Resilient Winthrop: Designing Coastal Community Infrastructure for Climate Change
Town of Winthrop · from the Town's website · 188 pages · 25.5 MB
open the file ↗ · original at the source ↗
Resilient Winthrop
Designing Coastal Community
Infrastructure for Climate Change
July 27, 2017
Prepared by
Town of Winthrop
1 Metcalf Square
Winthrop, MA 02152
Massachusetts Office
of Coastal Zone
Management
251 Causeway Street
Boston, MA 02114
Stantec
226 Causeway Street, 6th Fl.
Boston, MA 02114
Woods Hole Group
81 Technology Park Drive
East Falmouth, MA 02536
Financial assistance provided by the Executive Office of Energy & Environmental Affairs (EEA), through the
Massachusetts Office of Coastal Zone Management (CZM), under the FY17 Coastal Community Resilience Grant
Program. This program provides financial and technical resources to advance new and innovative local efforts to
increase awareness of climate impacts, identify vulnerabilities, and implement measures to increase community
resilience.
a
Resilient Winthrop
Designing Coastal Community
Infrastructure for Climate Change
Contents
Executive Summary
V ulnerability Assessment Purpose
V ulnerability Assessment Process
Future Areas of Coastal Flooding
Critical Public Infrastructure
Likely Flood Areas in Winthrop
Critical Public Infrastructure
L iving with Coastal Waters
Site-Specific Adaptation Measures
Shoreline Adaptation Measures
Regulation and Policy
Implementation
Next Steps
1
2
3
4
5
6
7
8
9
10
11
12
IDENTIFY
PRIORITIZE
STRATEGIZE
b
List of Tables
Table E-1 Prioritized Critical Public Infrastructure iii
Table E-2 Shoreline Adaptation Concept Information v
Table E-3 Pump Station Adaptation Concept Information v
Table 5-1 Flood Area Existing Conditions – Belle Isle Marsh 5-3
Table 5-2 Probable Future Flooding – Belle Isle Marsh 5-4
Table 5-3 Flood Area Existing Conditions – Nahant Avenue 5-5
Table 5-4 Probable Future Flooding – Nahant Avenue 5-6
Table 5-5 Flood Area Existing Conditions – Winthrop Beach 5-7
Table 5-6 Probable Future Flooding– Winthrop Beach 5-8
Table 5-7 Flood Area Existing Conditions - Lewis Lake 5-11
Table 5-8 Probable Future Flooding – Lewis Lake 5-12
Table 5-9 Flood Area Existing Conditions – Point Shirley 5-14
Table 5-10 Probable Future Flooding – Point Shirley 5-15
Table 5-11 Flood Area Existing Conditions – Fishermen’s Bend 5-17
Table 5-12 Probable Future Flooding – Fishermen’s Bend 5-17
Table 5-13 Flood Area Existing Conditions – Ingleside Park 5-19
Table 5-14 Probable Future Flooding – Ingleside Park 5-19
Table 5-15 Flood Area Existing Conditions – Girdlestone Road 5-20
Table 5-16 Probable Future Flooding – Girdlestone Road 5-21
Table 6-1 Critical Public Infrastructure Risk Scores and Ranking 6-5
Table 8-1 Range of costs for site adaptations 8-3
Table 8-2 Potential Sewer Pump Station Flood Depths and Adaptation Installations 8-4
Table 11-1 Range of costs for Pump Station adaptations 11-1
Table 11-2 Range of costs for shoreline / area adaptation 11-2
Table 11-3 Potential Permits Needed for Shoreline Construction 11-4
c
List of Figures
Figure E-1 Locus Map i
Figure E-2 Map of 2030 Flood Areas and Adaptation Locations iv
Figure 3-1 Fisherman's Bend, October 2016 3-2
Figure 3-2 Town-Identified Areas of Local Flooding 3-3
Figure 3-3 Winthrop Areas of Probable Flooding 3-5
Figure 3-4 Winthrop Depth of Flooding (1% Chance water level) 3-6
Figure 3-5 Areas where Wetland Mitigation will be Limited by Existing Development 3-8
Figure 3-6 Winthrop SLAMM Maps 3-9
Figure 3-7 2070 SLAMM Model with Existing Development 3-10
Figure 4-1 Town-Identified Critical Public Infrastructure Locations 4-1
Figure 5-1 Town-Identified Areas of Local Flooding 5-1
Figure 5-2 Timeline of Storm Structure Construction along Winthrop Beach 5-9
Figure 6-1 Prioritized Critical Public Infrastructure in Winthrop 6-4
Figure 9-1 Map of Adaptation Locations 9-6
Figure 9-2 Belle Isle Marsh Coastal Flood Modeling for Projected 2030 1% Chance Storm 9-8
Figure 9-3 Potential Flood Levels at the Belle Isle Bridge 9-9
Figure 9-4 Morton Street Concept Plan 9-10
Figure 9-5 Section A-A 1 (Morton Street) 9-10
Figure 9-6 Potential Morton Street Flood Levels 9-11
Figure 9-7 Ingleside Park Coastal Flood Modeling for Projected 2030 1% Chance Storm 9-13
Figure 9-8 Pleasant Street Concept Plan 9-14
Figure 9-9 Potential Pleasant Street Flood Levels 9-15
Figure 9-10 Section A-A 1 (Pleasant Street ) 9-15
Figure 9-11 Lewis Lake Coastal Flood Modeling for Projected 2030 1% Chance Storm 9-17
Figure 9-12 Washington Avenue Concept Plan 9-20
Figure 9-13 Section A-A 1 (Washington Avenue) 9-20
Figure 9-14 Potential Washington Avenue Flood Levels 9-21
Figure 9-15 Point Shirley Coastal Flood Modeling for Projected 2030 1% Chance Storm 9-23
Figure 9-16 Point Shirley Concept Plan 9-24
Figure 9-17 Section A-A 1 (Yirrell Beach) 9-25
d
List of Appendices
Appendix A - Glossary of Terms and Abbreviations
Appendix B - References A-5
Appendix C - Inundation Modeling A-9
Appendix D - Boston Harbor Flood Risk Model (BH-FRM) Mapping A-13
Appendix E - Probability of Exceedance Curve Data A-21
Appendix F - Winthrop Natural Resource Evolution Summary A-31
Appendix G - Critical Public Infrastructure Scoring Guidance A-45
Appendix H - Infrastructure Criticality Matrix A-47
Appendix I - Critical Infrastructure Risk Scores A-53
Appendix J - Modeled Flood Pathways A-55
Appendix K - Modeled Adaptation Measures A-61
i EXECUTIVE SUMMARY
Living in a coastal community, most Winthrop
residents are not surprised by the likelihood
of increased coastal flooding as a result of
climate change. They have experienced more
intense, frequent storms in recent years and
seen the effect that the combined impact of
storm surge and sea level rise can have upon
the shoreline. Residents expect that areas
experiencing coastal flooding, and perhaps
increased flooding, will continue to experience
flooding in the future if preventative measures
are not taken. That being said, most residents
have not thought much about how increased
coastal flooding could impact the infrastructure
systems that support their daily lives, and
change the natural resources that are an
important part of the physical character of the
town.
Based on the Boston Harbor Flood Risk
Model (BH-FRM), approximately 480 acres of
Winthrop’s 1.6 square miles is within a coastal
flooding area in present day, 500 acres in 2030,
and 800 acres in 2070 at a 1% chance water
level. The 1% chance water level depicts the
flood impacts of a storm event that occurs
every 100 years. While the flood area doesn’t
expand dramatically in future years due to the
geographic and topographic lay of the land
(e.g. series of drumlins connected by low lying
land), the depth of flooding during a storm
event does increase dramatically looking to
2070.
From a regional perspective, coastal flooding
in Winthrop has the potential for widespread
impacts given the Town’s geographic location
within Boston Harbor and as the only landside
connection to the Massachusetts Water
Resource Authority’s Deer Island Wastewater
Treatment Plant. Winthrop is an important part
of the Boston Harbor Flood Barrier Study,
which is being led by UMass Boston with
CLIMATE CHANGE
"any significant change in the
measures of climate lasting for an
extended period of time, including
major changes in temperature,
precipitation, or wind patterns."
- US EPA (2014)
Winthrop
Boston
Hull
Quincy
Weymouth
Hingham
Revere
Nahant
BOSTON
HARBOR
Figure E-1 Locus Map
Winthrop's location within Boston Harbor
support from the Barr Foundation.
The criticality of Winthrop to the region
broadens the resilience dialogue and heightens
the need for proactive adaptation planning.
RESILIENT WINTHROP: Executive Summary
ii EXECUTIVE SUMMARY
Assessment Process and
Findings
This Climate Change Vulnerability Assessment
followed a three step identify-prioritize-
strategize process focused on the vulnerability
of public infrastructure and natural resources
to coastal flooding.
Identify: What areas of Winthrop are
at risk of coastal flooding? What public
infrastructure is located in these areas?
Eight (8) primary flood areas were
identified within Winthrop. Withing these
areas, there were sixteen (16) critical
public infrastructure assets/facilities
susceptible to coastal flooding.
Prioritize: How critical is this
infrastructure and what is the likelihood
that it will flood?
Assets/facilities were ranked by criticality
independent of flood risk. Highest ranked
assets included Shirley Street, Argyle
Street Substation, emergency evacuation
routes, and the pump station. Factoring in
the probability of flooding led to certain
assets/facilities becoming a higher or lower
priority. Pump stations and key emergency
evacuation routes received the highest risk
score and thus priority.
The following table shows the prioritized
critical public infrastructure in Winthrop. Town
officials and the consulting team all took part
in the prioritization process.
Contained within the Winthrop mapped coastal
flooding areas are critical public infrastructure
assets/facilities that support daily life in
Winthrop - sewer pump stations, evacuation
routes, a substation, pressure reducing valve
stations, Winthrop High School, Beach Fire
Station, and Town Landing, for example.
Each of these assets/facilities are critical for:
The last criticality criteria accounts for
the fact that loss or damage from coastal
flooding could be limited to one property or a
neighborhood, it could also have widespread
impacts to the town or region.
Public Safety & Emergency
Services: How important is the
asset to community evacuation and
disaster response operations?
Social & Economic Activities:
How important is the asset to
providing people with access or
service to their homes and jobs?
Public Health & Environment:
How important is the asset to
controlling human exposure to
pollutants and secondary impacts
to the natural environment?
Area of Service Loss: Who is
impacted by the loss of or damage
to the core functions of the asset?
iii EXECUTIVE SUMMARY
Strategize: How can Winthrop adapt
to coastal flooding to help protect the
critical public infrastructure in town?
Based on priority ranking, one asset type
(pump stations) and four flood areas
(Belle Isle Marsh, Ingleside Park, Lewis
Lake, and Point Shirley) were selected
for concept designs. Creative adaptation
concepts of various scales (site-specific vs.
shoreline) were considered, each of which
addressing the technical aspects of coastal
flooding and advancing community and
environmental goals.
PRIORITY
RANK CRITICAL PUBLIC INFRASTRUCTURE FLOOD AREA SECTOR
1 Pico Sewer Pump Station Fishermen's Bend Water and Wastewater
2 Pleasant Court Sewer Pump Station Belle Isle Marsh Water and Wastewater
3 Washington Street (town evacuation route) Lewis Lake Transportation - Roadway
4 Main Street (town evacuation route) Belle Isle Marsh Transportation - Roadway
5 Pleasant Street (town evacuation route) Ingleside Park Transportation - Roadway
6 Beach Fire Station Lewis Lake Buildings
7 Winthrop High School Lewis Lake Buildings
8 Pressure Reducing Valve Station (Bayview Avenue) Point Shirley Water
9 Pressure Reducing Valve Station (Underhill Street) Winthrop Beach Water
10 Shirley Street (town evacuation/MWRA truck route) Point Shirley Transportation
11 Public Landing Point Shirley Transportation - Maritime
12 Pressure Reducing Valve Station (Revere Street) Belle Isle Marsh Water
13 Revere Street Sewer Pump Station Belle Isle Marsh Water and Wastewater
14 Belle Isle Bridge Belle Isle Marsh Transportation - Roadway
15 Power Substation (Argyle Street) Belle Isle Marsh Energy
16 Loring Road Boat Ramp Ingleside Park Transportation - Maritime
Complementary to the assessment’s focus on
publicly-owned infrastructure systems was
consideration of the impact of sea level rise
and storm surge to natural resources. The
Commonwealth’s Sea Level Affecting Salt
Marshes Model (SLAMM) shows the likely
progression of wetland migration across
Winthrop over the next several decades.
A large portion of the projected wetland
transitions and expansions are predicted to
occur in the existing open areas of Winthrop,
including, but not limited to, wetlands adjacent
to the Winthrop Cemetery and Coughlin Park.
These areas will likely experience significant
changes in land cover and wetland type and
may offer opportunities for natural resource
management and/or expansion due to the
changing climate.
Table E-1 Prioritized Critical Public Infrastructure
iv EXECUTIVE SUMMARY
Lewis
Lake
Snake
Island
Coughlin
Park
Deer Island
Boston Logan
International Airport
Deer Island
Wastewater
Treatment Plant
N
SHORT BEACH
CREEK
BELLE ISLE
MARSH
BOSTON
HARBOR
BOSTON
HARBOR
BOSTON
HARBOR
BELLE ISLE
INLET
BROAD SOUND
BROAD SOUND
The Five Sisters
Winthrop
Head
Winthrop
Beach
Donovan’s
Beach
Crystal
Cove
Town
Landing
Pico Playground
& Beach
Town
Hall
Winthrop
High School
Small Park
Small Beach
Fort Banks
Playground
Yirrell
Beach
Little
League
Field Miller
Field
Winthrop
Golf Club
Veterans
Field
Central Business
District
The Basin
Winthrop
Cemetery
Washington Ave
Winthrop St
Winthrop St
Main St
Pleasant St
Shirley St
Shirley St
Veterans Road
Winthrop Shore Dr
Revere St
Morton Street
Figure E-2 Map of 2030 Flood Areas and Adaptation Locations
REVERE ST PUMP
STATION
PLEASANT COURT
PUMP STATION
PICO AVE PUMP
STATION
NAHANT AVENUE
FLOOD AREA
(7.5 AC)
LEWIS LAKE
FLOOD AREA
(153 AC)
BELLE ISLE MARSH
FLOOD AREA
(106 AC)
INGLESIDE PARK
FLOOD AREA
(38 AC)
WINTHROP BEACH
FLOOD AREA
(88 AC)
POINT SHIRLEY
FLOOD AREA
(88 AC)
Shoreline Adaptation
Site Specific Adaptation
FISHERMEN'S BEND
FLOOD AREA
(35 AC)
v
Adaptation Concepts
Shoreline Adaptations
Shoreline strategies for four focus areas were advanced to concept designs. The concept designs were modeled for effectiveness using the BH-FRM for the 1% chance flood depth in 2030 (the depth of flooding relative to sea
level and storm surge during a 100 year storm event). The height of each adaptation was modeled at this elevation, plus one foot of freeboard (e.g. a 4-foot projected water surface elevation would be modeled for a 5-foot-tall
barrier). Each adaptation should allow for additional linear or vertical modifications to account for changes in future conditions. The following tables contain general information and cost estimates for each adaptation concept.
* Estimates include approximate cost of materials
and labor for installation. Estimates do not include
design, permitting, right-of-way acquisition,
construction mobilization and demobilization,
operations, or maintenance.
Key to Estimated Range of Costs:
$ = <$100,000 ; $$ = $100,000
to $500,000 ; $$$ = $500,000 to
$3,000,000 ; $$$$ = $3,000,000
PUMP STATION ADAPTATION TYPE CONSTRUCTION COST ESTIMATE*
Stop Logs $4,000 - $6,000 each
Watertight Exhaust Ducts $10,000 - $15,000 each
Watertight Floor Hatches $10,000 - $15,000 each
Repoint Building Façade 5-feet above grade $20 - $30 per square foot
Waterproof Building Façade 5-feet above grade $5 - $10 per square foot
Raise Outdoor Equipment Pads $500 – $1,000 each
Raise Electrical Equipment Supports $10 - $20 each
Work Platforms for Raised Electrical Equipment $50 - $100 each
5-ft Concrete Perimeter Wall $300 - $500 per linear foot
FLOOD
AREA
APPROX.
2030
FLOOD
AREA
(ACRES)
CRITICAL PUBLIC
INFRASTRUCTURE
1% CHANCE
FLOOD DEPTH
(FEET) RECOMMENDED ADAPTATION
CONCEPT
POTENTIAL
HEIGHT OF
INSTALLATION
(FEET)
POTENTIAL
LENGTH OF
INSTALLATION
(FEET)
MODELED EFFECTIVENESS FOR FLOOD PROTECTION
UNDER 1% CHANCE FLOOD DEPTH (2030)
2030 COST OF
CONSTRUCTION*
2070 ADDITIONAL
COST*
2030 2070
Belle Isle
Marsh 106
Main Street (Evacuation
Route & Deer Island
Trucking Route)
2'-25'' 6' Planted berm / elevated sidewalk with
knee wall along Morton Street right-of-way. 1'-3" 625 Relatively ineffective solely along Morton Street. Needs to extend further
west & south along the inlet. $$$ $$$-Engineered
flood barrier
Ingleside
Park 38 Pleasant Street (Evacuation
Route) 8'' 3'-5'' Hybrid seawall, with seating & planting
adjacent to Donovan’s Beach. 1'-9" 325 Effective as a coastal flood adaptation. $$$ $$-Engineered
flood barrier
Lewis Lake 153
Washington Avenue
(Evacuation Route,
Winthrop High School)
1'-5'' 4'-25" Flood barrier at Washington Avenue. 2'-6" 900 Effective as a coastal flood adaptation, if culvert & tide gate system at
Crystal Cove work as intended. $$$ $$
Point
Shirley 88
Shirley Street/Tafts Avenue
(Evacuation & Deer Island
Trucking Route)
12'' 4'
Beach nourishment / dune creation at Yirrell
Beach (pending design study). Pending design
study 3,850 Effective in reducing wave overtopping & flood depth levels if properly
engineered.
$ $$$$$
Dune creation at Yirrell Beach (pending
design study). $$$$ to $$$$$ $$$$$
Site Specific Adaptations
Three major sewer pump stations in town are identified within BH-
FRM flood areas. These stations collect and distribute hundreds of
thousands of gallons of sewage each day. The stations are at specific
low points in the community to collect neighborhood waste and
pump it out to the larger sewer mains. Pump station retrofits such as
perimeter walls and dry floodproofing techniques and other information
are identified in the following table. These adaptation measures may
also be applied to other asset types, private residences and commercial
buildings.
Table E-2 Shoreline Adaptation Concept Information
Table E-3 Pump Station Adaptation Concept Information
EXECUTIVE SUMMARY
This page intentionally blank
vii EXECUTIVE SUMMARY
Following completion of this assessment,
the next step for the Town is to advance
the concept designs and assessment
recommendations towards implementation and
expand the resilience discussion to include
consideration of other climate-related hazards
and community assets. Doing so will require
a commitment from the Town, its residents
and business owners, and agency partners to
advance community resilience at all scales in
the short and long term.
In Fall 2017, the Town will begin a community
resilience building workshop process as part of
the Commonwealth’s Municipal Vulnerability
Preparedness (MVP) Program . This Program
expands the focus from just coastal flooding to
include consideration of other climate-related
hazards such as increased precipitation and
heat, for example. Results of the workshop
and planning efforts will be used to inform
existing local plans, grant applications,
budgets, and policies.
This study was completed with a cross section
of input from residents at two public meetings
and the help of the Project Management Team
which included representation from the Town
Manager’s Office, Department of Public
Works, Fire Department, Police Department,
Conservation Commission, Massachusetts
Office of Coastal Zone Management and the
consultant team from Stantec and Woods Hole
Group.
This page intentionally blank
1-1 VULNERABILITY ASSESSMENT PURPOSE
Many small coastal communities in
Massachusetts have experienced the waves,
high winds, and severe flooding that are
delivered by Nor’easters and hurricanes.
These storms can damage homes, cause
power outages, and impact local and regional
infrastructure and operations. Sea levels
are anticipated to rise more than six inches
over the next 15 years, and more than three
feet over the next 50 years. Climate change
is expected to cause higher high tides and
longer, more intense, and more frequent
storms. Therefore, it is important for coastal
communities like Winthrop to prepare for an
unpredictable future environment.
As the Commonwealth advances an integrated
climate change strategy (Executive Order
569), Massachusetts communities are working
to implement policies and adaption measures
at the regional and local level to enhance
resiliency and climate preparedness. At the
regional level, the Metro Mayors Coalition
set climate preparedness as its programmatic
priority, and established the Metro Boston
Climate Preparedness Taskforce. The
Taskforce is working to shape and drive
forward increased collaborations that advance
regional resiliency.
STUDY GOAL:
To identify and prioritize critical
public infrastructure vulnerable
to coastal flooding and explore
adaptation measures to improve
infrastructure and natural resource
resilience over a range of future
conditions.
1 VULNERABILITY ASSESSMENT
PURPOSE
View of the Winthrop Water Tower as seen
from Pico Beach
1-2 VULNERABILITY ASSESSMENT PURPOSE
Through participation on the Taskforce and
a review of municipal priorities, the Town of
Winthrop has proactively begun to design and
construct improvements to reduce the impacts
of coastal flooding at critical infrastructure
locations. Efforts like the Winthrop Hazard
Mitigation Plan, Winthrop Harbor Plan, and
Coughlin Park Green Infrastructure Study have
exhibited the Town’s commitment to assessing
the vulnerability levels and existing conditions
of both the built and natural environment.
Other state and federally funded efforts to
address coastal flooding in Winthrop include
improvements along Winthrop Shore Drive,
Winthrop Beach, Tafts Avenue, and Lewis
Lake.
Each of these infrastructure improvement
projects addresses flooding issues in different
areas of Winthrop. However, the Town
recognizes the need to take a step back and
evaluate critical infrastructure at a Town-
COMMUNITY
RESILIENCE
"the capability to anticipate
risk, limit impact, and bounce
back rapidly through survival,
adaptability, evolution, and growth
in the face of ... change."
- Definitions of Community Resilience: An
Analysis (A CARRI Report)
wide level. This vulnerability assessment will
assist the Town with the prioritization and
strategic implementation of projects to help
infrastructure assets and areas most at risk
from coastal flooding become more resilient.
This information will also inform individual
home-owners about what they might expect on
their own properties, regarding future coastal
flooding.
Row boat on flooded Shirley Street, November 1932,
Courtesy of the Boston Public Library, Leslie Jones Collection.
2-1 VULNERABILITY ASSESSMENT PROCESS
2 VULNERABILITY ASSESSMENT
PROCESS
Settled in 1630, Winthrop is one of the oldest
communities in the United States. At 1.6
square miles and an estimated population of
17,500, Winthrop is also one of the smallest
and most densely populated municipalities
in Massachusetts. With 8.3 miles of tidal
shoreline and a small geographic footprint,
Winthrop is particularly vulnerable to coastal
flooding from sea level rise and climate
change.
The increasing chance of coastal flooding
threatens Winthrop’s shoreline, including
public facilities, infrastructure, recreational
areas, and coastal ecosystems. Today,
VULNERABILITY:
"Structures, systems, populations,
or other community assets as
defined by the community, that
are susceptible to damage and
loss from hazard events."
- FEMA Local Mitigation Plan Review Guide
(2011)
Source: Winthrop town website
approximately 45% of the 1.6 sq mi town is
within a flood zone. That's nearly 480 acres.
By 2030, it could increase to 50% (500 acres),
and 60% (800 acres) by 2070.
2-2 VULNERABILITY ASSESSMENT PROCESS
PRIORITIZE
How critical is this infrastructure
and what is the likelihood that it
will flood?
STRATEGIZE
How can Winthrop adapt to
coastal flooding to help protect
the critical public infrastructure in
town?
IDENTIFY
What areas of Winthrop are at risk
of coastal flooding? What public
infrastructure is located in these
areas?
The assessment begins by explaining the
development history of Winthrop and the
areas of the Town most likely to experience
coastal flooding based on sea level rise
projections and a wide range of potential
storm events. This information allows us
to locate existing public infrastructure and
natural resources within seven vulnerable
areas of the Town. (Chapters 3 , 4 & 5 )
The next step includes evaluating identified
public infrastructure assets based on how
critical they are to the community-at-large,
and how likely they are to flood in present
day, 2030, and 2070. The result is a total
risk score that can be used as the basis for
prioritizing investments. (Chapter 6 )
The last part of the assessment
recommends site-specific, shoreline,
and policy or regulatory measures
to improve the resilience of critical
public infrastructure. It also lays the
foundation for follow on efforts and future
implementation phases. (Chapters 7 - 12 )
Considering this, the goal of this climate
change vulnerability assessment is to evaluate
potential impacts of coastal flooding in the
Town of Winthrop, based on what we know
about extreme weather and sea level rise, and
to identify measures to protect critical public
infrastructure.
A 3-step process was followed for this
assessment:
2-3 VULNERABILITY ASSESSMENT PROCESS
Throughout the assessment process, critical
infrastructure, potential areas of flooding,
and neighborhoods were targeted through the
cooperative engagement of a consultant team,
residents, and the input of Town staff.
The Town established a Project Management
Team (PMT) to facilitate and manage project
implementation. The Team met on multiple
occasions to share local knowledge, review
datasets, and discuss preliminary concepts. The
PMT includes:
• Joe Domelowicz Jr., Assistant to
the Town Manager for Grants and
Economic Development
• Steve Calla, Department of Public
Works Director
• Terrence Delehanty, Police Chief
• Paul Flanagan, Fire Chief
• Kara Campbell, Conservation Agent
• Lisa Engler & Patricia Bowie, Coastal
Zone Management (CZM)
• Staff from the consultant team at
Stantec and Woods Hole Group
Two public meetings were held throughout the
project to gather local knowledge and opinion:
The first public meeting was held on April 5,
2017 at EB Newton to:
• explain the purpose and scope of the
project
• present the Boston Harbor Flood Risk
Maps (BH-FRM) modeling by Woods
Hole Group
• provide an opportunity to ask
questions.
An open house and public meeting was held on
May 23, 2017 at Winthrop Town Hall to:
• present the BH-FRM modeling for
future years 2030 and 2050 (Chapter 3)
• explain how critical infrastructure was
identified and selected (Chapter 6)
• present potential adaptation measures
for sites and shorelines throughout
town (Chapter 7)
• provide an opportunity to comment and
ask questions.
A meeting was also held with the Department
of Conservation and Recreation (DCR) on
June 12, 2017. A subsequent meeting will
be scheduled with the Massachusetts Water
Resources Authority (MWRA) to discuss the
findings of this assessment.
April 5, 2017 public meeting at EB Newton,
2-4
This page intentionally blank
3-1 IDENTIFY: Future Areas of Coastal Flooding
1894 drawing of Winthrop, showing
Washington Street Bridge over Fisher's Creek
(AF Poole)
This section focuses on understanding where
Winthrop has and is experiencing flooding,
where there are likely future flooding
locations, and what has been done to address
the flood risk. Once the challenge locations are
known, a conversation can be had regarding
potential adaptation measures and means of
project funding.
Coastal flooding occurs when the waves, storm
surge, and tides overtop the shoreline and
low-lying areas become submerged. While
there are additional factors that contribute to
flooding within our built environments (such
as intense precipitation events that can cause a
rising water table and increase in stormwater
runoff from roofs, roadways, and parking
areas), coastal based flooding is the focus
of this vulnerability assessment. Additional
localized flooding should also be assessed as
part of future studies.
Coastal Development in
Winthrop
Winthrop was settled by Europeans in 1635
(MHC, 1981). Historic mapping shows four
farming plots during this period, and a small
fishing village at Point Shirley by the mid-18 th
century. These maps also illustrate the marsh
land and open water that has filled over the
years due to natural events and human activity.
The most notable changes include Fisher’s
Creek and Shirley Gut.
3 IDENTIFY: Future Areas of
Coastal Flooding
Figure 2. Historic Map of Boston Harbor, 1775
Illustration of Point Shirley, Deer Island, and
Shirley Gut, c. 1775. ("Boston: Its Environs and
Harbour," Sir Thomas Hyde)
3-2 IDENTIFY: Future Areas of Coastal Flooding
Lewis Lake was previously an extensive marsh
surrounding Fisher’s Creek. It was open to
Boston Harbor until the mid-19th century, but
was bridged in the 1880s and subsequently
filled, with a tide gate installed in the early
20th century (MHC, 1993). Shirley’s Gut once
separated Point Shirley from Deer Island. By
the 20th century, sand drifted into the narrow
waterway, and the Hurricane of 1938 finally
filled it, connecting Winthrop to Deer Island
(Culhane et. al.). Locations such as these
are common around town, where low lying,
previously wet land is now developed.
The existing high tide elevation is currently
between 9 and 10 feet. Sea level rise can be
gaged during King Tides ( Figure 3-1 ). This
extreme tide event suggests what the average
high tide may look like within the next half
century (DeCosta-Klipa, 2016). Of note,
the King Tide on October 17-19, 2016 was
between one and two feet higher than a normal
high tide.
The areas of filled tidelands and the rising
sea level give some indication of where the
water wants to go during storms and/or high
tide events. This idea is emphasized in the
historic and present account of the flooding in
Winthrop, as well as the future coastal flood
modeling, presented in this chapter.
KING TIDE
The King Tide is the highest predicted high
tide of the year at a coastal location. It is
above the highest water level reached at
high tide on an average day
- US EPA (https://www.epa.gov/cre/king-
tides-and-climate-change)
Figure 3-1 Fisherman's Bend, October 2016, at typical high tide (left) and King Tide (right)
(mycoast.org King Tide Report by Joanne Anderson)
3-3 IDENTIFY: Future Areas of Coastal Flooding
Historic and Current Flooding
Locations
Several recorded and anecdotal storm events,
specific to coastal flooding, were noted in
the 2014 Winthrop Hazard Mitigation Plan
(HMP), including:
• 16 coastal flood events between 2006
and 2014, resulting in $3.11 million in
property damage.
• 40 heavy snowfall events between
1996 and 2014, including $9.6 million
in property damage.
• Ten severe winter storms recorded
between 1978 and 2013 – seven of
which occurred after the year 2000.
The coastal flood of 1978 (blizzard) remains
the record high flooding event in Winthrop
to date. After the Blizzard of 1978, high
water marks inventoried by the United States
Geological Survey, U.S. Army Corps of
Engineers, and Massachusetts Department of
Public Works were recorded between 9.5 and
12 feet above Mean Sea Level. (HMP, 2014)
The Federal Emergency Management Agency
(FEMA) uses historical climate information
to estimate potential damages from natural
hazards. Flood zones are modeled to define
areas at risk of flooding. The areas are
illustrated on Flood Insurance Rate Maps
(FIRMs), which identify properties required to
obtain flood insurance.
The FIRMs issued in 2016 for Winthrop show
approximately 45% of town within the 1%
annual chance flood (also known as the 100-
year storm).
Anecdotal information regarding local
flooding, gathered from the town during
the 2014 Winthrop Hazard Mitigation Plan,
supports the FEMA data. In addition to
identifying various seawalls and headwalls
(Woodside Ave, Somerset Ave, Sargent St,
Cottage Park Rd), areas of local flooding
included:
Yirrell Beach
Shirley Street Neighborhood
Lewis Lake
Ingleside Park
Lower Nahant Avenue
Coughlin Park
Bayou Street Neighborhood
A more in-depth review of these areas
is included as part of Chapter 5 of this
vulnerability assessment.
Figure 3-2 Town-Identified Areas of Local
Flooding
REVERE
DEER
ISLAND
A
B
C
D
E
F
G
A
B
C
D
E
F
G
3-4 IDENTIFY: Future Areas of Coastal Flooding
Boston Harbor Flood Risk
Model (BH-FRM)
A scientifically accurate, dynamic, robust,
and probability-based analysis of potential
flooding in Winthrop is key to effectively
evaluate the risks of future sea level rise
and storm surge. This allows the Town to
identify and prioritize areas and assets within
probable areas of flooding. Then potential
adaptation options can be studied in order to
build overall resilience for the community.
Using established techniques and previously
generated model data from work with the
Massachusetts Department of Transportation,
probabilistic flood information forms the basis
for the vulnerability assessment in the Town of
Winthrop.
Sea level rise and storm surge can be modeled
in a number of different ways. This assessment
utilizes the Boston Harbor Flood Risk Model
(BH-FRM) to provide results for the Town
of Winthrop. The model, called the Boston
Harbor Flood Risk Model (BH-FRM), is
used to provide the results for the Town of
Winthrop.
Concern about potential impacts to the
City of Boston from future storms drove
the creation of the BH-FRM – a model
with the best representation of the physical
processes, as well as accurate and higher
resolution predictions of inundation due to
the combination of sea level rise and storm
surge. The hydrodynamic modeling utilized for
the BH-FRM was geared towards a physics-
based approach to determine the water level
increases and flooding, and provided results
to identify specific locations that may require
adaptation alternatives.
For this project, Woods Hole Group (WHG)
has produced two types of BH-FRM maps to
illustrate potential impacts to areas of coastal
flooding:
1. The probability, or likelihood, of
coastal flooding today and in future
years 2030 and 2070 ( Figure 3-3 ). A
range of percent chance spans from
100% (annual storm condition) to 0.1%
(a one in 1,000 chance storm – a less
frequent, more intense occurrence).
2. Depth of flooding, relative to sea
level ( Figure 3-4 ). These maps show
different depths for present day, 2030,
and 2070, associated with both the 1%
(1 in 100) and 0.1% chance floods.
For more in-depth information about the BH-
FRM, see Appendix D .
HYDRODYNAMIC
MODEL
MODELED STORM EVENTS
Including hurricanes and nor'easters, as well as
climatology projections.
SEA LEVEL RISE PROJECTIONS
Consistent with both the US National Climate
Assessment and projections specific to
Massachusetts.
DYNAMIC COASTAL PROCESSES
Driven by wave effects, wind, tides, and storm
surge.
Mapping Coastal Flooding:
BH-FRM results are based on a
hydrodynamic model developed
for the Massachusetts Department of
Transportation (Bosma et al. 2016).
Note: This data does not take into account
inland freshwater flooding or stormwater.
3-5 IDENTIFY: Future Areas of Coastal Flooding
2013 2030 2070
Figure 3-3 Winthrop Areas of Probable Flooding
Present Day
BROAD SOUND
CRYSTAL
COVE
BOSTON
HARBOR
BELLE ISLE
MARSH
BROAD SOUND
CRYSTAL
COVE
BOSTON
HARBOR
BELLE ISLE
MARSH
BROAD SOUND
CRYSTAL
COVE
BOSTON
HARBOR
BELLE ISLE
MARSH
3-6 IDENTIFY: Future Areas of Coastal Flooding
Present Day 2030 2070
Figure 3-4 Winthrop Depth of Flooding (1% Chance water level)
BROAD SOUND
CRYSTAL
COVE
BOSTON
HARBOR
BELLE ISLE
MARSH
BROAD SOUND
CRYSTAL
COVE
BOSTON
HARBOR
BELLE ISLE
MARSH
BROAD SOUND
CRYSTAL
COVE
BOSTON
HARBOR
BELLE ISLE
MARSH
3-7 IDENTIFY: Future Areas of Coastal Flooding
Natural Resource Modeling
Climate change, with increased storm intensity,
changes in precipitation patterns, and global
sea-level rise will exacerbate already difficult
coastal management issues related to both
infrastructure and natural resources (Bosma
et al., 2015). Recent studies have identified
sea-level rise as one of the most certain and
potentially destructive impacts of climate
change (Meehl et al., 2007). Coastal wetlands
are among the most susceptible ecosystems to
climate change, especially accelerated sea-
level rise. (Nicholls et al. 2009) points out that
coastal wetlands, including salt marshes and
intertidal areas, could experience substantial
area losses due to sea-level rise. Because
coastal wetlands are extremely productive
ecosystems, and provide a variety of
ecosystem services, such as flood protection,
waste assimilation, nursery areas for fisheries,
and conservation and recreation benefits, such
loss would have a high human cost.
Recognizing the threats posed by climate
change and sea-level rise, the Massachusetts
Office of Coastal Zone Management (CZM)
desired to assess and analyze the effects of
sea-level rise on coastal wetlands for the
Commonwealth of Massachusetts (Woods
Hole Group, 2016). The project’s intent was to
simulate the effects of sea-level rise using an
ecological model and implement the model at
its highest level of complexity.
The model selected to evaluate the impact of
sea level rise on coastal resources was the Sea
Level Affecting Marshes Model (SLAMM),
originally developed with EPA funding in
the 1980s. The SLAMM model attempts to
capture the major coastal processes, at least
at a rudimentary level, involved in wetland
conversions and shoreline modifications
expected to occur over a long term.
The results of the marsh migration modeling
are intended to be used for future coastal
planning in a number of ways. For instance,
model results from this project can be used
to identify areas with barriers to landward
migration of salt marshes. These results can
therefore serve as a guide for development
and implementation of adaptation strategies
for coastal managers and policymakers to
proactively address potential impacts from
long-term sea-level rise. The results produced
for the Town of Winthrop have been extracted
from the larger CZM Commonwealth of
Massachusetts project for this assessment.
More in-depth information on SLAMM is
provided in Appendix F .
The SLAMM results ( Figure 3-6 ) project some
minor wetland expansion and loss of upland
area in 2030. This expansion will occur at
the fringes of existing wetlands in areas that
are already designated as open space, and
should not interfere with existing development
much differently than in current conditions.
By 2070, sea-level rise is projected to induce
large scale shifts across Winthrop, including
transitions from irregularly flooded marsh
to regularly flooded marsh, expansion of
wetlands into transitional marsh scrub-shrub
habitat, expansion of beach and tidal flat areas,
conversion of inland open water to estuarine
open water, and expansion of open ocean water
areas ( Figure 3-6 , right panel).
3-8 IDENTIFY: Future Areas of Coastal Flooding
Figure 3-5 Areas where Wetland Mitigation will
be Limited by Existing Development
REVERE
DEER
ISLAND
a
b
c
d
e
f
g
h
Some areas of potential wetlands migration
will be limited by (and will interfere with)
existing development ( Figure 3-5 ). These areas
include:
Commercial/industrial areas in the vicinity
of Argyle Street
Residential areas south of Banks Street and
Morton Street
Residential/commercial areas adjacent to
the Belle Isle Bridge
Residential areas around Pico Avenue
Residential/industrial areas around
Seaview Avenue
Residential/commercial/municipal areas
surrounding Lewis Lake Park and the
Winthrop Golf Course
Residential/commercial areas along Shirley
Street (from Sturgis Street to Crystal Cove
Avenue
Residential areas southeast of Coughlin
Park
Due to the high density of development and
impervious surface in these areas of Winthrop
it is unlikely that they will be allowed to
transition to wetland. These developed
areas will likely experience higher water
tables, increased salt water intrusion, day
to day nuisance flooding (due to a higher
daily tides), and higher frequency of storm
flooding. Therefore, these areas will likely
need additional protection in the future or
retreat options under normal tidal conditions
(accounting for sea-level rise).
a
b
c
d
e
f
g
h
3-9 IDENTIFY: Future Areas of Coastal Flooding
Figure 3-6 Winthrop SLAMM Maps
2030 2070
These results are part of the Statewide Modeling the Effects of Sea Level Rise on Coastal Wetlands for Massachusetts Coastal Zone Management. (Woods Hole Group, 2016).
Broad Sound
Crystal Cove
Boston
Harbor
Belle Isle
Marsh
Broad Sound
Crystal Cove
Boston
Harbor
Belle Isle
Marsh
Broad Sound
Crystal Cove
Boston
Harbor
Belle Isle
Marsh
Present Day
3-10 IDENTIFY: Future Areas of Coastal Flooding
A large portion of the projected wetlands
transitions and expansions are predicted to
occur in the existing open areas of Winthrop,
including:
• Wetlands adjacent to the Winthrop
Cemetery
• Lewis Lake Park and the Winthrop
Golf Course
• Wetlands adjacent to Pico Beach
• Coughlin Park
These areas will likely experience significant
changes in land cover and wetland type and
may offer opportunities for natural resource
management and/or expansion due to the
changing climate. More detailed information
on the changes to these four areas and
recommended adaptations are discussed in
Chapter 9 .
Figure 3-7 2070 SLAMM Model with Existing
Development
WINTHROP
CEMETERY
LEWIS LAKE PARK
& WINTHROP GOLF
COURSE
PICO
BEACH
COUGHLIN
PARK
4-1 IDENTIFY: Critical Public Infrastructure
Pressure Reducing Valve Station (Bayview Ave)
Pressure Reducing Valve Station (Revere St)
Pressure Reducing Valve Station (Underhill St)
Public Landing
Revere St. Sewer Pump Station
Shirley Street (evacuation route)
Washington Street (evacuation route)
Winthrop High School
L
N
M
O
P
The combination of future sea level rise and
storm events has the potential to damage
important public infrastructure, such as
evacuation routes and sewer pumping stations,
within identified coastal flood areas throughout
Winthrop. Due to climate change, these
locations are in danger of becoming subject to
conditions for which they were not designed.
Without proper planning, damage could
become more frequent, take longer and cost
more to repair, and entail more socioeconomic
disruption (EEA, 2011).
The 2012 Hazard Mitigation Plan identified
97 critical infrastructure locations susceptible
to a variety of hazard events (flooding, fire,
earthquake, etc.). These included facilities
important for disaster response and evacuation
and those where additional assistance might be
needed during an emergency (HMP, 2014).
For this vulnerability assessment, the 2012 list
has been narrowed and edited by the Project
Management Team (PMT) to include 16
critical public infrastructure locations within
areas susceptible to coastal flooding:
4 IDENTIFY: Critical Public Infrastructure
A
B
C
D
E
F
G
Figure 4-1 Town-Identified
Critical Public Infrastructure
Locations
REVERE
DEER
ISLAND
H
I
J
K
A
B
C
D
E
F
G
H
I
J
K
L
N
M
O
P
Beach Fire Station
Belle Isle Bridge
Loring Rd. Boat Ramp
Main Street (evacuation route)
Pico Sewer Pump Station
Pleasant Court Sewer Pump Station
Pleasant Street (evacuation route)
Power Substation (Argyle Street)
4-2 IDENTIFY: Critical Public Infrastructure
Shoreline Structures
Shoreline structures in Winthrop include stone
revetment, concrete seawalls, bulkheads,
breakwaters, and groins. The Massachusetts
Office of Coastal Zone Management (CZM)
provides inventory and assessment data for
coastal infrastructure via the Massachusetts
Ocean Resource Information System (MORIS)
data. Publicly-owned structures, identified by
the 2009 MORIS data, includes six structures
owned by the Massachusetts Department
of Conservation and Recreation (DCR) and
27 town-owned structures in various levels
of condition. Half of the identified public
shoreline structures were assessed as needing
moderate to significant levels of rehabilitation.
How are shoreline structures
vulnerable to coastal
flooding?
Shoreline structures have long been
used as the first line of defense against
the crashing waves of the sea. As
sea levels rise and storms become
stronger and more frequent, these
structures become more susceptible
to damage. Erosion of the soils on the
sea side of the structures may expose
wall foundations and cause walls to
fail.
Stone revetment and concrete seawall
along Winthrop Parkway and Upland Road
PUBLIC
INFRASTRUCTURE
includes Town-owned assets as
well as state infrastructure and
private utility assets that provide
critical public services.
For this assessment, critical public
infrastructure includes transportation
corridors, water, wastewater, and stormwater
systems, buildings, energy and transmission
systems, natural resources (dunes, beaches,
salt marsh, etc.), open space, and recreational
facilities. The following sections of this
chapter describe why this infrastructure is
important to the Town and region, and what
elements are susceptible to coastal flood
damage.
4-3 IDENTIFY: Critical Public Infrastructure
How are buildings vulnerable
to coastal flooding?
Some of these buildings are within BH-
FRM flood areas. Flooded buildings
are particularly susceptible to water
damage or collapse. In addition,
sea level rise will result in higher
groundwater elevations, which could
compromise building foundations
that are not supported on piles.
Buildings
Throughout Winthrop, building infrastructure
includes commercial, residential, institutional,
and governmental facilities. Public buildings
include schools, municipal offices, an
emergency operations center, library, public
works facilities, fire and police stations, and
the U.S. Post Office. Many of these buildings
are in the central business district, which is
elevated approximately 30 feet above the
Winthrop shoreline, and are out of projected
flood areas. Buildings at lower elevations may
be susceptible to flood impacts.
Transportation
Winthrop’s transportation infrastructure
includes a network of roads and maritime
facilities that are critical for the regional
movement of people, equipment, and goods.
Roadways are vital for the Town, as nearly
80% of working residents commute outside
of Winthrop daily. By contrast, few commute
into Town, with 70% of local jobs filled by
Winthrop residents. Damage to roadway
networks due to coastal flooding would have
significant economic, social, and emergency
response impacts.
Road
The road network in Winthrop includes a
combination of numbered highways (Route
145), major local collectors (e.g. Main Street,
Revere Street, Winthrop Shore Drive), and
minor local arterials (e.g. Highland Avenue,
Lincoln Street).
To access the town, vehicles travel via Route
145, o Winthrop Parkway or across the Belle
Isle Bridge (Main Street). Winthrop Parkway
connects the town to Revere along a narrow
strip of land between the Belle Isle Marsh and
How are roads vulnerable to
coastal flooding?
Flood water can make roadways
unpassable to automobile traffic.
Typically, when there are 4- to
6-inches of water on the surface,
drivers are hesitant to cross. The force
from flood waters can also destroy
roadway pavement and lead to
washouts. Sea level rise will result
in higher groundwater elevations,
which could flood the roadbed
and lead to road collapse. Bridges
and culverts are also vulnerable to
flood damage. As the depth and
strength of flood waters increase,
the streambed surrounding these
structures can erode or wash out,
causing damage or collapse.
4-4 IDENTIFY: Critical Public Infrastructure
scale, coastal flooding also has the potential
to impact the primary travel route to the
MWRA’s Deer Island Sewage Treatment Plant
(treating wastewater from 2.5 million people
in the Greater Boston area), where 300-500
personnel provide 24-hour operations and
maintenance.
Broad Sound. The Belle Isle Bridge, at the
western end of Main Street, crosses the Belle
Isle Inlet, connecting Winthrop to East Boston.
This bridge was replaced in 2013 to address
the poor condition of the structure.
The Massachusetts Bay Transportation
Authority’s (MBTA) Paul Revere
Transportation Bus Service serves the
community with approximately 90 stops
throughout Winthrop, divided between two bus
routes. These routes also connect to MBTA’s
Blue Line Orient Heights Station, which is
located ½ mile west of the Winthrop/East
Boston border. From this station, riders can
travel west to Boston (Bowdoin Station) or
north to Revere (Wonderland Station). In 2013,
nearly 500,000 riders used the 712 and 713
MBTA Paul Revere Bus Service. Including
both the Paul Revere Bus Service and MBTA
Blue Line, roughly 20% of Winthrop residents
use public transportation to commute to work.
(Winthrop, 2005)
With only two roadways to access the
Winthrop peninsula, the resilience of
transportation infrastructure is particularly
important for emergency evacuation and
response. Roads play an important role in
disaster recovery efforts by providing access
to damaged areas for emergency responders
and construction equipment. On a regional
Town Landing, today
Winthrop Road Infrastructure
Hig H land
a ve
Reve R e St
Main St
Wint HR op
S H o R e d R
l incoln St
145
145
145
BROAD SOUND
CRYSTAL COVE
BELLE ISLE
MARSH
4-5 IDENTIFY: Critical Public Infrastructure
How is maritime
infrastructure vulnerable to
coastal flooding?
A significant storm event could
cause considerable damage
to maritime infrastructure. An
increased frequency of storms could
compromise structural integrity
over time. At Town Landing, waves
could overtop the stone revetment,
damaging the harbormaster’s
building and parking area. Flooding
could also result in inland debris
entering Crystal Cove, which would
impair mobilization of emergency
response watercraft.
Maritime
Public maritime infrastructure in Winthrop
includes several small boat ramps, a mooring
field in Crystal Cove, with space for 800-900
recreational boats, and the Winthrop Town
Landing.
The Town Landing is the only public maritime
facility in Winthrop. Located on Shirley Street,
the facility includes a marina, boat ramp, pier,
and the harbormaster’s office. Public services
at the marina include boat slips, a pump-out
station, and a davit crane. The town landing
was built on tidelands (previously submerged),
filled sometime in the mid-1900s. The stone
revetment protection wall along the shoreline
has been recently repaired.
Charter boats can use Town Landing as a pick-
up and drop-off location. The boat ramp in
this location is used as an operating center for
emergency vehicles, such as the harbormaster
patrol boats and the Winthrop Fire Boat. In the
winter, the Town Landing parking lot holds
cars, typically parked on the street, during a
Snow Emergency Parking Ban.
The pier at Town Landing serves the Winthrop
Ferry, which provides commuter services
to Rowes Wharf in Boston. Implemented
in November 2015, the ferry also provides
access to Georges Island and Lovells Island,
two of the Boston Harbor Islands managed
by the National Park Service. The ferry runs
from May to October, during peak commute
times, with limited weekend service. The 2001
Winthrop Commuter Boat Feasibility Study
found that most riders would travel either from
homes in Winthrop to downtown Boston, or
from South Shore residences to work at the
Deer Island Sewage Treatment Plant.
Town Landing area, in the 1930s
Source: Winthrop Historical Commission
(www.facebook.com/ Winthrop-Historical-
Commission-1482925941926459/
4-6 IDENTIFY: Critical Public Infrastructure
Water and Wastewater
Water and wastewater systems in Winthrop
are owned by the Department of Public Works
(DPW) Water Division and Massachusetts
Water Resources Authority (MWRA).
The Town and MWRA-owned and maintained
water tower holds roughly 1 million gallons
of water for several communities served by
the MWRA. The tower is located on Faunbar
Avenue in the Cottage Hill neighborhood and
is a major landmark seen around town and
beyond. The tower sits on the eastern edge of
the hill, roughly 120 feet above sea level, and
is vulnerable to coastal erosion that has been
reducing the land area adjacent to the tower.
Sewer pumping stations within Winthrop are
located at Revere Street, Pico Avenue, and
Pleasant Court. Recently updated, the stations
are elevated, well-constructed structures, with
water resistant flood panels. There are also
emergency generators located at each pump
station.
Massachusetts Water Resources Authority
(MWRA) owns and maintains over two
miles of 24-inch diameter sewer main, which
channels sewage from the Revere town
boundary through Winthrop for treatment
at the Deer Island Sewage Treatment Plant.
Another 108-inch MWRA main through town
Air
The eastern shore of Boston Logan
International Airport, managed by the
Massachusetts Port Authority (Massport),
is within Winthrop town boundaries.
Approximately 900 Winthrop residents work at
the facility (MAPC and CTPS, 2004).
Massport prepared a Disaster Infrastructure
Resiliency Plan (DIRP) in 2014/2015
How is the water and
wastewater system
vulnerable to coastal
flooding?
Erosion and transportation
infrastructure washout could have
secondary impacts on underground
piping systems. Rising sea levels and
the consequent rising groundwater
elevations could also cause soils
to shift, particularly at boundaries
between different soil types.
Movement and loss of soil strength
places stress on pipes and joints, and
can cause significant damage.
including a hazard analysis of sea level rise
and storm surge, and recommendations for
short-term adaptation strategies. Additionally,
the Critical Assets Resiliency Report in 2014,
developed concept and operation plans for
the airport facilities. This assessment does not
address Logan Airport given Massport’s efforts
to improve and protect its infrastructure from
coastal flooding.
directs sewerage from East Boston to Deer
Island. The 108-inch main was built in 1891
and plays a vital role in wastewater treatment
for 43 communities and 2.5 million people
(Baldwin, 2006). Entering the town at the
Belle Isle Bridge, the pipeline to Deer Island
through Winthrop is nearly three miles long.
The underlying issue of this critical sewage
line is its location within floodplain areas and
the condition of the pipeline. Analyzation of
the line is currently underway to comprehend
what is needed to update/reconstruct the
pipeline
4-7 IDENTIFY: Critical Public Infrastructure
BROAD SOUND
CRYSTAL COVE
BELLE ISLE
MARSH
BOSTON
HARBOR
Outfalls with check valves at Tafts Avenue
Stormwater
The stormwater system within Winthrop
includes over 20 miles of underground
piping, outfalls, catch basins, and manholes.
Approximately 115 outfalls are installed
throughout the Town in low-lying areas to help
relieve inland flooding during storm events.
The majority of these outfalls do not have
check valves to block water from the ocean
from entering the system at the headwalls.
How is the stormwater
system vulnerable to
coastal flooding?
When a heavy storm or tidal event
occurs, the Town’s drainage systems
can fill up and cause flooding at
the street level. Future sea level
rise and storm events will worsen
flooding conditions by increasing
the volume of water to the system
and blocking outfall locations. Like
other underground utilities, erosion
and transportation infrastructure
washout, and movement and loss
of soil strength can cause significant
damage to stormwater pipelines.
Winthrop Stormwater Infrastructure
4-8 IDENTIFY: Critical Public Infrastructure
Natural Resources and Open
Space
Winthrop offers many beaches, conservation
areas, parks, and recreation facilities to
the public. The Town owns many of these
resources, with exception of Belle Isle Marsh
and Winthrop Shore Reservation, which
are publicly owned and managed by the
Massachusetts Department of Conservation
and Recreation (DCR).
Beaches:
Winthrop Beach – Approximately 1 mile
long, Winthrop Beach is the Town’s largest
beachfront resource. Owned by the DCR,
Withrop Beach provides vital wildlife habitat,
shoreline protection, and coastal beauty that
attracts residents and brings visitors to Town.
Yirrell Beach – As a Town-owned resource,
Yirrell Beach stretches for about 0.7 miles
along the eastern coast of Point Shirley. Yirrell
Beach acts as not only a shoreline protection,
but as another recreational open space for
residents to enjoy.
Donovan’s Beach – Located across Pleasant
Street from Ingleside Park, Town-owned
Donovan’s Beach gives Winthrop residents
waterfront access and beautiful sunset views of
the City of Boston. It also provides shoreline
protection from the Boston Harbor during
coastal flooding events.
Pico Playground & Beach –Located adjacent
to Fishermen’s Bend Marsh, the Pico
Playground and Beach are Town-owned
recreational facilities. At approximately 0.7
acres, these resources give the public access to
Snake Island and Crystal Cove.
Yirrell Beach
Salt Marsh:
Fishermen’s Bend – Owned by the Town,
Fishermen’s Bend contains a salt marsh and
public access paths. At approximately 7.5
acres, the marsh currently provides protection
to residential properties during flooding events
such as the King Tide.
Belle Isle Marsh – Encompassing around 250
acres of salt marsh and tidal flats, the Belle
Isle Marsh provides an array of recreational
and ecological services. As a DCR-owned
property, and shared between the communities
of Revere, East Boston, and Winthrop, the
Belle Isle Marsh contains various walking
paths and conservation habitats that serve as
integral components of Winthrop’s community.
The salt marsh provides habitat to species such
as the piping plover, upland sandpiper, cord
grass, and seabeach needlegrass, enhancing
ecological diversity.
4-9 IDENTIFY: Critical Public Infrastructure
(Photo by Winthrop Parks Committee https://
winthropparks.wordpress.com/)
Parks:
Lewis Lake/Winthrop Golf Club – Located in
the center of Winthrop, Lewis Lake and the
Winthrop Golf Club serve as vital recreational
assets for the Town. These Town-owned
resources play an important economic role
within the Town, as visitors and residents
frequent the open space, including walking
paths and a 9-hole golf course.
Coughlin Park – Renovated in 2014, Town-
owned Coughlin Park provides a range of
recreational resources for Winthrop residents.
It contains a playground, sports facilities, and
waterfront amenities.
Ingleside Park – At around 10 acres, Ingleside
Park serves as a hub for Winthrop recreational
and community activities. Owned by the
Town, this park includes a playground, skating
rink, picnic areas and other sports facilities.
Ingleside is a crucial part of Winthrop’s open
space, as it is located within the center of the
town and can host many public events and
sports activities.
How are natural resources
vulnerable to coastal
flooding?
Coastal flooding and higher
groundwater elevations have the
potential to permanently damage
hard and natural surfaces. Beaches
and coastal wetlands provide
ecological benefits including flood
protection, absorption of pollutants,
and habitat for fish and shellfish
(Bosma et. al., 2014). Coastal erosion
and sea level rise will diminish these
resources, which are crucial to
community health and safety.
4-10 IDENTIFY: Critical Public Infrastructure
Energy
Winthrop’s energy infrastructure includes
facilities for energy production, transmission,
storage, and distribution. Facilities include
substations, electric lines and street lights, and
natural gas systems.
National Grid supplies Winthrop with electric
power. The company manages two power
substations within town. Beginning in 2009,
National Grid conducted an extensive, three
phase project that upgraded and connected
the two substations to ensure future service
reliability for residents. New equipment,
connection lines and distribution lines were
installed in both locations, primarily on
preexisting utility poles (Domelowicz, 2011).
Natural gas service is also supplied by
National Grid via underground lines.
Telecommunications
Comcast cable currently provides
telecommunication services to the Town of
Winthrop.
Five communication towers within Winthrop
are located at:
• Public Safety Communication Tower at
Faunbar Avenue
• Cell tower at United Methodist Church
• Cell tower at Fellows hall
• Cell tower at St. Johns the Evangelist
Church
• Cell tower at the Expert Auto
How is energy infrastructure
vulnerable to coastal
flooding?
Substation facilities and power
distribution lines are vulnerable to
roadway erosion/washout which
can cause service interruptions or
considerable damage to equipment.
Increased flooding and groundwater
levels also have the potential to
threaten this infrastructure which
can cause public health and
environmental hazards.
How is telecommunication
infrastructure vulnerable to
coastal flooding?
Telecommunication systems are
susceptible to failure or destruction
due to increased flooding and
groundwater levels. These conditions
can weaken foundations that
support overhead poles and expose
underground conduits to increased
water and salinity levels. Prolonged
inundation could compromise short
term and long term system integrity
and function, and reduce the overall
lifespan of system components (e.g.
sheathing and cabling).
5-1 IDENTIFY: Likely Flood Areas in Winthrop
5 Flooding can arise from multiple factors.
Coastal flooding occurs along tidal waterways
due to winds, waves, storm surge, and tides.
Inland sources contribute to flooding from
stormwater runoff, overflows of natural or
structured drainage systems, and/or rising
water table levels. It is important to understand
the relationship between these systems to get
a complete view of flooding issues within
a community. However, the purpose of this
assessment is to specifically focus on the
protection of assets and areas most at risk from
the coastal effects of storm surges and sea level
rise, or coastal flooding. Therefore, there may
be areas within Town that flood during heavy
precipitation events that are not predicted to
occur based on this assessment.
Although Winthrop’s entire 8.3 mile coastline
is vulnerable to coastal flooding, evaluating
the results of the Boston Harbor Flood Risk
Model (BH-FRM) brings to attention eight
larger, regional flood areas. These highlighted
locations (Figure 5-1) are already known to
flood during coastal storms. The eight BH-
FRM Flood Areas in Winthrop include:
• Belle Isle Marsh
• Nahant Avenue
• Winthrop Beach
• Lewis Lake
• Point Shirley
• Fishermen’s Bend Marsh
• Ingleside Park
• Girdlestone Road
IDENTIFY: Likely Flood Areas
in Winthrop
The following pages assess each area
by reviewing current conditions, recent
initiatives, and BH-FRM mapping. This will
help to further prioritize identified public
infrastructure (Chapter 6 ) and recommend
potential adaptation measures (Chapter 7 ) to
address coastal flooding.
Figure 5-1 Town-Identified Areas of Local
Flooding
REVERE
DEER
ISLAND
BELLE ISLE
MARSH
NAHANT AVE
WINTHROP
BEAHCH
LEWIS LAKE
FISHERMEN'S
BEND MARSH
INGLESIDE PARK
GIRDLESTONE
ROAD
POINT
SHIRLEY
5-2 IDENTIFY: Likely Flood Areas in Winthrop
Revere Street Sewer Pump Station and
Pressure Reducing Valve Station
Short Beach Creek at Belle Isle Marsh
Winthrop Avenue, view toward Upland Road
Belle Isle Marsh
The Belle Isle Marsh is located at the northern
end of Winthrop, and is also bordered by East
Boston and Revere. This natural resource is
owned and managed by the Department of
Conservation and Recreation, as well as the
towns of Winthrop and Revere. This nearly
300 acre salt marsh is one of the largest
remaining in the Metropolitan Boston area.
Habitats within the area include salt marsh, a
tidal creek, salt pans, and upland park land.
The area is home to a large list of bird species,
including State-listed species of Endangered,
Threatened, or Special Concern status.
As shown in Table 5-1 , the area of flooding
in Winthrop, adjacent to the marsh, contains
a range of land uses and several public
infrastructure points.
5-3 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-1 Flood Area Existing Conditions – Belle Isle Marsh
LAND USES
Mostly residential, with some industrial business on Argyle
Street and commercial properties near the Belle Isle Bridge,
natural resources & open space
ASSOCIATED WATERBODIES Boston Harbor & Belle Isle Inlet
PUBLIC SHORELINE STRUCTURES
Stone revetment (<5 feet high) along Morton Street from
Fairview Street to the Town Cemetery
5- to 10-foot stone revetment, below the Town Cemetery
5- to 10-foot bulkhead/seawall at Short Beach
10- to 15-foot stone revetment along Seawall Avenue
PUBLIC BUILDINGS
Pleasant Court Sewer Pump Station
Revere Street Sewer Pump Station
Pressure Reducing Valve Station at Revere Street
TOTAL BUILDINGS 240
TRANSPORTATION
INFRASTRUCTURE
Belle Isle Bridge to East Boston
Winthrop Parkway Land Bridge to Revere
Main Street, Pleasant Street, Morton Street & other local
roadways
Winthrop Harbor Walk & Eco Park
WATER AND WASTEWATER
INFRASTRUCTURE
Pleasant Court Sewer Pump Station
Winthrop Parkway Sewer Pump Station
Underground local and MWRA sewer mains
Pressure Reducing Valve Station at Revere Street
STORMWATER INFRASTRUCTURE Underground system, catch basins, and outfalls
ENERGY INFRASTRUCTURE Argyle Street Substation
Electric & natural gas distribution system
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES & OPEN
SPACE
Belle Isle Marsh
Short Beach
Fort Banks Playground
Kilmartin trail and footbridge
5-4 IDENTIFY: Likely Flood Areas in Winthrop
Considering the vulnerable low-lying land
within this flood area, many residences,
businesses, and facilities near the marsh will
become more susceptible to inundation from
sea level rise and coastal storms over the next
15 years. The BH-FRM mapping suggests that
intense storm events in 2030 may push enough
water into the marsh to flood Main Street by
six inches.
Table 5-2 Probable Future Flooding – Belle Isle Marsh
SIZE OF FLOOD AREA
Today: 95 Acres (9% of Winthrop)
2030: 106 Acres (10% of Winthrop)
2070: 135 Acres (13% of Winthrop)
TOWN-IDENTIFIED
FLOOD AREAS / ISSUES
Bayou Street Neighborhood – undersized drainage line backs up in
high precipitation events (HMP, 2014)
CURRENT INITIATIVES
/ CONSTRUCTION
PROJECTS
Belle Isle Marsh Marine Ecology Park (path along Morton Street, with
a passive recreation park, lookout area, footbridge to the Belle Isle
Cemetery.
PROBABLE FUTURE
FLOOD AREAS
Portions of Argyle Street and Golden Drive
Morton Street
Main Street
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Pleasant Court Sewer Pump Station
Main Street
Stone Revetment, seawalls & bulkheads
ADDITIONAL CRITICAL
PUBLIC INFRASTRUCTURE
(2070 FLOOD AREA)
Belle Isle Bridge
Argyle Power Substation
Revere Street Sewer Pump Station
Pressure Reducing Valve Station at Revere Street
Winthrop Traffic Control Point at Winthrop Parkway and Revere
Street
Winthrop Traffic Control Point at Main Street
5-5 IDENTIFY: Likely Flood Areas in Winthrop
Nahant Avenue
The rocky shoreline of this northeastern
section of Winthrop includes residences along
Nahant Avenue, and a portion of Grovers
Avenue and Seawall Avenue. The area is
entirely residential, with views of Broad Sound
toward Revere.
Table 5-3 Flood Area Existing Conditions – Nahant Avenue
LAND USES Residential
ASSOCIATED WATERBODIES Broad Sound
PUBLIC SHORELINE STRUCTURES None
PUBLIC BUILDINGS None
TOTAL BUILDINGS 45
TRANSPORTATION INFRASTRUCTURE Local roadways
WATER AND WASTEWATER
INFRASTRUCTURE Local underground lines
STORMWATER INFRASTRUCTURE Underground system, catch basins, and outfalls
ENERGY INFRASTRUCTURE Electric and natural gas distribution systems
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES & OPEN SPACE Pond Street Playground
Seawall Avenue looking toward Nahant
Avenue Flood Area
Nahant Avenue properties have a high
water table
5-6 IDENTIFY: Likely Flood Areas in Winthrop
The coastline here is vulnerable to flooding
from a combination of high groundwater, tidal
surge, and high precipitation. During a site
visit on March 23, 2017, water was observed
seeping up from the ground at the intersection
of Nahant and Grovers Avenues. Anecdotal
information was provided from a resident at
the first Public Meeting, noting that homes in
this area are almost always operating pumps
to remove water from their basements. The
2014 update of the Town’s Hazard Mitigation
Plan identifies two homes as repetitive loss
properties by the FEMA National Flood
Insurance Program. The 2030 BH-FRM shows
that homes in this area could see about ½ to
one foot of flooding during a 1% chance water
surface elevation.
Table 5-4 Probable Future Flooding – Nahant Avenue
SIZE OF FLOOD AREA
Today: 4 Acres (<1% of Winthrop)
2030: 8 Acres (1% of Winthrop)
2070: 23 Acres (2% of Winthrop)
TOWN-IDENTIFIED
FLOOD AREAS /
ISSUES
Undersized drain lines fill up and flood the neighborhood during
coastal storms and high tide (MAPC, 2014)
CURRENT INITIATIVES
/ CONSTRUCTION
PROJECTS
2014 Hazard Mitigation Plan identified replacing the undersized
drainage line and upgrading the existing drainage outfall headwall
and installing a flapper valve as priority mitigation measures for this
area.
BH-FRM MAPPED
FLOOD AREAS (2030-
2070)
Upland Road
Seawall Avenue, from Upland Road to Highland Avenue
Nahant Avenue, through Highland Avenue, and Pond Street
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
None
ADDITIONAL
CRITICAL PUBLIC
INFRASTRUCTURE
(2070 FLOOD AREA)
None
5-7 IDENTIFY: Likely Flood Areas in Winthrop
Winthrop Beach
The Winthrop Beach flood area, located on
the eastern shore of town, is a combination
of public facilities, private homes, and
commercial properties. The barrier beach is
owned and operated by the Massachusetts
Department of Conservation and Recreation
(DCR), and provides community benefits like
storm protection, recreation, and tourism.
Shoreline sandbar/breakwater structures at
Winthrop Beach
Table 5-5 Flood Area Existing Conditions
– Winthrop Beach
LAND USES Residential, commercial, natural resources & open
space, recreational property (State-owned beach)
ASSOCIATED WATERBODIES Broad Sound
PUBLIC SHORELINE STRUCTURES
Stone mound groins at Charles Street, Beacon Street,
Wave Way, Coral Avenue, Neptune Avenue
5- to 15-foot seawall & stone revetment along
Winthrop Shore Drive
Five Sisters (15 feet +)
PUBLIC BUILDINGS None
TOTAL BUILDINGS 670
TRANSPORTATION INFRASTRUCTURE Local roadways
WATER AND WASTEWATER
INFRASTRUCTURE Local underground lines
STORMWATER INFRASTRUCTURE
Underground MWRA sewer main and water line
Local underground utility lines
Pressure Reducing Valve Station at Underhill Street
ENERGY INFRASTRUCTURE Electric and natural gas distribution systems
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES & OPEN SPACE Winthrop Shore Beach
5-8 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-6 Probable Future Flooding– Winthrop Beach
SIZE OF FLOOD AREA
Today: 86 Acres (8% of Winthrop)
2030: 88 Acres (9% of Winthrop)
2070: 91 Acres (9% of Winthrop)
TOWN-IDENTIFIED FLOOD
AREAS/ISSUES
Ocean winds and waves overtop the seawalls during coastal
storm events, flooding Winthrop Shore Drive, adjacent roadways,
and residential properties.
CURRENT INITIATIVES /
CONSTRUCTION PROJECTS
DCR has designed and constructed a beach nourishment
project and repairs to shoreline structures. Construction of a
streetscape project, including drainage improvements along
Winthrop Shore Drive, is scheduled to begin this year.
BH-FRM MAPPED FLOOD
AREAS (2030-2070)
From Winthrop Beach in the east to Shirley Street at the west
From Veterans Road in the north, to Crystal Cove Avenue at the
south
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Shirley Street & Tafts Avenue (Route 145) - evacuation/trucking
route
Regional sewer main
Pressure Reducing Valve Station at Underhill Street
ADDITIONAL CRITICAL
PUBLIC INFRASTRUCTURE
(2070 FLOOD AREA)
None
The topography of the Winthrop Beach Flood
Area slopes from Winthrop Shore Drive down
to Shirley Street. Since the early 1900s, the
Commonwealth has made many efforts to help
reduce coastal flooding behind the beach.
The 2030 BH-FRM model calculates that there
is potential for extreme coastal storm events to
flood the area between Winthrop Shore Drive
and Shirley Street to approximately 1-foot
deep. A significant amount of flooding in this
area is caused by wave run-up and overtopping
(see above photo). Coastal storm waves will
pulse volumes of water landward and flow
through the Winthrop Beach infrastructure
towards Lewis Lake.
5-9 IDENTIFY: Likely Flood Areas in Winthrop
Storm protection
berm completed
Beach nourishment
at north end
Construction
of three
breakwaters
(“Sisters”)
Structural repairs to
three groins at south
end of beach
2015
2013
2014
1930
2012
1959
Beach restoration at south end,
with sand accreted behind Five
Sisters breakwaters
Two breakwaters added
(“Five Sisters”)
Sand placed in between Sisters
to replenish the beach.
Groins and revetment installed.
Sea walls raised and/or capped.
Figure 5-2 Timeline of Storm Structure Construction along Winthrop Beach
1932 storm along Winthrop Shore Drive, Courtesy of the Boston Public
Library, Leslie Jones Collection.
5-10 IDENTIFY: Likely Flood Areas in Winthrop
Lewis Lake
Before the construction of a steam railroad
loop and construction of Washington Street in
the late 19 th century, Lewis Lake was a small
tidal stream, known as Fisher’s Creek, with
adjacent marshland (MHC, 1981). Due to the
history here, infrastructure in this flood area
has been developed on what would historically
have been salt marsh.
The Town of Winthrop owns much of the land
in this central area of the community: Lewis
Lake Park and Daw Playground, the Golf Club
property, and Winthrop High School athletic
fields. In addition to these public recreational
and institutional properties, the fringes of
the Lewis Lake flood area include residential
and commercial land uses. Important public
infrastructure includes Route 145 (Washington
Avenue and Veterans Road) and the Beach Fire
Station which are vital to the Town’s security
and safety.
Winthrop High School
Shirley Street Fire Station
5-11 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-7 Flood Area Existing Conditions - Lewis Lake
LAND USES
Athletic fields/parks, natural resources, residential, waterfront, a
large amount of open space, neighborhoods, small businesses, high
school, golf club, cemetery
ASSOCIATED
WATERBODIES Crystal Cove - Lewis Lake - Broad Sound
PUBLIC SHORELINE
STRUCTURES Lewis Lake Tide Gate
PUBLIC BUILDINGS Beach Fire Station
Winthrop High School
TOTAL BUILDINGS 440
TRANSPORTATION
INFRASTRUCTURE
Shirley Street, Tafts Avenue (Route 145) and Veterans Road are
evacuation and trucking routes
WATER AND
WASTEWATER
INFRASTRUCTURE
Underground MWRA sewer main and water line
Local underground lines
Pressure Reducing Valve Station at Underhill Street
STORMWATER
INFRASTRUCTURE
Lewis Lake is a major catchment area for the town
Drainage swale recently installed / cleared out around perimeter of
golf course
Undergroud system, catch basins, outfalls
ENERGY
INFRASTRUCTURE
Electric transmission and distribution system
Natural gas distribution system
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES &
OPEN SPACE
Lewis Lake (including Norman F. Daw Playground and section of
Winthrop Harborwalk)
High School Stadium and ball fields
Golf Club
5-12 IDENTIFY: Likely Flood Areas in Winthrop
The area surrounding Lewis Lake experiences
flooding due to the build-up of silt in Lewis
Lake, which decreases the ability of the Lake
to properly drain (MAPC, 2014). The 2014
update of the Town’s Hazard Mitigation
Plan identifies three single family homes
and two multi-family buildings as repetitive
loss properties by the FEMA National Flood
Insurance Program.
Where the Lewis Lake Flood Area and the
Winthrop Beach Flood Area meet, (in the
vicinity of Shirley Street,) they are both likely
to contribute to flooding (around 50 structures
are partially in both flood areas). Lewis Lake
is also a major catchment area, collecting
stormwater from approximately 1/2 of the
community. It is recommended that these
occurrences are studied holistically, so that
an appropriate approach to resiliency may be
taken.
Winthrop Golf Course Drainage at Veterans
Road
Table 5-8 Probable Future Flooding – Lewis Lake
SIZE OF FLOOD AREA
Today: 140 Acres (14% of Winthrop)
2030: 153 Acres (15% of Winthrop)
2070: 165 Acres (16% of Winthrop)
TOWN-IDENTIFIED FLOOD
AREAS/ISSUES
Lewis Lake is a critical stormwater storage area (drains half of
town). Lake overflows during storm events, causing flooding in
surrounding area (HMP, 2014)
CURRENT INITIATIVES
/ CONSTRUCTION
PROJECTS
Drainage improvements along Veterans Road
Drainage swale around Golf Club perimenter
Lewis Lake Tide Gate
BH-FRM MAPPED FLOOD
AREAS (2030-2070)
From Crystal Cove to Revere Street – Shirley Street – Bowdoin Street
in the north
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Evacuation/trucking route
Regional sewer main
Beach Fire Station
ADDITIONAL CRITICAL
PUBLIC INFRASTRUCTURE
(2070 FLOOD AREA)
None
5-13 IDENTIFY: Likely Flood Areas in Winthrop
Point Shirley
Land use within the Point Shirley Flood Area
includes residential properties, commercial,
and recreational facilities. Sandwiched
between the Boston Harbor on the west and
Broad Sound to the east, many residences
within the area are regularly exposed to
inundation and wave action.
On the harbor side, Coughlin Park includes
a salt marsh, tidal flats and beach area. The
park offers recreational facilities including
basketball courts, water access, and walking
trails. The shoreline wraps around a cove area
called “The Basin” to the Winthrop Town
Landing. Town Landing is also identified as
critical public infrastructure, as it includes a
public boat ramp and ferry service to Boston.
Located on Shirley Street, across the Basin
from Coughlin park, Town Landing was built
on filled tideland in the mid-20 th century.
Between Coughlin Park and Town Landing are
approximately 50 privately-owned properties.
Yirrell Beach
MBTA Paul Revere Bus at Shirley Street
Other important public infrastructure
includes the Pressure Reducing Valve Station
at Bayview Avenue and Winthrop Town
Landing. Point Shirley, via Shirley Street
and Tafts Avenue, is also the key access
route for emergency equipment to reach the
neighborhood and the Deer Island Sewage
Treatment Plant. Prolonged flooding of
these roadways could have negative social,
environmental, and economic impacts.
5-14 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-9 Flood Area Existing Conditions – Point Shirley
LAND USES High Density and Multi-Family Residential, natural resources and
open space, commercial, marina
ASSOCIATED WATERBODIES Broad Sound, Boston Harbor
PUBLIC SHORELINE
STRUCTURES
10- to 15-foot stone revetment at Town Landing
5- to 10-foot seawall/revetment along Shirley Street (adjacent
to Town Landing)
5- to 10-foot seawall from the top of Yirrell Beach to Petrel Street
5- to 10-foot bulkhead/seawall/revetment along Grand View
Avenue (Shirley Street to north of Deep Water Street)
10- to 15-foot stone revetment along Grand View Avenue (from
Bayview Ave to south of Foam Street)
PUBLIC BUILDINGS None
TOTAL BUILDINGS 545
TRANSPORTATION
INFRASTRUCTURE Shirley Street to Tafts Avenue / local roadways
WATER AND WASTEWATER
INFRASTRUCTURE Sewer main to Deer Island
STORMWATER
INFRASTRUCTURE Underground system, catch basins, outfalls
ENERGY INFRASTRUCTURE Electric transmission and distribution system
Natural gas distribution system
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES &
OPEN SPACE Yirrell Beach
The 2014 Winthrop Hazard Mitigation Plan
identified Point Shirley as the most frequently
flooded area of Winthrop. The flat and narrow
areas of this flood zone make it susceptible to
storm surges and waves from the ocean, and
additional flooding from Boston Harbor. High
water levels measured after the Blizzard of
1978 were recorded at elevation 12.67 feet at
Elliot Street (existing elevation at this site is
about 10 feet).
During northwest winds and coastal storms,
Coughlin park faces coastal erosion and
inundation. The Town has completed a
feasibility assessment to evaluate design
installations that could help slow the erosion.
The process has identified green infrastructure
along the western shoreline as the best
alternative to increase coastal resilience of the
park.
The coastal flood modeling for this area
estimates that the Point Shirley Association (on
the corner of Shirley Street and Pebble Ave)
could experience around a foot of flooding
during a 1% chance water level in 2030. The
same location and storm could see four feet of
water during a severe storm in 2070.
5-15 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-10 Probable Future Flooding – Point Shirley
SIZE OF FLOOD AREA
Today: 84 Acres (8% of Winthrop)
2030: 88 Acres (9% of Winthrop)
2070: 90 Acres (9% of Winthrop)
TOWN-IDENTIFIED FLOOD
AREAS/ISSUES
Point Shirley is the most frequently flooded area in town.
Area is subject to decreased sediment, coastal erosion,
and shoreline change.
Existing seawall at Yirrell Beach is occasionally breached,
and doesn’t cover area between Wyman Street to Deer
Island. Local efforts have been made for protection and
repairs, but this area remains a top priority for flooding
mitigation. Area is subject to decreased sediment, coastal
erosion, and shoreline change.
Coughlin Park experience coastal erosion and flooding
during higher northwest wind events and coastal storms.
Area is also subject to decreased sediment and shoreline
change.
CURRENT INITIATIVES /
CONSTRUCTION PROJECTS
Grandview Avenue seawall was upgraded and heightened
by two feet from Billows Street to Coughlin Playground
Drainage pipelines have been enlarged along Shirley Street
and Tafts Avenue to increase the stormwater capacity of
the system.
BH-FRM MAPPED FLOOD AREAS
(2030-2070)
All of Point Shirley, with exceptions of the highest elevation
around Unding Avenue
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Evacuation / trucking route
Point Shirley Association
ADDITIONAL CRITICAL PUBLIC
INFRASTRUCTURE (2070 FLOOD
AREA)
None
5-16 IDENTIFY: Likely Flood Areas in Winthrop
Fishermen’s Bend
The Fishermen’s Bend Flood Area is primarily
marsh land. The coastline also includes tidal
flats, beach and a small dune. These natural
resources have been acquired by the Town and
are managed by the Conservation Commission.
There are walking trails within the marsh,
and the Pico Playground and Beach provide
recreational opportunities the surrounding
neighborhood. Residential properties abutting
the beach and salt marsh are also included in
the Fishermen’s Bend Flood Area.
Pico Avenue Sewer Pump Station
Entrance to Pico Park
Sea walls in this area have been previously
identified for upgrades. The Pico Avenue
Sewer Pump Station may see 1 ½ feet of
flooding during a 1% chance water surface
elevation in 2030, and potentially more than
four feet in 2070.
5-17 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-11 Flood Area Existing Conditions – Fishermen’s Bend
LAND USES Salt marsh & beach, residential, commercial, recreation
ASSOCIATED
WATERBODIES Crystal Cove, Boston Harbor
PUBLIC SHORELINE
STRUCTURES
Stone groin at the end of Pico Avenue
5- to 10-foot seawall/stone revetment along Frances Street
5- to 10-foot seawall at Woodside Avenue
PUBLIC BUILDINGS None
TOTAL BUILDINGS 145
TRANSPORTATION
INFRASTRUCTURE Neighborhood Roads
WATER AND WASTEWATER
INFRASTRUCTURE Underground system
STORMWATER
INFRASTRUCTURE Underground system, catch basins, outfalls
ENERGY INFRASTRUCTURE Electric transmission and distribution system
Natural gas distribution system
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES &
OPEN SPACE
Fishermen’s Bend Marsh
Pico Park
Pico Beach
Table 5-12 Probable Future Flooding – Fishermen’s Bend
SIZE OF FLOOD AREA
Today: 30 Acres (3% of Winthrop)
2030: 35 Acres (3% of Winthrop)
2070: 43 Acres (4% of Winthrop)
TOWN-IDENTIFIED FLOOD
AREAS/ISSUES
Woodside seawall and headwall experiences coastal surge
flooding during storm events
CURRENT INITIATIVES /
CONSTRUCTION PROJECTS The sewer pump station has backup generation capacity.
BH-FRM MAPPED FLOOD
AREAS (2030-2070)
Crystal Cove to Pleasant Street in the north
Fishermen’s Bend Marsh to Sunnyside Avenue in the west
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Pico Sewer Pump Station
ADDITIONAL CRITICAL
PUBLIC INFRASTRUCTURE
(2070 FLOOD AREA)
None
5-18 IDENTIFY: Likely Flood Areas in Winthrop
Ingleside Park
The Ingleside Park Flood Area stretches
between Donovan’s Beach on the west side
of the peninsula, and the Arthur T. Cummings
Elementary School near the civic center
of Winthrop. The beach and park are both
owned by the Town. Many public amenities
are within the flood area, including access
to Boston Harbor with views of Boston’s
skyline, walking trails, athletic fields, tennis
courts, basketball courts, a skateboard
park, playground and public skating rink.
Residences border much of the park perimeter,
with the Central Business District adjacent to
the southeast of the flood area.
On an 1859 “Map of Boston and its Vicinity”
by Henry Francis Walling, ( Norman B.
Leventhal Map Center, Boston Public Library ),
the Ingleside Park area appears as a tidal
stream and low-lying marsh. William H.
Clark’s History of Winthrop Massachusetts
described The area was described as a swamp,
in the area as swampland and noted that it
was filled in 1936 with funds from the Public
Welfare Department (Clark, 1952).
The flood pathway to Ingleside Park is at
Donovan’s Beach, likely the same location that
the tidal stream once entered the swamp. The
park floods often, (mostly from precipitation
View of City of Boston from Donovan's Beach
Pleasant Street
events,) and anecdotal conversations within
town noted a couple of buildings within the
Central Business District run pumps nearly all
the time. Existing drainage infrastructure is
being assessed (by others) at Ingleside Park.
The facility is at sea level, with drain pipe
discharging at Donovan's Beach. There is a
valve on the existing outfall that shuts down
during heavy tides. (MAPC, 2014)
The coastal flood modeling for this area shows
that Pleasant Street may be flooded to a depth
of 8 inches in during a 1% chance water
surface elevation in 2030, making the roadway
impassible. The same location and storm could
see 3.5-feet of water during a severe storm in
2070.
5-19 IDENTIFY: Likely Flood Areas in Winthrop
Table 5-13 Flood Area Existing Conditions – Ingleside Park
LAND USES Civic, school, residential, commercial, natural resources and open
space
ASSOCIATED
WATERBODIES Boston Harbor
PUBLIC SHORELINE
STRUCTURES Concrete seawall (<5 feet high) at Donovan’s Beach
PUBLIC BUILDINGS None
TOTAL BUILDINGS 150
TRANSPORTATION
INFRASTRUCTURE Pleasant Street (Route 145), local roadways, walking trails
WATER AND WASTEWATER
INFRASTRUCTURE Underground system
STORMWATER
INFRASTRUCTURE Underground system, catch basins, outfalls
ENERGY INFRASTRUCTURE Electric transmission and distribution system
Natural gas distribution system
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES &
OPEN SPACE Donovan’s Beach, Ingleside Park
Table 5-14 Probable Future Flooding – Ingleside Park
SIZE OF FLOOD AREA
Today: 28 Acres (3% of Winthrop)
2030: 37 Acres (4% of Winthrop)
2070: 65 Acres (6% of Winthrop)
TOWN-IDENTIFIED FLOOD
AREAS/ISSUES
The park is at sea level, and may benefit from a pump station
(MAPC, 2014)
CURRENT INITIATIVES /
CONSTRUCTION PROJECTS
The Town constructed dikes in the park, around two homes, to
temporarily reduce flooding in the area (MAPC, 2014)
BH-FRM MAPPED FLOOD
AREAS (2030-2070)
Shoreline from Loring Road Boat Ramp to Lincoln Street
Ingleside Park area, with potential to cross Pauline Street and
move southeast along Putnam Street and Woodside Avenue
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Pleasant Street
ADDITIONAL CRITICAL
PUBLIC INFRASTRUCTURE
(2070 FLOOD AREA)
None
5-20 IDENTIFY: Likely Flood Areas in Winthrop
Girdlestone Road
The Girdlestone Road Flood Area is north
of Ingleside Park and south of Main Street.
The area includes the Pleasant Park Yacht
Club, Atlantis Marina Condominiums/Boat
Facilities, and a residential neighborhood.
Table 5-15 Flood Area Existing Conditions – Girdlestone Road
LAND USES Private recreation, residential
ASSOCIATED
WATERBODIES Boston Harbor
PUBLIC SHORELINE
STRUCTURES None
PUBLIC BUILDINGS None
TOTAL BUILDINGS 115
TRANSPORTATION
INFRASTRUCTURE Pleasant Street (Route 145), neighborhood roads, boat slips
WATER AND WASTEWATER
INFRASTRUCTURE Underground system
STORMWATER
INFRASTRUCTURE Underground system, catch basins, outfalls
ENERGY INFRASTRUCTURE Electric and natural gas distribution systems
TELECOMMUNICATIONS
INFRASTRUCTURE Cable and telephone lines
NATURAL RESOURCES &
OPEN SPACE None
Pleasant Park Yacht Hall at Belle Isle Pier
5-21 IDENTIFY: Likely Flood Areas in Winthrop
Flood waters appear to enter the Girldestone
Road Flood Area at the Pleasant Park
Yacht Club boat ramp. This area should be
addressed, as Pleasant Street and the adjacent
neighborhoos could experience two feet of
flooding during a 1% chance water surface
elevation in 2030.
Table 5-16 Probable Future Flooding – Girdlestone Road
SIZE OF FLOOD AREA
Today: 9 Acres (1% of Winthrop)
2030: 12 Acres (1% of Winthrop)
2070: 19 Acres (2% of Winthrop)
TOWN-IDENTIFIED FLOOD
AREAS/ISSUES None mentioned.
CURRENT INITIATIVES /
CONSTRUCTION PROJECTS None
BH-FRM MAPPED FLOOD
AREAS (2030-2070)
Pleasant Street to Beal Street, including Girdlestone Road and a
portion of Tileston Road
CRITICAL PUBLIC
INFRASTRUCTURE
(2030 FLOOD AREA)
Pleasant Street (Route 145) evacuation route
ADDITIONAL CRITICAL
PUBLIC INFRASTRUCTURE
(2070 FLOOD AREA)
None
This page intentionally blank
6-1 PRIORITIZE: Critical Public Infrastructure
6
With critical public infrastructure and the
likely areas of flooding in town identified,
the next step in the assessment process is to
systematically evaluate and prioritize critical
infrastructure at the Town-wide level. This
process will enable the Town to make strategic
and cost-effective investments in the locations
that are most at risk from coastal flooding.
PRIORITIZE: Critical Public
Infrastructure
Shirley Street at Town Landing
6-2 PRIORITIZE: Critical Public Infrastructure
Calculating Risk
There are many different mathematical
models that can be used to calculate a risk
score to prioritize infrastructure assets/
facilities. For this study, the goal was to use
a system that was simple to follow and easily
communicated.
A five-tier qualitative rating system (assigned
1 to 5) was developed for determining the
consequence that flooding would have on any
given asset. The rating score is multiplied
by the likelihood that assets may flood under
present day, 2030, and 2070 scenarios using
the Boston Harbor Flood Risk Model (BH-
FRM) results. A weighting factor for the
probability of flooding is also included in the
calculation. Assets within present day flood
areas are given higher weighting than those at
risk in future years:
• 60% weighting within the present-day
flood areas
• 30% weighting for 2030
• 10% weighting for 2070.
The assets/facilities can then be evaluated, in
order of priority, based on the total score. In
other words, the higher the score, the higher
the priority to investigate adaptation measures
for the infrastructure.
RISK =
CONSEQUENCE x
PROBABILITY
6-3 PRIORITIZE: Critical Public Infrastructure
Consequence
The consequence of failure score, calculated
for each asset/facility, was based on adding
together individual ratings (1 through 5) for
each of the following four criticality criteria:
Winthrop Fire Station
Shirley Street Neighborhood from Yirrell
Beach
Area of Service Loss: Who is
impacted by the loss of or damage
to the core functions of the asset?
Public Safety & Emergency
Services: How important is the
asset to community evacuation and
disaster response operations?
Social & Economic Activities:
How important is the asset to
providing people with access or
service to their homes and jobs?
Public Health & Environment:
How important is the asset to
controlling human exposure to
pollutants and secondary impacts
to the natural environment?
Probability
The likelihood of flooding under present
day, 2030, and 2070 scenarios is based on
data developed using the BH-FRM. A data
point was created using geographic
information systems (GIS) for each
public infrastructure asset within the BH-
FRM. Based on a critical elevation at each
location, an estimated depth of flooding was
determined where the flood event is likely to
impair an asset in any given year (a 0.1% to
100% chance). In some cases, any depth of
water would put a location at risk, whereas
other locations can sustain core functions even
with a few inches of water. The possibility that
the water depth starts to harm an asset’s core
functions is calculated into the score. A detailed
table of this data for each asset is included in
Appendix G (Probability of Exceedance Curve
Data extracted from the BH-FRM).
It is recognized that there is a certain level of
interpretation or subjectivity applied when
assigning consequence ratings.
6-4 PRIORITIZE: Critical Public Infrastructure
Figure 6-1 Prioritized Critical Public Infrastructure in Winthrop
14
Washington Avenue
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop
Shore Drive
Tafts Avenue
Winthrop Street
Pauline Street
Shirley Street
Pleasant Street BROAD SOUND
CRYSTAL
COVE
BELLE ISLE
INLET
BOSTON HARBOR
BELLE ISLE MARSH
REVERE
DEER
ISLAND
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Washington Avenue
Shirley Street
Main Street
Winthrop Shore Drive
Veterans Road
Winthrop Street
Court Road
Revere Street
CRITICAL INFRASTRUCTURE
= Pico Sewer Pump Station
= Pleasant Court Sewer Pump Station
= Washington Street
= Main Street
= Pleasant Street
= Beach Fire Station
= Winthrop High School
= Pressure Reducing Valve Station (Bayview Ave)
= Pressure Reducing Valve Station (Underhill St)
= Shirley Street
= Public Landing
= Pressure Reducing Valve Station (Revere St)
= Revere St. Sewer Pump Station
= Belle Isle Bridge
= Power Substation (Argyle St)
= Loring Rd. Boat Ramp
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
6-5 PRIORITIZE: Critical Public Infrastructure
Winthrop’s Critical Public Infrastructure Priorities
Based on the methodology described above and outlined in more detail in Appendix G , critical
public infrastructure is prioritized in Table 6-1.
Table 6-1 Critical Public Infrastructure Risk Scores and Ranking
RANK CRITICAL INFRASTRUCTURE FLOOD
AREAS
CRITICALITY
TOTAL
% PROBABILITY OF
FLOODING
TOTAL
RISK
SCORE PRESENT 2030 2070
Pico Sewer Pump Station Fishermen's
Bend 15 5 25 100 307.5
Pleasant Court Sewer Pump Station Belle Isle
Marsh 15 2 25 100 280.5
Washington Street (town evacuation
route) Lewis Lake 15 2 20 100 258
Main Street (town evacuation route) Belle Isle
Marsh 18 0.5 5 100 212.4
Pleasant Street (town evacuation
route)
Ingleside
Park 15 0.2 5 100 174.3
Beach Fire Station Lewis Lake 14 1 5 100 169.4
Winthrop High School Lewis Lake 13 1 5 100 157.3
Pressure Reducing Valve Station
(Bayview Ave) Point Shirley 13 1 5 100 157.3
Pressure Reducing Valve Station
(Underhill St)
Winthrop
Beach 13 0.5 2 100 141.7
Shirley St (town evacuation/MWRA
truck route) Point Shirley 20 0.5 10 20 106
Public Landing Point Shirley 10 0 0.5 50 51.5
Pressure Reducing Valve Station
(Revere Street)
Belle Isle
Marsh 13 0 0.2 30 39.78
Revere St. Sewer Pump Station Belle Isle
Marsh 15 0 0.1 20 30.45
Belle Isle Bridge Belle Isle
Marsh 18 0 0 2 3.6
Power Substation (Argyle Street) Belle Isle
Marsh 18 0 0 2 3.6
Loring Rd. Boat Ramp Ingleside
Park 4 0 0 1 0.4
The pump station prioritization process emphasizes the importance of focusing on protecting
wastewater/sewer infrastructure and keeping evacuation/trucking routes open. The next chapters
will focus on providing adaptation strategies for these types of infrastructure.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
6-6 PRIORITIZE: Critical Public Infrastructure
This page intentionally blank
7-1 STRATEGIZE: Living with Coastal Waters
With evacuation routes and water/wastewater
facilities identified as the Town’s highest
priority infrastructure in Chapter 6, the next
step is to strategize how these places may
become more resilient in the face of sea level
rise, coastal storm surge, and related coastal
flooding.
Before discussing potential resilience
approaches, there are some important points to
make:
1. Adaptation measures will need
to be implemented over time, in
coordination with public and private
partners. The key is to advance
strategies at all scales, in a coordinated
manner, to address coastal flooding
risks in the short term and long term.
2. No adaptation installation is a
fail-safe solution as no amount
of modeling or planning can
fully predict the future. This is an
important reality that focuses our
attention on identifying strategies that
provide public benefits in the near term
and are flexible enough to work over a
range of future conditions.
» In addition to reducing the effects
of coastal flooding, adaptation
measures can include additional
public benefits such as improved
public access to the waterfront and
protection / enhancement of natural
resources.
7 STRATEGIZE: Living with Coastal Waters
Coughlin Park Shoreline. Source: Woods Hole
Group
» Flexible approaches that grow
with sea level rise may include
adaptable ecological installations,
natural berms, or other waterfront
structures that can be adjusted
vertically in height or expanded
along the shoreline.
Clever adaptation strategies that are
flexible and offer multiple community
benefits are more likely to gain the
community and financial support needed
for implementation.
7-2 STRATEGIZE: Living with Coastal Waters
3. Once the adaptation measure is
installed, ongoing support will help
ensure the installation is successful.
When selecting an adaptation measure,
an analysis of alternatives will help find
the best installation for the community.
Alternatives should include a variety of
installation types and consider:
» Cost - depending on the type,
quantity, and/or scale of measures
chosen, they can cost a few
thousand, or millions of dollars.
» Operations and maintenance – who
will design, install, and maintain
the retrofits? If the installation
requires pre-storm preparation, who
will respond to flood warnings?
Who will manage clean-up efforts
after the flood?
» Training – will the installation
require human intervention?
» Supporting measures – is the
installation able to work on its own,
or is it most effective if combined
with other measures?
For the purpose of this assessment, three
different scales of climate change adaptation
strategies are considered. Listed under each,
are critical public infrastructure that will
be the focus of adaptation measures in this
assessment:
Site-specific installations that protect a
single property or asset (Chapter 8 ):
• Pump Stations
• Beach Fire Station
• DPW Building
Shoreline/area-wide strategies that could
protect multiple properties (Chapter 9 ):
• Main Street, near the Belle Isle Bridge
• Pleasant Street, at Ingleside Park
• Washington Avenue, at Lewis Lake
• Shirley Street, on Point Shirley
Policy- or regulation-based measures to
provide town-wide protection standards
(Chapter 10 ):
• New construction
• Redevelopment projects
7-3 STRATEGIZE: Living with Coastal Waters
The strategies in this assessment focus on
Town-owned facilities, or within public right-
of-way, to provide the Town with installations
that are within their own control and can be
implemented in the near term. This focus does
not discount the importance of understanding
how other public service providers are
modifying their facilities to coastal flooding.
As part of the assessment process, the project
team met with the Massachusetts Department
of Conservation and Recreation (DCR) to
present the findings of the Boston Harbor
Flood Risk Model (BH-FRM) and discuss
resilience initiatives the agency is working on
or have considered.
This report should open the door for other
follow-up discussions about community-level
resilience planning and future implementation
phasing. Meetings with other service providers
in town could include:
• Massachusetts Water Resources
Authority (MWRA)
• Massachusetts Port Authority
(Massport)
• Massachusetts Department of
Transportation (MassDOT)
• Eversource
Winthrop Beach
7-4 STRATEGIZE: Living with Coastal Waters
This page intentionally blank
8-1 STRATEGIZE: Site-Specific Adaptation Measures
8 As identified on the critical infrastructure
mapping ( Figure 6-1 ), there are several
important utility facilities scattered throughout
the community. This section looks specifically
at site and building retrofits for public utilities
and structures. However, these adaptation
measures may also be applied to other asset
types, private residences and commercial
buildings.
Overview of Site Adaptation
Types
Sometimes, moving critical resources out of
the flood zone is the most feasible option for
resilience. While it may seem obvious to either
relocate or raise structures and equipment for
flood protection, each infrastructure type and
location requires consideration of the potential
benefits and drawbacks.
Relocating structures or equipment would
offer the most protection to infrastructure
within an area subject to flooding. It seems
to make the most sense to avoid the threat of
flooding by moving away from it. However,
with pump stations, pressure valves, and
substations, associated utility lines and
building connections may not be a feasible
option. If relocation is physically feasible,
steps for implementation include securing a
new property and funding, and identifying
challenges of construction or movement of the
infrastructure.
STRATEGIZE: Site-Specific
Adaptation Measures
Elevating critical infrastructure above
projected flood depths can also protect assets
from flood damage. This may include raising
entire buildings, certain utilities, or equipment.
Elevating these assets will require adequately
designed foundations that will exceed potential
flood water depths and manage flood water
velocities, wind, and earthquake loads.
Oftentimes critical infrastructure cannot
be moved or raised, and other adaptation
measures must be explored.
Wet floodproofing can allow an asset to
withstand flooding, and recover more quickly
after the water has receded. Types of wet
floodproofing include building with flood
resistant materials, anchoring equipment (for
Elevated building. Source: StormSmart Coasts
8-2 STRATEGIZE: Site-Specific Adaptation Measures
instance, fuel tanks), and installing quick
disconnects for appliances that may short out
or be filled with contaminated water during
a flood. Flood vents and pumps can prevent
walls from collapsing due to high water levels
or water saturated soils. However, pumps must
be timed appropriately, to match the exterior
flood levels as they recede.
Dry floodproofing strategies rely on exterior
building walls to act as a flood barrier. To
help create a watertight building, sealants or
impermeable layers can be applied to walls
and floors. Flood shields and watertight
access hatches can also contribute to building
protection. Flood shields are temporary
installations to barricade doors and windows.
Inside the buildings, backflow valves can
prevent contaminated water from entering a
building through sewer or drain pipes. And, as
a backup measure, pumps are recommended
to remove water that may still penetrate dry
floodproofing measures
Perimeter Barriers can be permanent
or temporary vertical structures aimed at
preventing flood waters from reaching a
particular asset. Permanent barriers include
sea walls or bulkheads. Temporary barriers
are stored locally and installed prior to a
flood event. Semi-permanent barriers are a
combination of these, often a knee wall is
built to a certain height with an option to add
temporary structures to adapt to higher flood
elevations. Alternatives to hard structures
include berms or levees. These are earthen
mounds, sometimes with a structural base,
designed to block flood waters from entering
certain areas.
Although they can be quite effective, barriers
only offer protection to a specific height,
so overtopping is still possible. Another
consideration, for temporary installations, is
Flood Shield
Source: Flood Control International
Example of dry floodproofing
Source: Flood C.I.
that the wall components may require storage
space, personnel training for installation, and
enough warning time to install the structure.
SCADA (Supervisory Control and Data
Acquisition) systems allow facilities to be
controlled from remote locations. Technologies
such as this can help raise awareness of
flood risk to assets and issue warnings that
may reduce damages or prevent failure of
components.
8-3 STRATEGIZE: Site-Specific Adaptation Measures
Key to Estimated Range of Costs:
$ < $100,000
$$ $100,000 to $500,000
$$$ $500,000 to $3,000,000
$$$$ $3,000,000 to $10,000,000
$$$$$ > $10,000,000
Revere Street Pressure Reducing Valve
Station
Table 8-1 Range of costs for site
adaptations
RECOMMENDED ADAPTATION
CONCEPT COST*
Relocate $ - $$$$$
Elevate $ - $$$$
Wet- or Dry Floodproofing $ - $$$
Perimeter Barriers $ - $$$$$
Communication Improvements
(e.g. SCADA) $ - $$$
* estimates are initial capital costs, and do not include annual
expenses required to maintain the measure over the design life.
It is assumed that the measures will be installed on publicly-
owned property. Table adapted from Amtrak NEC Climate
Change Adaptation Plan- Phase III Pilot Study , March 2017
8-4 STRATEGIZE: Site-Specific Adaptation Measures
Potential Strategies for Sewer
Pumping and Pressure Re -
ducing Valve (PRV) Stations
Three major sewer and wastewater pumping
stations in town are identified within BH-FRM
flood areas – Pico Avenue, Revere Street, and
Pleasant Court. These stations collect and
distribute hundreds of thousands of gallons
of sewerage each day. The stations are at
specific low points in the community to collect
neighborhood waste and pump it out to the
larger sewer mains.
The station at Revere Street is also home to
a Pressure Reducing Valve Station (PRV),
which is where the Department of Public
Works (DPW) controls potable water flow into
Winthrop.
Table 8-2 Potential Sewer Pump Station Flood Depths and Adaptation Installations
WATER/
WASTEWATER
STATION
POTENTIAL DEPTH OF
FLOODING (IN FEET; 1%
CHANCE WATER LEVEL)
POTENTIAL WALL HEIGHT
(FLOOD WATER LEVEL
PLUS 1-FT FREEBOARD)
POTENTIAL WALL PERIMETER
PRESENT
DAY 2030 2070 PRESENT
DAY 2030 2070
SURROUND
EXISTING
BUILDING
REPLACE
EXISTING
FENCE
Pleasant
Court 0’-9” 2’-0” 4’-9” 1’-9” 3’-0” 5’-9” 150’ 200’
Pico Avenue 0’-9” 1’-6” 4’-4” 1’-9” 2’-6” 5’-4” 120’ 175’
Revere St
Sewer Pump
Sta
Dry Dry 2’-3” - - 3’-3” 120’
275’
(surrounding
both
buildings) Revere St PRV Dry Dry 2’-3” - - 3’-3” 140’
Table 8-2 presents the modeled flood depths
that may occur during a 1% chance water
surface elevation (one chance in 100, or 100-
year water level). These stations were recently
updated with raised first floors, water resistant
floor panels, and generator upgrades.
Dry floodproofing techniques could be applied,
including the installation of flood doors on
the stations. Potential walls could be built to
at least the 2030 flood depth with 1-foot of
freeboard. Walls should be designed to be
able to adapt, in height, to future conditions in
response to climate change and sea levels rise.
Implementation, including cost estimates and
potential permitting requirements, is explored
in Chapter 11 .
9-1 STRATEGIZE: Shoreline Adaptation Measures
Area-wide strategies should be considered for
long, linear infrastructure, or when several
assets are grouped within one focus area.
Strategies focused at the shoreline and within
the community can make these locations more
resilient to coastal flooding.
These strategies will require significantly
more time and effort to finance, design,
permit, and construct than the site-specific
installations presented above. However, they
are also typically more cost effective by
providing protection for multiple public and
private assets. The strategies may range from
a couple of hundred linear feet shoreline, to
a couple thousand linear feet, and involve a
combination of public and private properties.
9 STRATEGIZE: Shoreline
Adaptation Measures
“Every storm makes changes;
and every change has its
consequences. Undoubtedly
we can keep the present area
of Winthrop, and perhaps even
persuade the ocean to enlarge
it rather than wear the shore
line away. However, it must be
remembered that this will only
be so if constant vigilance is
maintained and the walls and
breakwaters kept in repair.”
William H. Clark, The History of Winthrop
1952
Yirrell Beach
9-2 STRATEGIZE: Shoreline Adaptation Measures
To make installations like this possible, it
is crucial to open communication between
the Town, property owners, community, and
regulatory agencies early in the planning
process to gain support, develop partnerships,
secure funding, and set realistic project
timelines.
Where feasible, natural systems and processes
should be employed to help protect the
Town from coastal flooding and provide
ecological benefits. The potential for “green
infrastructure” installations exist where large
areas of natural resources (e.g. beach, tidal
flats, or salt marsh) line the shore. However, in
many locations in Winthrop, the constructed
environment may limit this type of installation,
and engineered barriers are more likely to
be utilized. Here, more traditional “gray
infrastructure” is appropriate.
Green Infrastructure
Existing and constructed green infrastructure
has proven ecological benefits for coastal
communities. Green infrastructure includes,
but is not limited to, salt marsh and dune
restoration, and living shorelines. A living
shoreline may involve planting salt marsh
and fringe marsh behind a biodegradable
coir or rock sill, and creating tidal channels
to enhance restoration and drainage. The
ecological benefits include:
• Absorption of wave energy.
• Erosion protection.
• Water quality improvement.
• Habitat for wildlife and plant species.
• Visual character enhancement along the
shoreline.
In addition, some of these systems maintain
themselves after storms and flood events, and
adapt to changes in sea level rise (NOAA,
2015).
Living Shoreline after construction
Living shoreline after vegetation growth
NOAA’s Coxsackie State Boat Launch Living
Shoreline Project (Source: noaa.gov )
9-3 STRATEGIZE: Shoreline Adaptation Measures
Careful study of the proposed green
infrastructure location, and plans from
experienced designers will help avoid adverse
impacts to existing habitat and wildlife.
Other considerations include project cost and
maintenance requirements, as storm events can
alter infrastructure and reduce its effectiveness.
Gray Infrastructure
Humans have always been attracted to
water, and the shoreline of Winthrop is no
exception. The Town is completely built out
(MAPC, 2014), with buildings and pavement
abutting beaches and other wetlands. Gray
infrastructure, or hard engineered structures
(e.g. sea walls, stone revetment, drainage pipes
and outfalls, etc.) have made this build out
possible.
However, these hard structures, to various
degrees, may reflect wave energy. This can
cause erosion to adjacent properties or fronting
coastal resources (e.g. beaches, dunes, etc.).
Over time, the structures themselves may be
undermined by the erosion of the beach in
front of it, causing eventual collapse and costly
repair. In addition, beach erosion over time can
limit areas for recreation, wildlife habitat, and
ability of this natural resource to provide wave
attenuation.
One benefit to constructing these steel and/
or concrete structures is that they can be
vertically extended over time. This would
allow wall height to be increased in phases as
data regarding future impacts from sea level
rise and storm surges is refined.
In some situations, a concrete cap or wall
may benefit from aesthetic details, to soften
the visual impact. Concrete form liners can
be designed with patterns to create an artistic
statement and/or announce a particular place or
neighborhood. Another way to break up a large
wall could be to integrate elements such as art,
planters, or terracing.
Pico Beach Seawall (gray infrastructure
9-4 STRATEGIZE: Shoreline Adaptation Measures
Hybrid installation example
Hybrid Installations
Some locations may benefit from a hybrid
of green and gray infrastructure to provide
protection for a wider range of potential
flood depths. Coastal wetland plantings and
berms can be designed to manage low to
medium tidal flooding, where engineered
walls could be provided for additional
storm surge protection (NOAA, 2015).
In any case, shoreline installations can
be designed, not only to create barriers
to coastal flooding, but also provide an
opportunity to benefit the surrounding
community. These benefits may include
improved public access to the waterfront
and/or enriching an area’s visual character.
Conceptual Design
Of the eight flood areas identified in Chapter
5 , the Project Management Team (PMT)
identified four locations for further study.
The following criteria was used to select the
locations:
• Includes the highest ranked critical
infrastructure identified in Chapter 6
• Can use public property to install the
adaptation
• Locations will illustrate different types
or combinations of adaptation measures
Due to these criteria, potential installations
described in this chapter include:
Belle Isle Marsh Flood Area – planted
berm with sidewalk along Morton Street
right-of-way
Ingleside Park Flood Area – hybrid sea
wall, with seating and planting adjacent to
Donovan’s Beach
Lewis Lake Flood Area – flood barrier at
Washington Avenue
Point Shirley Flood Area – beach
nourishment/dune creation at Yirrell Beach
9-5 STRATEGIZE: Shoreline Adaptation Measures
The following sections discuss the probable
flood entry points at each location, and a
near-term adaptation that is intended to
withstand a 1% chance water level in the
modeled 2030 conditions. Future adaptations
will require more focused location studies
and conversations with property owners,
neighborhoods, local boards, state agencies,
and other interested parties. The materials on
the following pages have been structured to
allow each flood area section to be extracted
from the assessment in support of future
implementation phases. The sections can serve
as an education packet for working group
meetings, support communication efforts with
public and private partners, and be included in
future funding applications. Implementation,
including estimated cost and potential
permitting, is explored in Chapter - .
As outlined throughout this report, the scope
of this study is to address only the effects
of coastal flooding and sea level rise to the
town. The following concept designs are
not intended to reduce the effects of inland
precipitation and storm drainage patterns. It is
recommended that further study be conducted
to address inland flooding in concert with the
information in this report. Potential outcomes
could include:
• Identification of flood areas and depths
inclusive of all coastal and inland
flooding
• Selection of locations and design types
for stormwater upgrades, including
pipe upsizing and green infrastructure
(plants and infiltration systems to help
“ Soak Up the Rain ” see EPA website
for more information )
• Restoration of streams and wetlands
• Conceptual design for additional
adaptation measures
Belle Isle Marsh from Morton Street
9-6 STRATEGIZE: Shoreline Adaptation Measures
Figure 9-1 Map of Adaptation Locations
Winthrop Massachusets
Lewis
Lake
Snake
Island
Coughlin
Park
Deer Island
Boston Logan
International Airport
Deer Island
Wastewater
Treatment Plant
N
SHORT BEACH
CREEK
BELLE ISLE
MARSH
BOSTON
HARBOR
BOSTON
HARBOR
BOSTON
HARBOR
BELLE ISLE
INLET
BROAD SOUND
BROAD SOUND
The Five Sisters
Winthrop
Head
Winthrop
Beach
Donovan’s
Beach
Crystal
Cove
Town
Landing
Pico Playground
& Beach
Town
Hall
Winthrop
High School
Small Park
Small Beach
Fort Banks
Playground
Yirrell
Beach
Little
League
Field Miller
Field
Winthrop
Golf Club
Veterans
Field
Central Business
District
The Basin
Winthrop
Cemetery
Washington Ave
Winthrop St
Winthrop St
Main St
Pleasant St
Shirley St
Shirley St
Veterans Road
Winthrop Shore Dr
Revere St
Morton Street
REVERE ST PUMP
STATION
PLEASANT COURT
PUMP STATION
PICO AVE PUMP
STATION
NAHANT AVENUE
FLOOD AREA
(7.5 AC)
LEWIS LAKE
FLOOD AREA
(153 AC)
BELLE ISLE MARSH
FLOOD AREA
(106 AC)
INGLESIDE PARK
FLOOD AREA
(38 AC)
WINTHROP BEACH
FLOOD AREA
(88 AC)
POINT SHIRLEY
FLOOD AREA
(88 AC)
Shoreline Adaptation
Site Specific Adaptation
FISHERMEN'S BEND
FLOOD AREA
(35 AC)
9-7 STRATEGIZE: Shoreline Adaptation Measures
The Belle Isle Inlet once flowed freely over the
tidal flats that were filled to construct Logan
Airport in the 1920s ( Massport website ).
Today, this opening between Winthrop and
East Boston is just under 200-feet wide,
traversed by the Belle Isle Bridge. The
bridge is the primary evacuation route for
the Winthrop community and Deer Island
Wastewater Treatment Plant employees. It was
recently reconstructed with the low member of
the structure about one- to two-feet above the
BH-FRM mapped 1% chance water level. In
2030, the bridge is projected to be only six-
inches above the 1% chance water level.
Ultimately, raising the bridge and approach
roadways should be explored. However, the
design process to construct the 2013 bridge
faced firm height restrictions from the Federal
Aviation Administration (FAA). Because
the FAA is unlikely to change the bridge
height restriction in the near term, further
study of potential scour and debris impacts
is suggested. The bridge evaluation may also
consider bridge components, connections, and
lifecycle for replacement or elevation. Bridge
adaptations may include additional riprap
to help protect foundations against swiftly
moving flood waters, and defend against debris
impacts. Structural upgrades can also increase
resistance to flood waters and floating debris.
Although the bridge is not estimated to be
overtopped by flood waters, the approaches
to the bridge are. During a 1% chance water
surface elevation in 2030, Main Street could
experience as much as 6” of flooding, making
it impassible. Although not part of this study,
Saratoga Street, on the East Boston side of
the bridge, is also at risk of flooding. On the
Winthrop side of the bridge, there are two
flood pathways identified by the BH-FRM: one
along Morton Street, and another on private
property at the west end of Morton Street
( Figure 9-4 ).
BELLE ISLE MARSH FLOOD AREA
9-8 STRATEGIZE: Shoreline Adaptation Measures
Public Infrastructure Adaptation
Recommendations
To help keep the water off Main Street in 2030,
the assessment team studied the feasibility of a
hybrid infrastructure installation along Morton
Street (from Pleasant Street to Fairview Street;
Figure 9-4 ). In addition to being identified as
a flood pathway, the roadway right-of-way is
within the Town’s control. As such, the right-
of-way was determined, by the PMT, to be
a good location to start looking at resilience
options. A planted berm was identified for
study along Morton Street to discourage flood
water from entering the area. The berm could
include a walking path to tie in with existing
plans for the Town’s Belle Isle Marsh Marine
Ecology Park and Marsh Walk .
Plans for the new park are currently designed
to connect Pleasant Street to a new passive
recreation park on Morton Street. From the
new park, the trail will connect with existing
walking trails to the north of Belle Isle
Cemetery.
A planted berm along Morton Street was
modeled by the Woods Hole Group, using the
BH-FRM, to identify whether it could reduce
the identified flood depth along Main Street.
Flood modeling of the installed berm did prove
to be effective for some of the adjacent Morton
Street neighborhood, but ineffective for
reducing flooding on Main Street. This shows
that both flood pathways must be addressed for
the adaptation to be effective.
Inundation Depth
Figure 9-2 Belle Isle Marsh Coastal Flood Modeling for Projected 2030 1% Chance Storm
Shoreline Adaptation
9-9 STRATEGIZE: Shoreline Adaptation Measures
If Main Street is to remain passable during
future coastal flood events, there must be
discussions with private property owners along
the shoreline, between the bridge and Morton
Street. Suggestions could be made to repair/
modify existing shoreline structures, install
new structures, or create living shorelines.
If agreements with private owners are not
possible in these locations, additional measures
must be considered landward of the flood
pathways to protect Main Street and the pump
station.
Supporting measures, considering inland
flooding will also need to be addressed.
Existing drainage pipes could be enlarged
to hold more water during a storm event.
Check valves should be installed at existing
outfalls to prevent coastal water from entering
the stormwater system. Additionally, green
infrastructure installations along Morton
Street, and streets perpendicular to it, may
promote stormwater infiltration to reduce flood
depths.
Natural Resource
Recommendations
Due to sea-level rise, the marsh along the
northeastern shores of Winthrop will want to
expand inland over the next several decades
( Appendix F ). No immediate adaptations are
required to maintain the natural resources
in this area. However, in the long-term, and
during storm events, more frequent overbank
flooding can be expected to surrounding
properties and the fringe marsh areas may
be expected to expand. Smaller, proactive
restoration measures could be considered
along the shorelines to protect infrastructure
and provide natural resource expansion and
protection. Potential options could consider
living shoreline applications and targeted thin
layer deposition projects that would involve
the placement of clean, compatible sediment in
thin layers on the existing salt marsh to assist
the elevations in keeping up with the rising
tidal increases.
Figure 9-3 Potential Flood Levels at the Belle Isle Bridge
Winthrop
East
Boston
BOSTON HARBOR
BELLE ISLE INLET
BELLE ISLE MARSH
SALT
MARSH
SALT
MARSH TIDAL
FLAT
TIDAL
FLAT
SALT MARSH
SALT MARSH
SHALLOW
MARSH
MEADOW
SALT
MARSH
BEACH
MAIN ST
SUNSET ST
GIRDLESTONE RD
TILESTON RD
SARATOGA ST
MORTON ST
PLEASANT CT
Mobil
Ace
Hardware
Pleasant
Park
Yacht
Atlantis
Marina
Belle Isle Seafood
Boat Yard
WILLIS AVE
PLEASANT ST PLEASANT ST
MARSHALL ST
BEAL ST
JERALD ST
PLEASANT PARK RD
AMELIA AVE
FAIRVIEW ST
READ ST
N
200’ 400’ 0
A
A 1
Pleasant Court
Pump Station
Dunkin
Donuts
Figure 9-4 Morton Street Concept Plan
F l o o d A r e a : B e l l e I s l e M a r s h
2070 PROBABLE FLOOD ELEVATION
2030 PROBABLE FLOOD ELEVATION
PRESENT DAY PROBABLE
FLOOD ELEVATION
POTENTIAL WALL TO ALLOW
FOR VERTICAL EXTENSION IN
FUTURE CONDITIONS
BELLE ISLE MARSH
POTENTIAL PLANTED
BERM
OPPORTUNITY
FOR ADDITIONAL
ADAPTATION
MEASURES
POTENTIAL
PLANTED
BERM
2030 FLOOD LIMIT
BELLE ISLE
BRIDGE
EXISTING GRADE
Figure 9-5 Section A-A 1 (Morton Street)
NOT TO SCALE
EXISTING STORMWATER
OUTFALL
FLOOD PATHWAY
FLOOD PATHWAY
FLOOD PATHWAY
READ ST
WALDEN ST
EDWARD ST
2030 FLOOD AREA SIZE Approximately 106 acres (10% of Winthrop)
CRITICAL
INFRASTRUCTURE
WITHIN FLOOD AREA
Main Street (evacuation and Deer Island trucking route)
2030 1% CHANCE
STORM FLOOD DEPTH 2'-3” (at Morton Street)
REVIEWED
ADAPTATION
A planted berm along Morton Street may reduce the identified flood path,
and reduce the flood depth along Main Street.
MODELED
EFFECTIVENESS
Relatively ineffective. The berm protects a few homes, but generally the flood
water will still enter the area west of the Morton Street installation.
ADAPTATION
LIMITATIONS
The berm cannot protect Main Street on its own.
Barriers offer protection to only a certain elevation, so overtopping is possible.
POTENTIAL
SUPPORTING
MEASURES
Upsize stormwater pipes, installing flapper valves on all outfalls.
Discuss potential adaptations with private property owners between the Belle
Isle Bridge and Morton Street (e.g. repair/modify existing shoreline structures
and/or install green infrastructure).
MORTON STREET
Figure 9-6 Potential Morton Street Flood Levels
9-12 STRATEGIZE: Shoreline Adaptation Measures
View toward Boston from Donovan's Beach
Southbound view along Pleasant Street
(Donovan's Beach on right)
As discussed in Chapter 5 , Ingleside Park was
swamp land until it was filled in 1936 (Clark,
1952). The flood pathway to Ingleside Park is
at Donovan’s Beach, assumed to be the same
location where a tidal stream once entered the
swamp. Coastal flooding on Pleasant Street
could be 8-inches deep by 2030, making this
roadway impassible during a major storm
( Figure 9-9 ).
INGLESIDE PARK FLOOD AREA
Public Infrastructure Adaptation
Recommendations
The modeled 1% chance water surface
elevation in 2030 shows water overtopping
the existing 3-foot high seawall at Donovan’s
Beach. Shoreline improvements could include
a hybrid wall, as shown on Figure 9-10 , to
9-13 STRATEGIZE: Shoreline Adaptation Measures
Inundation Depth
Figure 9-7 Ingleside Park Coastal Flood Modeling for Projected 2030 1% Chance Storm
increase the height of the barrier, infiltrate
stormwater, and provide erosion control at
the beach, habitat for wildlife, and seating to
beach users.
From the results of the BH-FRM, the PMT
considered a 1.5-foot high wall installation
all along the Donovan’s Beach property line.
WHG modeling of this installation shows it to
be an effective adaptation measure to prevent
storm surge from entering a large area under
2030 conditions.
However, Ingleside Park does drain a
considerable amount of stormwater from
development on the west side of Winthrop.
To effectively adapt to future climate change
conditions, other supporting measures must
be studied to consider stormwater runoff
and increased ground water levels due to
sea-level rise. These measures may include
enlarging drainage pipes to hold more water
during a storm event, installing flapper valves
to prevent coastal water from entering the
stormwater system, and installing green
infrastructure along roadways and in open
spaces to promote stormwater infiltration
and reduce flood depths. Depending on
future effects of sea-level rise and increased
precipitation at the park, the feasibility of
restoring the 19 th century stream may also be
considered.
Natural Resource
Recommendations
Office of Geographic Information (MassGIS)
wetlands data, mapped by the Massachusetts
Department of Environmental Protection
(DEP), identifies a strip of salt marsh
extending from just south of the Loring Road
Boat Ramp to just north of Donovan’s Beach.
Although living shorelines are beneficial in
some coastal areas, it is not recommended
here. Construction along the beach could cause
sediments to adversely impact the existing salt
marsh system. The proposed hybrid wall will
still provide some level of ecological benefits,
as well as other public amenities.
Shoreline Adaptation
A A 1
ATS
SALT MARSH
Court
Park
Donovan
Beach
PLEASANT ST
PLEASANT ST
CIRCUIT RD
BIRCH RD
OURT RD
EMERSON RD
LOWELL RD
EDGEHILL RD
INGLESIDE AVE
ENFIELD RD
LINCOLN ST
BROOKFIELD RD
PALMYRA RD
WHEELOCK ST
INGLESIDE
PARK
Former Middle
School
Larson R
200’ 400’
N
0
AREA
Figure 9-8 Pleasant Street Concept Plan
2030 FLOOD AREA SIZE Approximately 38 acres (4% of Winthrop)
CRITICAL INFRASTRUCTURE
WITHIN FLOOD AREA Pleasant Street (Evacuation Route)
2030 1% CHANCE STORM
FLOOD DEPTH 8”
REVIEWED ADAPTATION
Replacement of existing seawall with taller, adaptable flood barrier and
planted seat walls. The green infrastructure on the beach-side of the barrier
will provide ecological and recreational community benefits.
MODELED EFFECTIVENESS Effective as a coastal flood adaptation
ADAPTATION LIMITATIONS
Ingleside Park drains nearly 100 acres in town & this adaptation does not
consider inland precipitation.
Flood barriers offer protection to only a certain elevation, so over-topping is
possible.
POTENTIAL SUPPORTING
MEASURES
Upsize stormwater pipes, installcheck valves at all outfalls
Repair and/or modification of adjacent existing shoreline structures
Install green infrastructure in town to promote stormwater infiltration &
reduce runoff
Stream restoration feasibility study
F l o o d A r e a : I n g l e s i d e P a r k
BOSTON
HARBOR
POTENTIAL BARRIER /
GREEN INFRASTRUCTURE
INSTALLATION
2030 FLOOD LIMIT
2030 FLOOD LIMIT
EXISTING
STORMWATER
OUTFALL
EXISTING
SALT
MARSH
FLOOD PATHWAYS
OPPORTUNITY
FOR ADDITIONAL
ADAPTATION
MEASURES
Figure 9-9 Potential Pleasant Street Fl
2070 P
2030 P
Figur
NOT T
ood Levels
FORMER WETLAND SYSTEM AT INGLESIDE PARK.
1817 MAP OF BOSTON HARBOR, SURVEYED BY
ALEXANDER WADSWORTH
WATER-SIDE STEPS/PLANTINGS AT CALGARY
RIVERWALK, CANADA
PROBABLE FLOOD ELEVATION
PROBABLE FLOOD ELEVATION
POTENTIAL ADAPTABLE WALL
EXISTING BEACH
PLEASANT STREET
EXISTING BEACH EXISTING
CONCRETE WALL
EXISTING SIDEWALK
AND SEATING AREA
POTENTIAL GREEN
INFRASTRUCTURE INSTALLATION
re 9-10 Section A-A 1 (Pleasant Street )
O SCALE
INGLESIDE PARK
FISHERMEN'S
BEND
LEWIS LAKE
9-16 STRATEGIZE: Shoreline Adaptation Measures
LEWIS LAKE FLOOD AREA
Where it was once open to the harbor, Lewis
Lake is now landlocked with a single outfall
and a tide gate to regulate its holding capacity.
Prior to the turn of the 20th century, Lewis
Lake was an extensive wetland system,
including Fishers Creek, a tidal stream.
When Winthrop began to grow as a vacation
destination, a steam train line was constructed
to deliver tourists from Boston to the town
center and Winthrop Beach. A railroad bridge
was built over the wetlands and, several
years later, another bridge was constructed
connecting Washington Avenue to Shirley
Street. Soon after, the Washington Avenue
bridge connection was filled to create a
roadway and adjacent parcels. Though the rail
line was eventually demolished, part of the
railroad bridge bed, near Washington Avenue,
remains.
9-17 STRATEGIZE: Shoreline Adaptation Measures
Today, Lewis Lake collects stormwater
drainage from approximately half of the town.
The water table is high, and the identified area
of coastal flooding also experiences flooding
from extended amounts of precipitation.
During the 1% chance flood in 2030,
Washington Avenue could be under eight
inches of coastal flood water ( Figure 9-14 ).
Public Infrastructure Adaptation
Recommendations
The path of coastal flooding in the Lewis Lake
flood area comes from Crystal Cove ( Figure
9-12 ). This armored shoreline is privately
owned. Therefore, the PMT considered a flood
barrier along the Washington Street right-
of-way in front of these properties. Because
of this, careful planning would be required
to keep open access to the Elks Club and
residential properties of flood emergencies.
The barrier would be installed at the back of
the sidewalk, and could be designed to extend
vertically, adapting to future conditions.
Consideration of staff availability to respond
to flood warnings and receive appropriate
training is important to the success of this type
of installation.
When the Lewis Lake flood area is modeled
with this adaptation installation in place, it is
fairly effective at obstructing the coastal flood
water. This assumes that the culvert and tide
gate system at the south side of Washington
Avenue work as intended. However, it is still
likely that there will be significant flooding
at Lewis Lake, due to precipitation during
a storm event. Poor drainage will lead to
flooding in this area even with the coastal
adaptation in place.
Discussions of access and protection is
necessary with the property owners on the
south side of Washington Avenue. Instead of
installing a barrier along Washington Avenue,
a combined effort to install the barrier and
green infrastructure at the shoreline could also
expand the protection area to include these
private assets. Other long-term opportunities
for exploration include raising Washington
Avenue or reconstructing a bridge and
restoring the creek. Creek restoration is further
discussed in the below paragraphs.
Inundation Depth
Figure 9-11 Lewis Lake Coastal Flood Modeling for Projected 2030 1% Chance Storm
Shoreline Adaptation
9-18 STRATEGIZE: Shoreline Adaptation Measures
Natural Resource
Recommendations
Wetlands at Lewis Lake Park and the Winthrop
Golf Course primarily include inland open
water, regularly flooded marsh, and tidal fresh
marsh resources. The SLAMM maps show
minor changes by 2030 at the inland fringes
of these marshes as salt laden water is able to
further penetrate upstream in the system. Very
small inland portions of the regularly flooded
marsh areas begin to convert to tidal fresh
marsh. By 2070, much of the park and golf
course shows transition to open estuarine water
and regularly flooded marsh, and expanded
regularly flooded marsh, tidal flat and
transitional scrub shrub areas into available
upland areas.
In the long-term, and during storm events,
more frequent and expanded flooding can be
expected throughout the Lewis Lake open
space area, with additional inundation to
adjacent developed areas due to storm surge.
Long term choices regarding the future use
of this open space will need to be considered.
There is potential to restore the whole complex
to its natural wetland state by reconnecting
Lewis Lake to Boston Harbor and removing
upstream impediments to flow and compliment
with edge protection for the surrounding
communities and infrastructure. This approach
would restore the area to its historic condition
of an ecologically beneficial salt marsh
complex.
Lewis Lake area in 1894 (aerial drawing by AF Poole)
Wint HR op S H o R e
d R ive
S H i R ley St R eet
l e W i S l ake
REVERE
Wa SH ington a venue
9-19 STRATEGIZE: Shoreline Adaptation Measures
High water table at Winthrop Golf Club property
Living shoreline solutions along the
edges of developed areas would protect
against future storm surge while also
providing additional habitat resources.
Restored wetland areas and living shoreline
installations could also be integrated with
elevated walkways, kayak/canoe launches,
and hybrid infrastructure to enhance
recreational opportunities and waterfront
interaction throughout this area. As such,
there is a unique opportunity to create
a long-term vision of an expanded, but
different, recreation resource in this area for
the Town of Winthrop. However, protection
of this area could also be considered
through appropriate mitigation efforts at
Washington Avenue and appropriate tide
gate control. If the Town opts to try to
maintain existing recreational uses, this area
would need to continue to be fortified through
adaptations along Washington Avenue. Even
then, eventually fresh water drainage will
be a significant problem for this area due to
increased mean water elevations in Crystal
Cove. As such, increased flooding over the
mid- to long-term would be expected in this
area.
F l o o d A r e a : L e w i s L a k e
TIDAL FLATS
WASHINGTON AVE AREA
160’ 320’
N
0
LEWIS LAKE
WASHINGTON AVE
VETERANS RD
RIVER RD
ELMWOOD AVE
SHIRLEY ST
OCEAN AVE
IRWIN ST
STU
BE
CRYSTAL COVE
ELKS CLUB
NORMAN F. DAW
PLAYGROUND
CR
A
A 1
Figure 9-12 Washington Avenue Concept Plan
POTENTIAL ADAPTABLE
FLOOD BARRIER, WITHIN
RIGHT-OF- WAY
2070 PROBABLE FLOOD ELEVATION
EXISTING PARKING LOT AT ELKS LODGE
2030 PROBABLE FLOOD ELEVATION
PRESENT DAY PROBABLE FLOOD ELEVATION
PRESENT DAY HIGH TIDE
EXAMPLE FLOOD GATES (SOURCE: FLOODCONTROLINTERNATIONAL.COM)
POTENTIAL BARRIER
(WITHIN RIGHT-OF-WAY)
2030 FLOOD LIMIT
CRYSTAL COVE
Figure 9-13 Section A-A 1 (Washington Avenue)
NOT TO SCALE
EXISTING
STORMWATER
OUTFALL
OPPORTUNITY
FOR ADDITIONAL
ADAPTATION
MEASURES
2030 FLOOD LIMIT
FLOOD GATE
LOCATIONS
FLOOD PATHWAY
FLOOD PATHWAY
FLOOD PATHWAY
WAS
AVE
RGIS ST
UNDERHILL ST
MOORE ST
EACON ST
YSTAL
COVE
CAMERA LOCATION ELEVATION: 8.5’
GROUND PLANE
FLOOD PRESENT (3”)
FLOOD 2030 (1’6”) FLOOD 2070 (4’3”)
Figure 9-14 Potential Washington Avenue Flood Levels
HINGTON
NUE
2030 FLOOD AREA SIZE Approximately 153 Acres (15% of Winthrop)
CRITICAL
INFRASTRUCTURE
WITHIN FLOOD AREA
Washington Avenue evacuation route, Winthrop High School
2030 1% CHANCE
STORM FLOOD DEPTH 1'-6”
REVIEWED ADAPTATION
Vertical barrier within the Washington Avenue right-of-way, with an option
working with private property owners to construct the barrier along Crystal
Cove.
MODELED
EFFECTIVENESS Barrier is fairly effective at obstructing coastal flood water.
ADAPTATION
LIMITATIONS
Adaptation effectiveness assumes that the culvert and tide gate system at
the south side of Washington Avenue work as intended.
Flood Barriers offer protection to only a certain elevation, so overtopping is
possible.
Flood gates require personnel and adequate response time.
Significant flooding is still anticipated at Lewis Lake, due to precipitation during
a storm event. Poor drainage will lead to flooding in this area even with the
coastal adaptation in place.
POTENTIAL SUPPORTING
MEASURES
Upsize stormwater pipes, install check valves at all outfalls
Repair/modify existing shoreline structures
9-22 STRATEGIZE: Shoreline Adaptation Measures
POINT SHIRLEY FLOOD AREA
First settled in the 1600s, Point Shirley has a
long history of flooding and storm damage.
(MHC, 1981). The shore has shifted, filled, and
receded over time from both natural sediment
movement and development restrictions.
Public Infrastructure Adapta -
tion Recommendations
Because there are multiple coastal factors
affecting the Point Shirley and Shirley Street
neighborhoods, maintaining the present
conditions of these areas cannot be expected
to endure with climate change. A muti-faceted
approach will be required over time to adapt to
increased coastal storms and sea level rise.
Recent projects that the Town has constructed
or proposed include:
• Drainage upgrades along Tafts Avenue,
including enlarged pipelines to hold
more stormwater during coastal flood
events and duckbill valves to block
water entering the stormwater system
from Boston Harbor.
• Annual Sand dune creation
• Shoreline enhancement at Coughlin
Park
The PMT identified Yirrell Beach as the most
likely location for a Town-installed adaptation
measure. Beach nourishment/dune creation
was modeled to see whether this type of
adaptation could make Shirley Street more
resilient to climate change. The Point Shirley
flood area will still get overtopped with the
adaptations in place but the overtopping is
much less significant, and may be reduced
drastically for the full range of storms. The
dune and beach nourishment also shows
reduction of probability and depth levels in
the area. A beach and dune system needs to be
properly engineered where, being designed and
9-23 STRATEGIZE: Shoreline Adaptation Measures
installed correctly, it could provide even more
resiliency than indicated in this assessment.
For example, the correct slope and width of the
beach berm and dune elevation combination
can make a big difference.
Additional steps to help the Point Shirley flood
area become more resilient to coastal flooding
include:
• Fund a study for beach nourishment
and/or dune creation along Yirrell
Beach.
• Continue to update the drainage system
with larger pipes and check valves at
all outfalls.
• Coordinate with property owners
along the western shoreline of Point
Shirley to create a consistent sea wall/
bulkhead. Today’s varying heights
and gaps in the barrier make it easier
for higher tides to infiltrate the
neighborhood.
• Coordinate with property owners
within The Basin to consider salt marsh
restoration from Coughlin Park to
Winthrop Town Landing
• Provide educational, floodproofing,
and/or home raising programs
Natural Resource
Recommendations
Irregularly flooded marsh and tidal flat
resources currently exist along the Coughlin
Park shoreline. By 2070, a large portion of the
upland area of Coughlin Park could convert
to beach and tidal flat without intervention.
It is our understanding that there are ongoing
projects to bolster the shoreline at Coughlin
Park, which are not discussed in this document
to avoid redundancy.
Inundation Depth
Figure 9-15 Point Shirley Coastal Flood Modeling for Projected 2030 1% Chance Storm
Shoreline Adaptation
A
A 1
BROAD SOUND
BAY VIEW AVE
UNDINE AVE
SIREN ST
TRITON ST
BILLOWS ST
SHIRELY ST
PEBBLE AVE
HALE AVE
SHIRLEY ST
OTIS ST
TOWNSEND ST
MARYLAND AVE
TAFTS AVE
SHIRELY ST
SHIRELY ST
TERRACE AVE
HARBOR VIEW ROAD
GREEN HILL PATH
FAUNBAR AVE
WHITTIER ST
DEEPWATER ST
FOAM ST
GRAND VIEW
Coughlin
Park
Town
Landing
THE BASIN
BOSTON HARBOR
BREWSTER AVE
THE STRAND
INT SHIRLEY AREA
Cottage Hill
Point Shirley
DEER
ISLAND
375’ 750’
N
0
TIDAL
FLAT
AL
AT
TIDAL
FLAT
F l o o d A r e a : P o i n t S h i r l e y
Figure 9-16 Point Shirley Concept Plan
SHIRLEY
STREET
POTENTIAL DUNE
CREATION AT YIRRELL
BEACH. OTHER ‘NATURAL’
OPTIONS, SUCH AS
BEACH NOURISHMENT,
SHOULD ALSO BE FURTHER
INVESTIGATED
EXISTING SALT
MARSH
EXISTING
SALT
MARSH
PROPOSED LIVING
SHORELINE FOR
BANK STABILIZATION
OPPORTUNITY TO EXTEND SALT
MARSH AROUD THE BASIN
CHECK VALVES MAY BE
INSTALLED AT EXISTING
STORMWATER OUTFALLS
UNDERGROUND STORMWATER
PIPES MAY BE ENLARGED TO
ACCEPT MORE RUNOFF
EXISTING SEA WALLS AND OTHER
SHORELINE STRUCTURES MAY BE
REPAIRED OR MODIFIED
EXISTING PRIVATELY-OWNED
SHORELINE STRUCTURE
EXISTING
STORMWATER
OUTFALL
EXISTING
PUBLICLY-OWNED
SHORELINE
STRUCTURE
EXISTING STORMWATER
OUTFALL EXISTING PRIVATELY-
OWNED SHORELINE
STRUCTURE
EXISTING PUBLICLY-
OWNED SHORELINE
STRUCTURE
2030 FLOOD LIMIT
NOT TO SCALE
EXISTING SALT
MARSH
YIRRELL
BEACH
YIRRELL
BEACH
SHIRLEY STREET
TAFTS AVENUE
BAYVIEW AVENUE
2030 FLO
CRITICAL INFRA
FLOO
2030 1% CHAN
D
REVIEWED
MODELED
ADAPTATIO
POTENTIA
ME
STORMWATER COLLE
UPSIZED & TIDE GATE
INSTALLED AT OUTFAL
Figure 9-17 Sec
TAFTS A
Potential Dune
Potential Adaptation Strategies
OD AREA SIZE Approximately 88 acres (9% of Winthrop)
STRUCTURE WITHIN
OD AREA Shirley Street/Tafts Avenue (Evacuation & Deer Island Trucking Route)
CE STORM FLOOD
EPTH 6” to 12” plus wave run-up and overtopping
ADAPTATION Beach nourish-ment / dune crea-tion at Yirrell Beach (pending design study)
EFFECTIVENESS Effective in reducing wave overtopping & flood depth levels if properly engineered.
N LIMITATIONS
No installation can be designed to eliminate wave run-up and overtopping.
Natural installations (i.e. dune and salt marsh creation, beach nourishment) need space to grow over
time.
L SUPPORTING
ASURES
Coughlin Park shoreline stabilization project.
Continue stormwater improvements to increase the capacity of pipes and install check valves
were installed at the outfalls.
Repair/modification of existing shoreline structures.
Explore living shorelines at additional locations in the area.
POTENTIAL SEA
WALL EXTENSION
POTENTIAL DUNE CREATION
PROBABLE FLOOD ELEVATION 2070
PROBABLE FLOOD ELEVATION 2030
EXISTING BEACH EXISTING BEACH EXISTING
SEA WALL
CTION PIPES HAVE BEEN
CHECK VALVES HAVE BEEN
LS ALONG TAFTS AVENUE.
BEACHGRASS PLANTED TO STABILIZE AN ERODED
DUNE, SOURCE: MA CZM, STORMSMART PROPERTIES
FACT SHEET 3 .
LIVING SHORELINE INSTALLATION, BEAUFORT, NC,
SOURCE: NOAA.GOV
POTENTIAL WAVE HEIGHT 2030
tion A-A 1 (Yirrell Beach)
VENUE
This page intentionally blank
10-1 STRATEGIZE: Regulation and Policy
10 STRATEGIZE: Regulation and
Policy
The coastal flooding and sea level rise,
discussed throughout this report, will require
collective actions across both public and
private properties. When considering policy
and regulatory changes, the Town will
need to reach out to local groups, boards,
commissions, and residents to educate them
on the topics of coastal storms, local drainage
systems, and predicted sea level rise. This
can foster discussions on how the community
might adapt to coastal flooding related to
climate change. Discussions could address
questions such as:
What can the local government and individual
property owners do to adapt to projected
coastal flooding and other impacts of climate
change?
• What steps should be taken to further
defend against rising flood waters?
• How, and at what point, should the
community consider a managed retreat
from the shoreline?
• Where should funds be directed first?
What are the priorities?
With community involvement, these questions
can be addressed and decisions can be made
on how Winthrop can look toward a resilient
future. This may include the development of
local regulations and policies overseen by the
local government.
Sunset view from Donovan's Beach, Source: Winthrop town website
10-2 STRATEGIZE: Regulation and Policy
Municipal Regulations
Winthrop’s current regulations can be
adapted to prepare for projected water levels.
Existing town ordinances should be reviewed
and updated to increase the resiliency of
Winthrop’s built environment. Regulatory
modifications may be required to facilitate
retrofits of existing buildings and ensure new
developments are constructed to consider the
flood challenges Winthrop faces, along with
changes that can be made to reduce the Town’s
contributions to climate change:
Site-specific adaptations:
• Site Plan Review should be updated to
reflect sea level rise and the projected
flood areas.
• Resiliency review check-lists for each
board/commission in town should
be developed to consider the ability
of buildings and land to withstand,
endure, and recover from severe
weather events and flooding.
• A special permit process could allow
existing homes in flood areas to be
raised above local building height
limitations.
Area-wide adaptations:
• Update Winthrop’s Wetlands
Protection bylaws to restrict
vegetation clearing in flood zones
along coastal areas.
• Continue to enforce the Town’s
Floodplain Zoning District and
associated building regulations for
floodplain areas. Update this district
to remain consistent with FEMA
guidelines and floodplain mapping.
• Consider creating a new flood zone
overlay district to regulate new
construction within 1% chance flood
areas.
Town of Winthrop Entrance Sign
10-3 STRATEGIZE: Regulation and Policy
Policy and Planning
Climate adaptation presents Winthrop
with opportunities for carefully managed
growth and investment that ensure existing
neighborhoods can thrive, new neighborhoods
are ready for the changing climate, and
jobs are created and expertise developed
for long-term growth and protection. The
following policies are recommended for Town
implementation to further prepare for coastal
flooding and sea level rise in the future.
• In conjunction with the goals of the
Open Space and Recreation Plan:
» Identify coastal lands to be
protected and pursue acquisition of
those parcels;
» Acquire vacant properties in
identified probable areas of
flooding
» Revegetate eroded areas where
needed with conservation planting
programs to protect sensitive areas
as well as enhance the aesthetics of
the beach areas.
• A section on Climate Change
Preparedness could be included in the
update of the Town’s master plan, to
develop policy principles and actions
for climate change preparedness.
Development of best management
practices (BMPs) should be considered
and implemented to encourage
developers and home owners to follows
guidance and standards for properties
in projected flood areas.
• Town-funded projects could be
required to incorporate sustainable
practices to address the probable
impacts of future coastal storms and
sea level rise.
• Site-specific review of community
facilities in projected flood zones
should be considered for adaptation
measures and resilience plans, as
illustrated in Chapters 8 & 9 .
• Recent Center Business District (CBD)
Master Plan could re-evaluate certain
policies considering probable coastal
flooding and sea level rise. (e.g. height
requirements, densities, CBD footprint,
stormwater/green infrastructure/
renewable energy requirements, etc.)
• Winthrop’s emergency response plan
should be reviewed, considering
information provided in this study, to
prepare for and minimize flood damage
from coastal storms and sea level
rise. This would include facility- and/
or site-specific instructions (pre-and
post-storm actions/maintenance), and
relocating important equipment outside
of the flood areas.
• Town should identify groups and
agencies with special interests in
Winthrop, and create a special task
force to identify flood issues and shared
goals, and work together to achieve
them. The group could include:
» Department of Conservation and
Recreation
» Massachusetts Water Resources
Authority
» Massachusetts Port Authority
» Community leaders / groups
» Private land-owners
10-4 STRATEGIZE: Regulation and Policy
This page intentionally blank
11-1 STRATEGIZE: Implementation
11 STRATEGIZE: Implementation
Every project needs a budget, to meet special
requirements, and to have funding mechanisms
in place. The adaptation measures explored
in Chapters 8 and 9 are reviewed in this
chapter for cost, permitting, and funding
to assist Winthrop in moving forward with
implementation.
Range of Costs
Costs for site retrofits have been estimated
in Table 11-1 . The estimate includes initial
materials and labor, but not the cost of design,
permitting, and maintenance. These costs
can vary depending on the size and location
of the adaptation measures and should be
investigated if a specific adaptation measure is
being considered.
Table 11-1 Range of costs for Pump Station adaptations
ADAPTATION TYPE COST ESTIMATE*
Stop Logs $4,000 - $6,000 each
Watertight Exhaust Ducts $10,000 - $15,000 each
Watertight Floor Hatches $10,000 - $15,000 each
Repoint Building Façade 5-feet above grade $20 - $30 per square foot
Waterproof Building Façade 5-feet above grade $5 - $10 per square foot
Raise Outdoor Equipment Pads $500 – $1,000 each
Raise Electrical Equipment Supports $10 - $20 each
Work Platforms for Raised Electrical Equipment $50 - $100 each
5-ft Concrete Perimeter Wall $300 - $500 per linear foot
* Estimates include approximate cost of materials and labor for installation. Estimates do not include design, permitting, right-of-
way acquisition, construction mobilization and demobilization, operations, or maintenance.
Key to Estimated Range of Costs: $ = <$100,000 ; $$ = $100,000 to $500,000 ; $$$ = $500,000 to $3,000,000 ; $$$$ =
$3,000,000 to $10,000,000 ; $$$$$ = > $10,000,000
11-2 STRATEGIZE: Implementation
Table 11-2 Range of costs for shoreline / area adaptation
FLOOD
AREA
APPROX.
2030
FLOOD
AREA
(ACRES)
CRITICAL PUBLIC
INFRASTRUCTURE
1% CHANCE
FLOOD DEPTH
(FEET) RECOMMENDED
ADAPTATION
CONCEPT
POTENTIAL
HEIGHT OF
INSTALLATION
(LINEAR FEET)
POTENTIAL
LENGTH OF
INSTALLATION
(LINEAR FEET)
MODELED
EFFECTIVENESS FOR
FLOOD PROTECTION
UNDER 1% CHANCE
FLOOD DEPTH (2030)
2030 COST OF
CONSTRUCTION*
2070
ADDITIONAL
COST*
2030 2070
Belle Isle
Marsh 106
Main Street
(Evacuation Route
& Deer Island
Trucking Route)
2'-25'' 6'
Planted berm / elevated
sidewalk with knee wall
along Morton Street
right-of-way.
1-3" 625
Relatively ineffective
solely along Morton
Street. Needs to extend
further west & south
along the inlet.
$$$ $$$-Engineered
flood barrier
Ingleside
Park 38 Pleasant Street
(Evacuation Route) 8'' 3'-5''
Hybrid seawall, with
seating & planting
adjacent to Donovan’s
Beach.
1-9" 325 Effective as a coastal
flood adaptation. $$$ $$-Engineered
flood barrier
Lewis
Lake 153
Washington Avenue
(Evacuation Route,
Winthrop High
School)
1'-5'' 4'25'' Flood barrier at
Washington Avenue. 2-6" 900
Effective as a coastal
flood adaptation, if
culvert & tide gate
system at Crystal Cove
work as intended.
$$$ $$
Point
Shirley 88
Shirley Street/
Tafts Avenue
(Evacuation & Deer
Island Trucking
Route)
12'' 4'
Beach nourishment /
dune creation at Yirrell
Beach (pending design
study). Pending design
study 3,850
Effective in reducing
wave overtopping &
flood depth levels if
properly engineered.
$ $$$$$
Dune creation at Yirrell
Beach (pending design
study).
$$$$ to $$$$$ $$$$$
*Estimates include approximate cost of materials and labor for installation. Estimates do not include design, permitting, right-of-way acquisition, construction mobilization and
demobilization, operations, or maintenance. Key to Estimated Range of Costs: $ = <$100,000 ; $$ = $100,000 to $500,000 ; $$$ = $500,000 to $3,000,000 ; $$$$ = $3,000,000
to $10,000,000 ; $$$$$ = > $10,000,000
11-3 STRATEGIZE: Implementation
Environmental Permitting
Environmental permitting requirements are
an important consideration for every project
and especially for coastal projects proximate
to natural, cultural, and recreational resources
along the shoreline. Each adaptation concept
recommended in this Assessment will require
some level of environmental permitting under
public laws.
Determining the required permitting begins
with an understanding of environmental
resources at each adaptation site. The next step
is to identify location-specific design strategies
to avoid/minimize construction impacts to
those resources. The extent of anticipated
impacts informs the need for specific permits
which in turn impacts the overall project
schedule. Each permit has a related agency
review time frame and some approvals are pre-
requisites to others. Often the environmental
permits are on the critical path to advertise a
project for construction, which emphasizes
the importance of carefully managing the
environmental permitting process.
Table 11-3 outlines potential permits or
clearances often needed for shoreline
construction. Early coordination with
local officials and regulatory agencies is
recommended to obtain a comprehensive list of
all required permits at the start of each project.
In addition to the identified permits, additional
technical studies may be needed. For example,
in the Belle Isle Marsh Flood Area, sites south
of Main Street have a history of oil and hazard
material releases. Soil testing is recommended
in this area, and state approvals identifying
appropriate disposal methods and locations
may be required. Likewise, in the Point Shirley
Flood Area, recently released Natural Heritage
and Endangered Species Program (NHESP)
mapping shows potential habitat for protected
species such as the Grasshopper Sparrow,
Upland Sandpiper, Piping Plover, Common
Tern, and Lest Tern. Potential species and
habitat field assessments may be needed to
verify the absence/presence of these species in
each project area.
When the Town is applying for funding
for these projects, the timelines associated
with each permit should be factored into the
proposed project schedule. This includes the
agency review time frames for each permit/
approval and any Time of Year restrictions
placed on the project which may impact the
construction schedule. Depending on the
funding program, it may be necessary to
phase the project over a few funding cycles
to account for the permitting time frames.
For example, propose preliminary design
and some permitting in year one, final design
and permitting in year two, and construction
starting in year three. The phasing strategy will
vary depending upon the funding cycles and
required period of performance.
Flagging salt marsh boundaries at Coughlin Park, Summer 2016, Source: Woods Hole Group
11-4 STRATEGIZE: Im
ENVIRONMENTAL PERMIT OR APPROVAL (AGENCY)
FLOOD AREA
Recommended Adaptation Measure/Location & Environment
Belle Isle Marsh
Planted Berm with Sidewalk
Along Morton Street
Ingleside Park
Hybrid sea wall, with seating
and planting adjacent to
Donovan’s Beach
Lewis Lake
Flood barrier
at Washington
Avenue
LOCAL
Notice of Intent (NOI) / Order of Conditions (OOC)
Massachusetts, M.G.L. c.131, §40 and the Winthrop Wetlands
Protection Ordinance
(Winthrop Conservation Commission and MassDEP)
• • •
STATE
Massachusetts Environmental Policy Act (MEPA) – Environmental
Notification Form (ENF)
M.G.L. c. 30, §61-62H
(MA Executive Office of Energy and Environmental Affairs) •
Massachusetts Endangered Species Act (MESA) - Project Review
M.G.L c.131A
(Natural Heritage and Endangered Species Program of the
MA Department of Fish & Wildlife)
•
Section 106 / Chapter 254 Historic Review - Project Notification Form
(PNF)
S ection 106 of the National Historic Preservation Act of 1966 /
M.G.L. c. 9, §§ 26-27C as amended by St. 1988, c. 254
(Massachusetts Historical Commission)
• • •
Section 401 Water Quality Certification (WQC)
Federal Water Pollution Control Act, 33 U.S.C. 1341 et seq.,
§401 / Massachusetts Clean Water Act, M.G.L. c. 21, §26-53
(MassDEP)
If impacts to wetland resources
/ Mean High Water exceed
thresholds
If impacts to wetland resources
/ Mean High Water exceed
thresholds
If impacts
to wetland
resources / Mean
High Water exceed
thresholds
Chapter 91 Water Dependent License or Permit
Public Waterfront Act, M.G.L. c. 91
(MassDEP)
• •
FEDERAL
Coastal Zone Management (CZM) Federal Consistency Review
Federal Coastal Zone Management Act, 16 U.S.C. §1451 et
seq./ Massachusetts Coastal Zone Management Act, M.G.L.
c. 21A, §2, 4
(MA Office of CZM)
Section 404 Massachusetts General Permits (GP) from U.S. Army Corps
of Engineers (USACE) – Preconstruction Notification (PCN)
Federal Clean Water Act, 33 U.S.C. c. 1344 §404 et seq. /
Rivers and Harbors Act, 33 U.S.C. c.403 §10
(US Army Corps of Engineers, New England District)
If impacts below
Mean High Water
If impacts below
Mean High Water
If impacts below
Mean High Water
Table 11-3 Potential Permits Needed for Shoreline Construction
11-5 plementation
al Resources
ACTION PROCESS
Point Shirley
Beach Nourishment / dune
creation along Yirrell Beach
• Temporary or permanent alteration of wetland resource
areas and/or work in a regulated buffer to these areas.
Submit NOI application to local Conservation
Commission. Copy mailed to MassDEP Northeast
Region Office. Requires abutter mailings, legal
notice, site visit, and public hearing.
•
Exceed MEPA review thresholds and require a permit from a
State agency /department / board / commission / authority
or utilize state funds. Potential thresholds include work within
an Area of Critical Environmental Concern (Rumney Marsh)
and alteration of barrier beach (Yirrell Beach) or salt marsh
(Donovan’s Beach), for example.
Submit ENF to EEA. Copies mailed to MEPA directed
distribution list. Notice published in Environmental
Monitor and local newspaper. A site visit is typically
held.
•
Work within mapped areas of priority and estimated habitat
(14th Edition Natural Heritage Atlas, draft).
Submit Project Review Form or file for Streamlined
NOI/MESA review to show the project does not result
in “Take” of habitat, or provides mitigation for habitat
impacts.
•
Requires funding, licenses, or permits from any state or federal
governmental agency.
Submit PNF to MHC. Copies mailed to MA Bureau of
Underwater Archeological Resources, Tribal Historic
Preservation Officer, and local historic commission
(as appropriate).
If impacts to wetland resources
/ Mean High Water exceed
thresholds
If a project impacts more than 5,000 square feet of wetlands,
or requires more than 100 cubic yards of dredging, MA DEP
must review its compliance with state water quality standards.
Submit WQC application to MassDEP with sediment
analysis (for dredging). Public Notice published in
local newspaper. A complete application includes
Tthe following approvals: OOC, MEPA Certificate (as
appropriate).
•
Licenses required for any project located in, on, over, or
under tidal waters (flowed tidelands) or filled tidelands.
Permits are required for dredging.
Submit new or amended Chapter 91 license or
permit application to MassDEP. Public Notices mailed
to abutters and state agencies, and published in
local newspaper. A complete application includes
the following approvals: OOC, WQC, and MEPA
Certificate.
If impacts below
Mean High Water
Project within a coastal zone requires funding, licenses,
or permits from any federal governmental agency. CZM
Consistency Review ensures compliance with standards of
the MA CZM plans .
Complete a federal consistency application to
describe how the project is consistent with relevant
CZM program policies. Requires public notice &
decisions on all applicable state licenses /permits
If impacts below
Mean High Water
Fill/excavation in wetlands and waterways (Section 404).
Project must meet a detailed set of criteria for each type of
construction activity in, on, or over aquatic environments to
receive the GP.
Submit PCN to Corps New England District. Corps
publishes a Public Notice. A complete application
includes the following approvals: MHC sSection 106,
MESA, OOC, WQC, Ch.91.
11-6 STRATEGIZE: Implementation
Potential Funding Sources
The adaptation strategies discussed in
this assessment vary in terms of probable
construction costs and implementation
timeline. They include combination of green
and gray elements, and depending on the
location, will help protect specific sites, areas
of Town, and/or broader regional priorities.
As these strategies vary, so will the approach
to funding. The Town should set aside some
funds in the capital budget to help advance
some of the smaller scale strategies and/or
serve as a match to other grant programs. The
ability to leverage funds for the recommended
adaptation strategies will depend on the
availability of funding, and the ability to
phase each strategy to meet identified funding
targets.
Potential programs and project partners
could include a combination of federal and
state agencies, financial institutions, property
owners, and non-profit foundations.
Federal and state agencies release various
funding opportunities. The availability and
focus of these funding programs vary from
year to year based on administration priorities
and budgets. These programs have been,
and will continue to be, highly competitive.
Winthrop has been fortunate in prior years
to have received grants for various types of
infrastructure improvement projects. Some of
these grants have been specifically focused
on infrastructure resilience such as the Point
Shirley Drainage Improvements and Coughlin
Park Green Infrastructure Study, as well as
the completion of this assessment. In addition,
state agencies and quasi-state agencies such as
DCR and MWRA are funding infrastructure
improvements to upgrade their facilities
located within the Town.
Potential federal and state partners and
programs include:
• FEMA Hazard Mitigation Assistance
Program
• NOAA Sea Grant Program and Coastal
Ecosystem Resiliency grants
• U.S. Fish & Wildlife Service Coastal
Resilience Program grants
• Massachusetts Coastal Resilience
grants
• Massachusetts Dam and Seawall
Repair and Removal Fund
• Massachusetts Seaport Economic
Council grants
• MassWorks Infrastructure Program
Funding assistance from financial institu -
tions can take on various forms. MassDevel -
opment (a quasi-state real estate financing
agency) has state-wide authority to create and
fund Property Assessed Clean Energy (PACE)
finance programs, making it easier for mu -
nicipalities to structure C-PACE financing for
properties in their town and allow renewable
energies to grow in Massachusetts. In the fu -
ture, the Massachusetts PACE program could
be broadened from a renewables focus to
also include resilience investments similar to
what Connecticut is doing. The Connecticut
commercial and residential PACE programs,
C-PACE and R-PACE respectively, provide
access to private financing for qualifying re -
siliency investments—including hurricane and
flood-proofing.
11-7 STRATEGIZE: Implementation
At the local level, Massachusetts
municipalities also sell bonds to financial
institutions to borrow money needed to
pay for improvements to various municipal
assets ranging from buildings and facilities to
roadway infrastructure to emergency response
equipment. In addition to Massachusetts
Municipal Bonds (‘munis’), there are also
topic focused bonds such as green bonds, that
fund a specific project or type of project. The
Town could consider bonding the design and
construction of a specific adaptation as part of
a future bond program.
The Town should also be proactive in its
efforts to work with property owners to
integrate resilient design elements into future
development and redevelopment projects.
These property owners include private
residential and commercial owners, as well
as public agencies such as the DCR and
MWRA. The probability of coastal flood
mapping ( Appendix D ) and site adaption types
(Chapter 8 ) will help these owners make more
informed decisions about the desired level
of protection. A particular group of owners
in one part of Town may also be interested
in pooling together their financial resources
to help protect their properties. Some of the
funding programs available to the Town, such
as FEMA’s Hazard Mitigation Assistance
Program. can also help fund adaptation
strategies at a property scale. The Town should
make property owners aware of funding
opportunities as they become available.
Non-profit foundations may also be interested
in supporting the Town’s resilience efforts.
Entities such as the Kresge Foundation, Barr
Foundation, and Rockefeller Foundation are
funding climate-resilience planning and design
efforts with local and non-profit partners in the
metro-Boston area. These foundations support
projects that take an integrated approach to
building community resilience. The strategies
and grantmaking priorities of each foundation
change in response to internal interest areas
and national trends.
If the municipal budget can’t support the
required level of investment and bonding
is not an option, the Town could consider
implementing District Improvement
Financing (DIF, geographic focused) or
a Stormwater Utility (topic focused).
Essentially these financing mechanisms
impose a supplemental benefit assessment on
the owner’s property tax for a specific purpose.
Each of these mechanisms are allowable
under Massachusetts law and often involve
complementary zoning updates.
The major takeaway – the Town will need
to be creative in its approach to funding
adaptation strategies. Infrastructure adaptation
at a Town-wide level is expensive and will
need to be phased over time as new projects
or upgrades are proposed, or as standalone
projects as funding allows. Public-private
partnerships may prove beneficial to advancing
these strategies in the near term.
This page intentionally blank
12-1 STRATEGIZE: Next Steps
Sunrise from Winthrop Beach
This assessment lays the framework for
Winthrop’s efforts to build community
resilience. The Town has systematically
identified, prioritized, and strategized areas
of Town and critical infrastructure most at
risk of coastal flooding under present day and
future climate conditions. The next step is to
advance the assessment recommendations and
expand the resilience discussion to include
consideration of other climate-related hazards
and community assets.
12 STRATEGIZE: Next Steps
The next steps to advance the assessment
recommendations include:
• Remain active in the Boston Metro
Mayors Coalition Climate Preparedness
Task Force
• Review the Boston Harbor Flood
Barrier Study being led by UMass
Boston working for the Barr
Foundation
• Educate residents and business owners
on how they can prepare for coastal
flooding now and in the future
• Be proactive in integrating resilient
design elements into future public
and private development and
redevelopment projects
12-2 STRATEGIZE: Next Steps
workshop process will identify key climate-
related hazards, vulnerabilities and strengths,
develop adaptation actions, and prioritize next
steps. Results of the workshop and planning
efforts will be used to inform existing local
plans, grant applications, budgets, and policies.
The Town-wide mapping and evaluation of
coastal flooding completed as part of this
assessment will be beneficial to the workshop
process.
Again, the takeaway is that the Town does not
need to do this alone or all at once. While the
impacts of climate change are already being
felt locally, the Town’s ability to respond to
increased coastal flooding and other climate-
related hazards will take time and funding.
Most importantly, improving community
resilience will require a commitment from the
Town, its residents and business owners, and
agency partners to advance a multilayered
resilience strategy.
• Set aside funds in the Town’s capital
budget for the recommended adaptation
measures
• Phase adaptation measures based
on synergies with other capital
improvement projects and funding
availability
• Pursue grants and other funding
opportunities to leverage town funds
In addition, in Fall 2017, the Town will begin
a community resilience building workshop
process as part of the Commonwealth’s
Municipal Vulnerability Preparedness
(MVP) Program . This Program expands the
focus from just coastal flooding to include
consideration of other climate-related hazards
such as increased precipitation and heat, for
example. It will also expand the discussion
to include a comprehensive assessment of
infrastructural, societal, environmental, and
economic components of the Town. The
workshop process will follow a similar
identify-prioritize-strategize framework. The
A-1
Appendix A - Glossary of Terms
and Abbreviations
Terms
1% CHANCE FLOOD DEPTH The depth of flooding relative to sea level and storm surge during a
100 year storm event.
1% CHANCE WATER LEVEL/
SURFACE ELEVATION
The probable water elevation from a storm event that occurs ever
100 years.
ADAPTATION Adjustment or modification to a particular situation or circumstance.
DRY FLOODPROOFING
Protecting a building from floodwaters by creating an impermeable
barrier on the outside. (ex. Flood doors, watertight access hatches,
and wall and floor sealants)
EXECUTIVE ORDER 569
Executive Order signed by Governor Baker, which lays out an
approach to further reduced greenhouse gas emissions, safeguard
residents, municipalities and business from the impacts of climate
change, and build a more resilient Commonwealth.
COASTAL GREEN
INFRASTRUCTURE
Built ecological systems and processes intended to absorb wave
energy, reduce erosion, and improve water quality. Coastal
examples include constructed wetlands, urban forests, green roofs,
green streets, living shorelines, and rain gardens.
COASTAL GRAY INFRASTRUCTURE Engineered coastal structures, including seawalls, bulkheads, and
stone revetments.
COASTAL HYBRID
INFRASTRUCTURE
A combination of green and gray infrastructure. Coastal examples
include coastal wetland plantings and berms with engineered walls.
HYDRODYNAMIC MODELING
Modeling based on mathematical representations of the processes
that affect coastal water levels such as riverine flows, tides, waves,
winds, storm surge, sea level rise, and wave set-up, at a fine
enough resolution to identify site specific locations that may require
adaptation alternatives.
INUNDATION The flooding of low-lying coastal land caused by severe weather.
KING TIDE
The highest predicted high tide of the year at a coastal location. It
is above the highest water level reached at high tide on an average
day.
PERIMETER BARRIER Permanent or temporary vertical structure that surrounds a particular
asset to deter waters.
RESILIENCE
The capability to anticipate risk, limit impact, and bounce back
rapidly through survival, adaptability, evolution, and growth in the
face of ... change. (Definitions of Community Resilience: An Analysis -
A CARRI REPORT)
A-2
RISK SCORE
(Consequence of Failure x Probability of Flooding) - Score to prioritize
infrastructure assets/facilities. Rated through a five-tier qualitative
rating system (Severe to None).
STORM SURGE An abnormal rise of water generated by a storm, over and above
the normal tide ranges.
VULNERABILITY
Structures, systems, populations or other community assets as defined
by the community that are susceptible to damage and loss from
hazard events. (FEMA Local Mitigation Plan Review Guide 2011)
WET FLOODPROOFING
Allows an asset to withstand flooding, and recover more quickly after
the water has receded (ex. Building with flood resistant materials and
anchoring equipment.
Abbreviations
ADCIRC Advanced Circulation
AUL Activity and Use Limitation
BH-FRM Boston Harbor-Flood Risk Model
BMPS Best Management Practices
CBD Center Business District
CIP Capital Improvement Program
CZM Massachusetts Office of Coastal Zone Management
DCR Department of Conservation and Recreation
DIRP Disaster Infrastructure Resiliency Plan
DPW Department of Public Works
ENF Environmental Notification Form
EEA Executive Office of Energy and Environmental Affairs
FEMA Federal Emergency Management Agency
FHWA Federal Highway Administration
FIRM Flood Insurance Rate Map
GIS Geographic Information Systems
LIDAR Light Detection and Ranging
MA CZM Massachusetts Office of Coastal Zone Management
MASSDOT Massachusetts Department of Transportation
MASSGIS Massachusetts Office of Geographic Information
MASSPORT Massachusetts Port Authority
MBTA Massachusetts Bay Transportation Authority
MEPA Massachusetts Environmental Policy Act
MESA Massachusetts Endangered Species Act
A-3
MORIS Massachusetts Ocean Resource Information System
MVP Municipal Vulnerability Preparedness
MWRA Massachusetts Water Resources Authority
NHESP Natural Heritage and Endangered Species Program
NOAA National Oceanic and Atmospheric Administration
NOI Notice of Intent
OOC Order of Conditions
PCN Preconstruction Notification
PMT Winthrop Project Management Team
PRV Pressure Reducing Valve Station
SCADA Supervisory Control and Data Acquisition
SLAMM Sea Level Affecting Marshes Model
SLR Sea Level Rise
SWAN Simulating Waves Nearshore
USACE U.S. Army Corps of Engineers
WHG Woods Hole Group
WQC Water Quality Certification
A-4
This page intentionally blank
A-5
Appendix B - References
Amtrak. Amtrak NEC Climate Change Adaptation Plan – Phase III Pilot Study . March 2017.
AxisGIS. “ Winthrop Assessment Data .” CAI AxisGIS, https://www.axisgis.com/winthropma/ .
Baldwin, Sandy. “ Boston Harbor Pipe Dreams Come True! USGS Visits the Deer Island Sewage
Treatment Plant and a Cleaner Harbor. ” Sound Waves , USGS, Apr. 2006. Web. 15 Mar. 2017.
https://soundwaves.usgs.gov/2006/04/staff.html
Bourne Consulting Engineering, with Childs Engineering Corporation. Massachusetts Coastal
Infrastructure Inventory and Assessment Project ; Massachusetts Department of Conservation and
Recreation (DCR) Office of Waterways. 6 Jun 2009.
Cecil Group. Winthrop Harbor Assessment and Plan . April 2005.
City of Boston. Climate Ready Boston, Final Report . December 2016.
Clark, William H. The History of Winthrop Massachusetts 1630-1952 . http://www.
winthropmemorials.org/civic/pages/history-of-winthrop-clark.html
Culhane, Kerri, Jordan Fink, and Tabitha Kaigle; Conway School of Landscape Design.
Walk Winthrop: A Plan for a More Walkable Community . 31 Mar 2010. https://issuu.com/
conwaydesign/docs/walkwinthrop_2010
DeCosta-Klipa, Nik. “ What’s a King Tide and Why Are They Flooding Boston’s Waterfront? ” n.d.:
n. pag. Boston.com. The Boston Globe, 18 Oct. 2016. Web. 13 Mar. 2017.
Domelowicz, Joseph. “ National Grid Is in the Final Stages of Substation Upgrade. “Winthrop
Transcript. Wordpress, 14 Jan. 2011. Web. 15 Mar. 2017. http://www.winthroptranscript.
com/2011/01/14/national-grid-is-in-the-final-stages-of-substation-upgrade/
Executive Office of Energy and Environmental Affairs (EOEA) and the Adaptation Advisory
Committee. Massachusetts Climate Change Adaptation Report , September 2011.
Federal Emergency Management Agency. “ Hazard Mitigation Planning .” 6 Feb 2017.
Form + Place, Inc. Town of Winthrop Centre Business District Master Plan . March 2017.
Friends of Winthrop Beach. “ Winthrop Beach History. ” http://winthropbeach.org/winthrop-
beach-project-history/
A-6
Lynds, John. “ Belle Isle Bridge Officially Complete. ” East Boston Times Free Press. Wordpress,
28 Aug. 2013. Web. 15 Mar. 2017.
Massachusetts Bay Transportation Authority (MBTA). Ridership and Service Statistics.
Fourteenth Edition, 2014 . http://www.mbta.com/uploadedfiles/About_the_T/Panel/
MBTARidershipandServiceStatistics2014.pdf
Massachusetts Department of Conservation and Recreation (DCR). “ Winthrop Beach
Renourishment / Rumney Marsh Restoration. ” http://www.mass.gov/eea/agencies/dcr/
conservation/planning-and-resource-protection/projects/winthrop-beach-renourishment-project.
html
M.G.L. ch.90 §61 https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXIV/Chapter90/
Section61
Massachusetts Historical Commission (MHC). MHC Reconnaissance Survey Report: Winthrop.
Boston, Massachusetts, 1981.
Massachusetts Office of Coastal Zone Management (CZM). “ Massachusetts StormSmart
Coasts. ” http://www.mass.gov/eea/agencies/czm/program-areas/stormsmart-coasts/
Massachusetts Office of Geographic Information (MassGIS). “ 2010 U.S. Census –
Environmental Justice Populations. ” December 2012. http://www.mass.gov/anf/research-and-
tech/it-serv-and-support/application-serv/office-of-geographic-information-massgis/datalayers/
cen2010ej.html
Massachusetts Water Resources Authority (MWRA). “ Drinking Water Test Results for 2012. ”
June 2013. http://www.mwra.state.ma.us/annual/waterreport/2012results/metro.htm
Massachusetts Port Authority. “ Massport Board Approves Funding to Begin Boston Harbor
Dredging Project .” 24 Mar. 2016. http://www.massport.com/massport/media/newsroom/
massport-board-approves-funding-to-begin-boston-harbor-dredging-project/
Massachusetts Water Resources Authority (MWRA). “ Sewer Sections 4, 5, 6 and 186 Study -
Scope of Services, Contract No. 7423 ”. 22 Sept. 2016.
Massachusetts Water Resources Authority (MWRA). “ The Deer Island Sewage Treatment
Plant. ” 2 Sept. 2009. http://www.mwra.state.ma.us/03sewer/html/sewditp.htm
McGregor & Associates, P.C. T own of Winthrop Open Space and Recreation Plan 2005-2010 .
January 2005. http://www.town.winthrop.ma.us/sites/winthropma/files/uploads/osrpfinaldraft.pdf
Metropolitan Area Planning Council (MAPC). Town of Winthrop Hazard Mitigation Plan 2014
Update . 7 April 2015.
Metropolitan Area Planning Council (MAPC). “ Metro Mayors Coalition. ” http://www.mapc.org/
metro-mayors-coalition
A-7
Metropolitan Area Planning Council (MAPC). Walk Winthrop: A Greenway Action Plan. 21 Nov.
2011.
Metropolitan Area Planning Council (MAPC) and the Central Transportation Planning Staff.
Winthrop Community Development Plan, May 2004 .
National Flood Insurance Program. “ Coastal Flooding: Maps & Changes. ” Coastal Flood Maps.
27 Sept. 2016. Web. 13 Mar. 2017.
National Science and Technology Council. Ecosystem-Service Assessment: Research Needs for
Coastal Green Infrastructure . August 2015.
Schworm, Peter and Martin Finucane, Globe Staff. “ Hurricane Sandy Slams East Coast. ”
10.29.12 | 11:19 PM, http://archive.boston.com/ accessed 3/6/2017
Town of Winthrop. “ Town Landing Complex. ” n.d. Web. 15 Mar. 2017. https://www.town.
winthrop.ma.us/harbormaster-department/pages/town-landing-complex-0 .
Town of Winthrop. “ Winthrop Air Pollution, Noise, and Airport Hazards Committee. ” n.d.
Web. 15 Mar. 2017. http://www.town.winthrop.ma.us/winthrop-air-pollution-noise-and-airport-
hazards-committee
Town of Winthrop. “ Town of Winthrop Ferry News & Announcements. ” https://www.town.
winthrop.ma.us/node/20703/news
Tnmec Company Incorporated. “ Winthrop Standpipe. ” https://www.tnemec.com/resources/
project/429/Winthrop_Standpipe.pdf
U.S. Census Bureau. “ QuickFacts; Winthrop, Massachusetts. ” https://www.census.gov/
quickfacts/table/AGE295215/2581005
U.S. Environmental Protection Agency (EPA). “ King Tides and Climate Change. ” https://www.
epa.gov/cre/king-tides-and-climate-change
A-8
This page intentionally blank
A-9
Appendix C - Inundation
Modeling
Overview
In order for the Town of Winthrop to effectively evaluate the risks of climate change, and specifically
sea level rise and storm surge, to their coastal community and public assets, a scientifically
accurate, dynamic, robust, and probability based analysis of potential flooding is a key element of
a vulnerability assessment. This allows for the Town to identify and prioritize potential impacted
areas and assets, and then determine potential adaptation options to build overall resilience for
the community. Using established techniques and previously generated model data from work
with Massachusetts DOT, probabilistic flood information forms the basis for the vulnerability
assessment in the Town of Winthrop.
The Boston Harbor Flood Risk Model
Although there are various options for modeling sea level rise and storm surge, the most accurate
approach for assessing combined storm surge risk and sea level rise conditions is through the
implementation of hydrodynamic models that include the physical processes that are associated
with storm climatology and propagation. The model, called the Boston Harbor Flood Risk Model
(BH-FRM) is the model used to provide the results for the Town of Winthrop. Data from the
Boston Harbor Flood Risk Model (BH-FRM) has been successfully applied and used in Boston,
MA and the Boston Harbor Area for assessing potential vulnerabilities in the Central Artery tunnel
system.
The BH-FRM was a joint collaboration between MassDOT, Woods Hole Group, and UMass
Boston under a FHWA grant that aimed to assess the vulnerability of the Central Artery/Tunnel
Project (CA/T) to climate change (specifically SLR and storm surge). As one of the most valuable
components of Massachusetts’ transportation infrastructure, its maintenance, protection and
enhancement were a priority for the Commonwealth. The importance of modeling potential effects
of sea level rise and storm surge for the CA/T was especially evident after Hurricane Sandy hit the
New York Coastline, which had devastating impacts to vital transportation and city infrastructure.
Concern about potential impacts to the City of Boston from future storms drove the creation of
the BH-FRM – a model with the best representation of the physical processes, as well as accurate
and higher resolution predictions of inundation due to the combination of sea level rise and storm
surge. The hydrodynamic modeling utilized for the BH-FRM was geared towards a physics-based
approach to determine the water level increases and flooding, and provided results to identify
specific locations that may require adaptation alternatives.
A-10
BH-FRM Components
BH-FRM is a comprehensive flood risk model that can accurately assess flooding risk under present
day and future climate change conditions. The modeling system is comprised of the Advanced
CIRCulation model (ADCIRC), a two-dimensional, depth-integrated, long wave, hydrodynamic
model for coastal areas, inlets, rivers and floodplains that in this application is used to predict
storm surge flooding; and the unstructured grid version of Simulating Waves Nearshore model
(UNSWAN), a wave generation and transformation model. The ADCIRC model is tightly coupled
with UNSWAN, dynamically exchanging physical processes information during each time step,
to provide an complete and accurate representation of water surface elevations, winds, waves,
velocities, and flooding along the coastline and upland areas.
The model explicitly and quantitatively incorporates climate change influences on sea level
rise, tides, waves, storm track, and storm intensity. The model computations use a site-specific
model grid that covers the coast line and open water of the Boston Harbor but also propagated
overland. This grid was developed by interlacing multiple meshes with varying grid resolution
(coarse, intermediate and fine) and resulted in a mesh that could capture all critical topographic
and bathymetric features that influence flow dynamics within the system. The resulting mesh
has a resolution of 10 meters or less (as low as 2-3 meters in the CA/T study area), and was
developed using topographic and bathymetric data from the Boston Harbor area. A variety of
boundary conditions were set before modeling could begin and included (but were not limited
to) tidal constituents, freshwater input, bottom friction, direction wind reduction, and even the
understanding dam operations in the area influence flood control.
Model Calibration and Validation
While the models used in the BH-FRM pilot project are rooted in sound science and utilized
standard governing equations of water motion, the propagation of water through a unique geographic
setting results in site-specific variations that may require adjustment of model parameters to more
accurately represent the real-world system. For example, in an urban landscape, an area consisting
of numerous buildings will influence flow differently than a marsh, which will influence flow
differently than a parking area, which will influence flow differently than a sub-tidal estuary. For
these types of cases, it is reasonable to adjust parameters, such as frictional factors within accepted
bounds to better represent the water propagation. As such, the BH-FRM model was calibrated
using both normal tidal conditions and representative storm events for the northeast (Blizzard of
1978). The calibrated model was then validated to another storm event (Perfect Storm) to ensure
accuracy.
A-11
Sea Level Rise and Storm Climatology
Sea level rise modeling scenarios in BH-FRM include 2030 and 2070 time horizons. The SLR
scenarios bracket ranges that span multiple time horizons consistent with scenarios from the United
States National Climate Assessment (Parris et al, 2012). The final SLR values were adjusted for
local subsidence following Kirshen et al. (2008). Local subsidence is approximately 1.1 mm/year
or approximately 0.4 feet per 100 years. The SLR projections used for 2030 and 2070 in the BH-
FRM were 0.62 feet (19 cm) and 3.2 feet (30 cm) respectively.
The BH-FRM also models a statistically-robust sample of storms, including tropical (hurricanes)
and extra-tropical (nor’easters) and is based on the region’s existing and evolving climatology.
Tropical storms were specifically selected based on a screening process that evaluated storm tracks
capable of entering the northeast area, thereby potentially impacting the Boston Harbor region.
However, tropical storms are less common in the Northeast, therefore, it was critical to develop a
series of extra tropical storms for simulation in BH-FRM. Existing and historical meteorological
and water level data was used to pair storm surge events with individual storms to identify specific
extra-tropical storms that were or could be typical for the Boston Harbor area.
The probabilistic modeling approach simulates a statistically robust set of storms (both tropical
and extra-tropical) for each climate change and/or Sea Level Rise (SLR) scenario through a
Monte Carlo statistical approach. Results of the Monte Carlo simulations are used to generate
Cumulative Probability Distribution Functions (CDFs) of the storm surge water levels at a high
degree of spatial precision. In particular, an accurate and precise assessment of the exceedence
probability of combined SLR and storm surge, provided at high spatial resolution help decision
makers identify areas of existing vulnerability requiring immediate action, as well as, areas that
benefit from present planning for future preparedness. Results of the Monte Carlo approach also
produce a statistically robust, spatially variable map of risk for each given SLR scenario that can
be used to determine the potential need for adaptation, and the timing for potential adaptation, at
each facility and for each infrastructure asset.
For more information regarding the specific inputs and computational capabilities of the BH-FRM,
refer to the MassDOT-FHWA Pilot Project Report .
A-12
BH-FRM Outputs
Flood exceedance probability is defined as the probability of flood water encroaching on the land
surface at a particular location for a given climate time frame. Maps show flood exceedance
probabilities across Winthrop for near future climatic conditions (represented by the 2030 scenario)
and late 21 st century conditions (represented by the 2070 scenario). Exceedance probabilities
shown on these maps range from 0.1% (0.001, otherwise known as the 1000-year flood level)
to 100% (the annual storm water surface elevation level). These maps can be used to identify
locations, structures, assets, etc. that lie within different risk levels within the area. For example,
a building that lies within the 2% flooding exceedance probability zone would have a 2% chance
of flooding in that year (under the assumed climatology). In other words, in each year there is a
2% percent chance that this location will get wet. Stakeholders can then determine if that level of
risk is acceptable, or if some action may be required to improve resiliency, engineer an adaption,
consider relocation, or implement an operational plan.
By comparing the 2030 flood probability map to the 2070 flood probability map, individual
structures, assets, and areas can be assessed to determine how flooding is changing as a function
of time and the overall influence of climate change projections can also be evaluated. These maps
can also be used to assess flood entry points and pathways and thereby identify potential regional
adaptations.
The probability of flooding maps provide stakeholders the ability to determine if areas, buildings,
etc. are expected to be flooded and at what probability flooding is expected to be initiated. This
is important for weighing the tolerance for risk and evaluating when adaptation options may need
to be considered. Perhaps equally as important is the magnitude, or depth, of flooding expected.
Therefore, depth of flooding map can be created for any given flooding probability level. For the
Town of Winthrop, 1% (100-yr) and 0.1% (1000-yr) depth maps have been created showing flood
depths (at 0.5 ft increments). As such, the depth of flooding can also be evaluated when assessing
the risk to a system.
A-13
Appendix D - Boston Harbor Flood
Risk Model (BH-FRM) Mapping
A-14
Areas of Probable Flooding (2013)
River Road
Washington Avenue (Route 145)
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop Shore Drive
Tafts Avenue
Court Road
Winthrop Street
Pauline Street
Cross Street
Shirley Street
Broad Sound
Crystal Cove
Belle Isle
Inlet
Boston Harbor
Belle Isle Marsh
Broad
Sound
Pleasant Street
A-15
Areas of Probable Flooding (2030)
River Road
Washington Avenue (Route 145)
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop Shore Drive
Tafts Avenue
Court Road
Winthrop Street
Pauline Street
Cross Street
Shirley Street
Broad Sound
Crystal Cove
Belle Isle
Inlet
Boston Harbor
Belle Isle Marsh
Areas of Probable Flooding (2030)
Pleasant Street
A-16
Areas of Probable Flooding (2070)
River Road
Washington Avenue (Route 145)
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop Shore Drive
Tafts Avenue
Court Road
Winthrop Street
Pauline Street
Cross Street
Shirley Street
Broad Sound
Crystal Cove
Belle Isle
Inlet
Boston Harbor
Belle Isle Marsh
Areas of Probable Flooding (2070)
Pleasant Street
A-17
Depth of Flooding (2013)
River Road
Washington Avenue (Route 145)
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop Shore Drive
Tafts Avenue
Court Road
Winthrop Street
Pauline Street
Cross Street
Shirley Street
Broad Sound
Crystal Cove
Belle Isle
Inlet
Boston Harbor
Belle Isle Marsh
Depth of Flooding - 1% Chance Water Level (2013)
Pleasant Street
A-18
Depth of Flooding (2030)
River Road
Washington Avenue (Route 145)
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop Shore Drive
Tafts Avenue
Court Road
Winthrop Street
Pauline Street
Cross Street
Shirley Street
Broad Sound
Crystal Cove
Belle Isle
Inlet
Boston Harbor
Belle Isle Marsh
Depth of Flooding - 1% Chance Water Level (2030)
Pleasant Street
A-19
Depth of Flooding (2070)
River Road
Washington Avenue (Route 145)
Shirley Street
Main Street
Veterans Road
Revere Street
Winthrop Shore Drive
Tafts Avenue
Court Road
Winthrop Street
Pauline Street
Cross Street
Shirley Street
Broad Sound
Crystal Cove
Belle Isle
Inlet
Boston Harbor
Belle Isle Marsh
Depth of Flooding - 1% Chance Water Level (2070)
Pleasant Street
A-20
This page intentionally blank
A-21
Appendix E - Probability of
Exceedance Curve Data
BEACH FIRE STATION
APPROX. CRITICAL
ELEVATION (FT) 7.12
2013 2030 2070
EXCEEDANCE PROBABILITY
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH
(FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
0.1 wet <0.5 wet 1.0-1.5 wet 4.0-4.5
0.2 wet < 0.5 wet 1.0-1.5 wet 3.5-4.0
0.5 wet < 0.5 wet 1.0-1.5 wet 3.5-4.0
1 wet < 0.5 wet 0.5-1.0 wet 3.0-3.5
2 dry dry wet 0.5-1.0 wet 3.0-3.5
5 dry dry wet < 0.5 wet 2.5-3.0
10 dry dry dry dry wet 2.0-2.5
20 dry dry dry dry wet 1.5-2.0
25 dry dry dry dry wet 1.5-2.0
30 dry dry dry dry wet 1.5-2.0
50 dry dry dry dry wet 1.0-1.5
100 dry dry dry dry wet 0.5-1.0
* All elevation in NAVD-88
A-22
BELLE ISLE BRIDGE
APPROX. CRITICAL
ELEVATION (FT) 12.26
2013 2030 2070
EXCEEDANCE PROBABILITY
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH
(FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
0.1 dry dry 10.80 -1.46 14.1 1.84
0.2 dry dry 10.50 -1.76 14.0 1.74
0.5 dry dry 10.20 -2.06 13.5 1.24
1 dry dry 10.10 -2.16 12.8 0.54
2 dry dry dry dry 12.5 0.24
5 dry dry dry dry 12.2 -0.06
10 dry dry dry dry 11.6 -0.66
25 dry dry dry dry 10.8 -1.46
30 dry dry dry dry 10.7 -1.56
50 dry dry dry dry 10.4 -1.86
100 dry dry dry dry dry dry
LORING RD BOAT RAMP
APPROX. CRITICAL
ELEVATION (FT) 12.56
2013 2030 2070
EXCEEDANCE PROBABILITY
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH
(FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
0.1 9.70 -2.86 10.5 -2.06 14.1 1.54
0.2 9.60 -2.96 10.20 -2.36 14.0 1.44
0.5 9.00 -3.56 10.10 -2.46 13.5 0.94
1 8.30 -4.26 9.90 -2.66 12.8 0.24
2 8.10 -4.46 9.70 -2.86 12.5 -0.06
5 7.80 -4.76 9.20 -3.36 12.2 -0.36
10 7.20 -5.36 8.90 -3.66 11.6 -0.96
20 7.10 -5.46 8.30 -4.26 11.0 -1.56
25 7.00 -5.56 8.20 -4.36 10.8 -1.76
30 6.90 -5.66 8.10 -4.46 10.7 -1.86
50 6.70 -5.86 7.90 -4.66 10.4 -2.16
100 6.28 -6.28 7.28 -5.28 9.8 -2.76
* All elevation in NAVD-88
A-23
MAIN STREET
APPROX. CRITICAL
ELEVATION (FT) 9.00
2013 2030 2070
EXCEEDANCE PROBABILITY
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
0.1 9.8 0.8 10.8 1.8 14.1 5.1
0.2 9.7 0.7 10.5 1.5 14.0 5.0
0.5 9.1 0.1 10.2 1.2 13.5 4.5
1 8.8 -0.2 10.1 1.1 12.8 3.8
2 8.30 -0.7 9.9 0.9 12.5 3.5
5 dry dry 9.10 0.1 12.2 3.2
10 dry dry 8.80 -0.2 11.6 2.6
20 dry dry 8.50 -0.5 11.0 2.0
25 dry dry 8.10 -0.9 10.8 1.8
30 dry dry dry dry 10.7 1.7
50 dry dry dry dry 10.4 1.4
100 dry dry dry dry 9.80 0.8
PICO SEWER PUMP STATION
APPROX. CRITICAL
ELEVATION (FT) 8.50
2013 2030 2070
EXCEEDANCE PROBABILITY
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)
WATER
DEPTH (FT)
WATER
SURFACE
ELEVATION
(FT)The text goes on. The rest is in the file.
related records
Records whose documents say similar things, nearest first.
- Flooding & resilienceTown of WinthropMVP action grant applications: Ingleside Park and Morton Street, 2018
- Flooding & resilienceMetropolitan Area Planning CouncilHazard Mitigation Plan, 2025 update (draft)
- Flooding & resilienceTown of WinthropHazard Mitigation Plan, 2014 update
- Flooding & resilienceTown of WinthropCoughlin Park coastal resilience feasibility study, 2016
- Flooding & resilienceTown of WinthropCommunity Resilience Building workshop, 2018