Agenda
Town Council · from the Town's website · released Dec 3, 2024 · 8 pages · 2.7 MB
open the file ↗ · original at the source ↗
Meeting ID: 839 8578 4693 Passcode: 836634 Phone:-1-646-931-3860 Zoom Information WINTHROP TOWN COUNCIL Lown Council Members Town Council President James Letterie MEETING AGENDA Precinct 1 Councilor Costigan DECEMBER 3, 2024 Precinct 2 Councilor Munson EXECUTIVE SESSION 6:00PM Precinct 3 VP- Councilor Belcher TOWN COUNCIL MEETING 6:30PM Precinct 4 Councilor Swope HARVEY HEARING ROOM Precinct 5 Councilor Aiello Precinct 6 Councilor DaRos Councilor at Large DeMarco Councilor at Large Tassinari EXECUTIVE SESSION CALL TO ORDER ROLL CALL TOWN COUNCIL TO ENTER INTO EXECUTIVE SESSION Executive Session Pursuant to G.L. ¢.30A, §21(a) To discuss strategy session in preparation for contract negotiations. An open meeting may have a detrimental effect on the position of the public body and the chair so declares. MOTION TO ENTER INTO EXECUTIVE SESSION ROLL CALL ADJOURN EX. SESSION 11. 12. 13. MINUTES spproval of Minutes Reg. & Special vee November 19, 2024 as circulated “Nate Cramer-F' 25 Tax Classification PUBLIC HEARING ¢ Town Council appropriate the sum of $368,000 to pay for the Design and Engineering cost of water main replacements * Town Council vote to authorize the Town to accept & expend the amount of $475,000 in the form of a Grant from Clean Water Trust PUBLIC COMMENT CORRESPONDENCE COMMITTEE REPORTS Finance Committee SCHOOL DEPARTMENT REPORT TOWN MANAGER REPORT-_ D, D E OLD BUSINESS Town Council appropriate the sum of $368,000 to pay for the Design and Engineering cost of water main replacements Town Council vote to authorize the Town to accept & expend the amount of $475,000 in the form of a Grant from Clean Water Tax Classification FY25 Fire Station Discuss-Next Steps Summit Ave. Pathway Middle School Discussion-Demolition -NEW BUSINESS Councilor Attendance Discussion: Advisory Committee on Affordable Housing PUBLIC COMMENTPUBLIC RELATIONS / UPCOMING EVENTS Closing 12-24-24 at 12:00pm / Closed 12-25-24 / Open 12-26-24 from 8:00am-4:30pm Closing 12-31-24 at 4:30 pm / Closed 1-1-25 / Open 1-2-25 from 8:00am-4:30pm ADJOURNMENT Anthony Marino Town Manager Town Manager Report 12-3-2024 e Met with the most impacted homeowners (8-10 homes) on Morton and Banks Street and devised a plan to place sandbags around some homes. Director Calla has calculated how many bags we need, and we will implement a plan to install them. Initially, we discussed creating a volunteer event on a Saturday Morning to have them installed. It may take two days to get them installed. e Working with Union Representatives to schedule the initial Contract negotiation meetings. Five Unions (2 Police Unions, Clerical, Library, and DPW) have contracts that expire on June 30, 2025. ¢ Special thanks to everyone involved in another successful tree-lighting event in French Square. The tree looked great, and I want to thank Mike Upton from the DPW and all the DPW workers who worked on setting up the tree, ensuring a fantastic tree-lighting experience. e I informed Chris Kluchman, Director of the Livable Communities Division with EOHLC, about the Council vote and that we would be sending a letter in December about our non-compliance vote of the Town Council and our next steps. She was disappointed in the vote but appreciated us contacting her. e I met with and formally introduced Cheryl McCormick to John DaRos and Ana Leary from the Climate Commission. We discussed the list of climate-resilient projects that we are working on and the impact that not being compliant with MBTA/3A zoning would have on future applications. e Starting on the FY26 Budget Planning Process and sending out expectations to the Dept. Heads. The Department budgets will be due by the end of December, and we will start to compile the FY26 Base Budget Document in January 2025. We look forward to working with the Town Council Members, Finance Commission, School Committee, and Department heads as we create the FY26 Budget for the Town Council. Please contact me directly if you have any questions about the items listed above or any other issues. Thank you. Anthony Marino Winthrop Town Manager amarino@winthropma.gov TOWN OF WINTHROP OFFICE OF THE TOWN MANAGER Town Hall, 1 Metcalf Square, Winthrop, MA 02152 Telephone: 617-846-1077 Fax: 617-846-5458 Anthony Marino Town Manager Town Council Motion November 14, 2024 Fiscal Year 2025 Motion Summary Title: MWRA Borrowing for Water Main Replacement Design and Engineering Motion ID: TCM25-007 Amount: $368,000.00 Funding Source: MWRA Local Water System Assistance Program Motion Details Motion Type: Borrowing Authorization Submitted by: Anthony Marino, Town Manager Date Submitted: November 14, 2024 Text of Motion MOTION: I move that the Winthrop Town Council adopt the following order: ORDERED: That the Town appropriates the sum of THREE HUNDRED SIXTY-EIGHT THOUSAND DOLLARS ($368,000) to pay costs for design and engineering work for water main replacement at Winthrop St, Triton Ave, Siren St, Hale Ave, and Brookfield Rd,(all of which are part of the 5 year capital plan water main replacement program), including all costs incidental and related thereto; that to meet this appropriation, the Treasurer, with the approval of the Town Manager, is authorized to borrow said amount under and pursuant to M.G_L. ¢.44, §8(5), or pursuant to any other enabling authority, and to issue bonds or notes of the Town therefor; that the Treasurer, with the approval of the Town Manager, is authorized to borrow all or a portion of such amount from the Massachusetts Water Resources Authority (the “Authority”) and in connection therewith to enter into a loan agreement and/or financial assistance agreement with the Authority and otherwise to contract with the Authority with respect to such loan and for any grants or aid available for the project or for the financing thereof; that the Town Manager is authorized to accept and expend any grants or aid available for the project or for the financing thereof, provided that the amount of the authorized borrowing for the project shall be reduced by the amount of any such grants or aid received; and that the Town Manager is authorized to take any other action necessary or convenient to carry out this project; Funding Details Funding Source Funding Destination Account | Description Amount Account Description Amount IMWRA BORROWING [$368,000 | New- IFY25 MWRA $368,000 Water/Sewer |Water Main Capital Project [Design and Fund Engineering TOWN OF WINTHROP OFFICE OF THE TOWN MANAGER Town Hall, 1 Metcalf Square, Winthrop, MA 02152 Telephone: 617-846-1077 Fax: 617-846-5458 Anthony Marino Town Manager Town Council Motion November 14, 2024 Fiscal Year 2025 Motion Summary Title: Lead Service Inventory and Replacement Plan Grant Motion ID: TCM25-006 Amount: $475,000 Funding Source: State Grant Motion Details Motion Type: Appropriate Submitted by: Anthony Marino, Town Manager Date Submitted: November 14, 2024 Text of Motion MOTION: I move that the Town Council vote to authorize the Town of Winthrop to accept and expend the amount of Four Hundred Seventy-Five Thousand Dollars ($475,000.00) in the form of a grant awarded by the Clean Water Trust to be administered by the Town of Winthrop’s Water-Sewer Enterprise Fund. This grant payment is made from the Drinking Water State Revolving Fund (DWSRF). Grant Information: Agreement # DWL24-25, DEP Project # DWSRF-18929; or take any other action thereto. Funding Details Funding Source Funding Destination Account Description Amount Account Description Amount N/A N/A INVA New CWT Lead Service Plan [$475,000.00 mune IU! ‘SazyelIOSSe ‘¥202 ‘BZ yenbny rvr™ SOO" SILSSV> ud JOHAR NOLLVLS 3aI4 dOUHLNIM “LS NAC 1VM - b NOILdO mores 3 9 5 TIGERS Serene SmI Dane aera aoe : ere x - if B September, 2024 Town of WINTHROP New Fire Station @ Option 4: Walden Street KAESTLE BOOS Opinion of Probable Costs_~ Concept Level associates, inc Description Subtotals/ Totals Comments 1. Construction Costs HazMat Abatement + Demoltion $180,000 Interpolated Relocate Basketball Courts to Ingleside Park $1,000,000 Site Work $2,750,000 Interpolated FIRE Facility 27,130 sF $13,565,000 Interpolated Subtotal: ~~ $17,495,000 Design/Estimating Contingency @ 15% $2,624,000 Noriko Subtotal Direct Trade Costs: ~ $20,119,000" General Conditions & Overhead @ 8.00% $1,610,000 Noriko Insurance @ 1.40% $304,000 Noriko Bonds @ 1.00% $220,000 Noriko GC Fee (Profit) @ 3.00% $668,000 Noriko Permit Fee @ 1.50% Waived by Town Subtotal; ~~ $22,927,000 Escalation (to 2026 Bid) @ 16,00% $3,667,000 Noriko Total Construction Cost: $26,588,000 2. Equipping Costs Loose Equipment $350,000 Allowance AV Equipment $400,000 Allowance Security / Access Control $543,000 Allowance Furniture & Furnishings $407,000 Allowance Communications Equipment $50,000 Allowance New Antenna Tower / Connection $50,000 Allowance Network & Computers $100,000 Allowance Total Equipping Cost: $1,900,000 3. Owner's Indirect Costs Land Survey $20,000 Completed Geotechnical Investigation +Assess $35,000 Design & Construction A&E fees $2,850,000 10% of Const.& Equip.Cost Additional Services and Reimbursables $360,000 Project Management (OPM) $1,200,000 4.5% of Const.Cost Utility Backcharges $100,000 Allowance Moving $50,000 Allowance Reproduction / Miscellaneous $25,000 ‘Assume OnLine Service Legal/Advertising $40,000 Allowance Material Testing $80,000 Subtotal Owner's Indirect Costs: — $4,760,000 Owner's Contingency (10% of all costs) $2,430,000 Total Owner's Indirect Costs: $7,190,000 Total Project Cost: $35,678,000 dur ‘sajyeloosse SOO84 SILS3SV> ¥200 ‘82 ‘pnbny VW ‘dONHLNIM NOLLVIS 3UI4 dOUHLNIM 8 Ld3DNOD - Z NOILdO September, 2024 Town of WINTHROP New Fire Station @ Option 2: Pauline Street KAESTLE BOOS Opinion of Probable Costs _~ Concept Level associates, inc Description Subtotals/ Totals Comments 1. Construction Costs HazMat Abatement + Demolition $1,500,000 Noriko Relocating Existing Storm Water Pipe $3,696,000 Site Work $2,625,000 Noriko FIRE facility 27,130 SF $13,000,000 Interpolated Subtotal: $20,821,000 Design/Estimating Contingency @ 15% $2,523,000 Subtotal Direct Trade Costs: ~~ $23,344,000 General Conditions & Overhead @ 8.00% $1,868,000 Noriko Insurance @ 1.40% $353,000 Noriko Bonds @ 1.00% $256,000 Noriko GC Fee (Profit) @ 3.00% $775,000 Noriko Permit Fee @ 1.50% Waived by Town Subtotal: $26,596,000 Escalation (to a 2026 Bid) @ 16.00% $4,255,000 Noriko Total Construction Cost: $30,851,000 2. Equipping Costs Loose Equipment $350,000 Allowance AV Equipment $400,000 Allowance Security / Access Control $543,000 Allowance Furniture & Furnishings $407,000 Allowance Communications Equipment $50,000 Allowance New Antenna Tower / Connection $50,000 Allowance Network & Computers $100,000 Allowance Total Equipping Cost: $1,900,000 3. Owner's Indirect Costs Land Survey $20,000 Geotechnical Investigation + Assess. $35,000 Design & Construction A&E fees $3,280,000 10% of Const.& Equip.Cost Additional Services and Reimbursables $360,000 Project Management (OPM) $1,390,000 4.0% of Const.Cost Utility Backcharges $100,000 Allowance Moving $50,000 Allowance Reproduction / Miscellaneous $25,000 Assume Online Service Legal/Adveritising $40,000 Allowance Material Testing $80,000 Subtotal Owner's Indirect Costs: — $5,380,000 Owner's Contingency (10% of all costs) $2,820,000 Total Owner's Indirect Costs: $8,200,000 Total Project Cost: $40,951,000