Winthrop Hazard Mitigation Plan 2025 Update Public Presentation on the Draft Plan October 22, 2025 Winthrop Town Hall Martin Pillsbury Metropolitan Area Planning Council Background: Hazard Mitigation Overview of Hazard Mitigation Planning Why is Winthrop doing this plan? • Disaster Mitigation Act of 2000 : FEMA National Hazard Mitigation Guidelines • Periodic Plan Updates: Updated data and priorities • FEMA grant eligibility: Approved Plan required for FEMA Mitigation Grants Overview of Hazard Mitigation Planning 1. What preventative actions are being taken now to reduce risks and damages? 2. What additional actions can be taken in the future to increase resilience? A plan for Multiple Natural Hazards Flooding (coastal and inland) Wind events (thunderstorms, hurricanes, tornadoes) Winter hazards (blizzards, nor’easters) Geologic hazards (earthquakes, landslides) Wild Fires Extreme temperatures and drought Reducing impacts of natural hazards through strategies including projects, programs, and policies. Breaking the Cycle of Disaster & Rebuilding Disaster ▪ Prevention ▪ Property Protection ▪ Public Education and Outreach ▪ Protect Natural Resources ▪ Structural Projects (culverts, pumps, dams) ▪ Emergency Services Protection Hazards Mitigation and Climate Change Natural Hazards: a source of harm created by an environmental or geological event, including flooding and earthquakes Natural Hazard Mitigation: reducing damage from natural hazards, including short- term, episodic events Climate Change: increases the frequency, duration, and intensity of natural hazards; including heat, drought, and precipitation Climate Adaptation: reducing the risk to, and mitigating impacts from, the increasing frequency of natural hazards Adapting to the expected impacts of climate change is a form of hazard mitigation ing Process Plann The Process Guided by the Local Hazard Mitigation Team Local Team Role: • Update critical facilities and local hazard areas • Review mitigation goals • Provide local knowledge on existing mitigation measures • Review mitigation actions for the updated plan • Town Manager/Asst. TM • Fire Department • Police Department • Department of Public Works • Planning Board • Conservation Commission Board of Appeals • Building Commissioner • Public Health • Resilience Manager • Sustainability Manager Plan Development Process TEAM#1: Update & Map Critical Facilities Assessment of Risks & Vulnerabilities TEAM#2: Review Existing Mitigation TEAM #3 Update Status of Mitigation 1st Public Meeting TEAM #4 Review the Mitigation Strategy Prepare Draft Plan 2 nd Public Meeting Review Draft Plan We are here! Hazards and Vulnerability Identified by the Local Team: Yrillel Beach Shirley Street Neighborhood Lewis Lake Somerset seawall & headwall Cottage Park seawall & headwall Sargent Street seawall & headwall Woodside seawall & headwall Coughlin Park Bayou Street Neighborhood Ingleside Park Lower Nahant Avenue Pico Avenue Morton Street Washington Avenue & River Road Pleasant Street @ Girdlestone Rd. Local Flood Hazard Areas Examples of Critical Facility Sites Identified by the Local Team: Winthrop Police Dept Winthrop Fire HQ Winthrop DPW Building Winthrop EOC Town Hall Public Safety Communication Tower Belle Isle Bridge Lewis Lake Tidal Gate Stone Revetment, Seawall Pico Sewer Pump Station Winthrop Water Storage Tank Deer Island Wastewater Facility Pleasant Times Day Care Arthur Cummings School Children's Corner Preschool Winthrop Senior Center Other Natural Hazards Extreme Heat Drought Extreme Precipitation Wildfires Earthquakes Wind & Winter Hazards: Nor’easters/Blizzards Storm Event Date Superstorm Sandy October/November 2012 Severe Winter Storm, Snowstorm, Flooding February 2013 Severe Winter Storm, Snowstorm, Flooding January 2015 Severe Winter Storm March 2018 Severe Winter Storm, Blizzard December 2020 Severe Winter Storm, Snowstorm, Flooding February, April, October 2021 Mitigation Recommendations Mitigation Recommendations for the 2025 Plan COASTAL FLOODING A. Yirrill Beach project B. Lewis Lake drainage improvements C. Boston Harbor Drainage Outfall upgrade headwalls and seawalls D. Community Rating System: Consider submitting a CRS application E. Land acquisition: Acquire vacant flood prone lands if they become available FLOODING FROM PRECIPITATION F. Ingleside Park drainage assessment and improvements G. Lower Nahant Avenue drainage improvements H. Upgrade Bayou Street drain line; consider closed pipe system I. Morton Street:, and outfall chambers. J. Girdlestone Road/ Tileston Road: Implement drainage improvements, K. Pico Ave: Implement drainage improvements L. Utility Elevations: Complete utility elevation project in flood hazard areas Mitigation Recommendations for the 2025 Plan EXTREME WEATHER / WINTER HAZARDS M. Work to ensure electrical utilities are properly maintained WILDFIRE HAZARDS N. Develop and maintain a wildfire database DROUGHT HAZARDS O. Incorporate drought tolerant species into land use regulations P. Require permeable surfaces to promote infiltration and reduce runoff EXTREME TEMPERATURES Q. Public education on cooling centers and warming centers. GEOLOGIC HAZARDS R. Building Code: Local enforcement of the requirements of the MA Building Code Mitigation Recommendations for the 2025 Plan MULTI-HAZARDS S. Upgrade emergency generators: Town Hall/EOC T. Micro Grid: Investigate the benefits and feasibility of a micro grid to ensure resilient energy supply to critical facilities U. Coordinated Access and Evacuation: Collaborate with DCR, MassDOT and Boston to ensure coordinated access connecting Winthrop to the mainland for emergency access and evacuation. V. Integrate Hazard Mitigation into local plans and land use review processes: W. Incentivize Hazard Mitigation by adopting a local Stormwater Fee X. Increase Hazard Education and Risk Awareness Final Steps for Developing the Plan 1. Review & Finalize the Plan – The Town welcomes questions and comments 2. FEMA & MEMA Review of the Plan – Revisions if required 3. Town Adoption of Final Plan – After FEMA approval of the Plan \ The updated plan will be approved by FEMA for the next 5 years The Town will be eligible for FEMA grants for mitigation projects The Town wants to hear from you… WinthropResilience@mapc.org Please send by November 10 Questions and Comments may be sent to: The Draft Plan is available at: www.mapc.org/resource - library/winthrop - hmp
related records
Records whose documents say similar things, nearest first.