.287 0.012 3-Dec-20 0.00 0 189.0 182,401 1.505 0.279 0.011 0.283 0.012 4-Dec-20 0.77 833 189.8 183,234 1.512 0.281 0.011 0.285 0.012 5-Dec-20 0.00 0 189.8 183,234 1.512 0.281 0.011 0.285 0.012 6-Dec-20 0.00 0 189.8 183,234 1.512 0.281 0.011 0.285 0.012 7-Dec-20 0.00 0 189.8 183,234 1.512 0.281 0.011 0.285 0.012 8-Dec-20 0.00 0 189.8 183,234 1.512 0.281 0.011 0.285 0.012 9-Dec-20 0.00 0 189.8 183,234 1.512 0.281 0.011 0.285 0.012 10-Dec-20 0.23 67 190.0 183,301 1.512 0.281 0.011 0.285 0.012 11-Dec-20 0.94 1,081 191.0 184,382 1.521 0.282 0.011 0.287 0.012 12-Dec-20 0.00 0 190.5 183,856 1.517 0.282 0.011 0.286 0.012 13-Dec-20 0.00 0 190.5 183,856 1.517 0.282 0.011 0.286 0.012 14-Dec-20 0.00 0 190.5 183,856 1.517 0.282 0.011 0.286 0.012 15-Dec-20 0.00 0 190.5 183,856 1.517 0.282 0.011 0.286 0.012 16-Dec-20 0.00 0 190.5 183,856 1.517 0.282 0.011 0.286 0.012 17-Dec-20 0.00 0 190.5 183,856 1.517 0.282 0.011 0.286 0.012 18-Dec-20 2.39 2,580 192.9 186,436 1.538 0.286 0.011 0.290 0.012 19-Dec-20 0.00 0 192.9 186,436 1.538 0.286 0.011 0.290 0.012 20-Dec-20 0.00 0 192.9 186,436 1.538 0.286 0.011 0.290 0.012 21-Dec-20 0.00 0 192.9 186,436 1.538 0.286 0.011 0.290 0.012 22-Dec-20 0.00 0 192.9 186,436 1.538 0.286 0.011 0.290 0.012 23-Dec-20 0.00 0 192.9 186,436 1.538 0.286 0.011 0.290 0.012 24-Dec-20 0.00 0 192.9 186,436 1.538 0.286 0.011 0.290 0.012 25-Dec-20 10.27 12,380 203.2 198,816 1.643 0.302 0.013 0.308 0.013 26-Dec-20 24.00 24,909 227.2 223,725 1.855 0.335 0.018 0.346 0.014 27-Dec-20 5.38 5,356 232.5 229,081 1.900 0.342 0.019 0.354 0.015 28-Dec-20 0.00 0 232.5 229,081 1.900 0.342 0.019 0.354 0.015 29-Dec-20 0.00 0 232.5 229,081 1.900 0.342 0.019 0.354 0.015 30-Dec-20 0.00 0 232.5 229,081 1.900 0.342 0.019 0.354 0.015 31-Dec-20 0.00 0 232.5 229,081 1.900 0.342 0.019 0.354 0.015 3,881,000 61.4 10.3 2.0 17.0 13.8 Permit Limits - 12 month rolling average 1/15/2021 / CTGs Massachusetts Water Resources Authority Deer Island Power Plant Monthly Report CP-301 GAS FLARES Dec-20 GAS 365 DAY Rolling 365 Day DAY FLARE TOTAL NOx PM VOC CO SO2 kscf kscf tpy tpy tpy tpy tpy 30-Nov-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 1-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 2-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 3-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 4-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 5-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 6-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 7-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 8-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 9-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 10-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 11-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 12-Dec-20 0.0 23,281 0.41 0.06 0.02 0.16 0.91 13-Dec-20 0.0 23,278 0.41 0.06 0.02 0.16 0.91 14-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 15-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 16-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 17-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 18-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 19-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 20-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 21-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 22-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 23-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 24-Dec-20 0.0 23,056 0.41 0.06 0.02 0.16 0.90 25-Dec-20 178.0 23,234 0.41 0.06 0.02 0.16 0.91 26-Dec-20 260.9 23,495 0.41 0.06 0.02 0.16 0.92 27-Dec-20 0.0 23,495 0.41 0.06 0.02 0.16 0.92 28-Dec-20 0.0 23,495 0.41 0.06 0.02 0.16 0.92 29-Dec-20 0.0 23,495 0.41 0.06 0.02 0.16 0.92 30-Dec-20 0.0 23,495 0.41 0.06 0.02 0.16 0.92 31-Dec-20 0.0 23,495 0.41 0.06 0.02 0.16 0.92 Note: 1) The gas meter has been sent back to manufacturer due to a failure as of 1/15/97. Reinstalled 3/18/97. 1) Daily Gas Flare = Daily Gas Production - Daily gas to Boilers (adjusted - see report text) 1/15/2021 / FLARES MWRA Deer Island Power Plant Monthly Report Dec-20 ZURNS Boilers, Units 101 & 201 365-Rolling Total Day No. 2 Oil D. G. Hours PM VOC kgal kscf Operating tpy tpy 30-Nov-20 0.326 4156 8,765.8 2.511 1.456 01-Dec-20 0.000 4700 8,765.5 2.511 1.457 02-Dec-20 0.000 5161 8,765.5 2.511 1.457 03-Dec-20 0.000 4722 8,765.5 2.511 1.457 04-Dec-20 0.000 4077 8,765.5 2.510 1.456 05-Dec-20 0.000 4305 8,765.5 2.509 1.455 06-Dec-20 0.000 4779 8,765.5 2.508 1.455 07-Dec-20 0.000 5321 8,765.5 2.507 1.455 08-Dec-20 0.147 4491 8,765.5 2.507 1.454 09-Dec-20 3.236 3782 8,765.5 2.506 1.453 10-Dec-20 0.773 4109 8,765.8 2.504 1.452 11-Dec-20 0.000 5028 8,765.8 2.504 1.452 12-Dec-20 0.000 4640 8,765.8 2.503 1.451 13-Dec-20 0.000 5661 8,765.8 2.504 1.452 14-Dec-20 0.186 4694 8,765.8 2.502 1.451 15-Dec-20 3.163 3698 8,765.8 2.501 1.450 16-Dec-20 3.200 3541 8,765.8 2.500 1.449 17-Dec-20 3.263 3923 8,765.0 2.500 1.449 18-Dec-20 0.855 4274 8,764.3 2.499 1.448 19-Dec-20 0.000 4446 8,764.3 2.498 1.447 20-Dec-20 0.000 4633 8,764.3 2.497 1.447 21-Dec-20 0.000 4265 8,764.3 2.495 1.445 22-Dec-20 2.947 3440 8,764.3 2.494 1.444 23-Dec-20 1.073 3882 8,764.3 2.493 1.444 24-Dec-20 0.000 4525 8,764.3 2.493 1.444 25-Dec-20 0.000 5438 8,764.3 2.495 1.445 26-Dec-20 0.000 5624 8,764.3 2.497 1.446 27-Dec-20 2.284 3834 8,764.3 2.497 1.446 28-Dec-20 3.057 3858 8,764.3 2.496 1.445 29-Dec-20 3.076 3525 8,764.3 2.496 1.444 30-Dec-20 1.755 3898 8,764.3 2.493 1.442 31-Dec-20 2.817 3956 8,764.3 2.491 1.441 Date: Jan 12 2021 Time: 07:54 MWRA Deer Island, MA Page I of I Begin: Dec 01, 2020 00:00 End: Dec 31, 2020 23:59 **'** MULTl-PARAMETER SUMMARY REPORT**'** 365 Day Emissions - Combined Boilers Start 365 Day 365 Day Total Total S02 NOX tons tons -------- --------- --------- 12/01/20 2.12677 12.68443 12/02/20 2.12301 12.69954 12/03/20 2.11758 12.70971 12/04/20 2.10593 12. 70811 12/05/20 2.10320 12.70788 12/06/20 2.09911 12.71078 12/07/20 2.08967 12.71583 12/08/20 2.07853 12. 72373 12/09/20 2.06228 12.74571 12/10/20 2.04449 12.74563 12/11/20 2.03341 12.75566 12/12/20 2.01907 12.76083 12/13/20 2.01958 12.78016 12/14/20 2.01069 12.78149 12/15/20 1. 99809 12.80023 12/16/20 2.00762 12.82212 12/17/20 2. 00611 12.83201 12/18/20 2.00023 12.83549 12/19/20 2.01090 12.83478 12/20/20 2. 00996 12.83172 12/21/20 1.99594 12.82809 12/22/20 1.98592 12.84659 12/23/20 1.97680 12.85732 12/24/20 1. 96792 12.86078 12/25/20 1.95754 12.87056 12/26/20 1. 94760 12.89916 12/27/20 1.93987 12. 92369 12/28/20 1.9517 5 12.94565 12/29/20 1.95891 12.96874 12/30/20 1.94416 12.97815 12/31/20 1.93155 12.99386 -------- --------- --------- Report produced by Cirrus 365 Day 365 Day Total Total co HI tons rnmBtu --------- --------- 0.95300 985343.750 0.95340 985476.688 0.94464 985458.313 0.94165 984993.250 0.93754 984489.000 0.93623 984204.375 0.93571 984042.000 0.93523 983875.750 0.93514 983451.250 0.93536 982696.250 0.93518 982820.250 0.93486 982632.625 0.93458 982975.500 0.93415 982268.313 0.93323 981881.563 0.93314 981809.375 0.93501 981740. 813 0.92816 981268.000 0.92568 980891.375 0. 92567 980369.000 0.93061 979693.438 0.93163 979440.438 0.93190 979400.000 0.93294 979447.438 0.93263 979888.563 0.93457 980784.063 0.93661 980914. 250 0.93057 980864.188 0.92900 980711. 688 0.93323 979768. 063 0.93337 979259.500 --------- --------- DAS S/N (00000001) 1 /1 ')/')/)') 1 1/13/2021, 4:04 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-20 0.000 0.004 0.026 0.157 0 Feb-20 0.000 0.004 0.009 0.158 0 Mar-20 0.000 0.004 0.009 0.152 0 Apr-20 0.000 0.004 0.009 0.148 0 May-20 0.000 0.004 0.009 0.133 0 Jun-20 0.000 0.004 0.012 0.132 0 Jul-20 0.000 0.004 0.011 0.134 0 Aug-20 0.000 0.004 0.010 0.135 0 Sep-20 0.000 0.004 0.010 0.136 0 Oct-20 0.000 0.004 0.009 0.136 0 Nov-20 0.000 0.004 0.009 0.135 0 Dec-20 0.000 0.004 0.009 0.135 0 Emissions Limitations: 0.040 0.230 0.800 5.400 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Massachusetts Water Resources Authority Deer Island Treatment Plant Pumping Odor Control (CP102) - Stack # 1 DEP Conditional Permit No: MBR-91-IND-007A Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) 1/13/2021, 4:04 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-20 0.004 0.043 0.073 1.148 0 Feb-20 0.003 0.043 0.068 1.148 0 Mar-20 0.004 0.044 0.085 1.141 0 Apr-20 0.003 0.044 0.070 1.133 0 May-20 0.003 0.044 0.075 1.114 0 Jun-20 0.003 0.045 0.124 1.132 0 Jul-20 0.006 0.048 0.134 1.171 0 Aug-20 0.004 0.048 0.173 1.223 0 Sep-20 0.003 0.044 0.124 1.256 0 Oct-20 0.005 0.046 0.140 1.306 0 Nov-20 0.003 0.044 0.098 1.314 0 Dec-20 0.003 0.044 0.079 1.243 0 Emissions Limitations: 0.500 4.000 5.600 34.000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Primary A-D, East/West Grit Odor Control (CP103) - Stack # 2 & 3 DEP Conditional Permit No: MBR-91-IND-007B 1/13/2021, 4:04 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-20 0.002 0.028 0.047 0.594 0.024 0.277 0 Feb-20 0.002 0.029 0.044 0.596 0.022 0.277 0 Mar-20 0.002 0.029 0.047 0.596 0.023 0.278 0 Apr-20 0.002 0.029 0.046 0.597 0.023 0.278 0 May-20 0.002 0.029 0.047 0.598 0.024 0.278 0 Jun-20 0.002 0.030 0.055 0.601 0.023 0.278 0 Jul-20 0.005 0.033 0.060 0.608 0.024 0.278 0 Aug-20 0.006 0.037 0.075 0.631 0.023 0.278 0 Sep-20 0.004 0.037 0.046 0.631 0.023 0.278 0 Oct-20 0.004 0.037 0.101 0.662 0.025 0.279 0 Nov-20 0.002 0.036 0.046 0.662 0.023 0.279 0 Dec-20 0.002 0.036 0.047 0.662 0.024 0.279 0 Emissions Limitations: 0.250 2.000 3.800 23.300 verify <1 tpy 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 0.25 Massachusetts Water Resources Authority Deer Island Treatment Plant Primary Residuals Odor Control (CP301) - Stack # 4 and Secondary Residuals Odor Control (CP303) - Stack # 4 DEP Conditional Permit No: MBR-91-IND-007C and MBR-91-IND-007D Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Ammonia (NH3) 1/13/2021, 4:04 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-20 0.000 0.005 0.017 0.188 0 Feb-20 0.000 0.005 0.011 0.189 0 Mar-20 0.000 0.005 0.012 0.189 0 Apr-20 0.000 0.005 0.011 0.185 0 May-20 0.000 0.005 0.012 0.185 0 Jun-20 0.000 0.005 0.015 0.179 0 Jul-20 0.001 0.005 0.017 0.185 0 Aug-20 0.000 0.005 0.023 0.190 0 Sep-20 0.000 0.005 0.011 0.190 0 Oct-20 0.000 0.005 0.021 0.196 0 Nov-20 0.000 0.005 0.011 0.195 0 Dec-20 0.000 0.005 0.012 0.172 0 Emissions Limitations: 0.1250 1.0000 0.3600 2.2000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Secondary Odor Control (CP202) - Stack # 5 DEP Conditional Permit No: MBR-92-IND-056 1/13/2022 / CTGs MWRA Deer Island Power Plant Monthly Report From: 01-Dec-21 CTG 1 and CTG 2 To: 31-Dec-21 365-DAY ROLLING TOTAL (Both Units Combined) EMISSIONS, TONS Daily DAY Daily Fuel Fuel Hours gal Hours gal NOx PM VOC CO SO2 1-Dec-21 0.00 0 196.9 217,936 1.797 0.314 0.021 0.331 0.012 2-Dec-21 0.00 0 196.9 217,936 1.797 0.314 0.021 0.331 0.012 3-Dec-21 0.00 0 196.9 217,936 1.797 0.314 0.021 0.331 0.012 4-Dec-21 0.00 0 196.1 217,103 1.790 0.313 0.021 0.330 0.012 5-Dec-21 0.00 0 196.1 217,103 1.790 0.313 0.021 0.330 0.012 6-Dec-21 0.00 0 196.1 217,103 1.790 0.313 0.021 0.330 0.012 7-Dec-21 0.00 0 196.1 217,103 1.790 0.313 0.021 0.330 0.012 8-Dec-21 1.83 2,015 198.0 219,118 1.806 0.315 0.022 0.333 0.012 9-Dec-21 0.00 0 198.0 219,118 1.806 0.315 0.022 0.333 0.012 10-Dec-21 0.00 0 197.7 219,051 1.806 0.315 0.022 0.333 0.012 11-Dec-21 0.00 0 196.8 217,970 1.797 0.314 0.021 0.331 0.012 12-Dec-21 0.00 0 196.8 217,970 1.797 0.314 0.021 0.331 0.012 13-Dec-21 0.00 0 196.8 217,970 1.797 0.314 0.021 0.331 0.012 14-Dec-21 0.00 0 196.8 217,970 1.797 0.314 0.021 0.331 0.012 15-Dec-21 0.00 0 196.8 217,970 1.797 0.314 0.021 0.331 0.012 16-Dec-21 0.00 0 196.8 217,970 1.797 0.314 0.021 0.331 0.012 17-Dec-21 0.99 1,135 197.8 219,105 1.806 0.316 0.021 0.333 0.012 18-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 19-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 20-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 21-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 22-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 23-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 24-Dec-21 0.00 0 195.4 216,525 1.785 0.311 0.021 0.329 0.012 25-Dec-21 0.00 0 185.1 204,145 1.679 0.295 0.019 0.310 0.011 26-Dec-21 0.00 0 161.1 179,236 1.468 0.263 0.015 0.273 0.010 27-Dec-21 0.00 0 155.8 173,880 1.423 0.256 0.014 0.265 0.010 28-Dec-21 0.00 0 155.8 173,880 1.423 0.256 0.014 0.265 0.010 29-Dec-21 0.00 0 155.8 173,880 1.423 0.256 0.014 0.265 0.010 30-Dec-21 0.00 0 155.8 173,880 1.423 0.256 0.014 0.265 0.010 31-Dec-21 0.00 0 155.8 173,880 1.423 0.256 0.014 0.265 0.010 3,881,000 61.4 10.3 2.0 17.0 13.8 Permit Limits - 12 month rolling average 1/ 13/ 2022 /FLAR ES Massachusetts Water Resources Authority Deer Island Power Plant Monthly Report CP-301 GAS FLARES Dec-21 GAS 365 DAY Rolling 365 Day DAY FLARE TOTAL NOx PM VOC CO SO2 kscf kscf tpy tpy tpy tpy tpy 30-Nov-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 1-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 2-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 3-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 4-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 5-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 6-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 7-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 8-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 9-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 10-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 11-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 12-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 13-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 14-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 15-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 16-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 17-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 18-Dec-21 0.0 32,210 0.57 0.08 0.02 0.22 1.26 19-Dec-21 258.3 32,468 0.57 0.08 0.02 0.23 1.27 20-Dec-21 20.4 32,489 0.57 0.08 0.02 0.23 1.27 21-Dec-21 0.0 32,489 0.57 0.08 0.02 0.23 1.27 22-Dec-21 0.0 32,489 0.57 0.08 0.02 0.23 1.27 23-Dec-21 392.0 32,881 0.58 0.08 0.02 0.23 1.28 24-Dec-21 0.0 32,881 0.58 0.08 0.02 0.23 1.28 25-Dec-21 42.5 32,745 0.58 0.08 0.02 0.23 1.28 26-Dec-21 0.0 32,484 0.57 0.08 0.02 0.23 1.27 27-Dec-21 0.0 32,484 0.57 0.08 0.02 0.23 1.27 28-Dec-21 0.0 32,484 0.57 0.08 0.02 0.23 1.27 29-Dec-21 0.0 32,484 0.57 0.08 0.02 0.23 1.27 30-Dec-21 0.0 32,484 0.57 0.08 0.02 0.23 1.27 31-Dec-21 0.0 32,484 0.57 0.08 0.02 0.23 1.27 Note: 1) The gas meter has been sent back to manufacturer due to a failure as of 1/15/97. Reinstalled 3/18/97. 1) Daily Gas Flare = Daily Gas Production - Daily gas to Boilers (adjusted - see report text) MWRA Deer Island Power Plant Monthly Report Dec-21 ZURNS Boilers, Units 101 & 201 365-Rolling Total Day No. 2 Oil D. G. Hours PM VOC kgal kscf Operating tpy tpy 30-Nov-21 3.208 3235 8,733.5 2.539 1.453 01-Dec-21 1.704 3443 8,733.8 2.538 1.452 02-Dec-21 0.000 3927 8,733.8 2.536 1.451 03-Dec-21 0.000 4936 8,733.8 2.536 1.451 04-Dec-21 0.000 4942 8,733.8 2.537 1.452 05-Dec-21 0.000 4648 8,733.8 2.538 1.452 06-Dec-21 0.000 4149 8,733.8 2.537 1.452 07-Dec-21 0.000 4012 8,733.8 2.535 1.450 08-Dec-21 0.000 4937 8,733.8 2.535 1.451 09-Dec-21 0.000 4033 8,733.8 2.535 1.451 10-Dec-21 0.000 4045 8,733.5 2.535 1.451 11-Dec-21 0.000 4650 8,733.5 2.534 1.451 12-Dec-21 0.000 4628 8,733.5 2.534 1.451 13-Dec-21 0.000 4988 8,733.5 2.533 1.450 14-Dec-21 0.000 4302 8,733.5 2.533 1.450 15-Dec-21 2.423 3693 8,733.5 2.532 1.450 16-Dec-21 0.755 3784 8,733.5 2.532 1.450 17-Dec-21 0.751 4401 8,733.5 2.532 1.450 18-Dec-21 0.668 4467 8,733.5 2.533 1.450 19-Dec-21 0.000 5268 8,733.5 2.534 1.451 20-Dec-21 0.000 5346 8,733.5 2.535 1.452 21-Dec-21 2.639 3938 8,733.5 2.535 1.452 22-Dec-21 0.725 4350 8,733.5 2.536 1.452 23-Dec-21 1.972 4184 8,733.5 2.537 1.453 24-Dec-21 0.000 4898 8,733.5 2.538 1.453 25-Dec-21 1.010 4478 8,733.5 2.536 1.452 26-Dec-21 0.333 4556 8,733.5 2.535 1.451 27-Dec-21 0.789 4456 8,733.5 2.535 1.452 28-Dec-21 2.875 3757 8,733.5 2.535 1.452 29-Dec-21 1.817 3810 8,733.5 2.536 1.452 30-Dec-21 2.320 3732 8,733.5 2.536 1.452 31-Dec-21 0.000 4517 8,733.5 2.536 1.452 Date: Jan 05 2022 Time: 11:15 MWRA Deer Island, MA Page 1 of 1 Begin: Dec 01, 2021 00:00 End: Dec 31, 2021 23:59 **"* MUL Tl-PARAMETER SUMMARY REPORT***** 365 Day Emissions - Combined Boilers Start 365 Day 365 Day Total Total S02 NOX tons tons -------- --------- --------- 12/01/21 2.04255 13.08965 12/02/21 2.02939 13.06383 12/03/21 2.02159 13.04996 12/04/21 2.01949 13.04798 12/05/21 2.00776 13.04026 12/06/21 1.99682 13.01999 12/07/21 1. 98849 12. 99646 12/08/21 1.98579 12.98813 12/09/21 1.98560 12.95640 12/10/21 1.98539 12.94043 12/11/21 1.98350 12.91931 12/12/21 1. 98328 12.90738 12/13/21 1. 96563 12.88788 12/14/21 1.95786 12.87212 12/15/21 1.95751 12.85418 12/16/21 1.93711 12.82613 12/17/21 1. 92801 12.80107 12/18/21 1.92517 12.78864 12/19/21 1.90392 12.78574 12/20/21 1.88933 12.78490 12/21/21 1.88797 12.79582 12/22/21 1.88404 12.78146 12/23/21 1.88284 12.78571 12/24/21 1.88224 12.78448 12/25/21 1.88210 12.77978 12/26/21 1.88204 12.76104 12/27/21 1.87822 12.74825 12/28/21 1.85619 12.73972 12/29/21 1.83791 12.72299 12/30/21 1.83407 12.71407 12/31/21 1.83341 12.68976 -------- --------- --------- Report produced by Cirrus 365 Day 365 Day Total Total co HI tons rnmBtu --------- --------- 0.82574 998939.750 0.82498 998189.125 0.82496 998319.250 0.82549 998845.625 0.82559 999054.250 0.82814 998671.250 0.82806 997875.063 0.82698 998126.250 0.82681 997838.813 0.82524 997694.625 0.83108 997464.938 0.83198 997457.563 0.83170 997048.188 0.83117 996784.688 0.83118 996681.625 0.83319 996496.500 0.82966 996445. 438 0.82965 996536.813 0.82974 997036.813 0.82987 997470.625 0.82499 997630.875 0.82431 997881.938 0.82975 998187. 688 0.82849 998414.563 0.82963 997968.375 0.82730 997364.125 0.82505 997538.813 0.82438 997453.188 0.82409 997454.938 0.82008 997431.188 0.81799 997388.813 --------- --------- DAS S/N (00000001) 1/5/2022 1/19/2022, 12:50 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-21 0.000 0.004 0.009 0.118 0 Feb-21 0.000 0.004 0.008 0.118 0 Mar-21 0.000 0.004 0.020 0.129 0 Apr-21 0.000 0.004 0.009 0.129 0 May-21 0.000 0.004 0.009 0.129 0 Jun-21 0.000 0.004 0.009 0.125 0 Jul-21 0.000 0.004 0.013 0.127 0 Aug-21 0.000 0.004 0.009 0.126 0 Sep-21 0.000 0.004 0.009 0.125 0 Oct-21 0.002 0.006 0.020 0.136 0 Nov-21 0.000 0.006 0.009 0.136 0 Dec-21 0.000 0.006 0.009 0.136 0 Emissions Limitations: 0.040 0.230 0.800 5.400 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Massachusetts Water Resources Authority Deer Island Treatment Plant Pumping Odor Control (CP102) - Stack # 1 DEP Conditional Permit No: MBR-91-IND-007A Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) 1/19/2022, 12:50 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-21 0.003 0.043 0.076 1.246 0 Feb-21 0.003 0.043 0.068 1.246 0 Mar-21 0.003 0.042 0.089 1.250 0 Apr-21 0.003 0.042 0.076 1.256 0 May-21 0.003 0.042 0.090 1.271 0 Jun-21 0.003 0.041 0.093 1.240 0 Jul-21 0.003 0.038 0.107 1.213 0 Aug-21 0.003 0.037 0.112 1.153 0 Sep-21 0.003 0.037 0.094 1.122 0 Oct-21 0.003 0.034 0.100 1.083 0 Nov-21 0.003 0.034 0.081 1.065 0 Dec-21 0.003 0.035 0.083 1.069 0 Emissions Limitations: 0.500 4.000 5.600 34.000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Primary A-D, East/West Grit Odor Control (CP103) - Stack # 2 & 3 DEP Conditional Permit No: MBR-91-IND-007B 1/19/2022, 12:50 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-21 0.002 0.036 0.047 0.662 0.024 0.279 0 Feb-21 0.002 0.036 0.043 0.661 0.021 0.278 0 Mar-21 0.002 0.036 0.047 0.662 0.024 0.279 0 Apr-21 0.002 0.036 0.046 0.662 0.023 0.279 0 May-21 0.002 0.036 0.058 0.672 0.024 0.279 0 Jun-21 0.002 0.035 0.051 0.668 0.023 0.279 0 Jul-21 0.002 0.032 0.085 0.693 0.024 0.279 0 Aug-21 0.002 0.028 0.069 0.687 0.024 0.279 0 Sep-21 0.002 0.026 0.075 0.716 0.023 0.279 0 Oct-21 0.002 0.023 0.051 0.666 0.024 0.278 0 Nov-21 0.002 0.023 0.046 0.666 0.023 0.278 0 Dec-21 0.002 0.023 0.047 0.666 0.024 0.278 0 Emissions Limitations: 0.250 2.000 3.800 23.300 verify <1 tpy 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 0.25 Massachusetts Water Resources Authority Deer Island Treatment Plant Primary Residuals Odor Control (CP301) - Stack # 4 and Secondary Residuals Odor Control (CP303) - Stack # 4 DEP Conditional Permit No: MBR-91-IND-007C and MBR-91-IND-007D Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Ammonia (NH3) 1/19/2022, 12:50 PM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-21 0.000 0.005 0.012 0.166 0 Feb-21 0.000 0.005 0.010 0.166 0 Mar-21 0.000 0.005 0.012 0.166 0 Apr-21 0.000 0.005 0.011 0.166 0 May-21 0.000 0.005 0.012 0.166 0 Jun-21 0.000 0.005 0.014 0.166 0 Jul-21 0.000 0.005 0.014 0.163 0 Aug-21 0.000 0.005 0.017 0.157 0 Sep-21 0.000 0.005 0.011 0.157 0 Oct-21 0.000 0.005 0.012 0.148 0 Nov-21 0.000 0.005 0.011 0.148 0 Dec-21 0.000 0.005 0.012 0.148 0 Emissions Limitations: 0.1250 1.0000 0.3600 2.2000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Secondary Odor Control (CP202) - Stack # 5 DEP Conditional Permit No: MBR-92-IND-056 1/17/2023 / CTGs MWRA Deer Island Power Plant Monthly Report From: 01-Dec-22 CTG 1 and CTG 2 To: 31-Dec-22 365-DAY ROLLING TOTAL (Both Units Combined) EMISSIONS, TONS Daily DAY Daily Fuel Fuel Hours gal Hours gal NOx PM VOC CO SO2 1-Dec-22 0.00 0 53.9 56,439 0.453 0.081 0.005 0.084 0.003 2-Dec-22 0.00 0 53.9 56,439 0.453 0.081 0.005 0.084 0.003 3-Dec-22 0.00 0 53.9 56,439 0.453 0.081 0.005 0.084 0.003 4-Dec-22 0.00 0 53.9 56,439 0.453 0.081 0.005 0.084 0.003 5-Dec-22 0.00 0 53.9 56,439 0.453 0.081 0.005 0.084 0.003 6-Dec-22 0.00 0 53.9 56,439 0.453 0.081 0.005 0.084 0.003 7-Dec-22 1.81 2,162 55.7 58,601 0.471 0.084 0.005 0.087 0.003 8-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 9-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 10-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 11-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 12-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 13-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 14-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 15-Dec-22 0.00 0 53.9 56,586 0.454 0.081 0.005 0.084 0.003 16-Dec-22 0.81 903 54.7 57,489 0.461 0.082 0.005 0.086 0.003 17-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 18-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 19-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 20-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 21-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 22-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 23-Dec-22 0.00 0 53.7 56,354 0.452 0.081 0.005 0.084 0.003 24-Dec-22 3.19 3,776 56.9 60,130 0.483 0.085 0.005 0.089 0.003 25-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 26-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 27-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 28-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 29-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 30-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 31-Dec-22 0.00 0 56.9 60,130 0.483 0.085 0.005 0.089 0.003 3,881,000 61.4 10.3 2.0 17.0 13.8 Permit Limits - 12 month rolling average 1/ 17/ 2023 /FLAR ES Massachusetts Water Resources Authority Deer Island Power Plant Monthly Report CP-301 GAS FLARES Dec-22 GAS 365 DAY Rolling 365 Day DAY FLARE TOTAL NOx PM VOC CO SO2 kscf kscf tpy tpy tpy tpy tpy 30-Nov-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 1-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 2-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 3-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 4-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 5-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 6-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 7-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 8-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 9-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 10-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 11-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 12-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 13-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 14-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 15-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 16-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 17-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 18-Dec-22 0.0 26,490 0.47 0.07 0.02 0.18 1.03 19-Dec-22 0.0 26,232 0.46 0.07 0.02 0.18 1.02 20-Dec-22 0.0 26,212 0.46 0.07 0.02 0.18 1.02 21-Dec-22 0.0 26,212 0.46 0.07 0.02 0.18 1.02 22-Dec-22 0.0 26,212 0.46 0.07 0.02 0.18 1.02 23-Dec-22 0.0 25,820 0.45 0.06 0.02 0.18 1.01 24-Dec-22 0.0 25,820 0.45 0.06 0.02 0.18 1.01 25-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 26-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 27-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 28-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 29-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 30-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 31-Dec-22 0.0 25,777 0.45 0.06 0.02 0.18 1.01 Note: 1) The gas meter has been sent back to manufacturer due to a failure as of 1/15/97. Reinstalled 3/18/97. 1) Daily Gas Flare = Daily Gas Production - Daily gas to Boilers (adjusted - see report text) MWRA Deer Island Power Plant Monthly Report Dec-22 ZURNS Boilers, Units 101 & 201 365-Rolling Total Day No. 2 Oil D. G. Hours PM VOC kgal kscf Operating tpy tpy 30-Nov-22 0.000 4153 8,784.8 2.505 1.420 01-Dec-22 1.726 4257 8,784.8 2.506 1.420 02-Dec-22 1.551 4696 8,786.0 2.508 1.421 03-Dec-22 0.000 4478 8,786.0 2.507 1.421 04-Dec-22 0.000 4609 8,786.0 2.507 1.420 05-Dec-22 0.132 4510 8,786.8 2.507 1.420 06-Dec-22 1.834 3899 8,789.8 2.507 1.420 07-Dec-22 0.470 4090 8,792.5 2.507 1.420 08-Dec-22 0.000 4728 8,792.5 2.507 1.420 09-Dec-22 1.589 4431 8,796.3 2.508 1.420 10-Dec-22 3.095 3897 8,796.3 2.508 1.420 11-Dec-22 1.201 4293 8,796.3 2.508 1.420 12-Dec-22 0.000 4427 8,795.5 2.508 1.420 13-Dec-22 1.940 3970 8,795.5 2.507 1.419 14-Dec-22 3.460 3310 8,795.5 2.506 1.418 15-Dec-22 3.689 2747 8,795.5 2.505 1.417 16-Dec-22 1.733 3321 8,798.5 2.504 1.416 17-Dec-22 0.000 4498 8,798.5 2.504 1.416 18-Dec-22 0.000 4796 8,798.5 2.505 1.417 19-Dec-22 0.368 4631 8,802.3 2.504 1.416 20-Dec-22 0.396 4187 8,802.3 2.502 1.415 21-Dec-22 0.000 4629 8,802.3 2.502 1.416 22-Dec-22 0.753 4129 8,802.3 2.502 1.416 23-Dec-22 2.281 3883 8,802.3 2.502 1.415 24-Dec-22 1.612 4425 8,802.3 2.501 1.415 25-Dec-22 2.873 3623 8,802.3 2.501 1.414 26-Dec-22 1.582 4295 8,802.3 2.500 1.414 27-Dec-22 0.041 5165 8,802.3 2.501 1.414 28-Dec-22 2.135 4003 8,802.3 2.502 1.415 29-Dec-22 3.182 3449 8,802.3 2.501 1.414 30-Dec-22 3.158 3074 8,802.3 2.501 1.414 31-Dec-22 3.145 3336 8,802.3 2.500 1.413 Date: Jan 06 2023 Time: 08:55 MWRA Deer Island, MA Page I of I Begin: Dec 01, 2022 00:00 End: Dec 31, 2022 23:59 ••••• MULTl-PARAMETER SUMMARY REPORT••••• 365 Day Emissions - Boiler 201 Start 365 Day Total S02 tons -------- --------- 12/01/22 1. 36771 12/02/22 1.36785 12/03/22 1.36785 12/04/22 1.36785 12/05/22 1.36788 12/06/22 1.36894 12/07/22 1.36979 12/08/22 1.36979 12/09/22 1. 37052 12/10/22 1.37052 12/11/22 1.37052 12/12/22 1.37052 12/13/22 1.37052 12/14/22 1.37052 12/15/22 1.37052 12/16/22 1.37062 12/17/22 1.37062 12/18/22 1. 37062 12/19/22 1. 37142 12/20/22 1. 37142 12/21/22 1. 37142 12/22/22 1.37142 12/23/22 1.37142 12/24/22 1.37142 12/25/22 1.37142 12/26/22 1.37142 12/27 /22 1.37142 12/28/22 1.37142 12/29/22 1.37142 12/30/22 1.37142 12/31/22 1. 37142 -------- --------- Report produced by Cirrus 365 Day Total NOX tons --------- 6.43559 6.43691 6.43691 6.43691 6.43742 6.44005 6.44283 6.44283 6.44730 6.44730 6.44730 6.44730 6.44730 6.44730 6.44730 6.44840 6.44840 6.44840 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 6.45100 --------- 365 Day 365 Day Total Total co HI tons rnmBtu --------- --------- 0.29314 450159.375 0.29797 450187.844 0.29797 450187.844 0.29797 450187.844 0.29984 450205.781 0.31263 450276.750 0.32505 450340,656 0.32505 450340.656 0.34122 450431.406 0.34122 450431.406 0.34122 450431.406 0.34122 450431.406 0.34122 450431.406 0.34122 450431.406 0.34122 450431.406 0.34563 450453.844 0.34563 450453.844 0.34563 450453.844 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 0.35740 450504.031 --------- --------- DAS S/N (00000001) 1/6/2023 1/24/2023, 9:12 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-22 0.000 0.006 0.009 0.136 0 Feb-22 0.000 0.006 0.009 0.136 0 Mar-22 0.000 0.006 0.009 0.125 0 Apr-22 0.000 0.006 0.011 0.126 0 May-22 0.000 0.006 0.009 0.126 0 Jun-22 0.000 0.006 0.017 0.135 0 Jul-22 0.000 0.006 0.012 0.134 0 Aug-22 0.000 0.006 0.010 0.134 0 Sep-22 0.000 0.006 0.009 0.134 0 Oct-22 0.000 0.004 0.009 0.124 0 Nov-22 0.000 0.005 0.009 0.124 0 Dec-22 0.000 0.005 0.009 0.124 0 Emissions Limitations: 0.040 0.230 0.800 5.400 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Massachusetts Water Resources Authority Deer Island Treatment Plant Pumping Odor Control (CP102) - Stack # 1 DEP Conditional Permit No: MBR-91-IND-007A Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) 1/24/2023, 9:12 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-22 0.003 0.035 0.073 1.066 0 Feb-22 0.003 0.035 0.066 1.064 0 Mar-22 0.003 0.034 0.078 1.052 0 Apr-22 0.003 0.034 0.072 1.048 0 May-22 0.003 0.034 0.094 1.053 0 Jun-22 0.004 0.036 0.118 1.077 0 Jul-22 0.004 0.037 0.073 1.043 0 Aug-22 0.013 0.048 0.121 1.052 0 Sep-22 0.007 0.051 0.106 1.063 0 Oct-22 0.004 0.052 0.097 1.060 0 Nov-22 0.004 0.053 0.108 1.088 0 Dec-22 0.003 0.053 0.078 1.082 0 Emissions Limitations: 0.500 4.000 5.600 34.000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Primary A-D, East/West Grit Odor Control (CP103) - Stack # 2 & 3 DEP Conditional Permit No: MBR-91-IND-007B 1/24/2023, 9:12 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-22 0.002 0.023 0.047 0.666 0.024 0.278 0 Feb-22 0.002 0.023 0.044 0.667 0.021 0.278 0 Mar-22 0.002 0.023 0.047 0.667 0.024 0.278 0 Apr-22 0.002 0.023 0.048 0.670 0.023 0.278 0 May-22 0.002 0.023 0.047 0.660 0.024 0.278 0 Jun-22 0.002 0.023 0.056 0.664 0.023 0.278 0 Jul-22 0.002 0.023 0.082 0.661 0.024 0.278 0 Aug-22 0.005 0.026 0.114 0.706 0.024 0.278 0 Sep-22 0.002 0.026 0.075 0.706 0.023 0.278 0 Oct-22 0.002 0.027 0.059 0.713 0.024 0.278 0 Nov-22 0.002 0.027 0.051 0.718 0.023 0.278 0 Dec-22 0.002 0.027 0.047 0.718 0.023 0.278 0 Emissions Limitations: 0.250 2.000 3.800 23.300 verify <1 tpy 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 0.25 Massachusetts Water Resources Authority Deer Island Treatment Plant Primary Residuals Odor Control (CP301) - Stack # 4 and Secondary Residuals Odor Control (CP303) - Stack # 4 DEP Conditional Permit No: MBR-91-IND-007C and MBR-91-IND-007D Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Ammonia (NH3) 1/24/2023, 9:12 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-22 0.000 0.005 0.012 0.148 0 Feb-22 0.000 0.005 0.010 0.148 0 Mar-22 0.000 0.005 0.012 0.148 0 Apr-22 0.000 0.005 0.011 0.148 0 May-22 0.000 0.005 0.012 0.148 0 Jun-22 0.000 0.005 0.011 0.145 0 Jul-22 0.000 0.005 0.012 0.142 0 Aug-22 0.000 0.005 0.012 0.136 0 Sep-22 0.000 0.005 0.013 0.139 0 Oct-22 0.000 0.005 0.013 0.140 0 Nov-22 0.000 0.005 0.011 0.140 0 Dec-22 0.000 0.005 0.012 0.140 0 Emissions Limitations: 0.1250 1.0000 0.3600 2.2000 1.0 ppmv TRS Current Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Secondary Odor Control (CP202) - Stack # 5 DEP Conditional Permit No: MBR-92-IND-056 MWRA Deer Island Power Plant Monthly Report From: 01-Dec-23 CTG 1 and CTG 2 To: 31-Dec-23 365-DAY ROLLING TOTAL (Both Units Combined) EMISSIONS, TONS Daily DAY Daily Fuel Fuel Hours gal Hours gal NOx PM VOC CO SO2 1-Dec-23 0.00 0 128.3 148,520 1.219 0.204 0.018 0.221 0.010 2-Dec-23 0.00 0 128.3 148,520 1.219 0.204 0.018 0.221 0.010 3-Dec-23 0.00 0 128.3 148,520 1.219 0.204 0.018 0.221 0.010 4-Dec-23 0.00 0 128.3 148,520 1.219 0.204 0.018 0.221 0.010 5-Dec-23 0.00 0 128.3 148,520 1.219 0.204 0.018 0.221 0.010 6-Dec-23 0.00 0 128.3 148,520 1.219 0.204 0.018 0.221 0.010 7-Dec-23 0.00 0 126.5 146,358 1.202 0.201 0.018 0.218 0.009 8-Dec-23 0.00 0 126.5 146,358 1.202 0.201 0.018 0.218 0.009 9-Dec-23 0.00 0 126.5 146,358 1.202 0.201 0.018 0.218 0.009 10-Dec-23 0.00 0 126.5 146,358 1.202 0.201 0.018 0.218 0.009 11-Dec-23 4.07 4,396 130.6 150,754 1.238 0.207 0.018 0.225 0.010 12-Dec-23 0.00 0 130.6 150,754 1.238 0.207 0.018 0.225 0.010 13-Dec-23 0.00 0 130.6 150,754 1.238 0.207 0.018 0.225 0.010 14-Dec-23 0.00 0 130.6 150,754 1.238 0.207 0.018 0.225 0.010 15-Dec-23 0.00 0 130.6 150,754 1.238 0.207 0.018 0.225 0.010 16-Dec-23 0.00 0 129.8 149,851 1.230 0.206 0.018 0.223 0.010 17-Dec-23 0.00 0 129.8 149,851 1.230 0.206 0.018 0.223 0.010 18-Dec-23 5.71 7,636 135.5 157,487 1.294 0.216 0.020 0.235 0.010 19-Dec-23 22.26 25,146 157.7 182,633 1.503 0.248 0.024 0.271 0.012 20-Dec-23 0.00 0 157.7 182,633 1.503 0.248 0.024 0.271 0.012 21-Dec-23 0.00 0 157.7 182,633 1.503 0.248 0.024 0.271 0.012 22-Dec-23 0.00 0 157.7 182,633 1.503 0.248 0.024 0.271 0.012 23-Dec-23 0.00 0 157.7 182,633 1.503 0.248 0.024 0.271 0.012 24-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 25-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 26-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 27-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 28-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 29-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 30-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 31-Dec-23 0.00 0 154.5 178,857 1.472 0.243 0.023 0.266 0.011 3,881,000 61.4 10.3 2.0 17.0 13.8 Permit Limits - 12 month rolling average 1/12/2024 / CTGs Massachusetts Water Resources Authority Deer Island Power Plant Monthly Report CP-301 GAS FLARES Dec-23 GAS 365 DAY Rolling 365 Day DAY FLARE TOTAL NOx PM VOC CO SO2 kscf kscf tpy tpy tpy tpy tpy 30-Nov-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 1-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 2-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 3-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 4-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 5-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 6-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 7-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 8-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 9-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 10-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 11-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 12-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 13-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 14-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 15-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 16-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 17-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 18-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 19-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 20-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 21-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 22-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 23-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 24-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 25-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 26-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 27-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 28-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 29-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 30-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 31-Dec-23 0.0 22,205 0.39 0.06 0.02 0.15 0.87 Note: 1) The gas meter has been sent back to manufacturer due to a failure as of 1/15/97. Reinstalled 3/18/97. 1) Daily Gas Flare = Daily Gas Production - Daily gas to Boilers (adjusted - see report text) 1/17/2024 / FLARES MWRA Deer Island Power Plant Monthly Report Dec-23 ZURNS Boilers, Units 101 & 201 365-Rolling Total Day No. 2 Oil D. G. Hours PM VOC kgal kscf Operating tpy tpy 30-Nov-23 7.692 3876 8,800.3 2.531 1.470 01-Dec-23 2.334 3682 8,800.3 2.530 1.469 02-Dec-23 3.276 3685 8,799.0 2.529 1.468 03-Dec-23 2.825 4149 8,799.0 2.530 1.468 04-Dec-23 0.000 5207 8,799.0 2.530 1.468 05-Dec-23 0.000 5519 8,798.3 2.532 1.469 06-Dec-23 0.000 4977 8,795.3 2.533 1.470 07-Dec-23 0.000 4655 8,792.5 2.534 1.471 08-Dec-23 0.000 4364 8,792.5 2.533 1.471 09-Dec-23 0.000 4324 8,788.8 2.533 1.471 10-Dec-23 0.000 4696 8,788.8 2.533 1.471 11-Dec-23 0.000 4805 8,788.8 2.534 1.472 12-Dec-23 0.000 4693 8,789.5 2.534 1.472 13-Dec-23 0.000 5015 8,789.5 2.535 1.473 14-Dec-23 1.428 4130 8,789.5 2.536 1.474 15-Dec-23 0.184 4848 8,789.5 2.538 1.476 16-Dec-23 0.000 5124 8,786.5 2.541 1.477 17-Dec-23 0.000 4689 8,786.5 2.541 1.478 18-Dec-23 0.000 4480 8,786.5 2.541 1.477 19-Dec-23 0.000 4020 8,782.8 2.540 1.477 20-Dec-23 0.078 4505 8,782.8 2.540 1.477 21-Dec-23 2.679 4176 8,782.8 2.540 1.477 22-Dec-23 0.000 5400 8,782.8 2.542 1.478 23-Dec-23 0.000 4848 8,782.8 2.543 1.479 24-Dec-23 0.000 5139 8,782.8 2.543 1.479 25-Dec-23 1.421 4043 8,782.8 2.544 1.480 26-Dec-23 3.281 3525 8,782.8 2.543 1.479 27-Dec-23 1.244 3795 8,782.8 2.541 1.478 28-Dec-23 0.000 4284 8,782.8 2.541 1.478 29-Dec-23 0.000 4661 8,782.8 2.542 1.479 30-Dec-23 0.000 4808 8,782.8 2.544 1.481 31-Dec-23 0.000 4434 8,782.8 2.545 1.482 Date: Jan 10 2024 Time: 13:34 MWRA Deer Island, MA Page 1 of 1 Begin: Dec 01, 2023 00:00 End: Dec 31, 2023 23:59 ***** MUL Tl-PARAMETER SUMMARY REPORT***** 365 Day Emissions - Combined Boilers Start 365 Day 365 Day 365 Day 365 Day Total Total Total Total SO2 NOX co HI tons tons tons mmBtu -------- --------- --------- --------- --------- 12/01/23 2.50912 12.66471 0.71942 991068.375 12/02/23 2.50229 12.65706 0.71703 990688.375 12/03/23 2.49913 12.66363 0.71848 990872.438 12/04/23 2.49740 12.66329 0.72252 991235.875 12/05/23 2.49409 12.66551 0.72218 991831.750 12/06/23 2.49481 12.66250 0.70934 992237.875 12/07/23 2.48884 12.66338 0.69685 992517.375 12/08/23 2.48566 12.65681 0.69804 992296.188 12/09/23 2.48082 12.64044 0.68359 992015.250 12/10/23 2.47723 12.62215 0.68518 992079.750 12/11/23 2.47166 12.60808 0.68604 992227.563 12/12/23 2.46418 12.60425 0.68595 992389.250 12/13/23 2.45758 12.59672 0.68679 992760.250 12/14/23 2.45904 12.59152 0.68714 992981.625 12/15/23 2.46541 12.58509 0.68717 993781.563 12/16/23 2.46721 12.58369 0.68287 994641.625 12/17/23 2.46719 12.59850 0.68310 994757.750 12/18/23 2.46658 12.59551 0.68418 994565.375 12/19/23 2.46697 12.57768 0.67281 994144.188 12/20/23 2.46640 12.56014 0.67536 994294.063 12/21/23 2.46544 12.54970 0.67718 994383.250 12/22/23 2.46403 12.53600 0.68059 995053.750 12/23/23 2.46442 12.51545 0.67880 995330.000 12/24/23 2.46634 12.49076 0.67864 995545.313 12/25/23 2.46464 12.46790 0.67807 995603.250 12/26/23 2.45788 12.44769 0.67785 995366.125 12/27/23 2.45183 12.42606 0.67779 994696.625 12/28/23 2.45391 12.39197 0.67776 994576.875 12/29/23 2.45815 12.36670 0.67528 994881.125 12/30/23 2.46316 12.35314 0.67181 995505.625 12/31/23 2.46393 12.33643 0.67168 995745.438 -------- --------- --------- --------- --------- Report p roduced b y Cirrus DAS S/N (00000001) 1/19/2024, 6:48 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-23 0.000 0.005 0.009 0.124 0 Feb-23 0.000 0.005 0.018 0.133 0 Mar-23 0.000 0.005 0.009 0.133 0 Apr-23 0.000 0.005 0.027 0.150 0 May-23 0.000 0.005 0.027 0.167 0 Jun-23 0.000 0.005 0.023 0.173 0 Jul-23 0.000 0.005 0.057 0.218 0 Aug-23 0.000 0.005 0.014 0.222 0 Sep-23 0.000 0.005 0.034 0.247 0 Oct-23 0.000 0.005 0.033 0.270 0 Nov-23 0.001 0.005 0.012 0.274 0 Dec-23 0.000 0.005 0.009 0.274 0 Emissions Limitations: 0.040 0.230 0.800 5.400 1.0 ppmv TRS t Detection Limits, ppm v: 0.01 0.20 Massachusetts Water Resources Authority Deer Island Treatment Plant Pumping Odor Control (CP102) - Stack # 1 DEP Conditional Permit No: MBR-91-IND-007A Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) 1/19/2024, 6:48 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-23 0.003 0.053 0.076 1.085 0 Feb-23 0.003 0.053 0.067 1.087 0 Mar-23 0.003 0.053 0.076 1.085 0 Apr-23 0.003 0.053 0.208 1.220 0 May-23 0.003 0.053 0.192 1.318 0 Jun-23 0.003 0.051 0.245 1.445 0 Jul-23 0.003 0.050 0.437 1.809 0 Aug-23 0.003 0.040 0.138 1.826 0 Sep-23 0.003 0.036 0.278 1.999 0 Oct-23 0.003 0.036 0.253 2.154 0 Nov-23 0.003 0.035 0.114 2.160 0 Dec-23 0.003 0.035 0.089 2.171 0 Emissions Limitations: 0.500 4.000 5.600 34.000 1.0 ppmv TRS t Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Primary A-D, East/West Grit Odor Control (CP103) - Stack # 2 & 3 DEP Conditional Permit No: MBR-91-IND-007B 1/19/2024, 6:48 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-23 0.002 0.027 0.047 0.718 0.024 0.278 0 Feb-23 0.002 0.027 0.043 0.717 0.021 0.278 0 Mar-23 0.002 0.027 0.047 0.717 0.024 0.278 0 Apr-23 0.002 0.028 0.132 0.800 0.023 0.278 0 May-23 0.002 0.028 0.163 0.916 0.024 0.278 0 Jun-23 0.002 0.028 0.170 1.030 0.023 0.278 0 Jul-23 0.002 0.028 0.298 1.246 0.024 0.278 0 Aug-23 0.002 0.025 0.075 1.207 0.024 0.278 0 Sep-23 0.002 0.024 0.181 1.313 0.023 0.278 0 Oct-23 0.003 0.025 0.187 1.441 0.024 0.278 0 Nov-23 0.003 0.025 0.046 1.436 0.023 0.278 0 Dec-23 0.002 0.025 0.047 1.437 0.024 0.278 0 Emissions Limitations: 0.250 2.000 3.800 23.300 verify <1 tpy 1.0 ppmv TRS Detection Limits, ppm v: 0.01 0.20 0.25 Massachusetts Water Resources Authority Deer Island Treatment Plant Primary Residuals Odor Control (CP301) - Stack # 4 and Secondary Residuals Odor Control (CP303) - Stack # 4 DEP Conditional Permit No: MBR-91-IND-007C and MBR-91-IND-007D Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Ammonia (NH3) 1/19/2024, 6:48 AM Month-Year # Exceedances (>1.0 ppmv TRS) Notes Tons 12-Month Rolling Total Tons 12-Month Rolling Total Jan-23 0.000 0.005 0.012 0.140 0 Feb-23 0.000 0.005 0.010 0.140 0 Mar-23 0.000 0.005 0.012 0.140 0 Apr-23 0.000 0.005 0.028 0.157 0 May-23 0.000 0.005 0.032 0.177 0 Jun-23 0.000 0.005 0.037 0.203 0 Jul-23 0.000 0.005 0.071 0.262 0 Aug-23 0.000 0.005 0.032 0.282 0 Sep-23 0.000 0.005 0.050 0.319 0 Oct-23 0.000 0.005 0.039 0.344 0 Nov-23 0.000 0.005 0.011 0.344 0 Dec-23 0.000 0.005 0.012 0.344 0 Emissions Limitations: 0.1250 1.0000 0.3600 2.2000 1.0 ppmv TRS Detection Limits, ppm v: 0.01 0.20 Total Reduced Sulfur (TRS) Total Non-Methane Hydrocarbons (TNMHC) Massachusetts Water Resources Authority Deer Island Treatment Plant Secondary Odor Control (CP202) - Stack # 5 DEP Conditional Permit No: MBR-92-IND-056 Boston/Winthrop Fire Truck Responses_____ Date: City/Town: Reason for Responses: Area: 1/1/2023 Boston/Winthrop Fire in Dumpster Winthrop Terminal 1/5/2023 Winthrop Alarm in North Main North Main 2/26/2023 Winthrop Alarm Maint Bldg 3/24/2023 Boston/Winthrop Alarm Gravity Thickener 4/4/2023 Winthrop Alarm Active/Smoke Detector Primary OPS 5/5/2023 Boston/Winthrop/EMS Winthrop Turbine Incident Parking Lot 3 6/23/2023 Winthrop/Ambulance Ill Employee 2nd Fl Maintenance 7/17/2023 Boston/Winthrop Alarm Thermal 7/21/2023 Winthrop Alarm Primary Cross Gallery 12/15/2023 Boston/Winthrop Alarm Gravity Thickener 12/25/2023 Winthrop Alarm Gravity Thickener 2/26/2024 Boston/Winthrop Alarm Maintenance Bldg 3/14/2024 Winthrop/EMS Ill Employee Maintnenance Bldg 3/24/2024 Boston/Winthrop Alarm Gravity Thickener 5/5/2024 Winthrop Alarm South Pump Facility 5/7/2024 Boston/Winthrop/EMS Fire Notification Cryo Facility Other: fire suppression released smoke in Maint Office Area Faulty Flow Switch Microwave casued smoke alarm Flow Switch Hot water steam set off beam detector Flow Switch Flow Switch Faulty Flow Switch Flow Switch Unknown Smoldering Insulation on cold box Gate Logs Date Chemical Fuel Oil Warehouse Equipment (Const E Trash (Grit+Dumpster) 5/20/2022 2 4 2 5/23/2022 2 2 2 12/6/2022 3 1 1 12/7/2022 2 2 12/8/2022 3 5 2 1 12/9/2022 2 6 2 3/20/2023 3 3 1 3/27/2023 1 4 3 3/28/2023 4 2 2 3/30/2023 2 5 1 1 3/31/2023 3 3 1 8/7/2023 4 6 1 8/15/2023 4 8/17/2023 4 3/20/2024 2 3 1 1 Total 8 6 5 4 11 10 7 8 8 9 7 11 4 4 7 MWRA / Deer Island Treatment Plant Contract 6723 – Seawall Preliminary Design Report (PDR) Summary Main PDR Recommendation Table Summary Highlighted text shows priority repairs within next 3 years. Component Repair Option Cost Reference Seawall Repair 6 – remove 5” concrete in damaged areas, patch, protective coating & cathodic protection $21 M 2.3.5 Pedestrian Railing Replacement 2 – 42” aluminum railing $1.1 M 2.3.14 Behind Wall Drainage System N/A – new 9”w x 5’d channel w/grating behind seawall $2 M (presented) $3.5M (shown in Cost estimate) Figure 2.3.6, Appendix F 7.2 Revetment None made, but North revetment should be 8 & 9.5 ton stone; is currently 4 &8 - ton stone respectively. Could be “Considered in the future” None listed Appendix C 4.1.3 Stone Toe Protection Apron (STPA) 3 – reuse 2.5 ton armor stone & re-lay at 10H:1V slope w/new bedding at seawalls $16.2 M 2.4.1 and Appendix C 4.1.1 Granite Blocks Appendix C: 5.2.1 Option 1 – Mechanically fasten w/steel dowel None listed 2.4.3 and Appendix C 5.2.1 Option 1 Outfalls None recommended None listed 2.5.2 and Appendix A Beach Fill Enhance beaches fronting seawalls as a “maintenance item”. Not a formal recommendation in this PDR. None listed 2.6.10 and Appendix E Dredging Limits of dredging would be for slope modifications to Stone Toe Protection Apron Not expressly mentioned if included in STPA cost estimate 2.7 and Appendix F Concrete Testing shows high chloride content to the lower half of the seawalls which is the cause for much of the spalling and delamination. The recommended seawall repair option includes removing areas with high chloride content to a depth of 5-inches and patching with a low slump high density concrete and adding a protective coating to the entire exposed face. They also recommend a cathodic protection system to protect the steel – which is not described within. Option 5 includes a similar approach but without the cathodic protection system at a cost of $16.5 M, roughly $4.5 M less. They do not address repairing the already corroded rebar. The inspections indicated that much of the expansion joint material on the sidewalk and seawalls is loose, separated, missing or damaged. Coupled with rain and wave overtopping, the water is penetrating through the joints at the top of the wall and causing “V” shape spalls. They recommend removing the loose material and replacing all expansion joint materials. A cost for this was not provided. The inspection report also identified many cracks throughout the upper portion of the seawall. In these areas, Green recommends chipping the areas to sound concrete and pressure injecting epoxy material. The cost for the crack repair is included in certain seawall repair options. Surface runoff/flooding: Inspections determined that the drainage system was likely not designed to handle surface runoff, as the top 3 feet of soils were low permeability soils (compacted glacial till). It is because of that that after rain events the seawall sees high overland flow and flooding problems. The recommendation is to create a separate drainage system to handle surface water consisting of a 9-inch wide, 5-foot deep channel with grating behind the seawall and 6” PVC drain pipes spaced every 12-feet. Railings: Rail post holes are not grouted flush allowing sea water to sit at the base, which is causing the posts to rust. The inspections also note a failed coating system and rail deterioration. The recommendation is to install new 42-inch tall aluminum picket fence. The remainder of the PDR is summarized in the corresponding reports. It wasn’t summarized well in the main PDR document and some alternatives are missing recommendations and cost estimates. Appendix A – Seawall and Stormwater Drainage Outfall Report This report documents seawall and drainage inspection procedures including access, and visual and delamination (sounding) testing and includes photographs of specific areas of concern and detailed sketches outlining locations and quantities of delamination, exposed and debonded reinforcing, spalling etc. along each seawall and sidewalk. Generally: The CP-204 and CP-301 seawalls show delamination, spalls and debonded reinforcing from the top of the footing up to about 8-ft. Many footing locations are either covered by the mudline or exhibit scaling and abrasion. The expansion joint filler is missing at several locations; weep holes for drainage are often blocked; top of wall locations at construction joints exhibit severe spalling and delamination which is causing chunks of concrete to fall into the sea and tripping hazards on the walkway. Many of the drainage outfalls are missing the rubber “duckbill” valves that were installed to prevent tidal influence in the stormwater system. Additionally, many of the outfalls are mostly buried by sand deposits, holding the duckbill valves closed and severely limiting the functionality of the stormwater outfall. Appendix B – Seawall Testing Reports The testing reports include the results of the chemical and physical testing of the concrete cores taken from the seawalls where chloride content, compressive strength, aggregate size, grading, depth of carbonation, water-to-cement ratio, and air content were analyzed. This was mainly to provide the “as built” condition of the concrete as well as how deep the seawater influence has penetrated. Generally, the compressive strength of the concrete exceeded what was specified with the exception of two of the twelve locations. The coarse aggregate size was consistently ¾” (min 0.5”, max 1”) and was determined to be generally well graded. The depth of carbonation ranged from 0 to 1/4”. Water to cement ratio ranged from 0.40 to 0.48 with approximately 8-11% unhydrated cement particles. Lastly, half of the samples’ air void systems were not consistent with the current American Concrete Institute (ACI) recommendations for freeze-thaw resistance. No trend between CP 204 or 301 seawall or location of sample (top/middle/bottom of wall) was identified in this analysis. Appendix C – Seawall and Shoreline Assessment CP-043 Northeast Revetment: Generally looked good with minor toe stone displacement. Armor stone appeared stable. While there is a noticeable transition between the granite blocks (square cut vs rough cut) at station 22+20, there was no distinguishable difference or transition between the 4-ton and 8-ton revetments shown on the Record Drawings. There was minimal deterioration between 2021 inspections and those performed in 2005. CP-204 Seawall: Showed no signs of settlement, undermining, wall rotation, or movement at expansion joints. The top of footing was consistently exposed and the wall stem was generally in poor condition below El. 118 and fair condition above. Conditions have deteriorated significantly since 2005 inspections. Stone toe protection apron (STPA) in front of the wall had no discernable structure and although didn’t appear to have changed significantly since the 2005 inspections and were noted to be in poor condition. CP-301 Seawall: Showed no signs of settlement, undermining, wall rotation, or movement at expansion joints. The top of footing was consistently exposed and the wall stem as generally in poor condition below El. 118 and fair condition above. Conditions have deteriorated significantly since 2005 inspections. Stone toe protection apron (STPA) in front of the wall showed considerable movement worsened significantly since the 2005 inspections and were noted to be in poor condition. Lastly, at the CP-204/301 transition, there is an area where the footing is undermined and the cut-off wall below the footing is visible. CP-204 South Revetment: Generally in good condition with similar conditions as 2005 inspections. CP-048 Southwest Revetment: Generally in good condition with similar conditions as 2005 inspections. CP-048 West Revetment: Generally in good condition with moderate toe stone movement in a roughly 100-ft destabilized area. Generally similar conditions as 2005 inspections. A revetment analysis was performed to determine the weight of the armor stone required to properly protect the shoreline. The results that the CP-043 Northern Revetment and the CP-304 Seawall’s armor stones are significantly undersized for the current 100-year storm, with the CP-301 Seawall’s armor stone being undersized for the future 2050, 100-year storm in addition to the other two systems. The Northern portion of the CP-043 revetment should be overlaid with 8-ton stone while the southern section of the CP-043 northern revetment should be overlaid with 10-ton stone to provide adequate protection for future conditions. Although the report and the calculations repeatedly state this revetment is undersized, no formal recommendation to upgrade this area was made, saying only it “should be considered in the future”. For the seawall scour protection, both CP-301 and CP-204 seawalls can either be upgraded to 8-ton armor stone at the current 1V:2H slope or 2.5 ton stone at 1V:6H slope or shallower to remain stable in the 2050 100-year storm. The recommendation is to re-use the existing 2.5 ton armor stone and lay it at a 1V:10H slope and underlay it with a 500-lb underlayer and 25-lb bedding layer. Keeping the scour protection to the originally designed 23-feet out from the wall stem would classify this improvement as scour protection apron maintenance and ease permitting. A global stability analysis was performed for both CP-301 and 204 seawalls. The results conclude that the walls were adequately sized to prevent an overturning or bearing capacity failure for all cases analyzed. For portions supported on piles, the pile loads are within the installed capacities. Granite Block Crest Lining: two options were presented to help reduce blocks’ movement during storms: 1) Mechanically fastening them with steel dowels and grout to the armor stone; and 2) Increasing the grade behind the stone. No recommendation or price were provided, but it is assumed Option 1 would be the accepted approach. Appendix D – Technical Memo on Wave Overtopping and Forcing This memo details how the Massachusetts Coast Flood Risk Model (MC-FRM) which was developed by Woods Hole Group for the MassDOT and supplemented with DITP ground, LiDAR and bathymetric survey was used to generate wave height, wave force, and water levels for current and future conditions which were used in the evaluations presented above. The results indicate the current 100-year storm water level to be 115.5-ft (MWRA datum) and future, 2050 100-year water level to raise to 118.1-ft. the wave heights vary between the east (7-9.5-ft with a frequency of ~10.5 sec) and west side (3-4-ft with a frequency of ~4 sec) in the current conditions. Those numbers increase to 8-11-ft (east) and 4.5-5.5-ft (west) in the 2050 conditions. Frequency only increased slightly between current and future conditions. Modeling results confirmed the calculations in Appendix C indicating that the northeast revetment was susceptible to damage with an overtopping rate of 0.54 cfs/lf and the CP-204 seawall was susceptible to damage at an overtopping rate of 0.02 cfs/lf during future 2050 conditions. Note the scale for damage to seawalls is different than that of revetments. Wave forces on the seawall were also calculated. These values are 35 and 55 kpis/foot in the current day and future 2050 100-year storms, respectively. Appendix E – Technical Memo: Beach Study and Coastal Inspections This memo details the condition of the shoreline and how it has been affected since the construction of the shoreline protection system at DITP. Based on available data, the shoreline was compared from years 1847-1978 and years 2001-2019 to represent pre- and post- construction conditions. In the pre-construction conditions, the shoreline remained relatively stable minus the northeast corner and a portion of the western side of the island which were affected by the New England Hurricane of 1938. Post-construction, the shoreline has shown to be stable, as expected given the shoreline protection deployed. Figure 3 contrasts shoreline movement between these two periods. Yirrell Beach was noted to be showing an increased rate of accretion, at 3.2 feet/year which can be attributed to active beach management activities. The study further investigated change in nearshore morphology (where sand is being deposited/eroded in front of existing shoreline protection structures) between 2010 and 2021 using the topography and bathymetry collected as part of this contract. This evaluation shows erosion of the northernmost end of the northern revetment. On the seawalls, erosion is shown at the location of the tow stones with deposition of the nearshore beaches. The southern revetment shows variability especially where the shore-perpendicular structures exist, and the western revetment generally shows deposition which is likely due to the curvature of the shoreline. Lastly, the memorandum modeled sediment transport in front of the seawalls during a 100-year storm and whether beach nourishment (sand placement) would be beneficial. The beaches that front the seawalls exhibit erosion during storms as evident by the exposed stone toe protection apron. The model concludes that beach fill will provide a considerable reduction of exposure to the toe protection, making it more resilient and reduces wave impacts on the seawall. Erosion during a 100-year storm would reduce from 6-ft in front of the CP-204 seawall to 3.5-ft, and from 10-ft to 2-ft in front of the CP- 301 seawall. Beach nourishment could then routinely be added as a maintenance item for seawall protection. No formal recommendations, quantities/size of sand, or cost estimate was provided in this memorandum. Appendix F – Geotechnical and Hazardous Materials Report This memorandum outlines the procedures for conducting borings, groundwater and sediment sampling and testing and provides background information on the environmental status of DITP. They noted that a Class A-3 Response Action Outcome (RAO) was filed for the site in 2001 which included a Method 3 Risk Assessment was concluded with a condition of No Significant Risk with the implementation of an Activity Use Limitation (AUL) on the 9 lots that comprise DITP (this project spans Lots 3, 4, and 6). The AUL restricts future residential use and imposes soil management requirements during construction and excavation activities. Soil Chemical Testing Results: TPH, EPH and metal were detected in the soil at limits above laboratory reporting limits, however no contaminants were detected above the MCP RCS-1. Groundwater Chemical Testing Results: VOCs, SVOCs, metals and ammonia as Nitrogen were detected at limits above laboratory reporting limits, however no contaminants were detected above the MCP RCGW-2. Sediment Sampling Testing Results: EPH, SVOC’s and metals were detected above laboratory reporting limits, however MCP RCS-1 standards only apply to soil and there are no reportable concentrations. All samples are consistent with concentrations previously identified and are not reportable under the MCP. Boring results indicated a thin layer of topsoil, followed by fill soils that were claey sand with gravel and sandy lean clay with gravel and appeared to be re-worked glacial till. It was a medium-dense to very dense soil with low permeability and poor compaction properties. Groundwater levels did not appear to be tidally influenced, but did appear to be influenced by rain events. Additional explorations (geoprobes) were since performed to better understand the groundwater behind the seawall and will be included in the updated report. The recommendations are for a rip-rap layer similar to what was installed in the northernmost 600-ft be installed on the vegetated slope portion of the seawall adjacent to the disinfection tanks. The rip rap layer should be installed a sufficient distance beyond the impact of breaking waves splashing over the seawall, and a drainage system be installed on the backside of the wall (mentioned previously). This drainage system would be independent of the groundwater/tides and be for storm related run-off only. No significant reportable contamination was identified the would impact the proposed construction. It is likely that most excess soil would be acceptable at a less than RCS-1 fill site. RAM Plan and SMP are requirements of the AUL. Given the low permeability of the soils, recharge of construction dewatering is not likely an option. On- site treatment consisting of a fractionalization tank settling and removal of fine particles through a bag filter system prior to discharge to the stormwater system is the most likely requirement. Sediment management in locations where dredging is proposed (slope for Stone Toe Protection) could be reused as daily cover at a Massachusetts lined or unlined landfill. Areas with high conductivity (due to high clay content) may require disposal at an out of state landfill for non-hazardous waste. Appendix G – Permit Evaluation Technical Memorandum This memorandum summarizes all regulatory reviews, permits, approvals, notifications and licenses, together called “permits” that could potentially be applicable on this project based on the proposed scope of work and describes why they are or are not relevant. It outlines permits by federal, state and local agencies and documents a schedule for submittal date in both design and construction to keep the project on track. The memorandum outlines six federal permits, ten state permits and one local permit that may be required. Appendix H - Plans The Drawings are rough plans highlighting the areas for seawall repair, STPA repair and Granite block anchoring. Very conceptual, even for a “30% submittal”. Appendix I – Cost Estimate The cost estimate contains worksheets for all options of the following recommendations: • Railing replacement • Seawall Repair • Behind wall drainage system. It does not include: • Any new revetment (unclear if this is recommended) • STPA repair • Granite Blocks • Outfall rehab/replacement (unclear if this is recommended) • Beach fill (unclear if this is recommended) Appendix J – Flood Evaluation Study Memorandum This memorandum discusses the approach for developing the overtopping model for the DITP. Woods Hole Group used the design water levels and wave conditions developed under other sections of the PDR to supplement the MC-FRM (also discussed under other sections of the PDR, and developed for the Mass DOT and supplemented by LiDAR and bathymetry obtained under this project) to model wave overtopping and inundation. The results of the model indicated that while a majority of DITP is of high elevation and protected by shore protection structures, the following areas would be impacted under current conditions, during a 100-year storm: • Northeast Revetment (CP-043) and CP-204 seawall would experience flooding along the crest of the walkway with no upland effects; • CP-301 Seawall would experience similar flooding along the walkway with additional flooding along the southern portion inside the fence line – in proximity to the southernmost Digester Module (Module 2). • Landward flooding to the western and southern revetment (CP-204 and CP-208) which would affect the pier facility, westernmost portion of Parking Lot 3 inside the DITP fence line and southernmost pedestrian walkways; • Flooding at the Tafts Ave entry to DITP, in the public parking area. Flooding in the above areas is limited to 1-ft or less. During the future 2050, 100-yr storm, impacted areas are similar, with the following additions: • Tafts Ave is showing 3-4 feet of flooding at the entry way to DITP; • Pier facility is showing roughly 2-ft of flooding and flooding further into Parking Lot 3 inside the DITP fence line • Flooding at R/T Building and around guard shack; • 1-2 feet of flooding along Deer Island Road around SSPS, and Road D between SSPS and the Gravity Thickeners, and Road 9 in front of the Residuals OC Facility • 1-2 feet of flooding in the area of Digester Module 2 inside the DITP fence line. One thing to note is that Woods Hole Group used true 100-year storm elevations, as modeled by their software. Our design criteria (and the storm surge map we developed internally) use historical 100-yr storm +2.5-ft.