About Winthrop: background information
Town of Winthrop · from the Town's website · 38 pages · 5.2 MB
open the file ↗ · original at the source ↗
Winthrop, MA
April 6, 2018
Background Information
Agenda
▪ 7:30 – 8:00 | Registration
▪ 8:00 – 8:30 | Welcome & Overview
▪ 8:30 – 9:00 | CRB Workshop Why Are We Here?
▪ 9:00 – 9:30 | Identify Challenges & Goals
▪ 9:30 – 10:00 | Background Information About Winthrop
▪ 10:00 – 10:30 | Climate Change (Mass Audubon)
▪ 10:30 – 11:00 | Characterize Natural Hazards
▪ 11:00 – 12:30 | Identify Community Vulnerabilities & Strengths
▪ 12:30 – 1:30 | LUNCH!
▪ 1:30 – 2:00 | Natural Infrastructure Solutions (The Nature Conservancy)
▪ 2:00 – 3:30 | Identify & Prioritize Community Actions
▪ 3:30 – 4:00 | CRB Workshop Recap & Wrap Up
Background Information
▪ Population: 17,497 (as of 2010
Census)
▪ Located on a peninsula
▪ 1.6 square miles | 7 mile shoreline
▪ Connected to Revere by a narrow
piece of land and to East Boston by a
bridge over the Belle Isle Marsh
▪ Densely populated
▪ One of the oldest communities in the
United States (settled in 1630)
Winthrop Age Distribution
▪ Median Age in 2010: 43.7
Population Projections
▪ Population projected to get older
▪ Slight increase in age 25 – 34
Environmental Justice Population – English Isolation
Background Information
▪ Winthrop is the only
landside connection to
the Massachusetts
Water Resource
Authority Deer Island
Wastewater Treatment
Plant
▪ The plant removes
human, household,
business and
industrial pollutants
from wastewater that
originates in homes
and businesses in 43
greater Boston
communities.
Transportation, Water, Sewer & Solid Waste
▪ Winthrop is served by State Route
145 which connects community to
Revere.
▪ Served by bus service.
▪ Water is supplied by the MWRA.
• The Town maintains an extensive
distribution system.
▪ Sewer is Town owned and
maintained – connects to MWRA
interceptor and is treated at Deer
Island.
▪ Curbside solid waste recycling
contract managed by DPW.
Environmental Features
▪ Located in Mystic River
Watershed.
▪ Only body of surface water in
town is Lewis Lake.
▪ Home to a portion of Belle Isle
Marsh – the last remaining salt
marsh in the metro Boston area.
▪ Major wetland areas in Town are
all coastal/tidal.
Environmental/Natural Features & Parks
▪ Winthrop Beach
▪ Yirrell Beach
▪ Donovan’s Beach
▪ Pico Playground & Beach
▪ Fisherman’s Bend
▪ Belle Isle Marsh
▪ Lewis Lake/Winthrop Golf Club
▪ Coughlin Park
▪ Ingleside Park
Severe Weather
▪ 16 coastal flood events between
2006 – 2014 resulting in over
$3M in property damage
• 3 coastal flood events during the
first quarter of 2018!
▪ 40 heavy snowfall events
between 1996 – 2014
▪ 10 severe winter storms recorded
between 1978 – 2013 – seven of
which occurred after the year
2000
Winthrop Hazard Mitigation Plan
▪ FEMA Approved
▪ Identifies the following natural hazards that impact
Winthrop: flooding, wind, hurricane, nor’easter,
wildfire, tornado, landslide, earthquake
“Winthrop Hazard Mitigation Plan
Highlighted Potential Hazard Mitigation Actions
* Complete the Yurrell Beach seawall extension.
* Upgrade the storm drain system in the area between Winthrop Shore Dnve and Lewis Lake.
+ Add coastal storm surge and flooding protection for the Shirley Street neighborhood adjacent
to Winthrop Shore Drive.
+ Complete the drainage assessment at Ingleside Park and upgrade existing drainage
infrastructure.
Provide for more frequent maintenance of Town-owned drainage infrastructure.
Finish mapping all stormwater outfalls and catch basins on GIS.
Incorporate hazard education awareness, mitigation planning and natural hazard incentives into
Town planning and community development operations.
TOWN OF WINTHROp
HAZARD MITIGATION PLAN
2014 UPDATE
FINAL PLAN APPROVED By FEMA
August 3, 2015
ee _|
i
i
|
|
|
|
A
WOODARD
& CURRAN
Resilient Winthrop
▪ Goal of project to identify and prioritize
critical public infrastructure and explore
adaptation measures to improve
infrastructure and natural resource
resilience in a number of future
conditions.
▪ Within mapped coastal flooding areas
are critical public infrastructure
assets/facilities that support daily life in
Winthrop
• Sewer Pump Stations, Evacuation
Routes, Substation, Pressure Reducing
Valve Stations, Winthrop High School,
Fire Station, Town Landing, others…
“Critical Public Infrastructure
A) Beach Fire Station
O Belle Isle Bridge
@ Loring Rd. Boat Ramp
(D) Main Street (evacuation route)
@ Pico Sewer Pump Station
@ Pleasant Court Sewer Pump Station
(G) Pleasant Street (evacuation route)
@ Power Substation (Argyle Street)
@ Pressure Reducing Valve Station (Bayview Ave)
J) Pressure Reducing Valve Station (Revere St)
K) Pressure Reducing Valve Station (Underhill St)
@ Public Landing
@ Revere St. Sewer Pump Station
(Ni) Shirley Street (evacuation route)
© Washington Street (evacuation route)
@ Winthrop High School
Figure 4-1 Town-identified i
Critical Public Infrastructure %
Locations DEER
ISLAND
A
a
7 ~
WOODARD
&CURRAN
Coastal Resiliency at Coughlin Park
▪ Specific plan to increase resiliency at
Coughlin Park.
▪ Report evaluated installations that could
help slow erosion and identified green
infrastructure along the western
shoreline as the best alternative to
increase coastal resilience of the park.
Other Work in Winthrop
▪ Winthrop Harbor Plan
▪ Improvements along Winthrop Shore
Drive, Winthrop Beach, Tafts Avenue,
Lewis Lake
▪ Community Development Plan
Other Work in Winthrop
▪ Sewer improvements on Putnam Street, Putnam Place and Walden Street. Project
included water main replacement on Jefferson Street and Fremont Street and upgrades
to a section of the drainage system at the intersection of Jefferson Street and Putnam
Street.
▪ Sewer, water, drain and sidewalk improvements on Walden Street, Lincoln Street, Read
Street, Walden Place and Jerald Street. Drainage improvements included upgrading
existing drainage to increase capacity in portions of Walden St., Lincoln St. and
approximately 550 LF along Brookfield Rd. to the outfall structure at Donovan’s Beach.
▪ Water main, drain and sewer improvements on Bellevue Avenue, Prescott Street,
Somerset Avenue, Nahant Avenue and Sewall Avenue.
▪ Water main improvements with some sewer repairs on Plummer Ave., Woodside Ave,
Woodside Park, Frances St., Sunnyside Ave, Pico Ave, Corinha Beach Rd. and
throughout the neighborhoods surrounding the water tower.
▪ Sewer and water main improvements on Franklin Street and Harvard Street.
Other Work in Winthrop
▪ Water main on Central Street, South Main Street, Hutchinson Street, Taylor Street
and Underhill Street. Drainage improvements on Taylor Street and Hadassah
Way. Pavement and sidewalk improvements on Winthrop Street.
▪ Lewis Lake Tide Gate – Replace existing failed automated tide gate with new
automated tide gate. Provided a manually operated tide gate on seaward side to
provide needed redundancy.
▪ Miller Field/Lewis Lake Drainage and Site Improvements: Complete renovation of
Miller Field including site drainage improvements and improvements to swales
along the Veterans Road and Cross Street at the Winthrop Golf Club.
▪ Various water and sewer emergency repairs.
▪ Current projects include infrastructure improvements in the Centre Business
District and shoreline stabilization at Coughlin Park.
Severe Weather
▪ Areas of local flooding include:
• Yirrell Beach
• Nahant Avenue
• Belle Isle Marsh
• Winthrop Beach
• Point Shirley
• Lewis Lake
• Ingleside Park
• Lower Nahant Avenue
• Coughlin Park
• Fisherman’s Bend Marsh
• Pico Avenue
• Morton Street
Severe Weather
▪ Flooding at Jefferson Street/Putnam Street intersection: Previous improvements helped reduce the
frequency of flooding in this area. Additional infrastructure improvements planned under the Centre
Business District project are designed to provide additional capacity for larger storm events.
▪ Ingleside Park/Walden Street: Area floods when intense storm events coincide with rising tides. Previous
improvements have reportedly helped alleviate the frequency and duration of flooding in this
area. Additional improvements to the outfall and outfall structure at Donovan’s Beach and the drainage
system in Ingleside Park have been recommended to further alleviate flooding issues.
▪ Flooding continues at the Winthrop Golf Course. Grading proposed to improve these conditions under the
Miller Field/Lewis Lake Drainage and Site Improvements project were not constructed due to funding
concerns.
▪ Morton Street, Pico Avenue, Washington Avenue and Shirley Street: Significant flooding has occurred in
these areas during recent storms. The Town will be evaluating options to improve these conditions.
▪ Coughlin Park shoreline: Significant erosion continues to occur along this shoreline. The Town is in the
process of permitting improvements for a shoreline stabilization project. Construction of these
improvements is anticipated to begin in late 2018 or early 2019.
_-@liver OLIVER: MassGI$'s Online Mapping Tool OLIVER Updates
Ok =X Se oo .S) © if)
CHELSEA
@%
WINTHROP
+)
MassGIS Topogra
248.2
_ =
s Basemap
Sliver OLIVER: MassGIS's Online Mapping Tool OLIVER Updates
OO! @= ee @eaQa 5 f i) vi) WINTHROP ¥ © -“~ 5 @-
CHELSEA J %
Legend
Areas of Critical Environmental Concern ACECs
Lae *
_@liver OLIVER: MassGIS's Online Mapping Too! OLIVER Updates
2RQAA-pe *)
GF { ‘3,
WINTHROP Me +) ‘ = ll a 2) he
Legend
NHESP Natural Communities
NHESP Priority Habitats of Rare Species
CHELSEA
NHESP Estimated Habitats of Rare Wildlife
M
Main=Streas
qin
WINTHROP
> PHAS86
MassGIS Topographic F
_@liver OLIVER: MassGIS's O
Mapping Too! OLIVER Updates
@ a ") o | |Search for a location 2 @ J || Zoom to a town
FEMA National Flood Hazard Layer Polygons
)) A 1% Annual Chance of Flooding, no BFE
§) AE: 1% Annual Chance of Flooding, with BFE
@ AE: Regulatory Floodway
O§ AH: 1% Annual Chance of 1-3ft Ponding, with
Ml AO: 1% Annual Chance of 1-3ft Sheet Flow Fic
MVE: High Risk Coastal Area
_@liver OLIVER: MassGIS's Online Mapping Tool OLIVER Updates
ds % #3 @-
Q \- & CS) re) Le) C8 | [search for a location P i) % WINTHROP v
(4)
s
Legend
Hurricane Surge Inundation Zones
Category 1
(Category 2
Category 3
GN category 4
2
&
wa
oy
i
es
/
!
/
/
j
é
/
/
}
rd Ss 12
f 236, 456.7 1m 905,603.42m
{ MassGIS Topographic Features Basemap
WHAT ABOUT THE
FUTURE?
Flood Risk
▪ According to Boston Harbor Flood
Risk Model – 480 acres (45%) of
Winthrop’s 1.6 miles is within a
coastal flooding area.
▪ By 2070, 800 acres (60%) will be
within a coastal flooding area.
▪ The flood area does not expand
dramatically, but the depth of flooding
during a storm event DOES.
Areas of Probable Flooding
e
¥ ¥ ;
LE ISLE _e 6 LE ISLE S52 LLE ISLE
» MARSH fo y MARSH = ; MARSH
ae é 4 ” - , ~ + eit
a
CRYSTAL
CRYSTAL rae
COVE .
COVE
“e
CRYSTAL
COVE
a
z
>
ie)
a
Qa
<=
9
) m&
L]
BROAD SOUND
BROAD SOUND
BOSTON BOSTON | | BOSTON
HARBOR HARBOR HARBOR
A
7
a
Figure 3-3 Winthrop Areas of Probable Flooding TY
Depth of Flooding (1% Change Water Level)
Annual Maximum Temperature
Annual Maximum Temperature Observed
Suffolk County, MA °F
Ve 5-yr Mean ' [
= 0 \ ad
7448 @resiuent MA
©
240
7 = Modeled °F
if 2056-2060 N E C SC &
70 Max 68.44 Ww Nowheas onatinatace 5S
68 - Median 64.64 4
Min 61.53 “YY
66-4
Changes from
64- 1971-2000 for:
2020 - 3.40°
62-5 2049 F
2040 - 4.64"
60 - - 8 2069 F
- 2060 - 5.69°
58 2089 F
56- 2080 - 6.38"
Year
T T T T T T T 1 2097 F A
1960 1980 2000 2020 2040 2060 #2080 ym
7 ~
WOODARD
&CURRAN
Annual Minimum Temperature
Annual Minimum Temperature Observed
Suffolk County, MA °F ) mye
607 Zz lient MA
S-yt Mean ~ wresitwen
585 3
©
6-4 oO
° E Modeled °F N IF ( SC &
54-4 & 2066-2070 Northeast aratitine SE
52-4 Max 5215 Ww —~ —
Median 47.52 “YY
507 Min 4282 4
48 - Changes from
46 1971-2000 for:
4 2020 - 3.62°
44 2049 F
427 2040 - 5.02"
40- 2069 F
38-4 2060 - 6.25
2089 F
36 | T T T T T T T Year 2080 7 6.81"
1960 1980 2000 2020 2040 2060 2080 2097 F A
~~
WOODARD
& CURRAN
Annual Days With Maximum Temperature Above 90
Annual Days With Maximum Temperature Above 100
“Annual Total Precipitation
Annual Total Precipitation
Observed
Suffolk County, MA
704-~ Inches N laa
xo
Men B resilient MA
me sy ~ @resilen
2
ic
6046
6. Modeled Inches N IE ( SC &
fal Northeast Climate WIN &
$5 Max an —________—
Median IY
Min “YY
Changes from
1971-2000 for:
2020 - "
2049 0.94
304 2040 - 1
2069 2.42
257 2060 -
2.78"
Year 2089 /
20 T T T T T T T 1 2080 _
1960 1980 2000 2020 2040 2060 2080 377'
2097 A
yw
WOODARD
& CURRAN
Agenda
▪ 7:30 – 8:00 | Registration
▪ 8:00 – 8:30 | Welcome & Overview
▪ 8:30 – 9:00 | CRB Workshop Why Are We Here?
▪ 9:00 – 9:30 | Identify Challenges & Goals
▪ 9:30 – 10:00 | Background Information About Winthrop
▪ 10:00 – 10:30 | Climate Change (Mass Audubon)
▪ 10:30 – 11:00 | Characterize Natural Hazards
▪ 11:00 – 12:30 | Identify Community Vulnerabilities & Strengths
▪ 12:30 – 1:30 | LUNCH!
▪ 1:30 – 2:00 | Natural Infrastructure Solutions (The Nature Conservancy)
▪ 2:00 – 3:30 | Identify & Prioritize Community Actions
▪ 3:30 – 4:00 | CRB Workshop Recap & Wrap Up
Winthrop, MA
April 6, 2018
Community Resiliency Building Workshop
www.CommunityResilienceBuilding.com
Community Resilience Building Risk Matrix rate
Top Priority Hazards (tornado, floods, wildfire, hurricanes, earthquake, drought, sea level rise, heat wave, etc.)
Priority Time
|H-M-L priority for action over the Short or Long term (and Ongoing)
Short Long
H-M-L Ongoing
V = Vulnerability $= Strength
Features | Location |Ownership| V or S
Infrastructural
Societal
Environmental
A
7
a,
WOODARD
& CURRANrelated records
Records whose documents say similar things, nearest first.
- Flooding & resilienceMetropolitan Area Planning CouncilHazard Mitigation Plan, 2025 update (draft)
- Flooding & resilienceTown of WinthropCoughlin Park coastal resilience feasibility study, 2016
- Flooding & resilienceTown of WinthropMVP action grant applications: Ingleside Park and Morton Street, 2018
- Flooding & resilienceTown of WinthropResilient Winthrop: coastal infrastructure and climate change, 2017
- Flooding & resilienceTown of WinthropMorton Street Resilience Project feasibility report, 2024