TOWN OF WINTHROP OFFICE OF THE TOWN MANAGER Town Hall, 1 Metcalf Square, Winthrop, MA 02152 Telephone: 617-846-1077 David G. Cressman Town Manager May 16, 2018 Matthew Beaton Secretary Executive Office of Energy and Environmental Affairs 100 Cambridge Street, Suite 900 Boston, MA 02114 Subject: Winthrop MVP Grant Application for Ingleside Park Secretary Beaton, Good day, I am pleased to submit for your consideration this application for funding under the 2018 MVP Action Grant program. The Town of Winthrop’s application in the amount of $156,799.00 will support the town’s efforts to address climate change impacts that are affecting the Ingleside Park and the surrounding Winthrop neighborhoods. If successful, the town is prepared to match this request with $52,265.00 of town general funds to provide for the total project cost of $209,065.00. Ingleside Park is comprised of several acres of historically filled tidal marsh, which was converted to a park and surrounding neighborhood during the early part of the 20th Century. The park and neighborhood are also adjacent to Winthrop’s Centre Business District, an upland area, which has been identified locally as critical to future growth in the community. The town’s MVP plan identified significant infrastructure assets in this neighborhood that need to be protected. The goal of this project is to increase drainage out of the park and examine the upland drainage system to determine if rain water can be diverted and/or intercepted prior to reaching the park. Awarding of this grant will allow the Town to take a step forward in increasing the resiliency of the Ingleside Park, Centre Business District and surrounding neighborhood and will assist Town residents in this area by reducing the flood risk to their homes. Specifically, the project could help with flooding at the elementary school and with the business infrastructure in the Centre Business District by mitigating some of the accumulated effects of high ground water during large rain events. The project also offers the potential for transferability, as there are many communities along the coast that have filled tide lands that are used for recreational activities. Many of these areas are prone to flooding due to poor drainage. Best regards, Bi A Cc Ya David G. Cressman Town Manager CC: Kathleen Theoharides, Assistant Secretary of Climate Change Town Hall, 1 Metcalf Square, Winthrop, MA 02152 Telephone: 617-846-1077 MUNICIPAL VULNERABILITY PREPAREDNESS PROGRAM FY18 MVP ACTION GRANT RFR ENV 18 POL 03 Applicant : Town of Winthrop, Massachusetts Address: One Metcalf Square, Winthrop, MA 02152 Local Project Manager: Name: Steven Calla, Director Department: Department of Public Works Email: scalla@town.winthrop.ma.us Phone: 617-846-1341 Fax: 617-539-1545 Type of Climate Change Adaptation/Resilience Project : Nature Based Water Infiltration Techniques/Redesigns & Retrofits – Feasibility Study and Permitting Project Title: Ingleside Park Feasibility Study and Permitting Total Project Cost: $209,065 Match Amount (at least 25% of TOTAL project cost): $52,265 Grant Amount Requested: $156,799 Project Summary (brief description of the proposed project in one or two short paragraphs): The Town of Winthrop proposes to conduct a feasibility study to mitigate flooding in Ingleside Park. In addition, the coastal processes at the site will be evaluated to determine the water levels, tidal influence, waves and storm surge elevations at the project site for present day, as well as three future out-years (i.e., 2030, 2070, and 2100) incorporating sea level rise. These data will inform the alternatives analysis to select an appropriate nature-based or conventional infrastructure type, examining a broad range of nature-based and conventional flood mitigation techniques to determine the best solution for Ingleside Park; the selected alternative will provide the most flood control and additional environmental benefits, as well as have the longest lifetime. The Town of Winthrop will be a key partner to this process and will provide critical feedback at all stages of the project. Once a flood mitigation alternative is chosen, conceptual plans will be designed and completed, and permits will be applied for. 2 Ingleside Park Feasibility Study and Permitting Municipal Vulnerability Preparedness Program/MVP Action Grant Introduction The Town of Winthrop’s Ingleside Park Feasibility Study will analyze nature-based and conventional flood control techniques that provide coastal storm damage protection and enhance natural resources. The Ingleside Park Feasibility Study is consistent with the Executive Office of Energy & Environmental Affairs’ goals to advance prioritized climate change adaptation actions and implementation strategies identified through community-wide vulnerability assessments. The proposed project was identified as a priority adaptation action from the Town’s community-driven, comprehensive assessment of climate hazards across multiple sectors of Winthrop, including infrastructural, societal, environmental, and other sectors as chosen by the Town of Winthrop. This project will explore and research both nature-based and conventional flood mitigation techniques in the area of Ingleside Park which is fronted by the Belle Isle marsh complex. Potential strategies will likely include: raising the march elevation, installing fiber rolls, installing a vegetated berm, and other nature-based or conventional solutions. In addition, the proposed project will include full consideration and incorporation of climate change projections and data that align with the anticipated lifespan of the project and the risk tolerance of the assets. In 2017, Winthrop completed a climate change and vulnerability assessment (Resilient Winthrop – Designing Coastal Community Infrastructure for Climate Change). Based on priority ranking, one asset type (pump stations) and four flood areas (Belle Isle Marsh, Ingleside Park, Lewis Lake and Point Shirley) were selected for concept designs. The flood pathway to Ingleside Park is Donovan’s Beach. The Assessment states that coastal flooding on Pleasant Street could be 8-inches deep by 2030, making Pleasant Street impassible during a storm. In April 2018, Winthrop started the Municipal Vulnerability Preparedness (MVP) program’s Community Resiliency Building (CRB) Workshop. The focus of the workshop was to educate participants and increase awareness of risks facing the Town of Winthrop from natural and climate-related hazards. The process identified vulnerabilities and strengths in Winthrop from an infrastructure, societal and environmental perspective and served as the foundation for discussion. Prior to the workshop, outreach to key municipal staff, residents, businesses and organizations was conducted through the kick-off meeting. During the CRB process, the entire Town was highlighted as being vulnerable to natural hazard events due to its location and the fact that it is surrounded by the ocean – not just a specific neighborhood. There were specific areas mentioned by attendees at the workshop as being vulnerable and those include: • Neighborhoods: - Ingleside Park/Belle Isle Marsh – Low lying area, coastal surge and flooding. - Pico Avenue/Fisherman’s Bend – Experiences flooding during storm events. - Ingleside Park – Backup and flooding due to lack of stormwater storage capacity and undersized drains. Floods during coastal storm/precipitation events. - Point Shirley/Shirley Street – Low-lying street and adjacent seawall experience wave overtopping and flooding during storm events. - Lewis Lake – Serves as a drainage area for part of the downtown area – lake overflows during storm events and causes localized flooding in adjacent areas. - Yirrell Beach – Coastal surge and flooding - Lower Nahant Avenue – Coastal surge, high tide and high precipitation events all cause backup in undersized drain lines and flooding within adjacent neighborhood. - Coughlin Park – Coastal erosion and flooding during coastal storms. 3 - Bayou Street Neighborhood – Flooding due to undersized drainage line that backs up during high precipitation events. • Ecosystems: Belle Isle Marsh, Coughlin Park, Yirrell Beach, Ingleside Park, Lewis Lake, Beaches • Transportation: Route 145 and Winthrop Parkway (also evacuation routes), Shore Drive, Ingleside Park, bridges, all roads in Town • Infrastructure: Drainage system, Water/Sewer Infrastructure, Pump Stations, Sea Walls, Utility Power, Public Safety Building, Culverts, MWRA Deer Island Treatment Plant, Municipal Services (police, fire, emergency shelters), Existing Buildings, Proximity to MassPort/Logan International Airport The CRB process identified six top recommendations to improve resiliency in Winthrop. The Draft Community Resiliency Building Workshop – Summary of Findings is included as Attachment C and the six recommendations are summarized below. Rank Action Notes 1 Sewer & Drainage Infrastructure Clean, maintain and upgrade (particularly in the Town Center and low-lying areas) sewer and drainage infrastructure. Seek funding for repair and replacement, design additional storage capacity and modify bylaws and incentives that would support improved conditions for projects. Work would also include flood control projects. 2 Maintain, Replace, Upgrade Seawalls Various existing infrastructure is in place throughout Winthrop and is in need of repair and upgrade. 3 Natural and Green Infrastructure Solutions, Low Impact Development To support or enhance the functioning of seawalls and the shoreline as a barrier and for improved stormwater management. Work would also include flood control projects. 4 Develop or redevelop a new public safety building (police, fire, ambulance) This includes finding a site, designing the building, securing funding and completing construction of a new facility. 5 Maintain and protect Belle Isle Marsh, Coughlin Park and beaches as assets to the community for both recreation and resiliency support. Work for areas of the community that act as natural barriers includes dune enhancement, plantings, berms, etc. 6 Identify funding for projects to increase resilience This includes further developing the tax base to increase revenue in the community and securing the money along with leveraging local resources and representatives to seek out and secure funding for Winthrop. Figure 1: Top Six Recommendations to Improve Resiliency. From Community Resiliency Building Workshop Summary of Findings – May 2018 a) Problem and Climate Adaption Geographically the Town forms the northern border of the entrance to Boston Harbor. As a peninsula, the Town is physically isolated from Revere and East Boston by the Belle Isle Inlet Tidal Marsh, the last urban estuary in the Greater Boston Area and the most significant regional environmental feature found in Winthrop. Winthrop is a part of the Mystic River Watershed, which is approximately 76 square miles and extends to twenty-one municipalities north and west of the City of Boston. Because of its location, it is one of the most urban and densely populated watersheds in Massachusetts. The Town’s land area is 1.6 miles and is located on a peninsula. Winthrop has 7 miles of shoreline, of which 4.4 miles lies along Boston Harbor (locally referred to as Winthrop Harbor). The Table below from the Winthrop Hazard Mitigation Plan 2014 Update summarizes the hazard risks for Winthrop. This evaluation takes into account the frequency of the hazard, historical records, and variations in land use. This 4 analysis is based on the vulnerability assessment in the Commonwealth of Massachusetts State Hazard Mitigation Plan, 2013. Figure 2: Hazard Risks Summary. From Winthrop Hazard Mitigation Plan 2014 Update In addition, the Massachusetts Office of Coastal Zone Management estimates sea level rise ranging from 0.81 feet under a low emissions scenario to 6.83 feet under a high emissions scenario by the end of this century. Such a broad range creates significant issues for Massachusetts coastal communities. Figure 3: Relative sea level rise estimates for Boston, MA. Global scenarios were adjusted to account for local, vertical land movement with 2003 as the beginning year of analysis. From Sea Level Rise: Understanding and Applying Trends and Future Scenarios for Analysis and Planning – Massachusetts Office of Coastal Zone Management. Since 1991, Winthrop has experienced seventeen natural hazards that triggered federal or state disaster declarations, the vast majority of which involved heavy flooding. According to the Winthrop Hazard Mitigation Plan 2014 Update, both flooding and other coastal hazards have both a high frequency and serious severity, even before the impacts of sea level rise are considered. In this particular case, high frequency means events that occur more frequently than 10% a year, while serious severity means scattered major property damage (more than 50% destroyed), some minor infrastructure damage, wider geographic area (several communities), essential service interruption, and some injuries and/or fatalities. In particular, flooding was the most prevalent serious natural hazard identified by local officials. 5 Winthrop is subject to three kinds of flooding: 1) coastal flooding, where wind and tide leads to flooding along tidal waterways; 2) inland/riverine flooding, where the rate of precipitation and/or amount of stormwater runoff overwhelms the capacity of natural or structured drainage systems causing overflows; and 3) urban flooding, where precipitation causes the water table to rise and leads to flooding of low-lying areas such as streets and underpasses (Winthrop Hazard Mitigation Plan 2014 Update). Often these three types of flooding combine under storm events, as large amounts of draining stormwater becomes blocked by the inland push of wind and tide driven water, leading to flooding on a massive scale. Sea level rise contributes greatly to this type of stormwater flooding, as higher sea levels mean flooding of types 1 and 3 is more likely to occur. In addition, one overall impact of climate change is to make the frequency of such storms more likely and their severity much worse, leading to increased flood events for the town moving forward. Ingleside Park is a natural detention area for stormwater runoff and ocean storm flow. The area was previously an old tidal salt marsh until it was filled in 1936 and converted into a park. Drainage problems in Ingleside Park have been documented as far back as 1955 in the Report of Sewerage and Drainage for the Town of Winthrop, Massachusetts (Weston & Morgentoth, Inc). According to the report, drainage difficulties in this area are manifold. The capacity of the main interceptors is entirely insufficient to the flow. Therefore, the water level in the storm drains rises until it overflows and floods the park. At the low spots, pools are formed which cannot drain but have to dry out. The former railroad bed crossing Ingleside Park forms a natural barrier with an insufficient number of catch basins. When, at high tides, the tide gates at the outfall close, the run-off backs up and floods the lower part of Ingleside Park which is partially below high tide. Winthrop’s 2104 Hazard Mitigation Plan update identified eleven areas where flooding is of particular note, including Ingleside Park which suffers from backup and flooding due to lack of stormwater storage capacity and undersized drains. Floods occur during high tide events coinciding with high precipitation events greater than 1 inch. The 2014 Hazard Mitigation Plan Update lists Ingleside Park as a high priority mitigation measure – complete drainage assessment of the park and upgrade undersized drainage infrastructure. The park is at sea level with a pipe that drains to the bay. There is a valve that shuts during heavy tides, but the area may need a pump station as well. To help with flooding in this area, the Town has constructed dikes around two homes as a temporary solution. Currently, the upland drainage is naturally pitched towards the old salt marsh (now park). The park floods from rain water during heavy rain events. The low-lying park accumulates water during these rain events and can take several weeks to drain through a pipe which extends through a sea wall and drains across Donavan Beach. There are Figure 4: Map of 2030 Flood Areas and Adaption Locations – Resilient Winthrop July 12017 6 several buildings including an elementary school along the park that continually run sump pumps to prevent flooding. Additionally, many businesses along the Central Business District run sump pumps continually because of the high groundwater especially during and immediately after large rain events. During rain/flood event the sump pumps often become overwhelmed due to the accumulated water in the flooded park resulting in flooding of the lower levels of the buildings. The MVP plan identified the following infrastructure threatened in the Ingleside Park area: • Pleasant Street roadway, • Walking paths with the park, • Natural gas distribution system, • Electric transmission and distribution system • Natural gas distributions system • Cable lines, • Telephone lines, and • Other infrastructure in this area. The proposed project will not be able to address all of these problems however, it will focus on alleviating the flooding due to rain water accumulation within the Park by examining the drainage area within the park and the outlet to Donavan’s Beach. The goal will be to determine the increase the drainage needed and to examine the upland drainage system to determine if some of the rain water can be diverted and/or intercepted prior to reaching the park. b) Need for Assistance The Town requires assistance to complete this project. The Town has not been able to raise the funds to address the entire problem at this time. However, the awarding of this grant will allow the Town to take a step forward in increasing the resiliency of the Ingleside Park area. c) Project Description This project will assist the Town residents in this area be reducing the flood risk to their homes. Specifically, flooding to the elementary school and the elementary school and some of the other buildings. This project also can help the business infrastructure in the Central Business District by mitigating some of the accumulated effects high ground water during large rain events. The Town proposes to assess which nature-based or conventional flood mitigation techniques are applicable to this location by developing an understanding of the existing environmental conditions and coastal processes at the site. A comprehensive evaluation will be used to assess the existing environmental conditions in Ingleside Park and provide information that will be used to evaluate and select potential alternatives for mitigating the flooding in the Ingleside Park area. The existing conditions assessment will develop a complete picture of the ongoing processes that shape Ingleside Park, by utilizing an already developed and tested highly resolved, numerical processes model developed for Massachusetts Department of Transportation (MassDOT) and the Federal Highway Administration (FHWA) to assess the combined impact of sea level rise, storm events (tropical and extra-tropical), winds, tides, and waves. With a full understanding of the present-day processes at the site, as well as an examination of potential sea level rise scenarios, an alternatives analysis will be developed that evaluates the performance and longevity of various living shoreline alternatives based on a criteria matrix, which will include but is not limited to design life, level of protection, permit ability, cost, environmental benefits, and avoidance of adverse impacts. Scope of Work Technical Approach 7 The technical approach includes the following seven (7) tasks intended to assess the feasibility of implementing a nature-based shoreline project at the site and to advance the project through the conceptual design phase, including the development of conceptual engineering plans. Task 1. Kick Off Meeting/Identify and review existing information This Task will include a meeting between the Town, CZM and its consultants to discuss timeline, anticipated project inhibitors, and/or any last-minute changes from CZM. The meeting will take place in Winthrop at a location to be determined. In addition, this task will compile existing information related to topography and bathymetry, wetland resources, including eelgrass and shellfish beds, historical shoreline change rates and current FEMA flood zones. Data gaps will be identified as the basis for supplemental data collection if required. A meeting with the Town will be scheduled as part of this task to discuss the project and to solicit data and input for this effort. Task 2. Site Spot Evaluations Spot elevations at the site will be obtained to determine the elevation of the culvert. A site topographic survey will be completed to determine the site boundaries, present location of the shoreline, the locations of the wetland resources flagged in Task 2, and the elevations of the upland adjacent to the landward edge of the marsh. These data will provide needed input directly for the alternatives analysis described in Task 3. Task 3. Analysis of coastal processes An existing coastal model, the Boston Harbor Flood Risk (BH-FR) Model developed by Woods Hole Group for MassDOT and FHWA, will be utilized to evaluate the coastal processes at the site. The BH-FR model is a highly resolved, numerical process model developed for the greater Boston Harbor area, which assesses the combined impact of: • Sea level rise • Storm events (tropical and extra-tropical) • Winds • Tides • Waves A statistical model will be applied to the data to calculate the 5-, 10-, 25-, 50- and 100-year return periods for the local wave heights and water levels at the project site. This information will be used to inform the design criteria for the nature-based alternatives. Up to 10 years of historical aerial photography, recent orthoimagery and shoreline surveys will be compiled to calculate both long- and short-term shoreline change rates. Task 4: Drainage Analysis Woodard & Curran will develop an existing conditions hydrologic/hydraulic model to serve as a baseline condition from which to evaluate potential mitigation measures. The modeling will consist of two components; a hydrologic model that will estimate the rate and volume of runoff generated from the watershed under various storm events and a riverine hydraulic model that will estimate the elevation and aerial extents of flooding that results from the runoff generated from the watershed. W&C is presently proposing to utilize HydroCAD and HEC-RAS computer software to conduct the hydrologic and hydraulic modeling. Following completion and review of the data collection efforts, W&C will meet with the Client to discuss to advantages, if any, of using Bentley’s SewerGEMS or Wallingford’s Infoworks RS/CS software to perform these analyses. Task 6. Stormwater Management (nature-based and conventional) alternatives analysis A meeting with CZM and the Town will be held to identify nature-based alternatives that can increase the resiliency and reduce the flooding of the area. With the improved knowledge of coastal processes, up to three (3) conceptual conventional and/or nature-based alternatives will be identified and evaluated. The alternatives analysis will use a criteria matrix approach, including such indicators as feasibility, design life, level of protection provided, permitability, 8 cost, public and environmental benefits and avoidance of adverse impacts. This task will identify profile geometry and length required, preliminarily quantify materials needed, and assess performance/maintenance requirements as the basis for recommending conceptual layout(s) for Task 6. The Town and other stakeholders will collaborate to ensure that the nature-based alternative selected is consistent with resiliency goals and feasible to implement from both a regulatory and construction standpoint. Task 7. Preliminary engineering design Based on the chosen alternative selected in Task 6, preliminary engineering designs will be produced detailing the design specifications for the preferred alternative. Task 8. Final documentation and visualizations A summary report will be completed that will summarize Tasks 1 through 6 and will provide the additional information needed for the Town to advance the selected nature-based alternative to a final design. To further advance nature- based in the state, the final report and associated graphics can also be used to transfer the input data and selection and design steps used in this project to other Towns in the region that have similar coastal management issues that might benefit from a nature-based approach. Additionally, the Massachusetts Office of Coastal Zone Management (CZM) and other agencies will be able to use this report to disseminate design steps and describe the advantages of nature-based projects over traditional hard coastal engineering alternatives. d) Transferability The proposed project is directly transferable to other communities along the shore that have filled tide lands that are used for recreational activities. Many of these areas are prone to flooding due to poor drainage. The project will examine the upland drainage area and determine if it is feasible to divert or intercept rain water before it reaches the park (filled tide lands). Implementation of this project will provide a guideline for those communities that have similar geomorphology. The alternatives analysis and the conceptual designs developed as part of this project will provide a road map for the increasing the resiliency of similar areas. Experience gained from this project could benefit those sites as well, through the transfer of knowledge and experience with green infrastructure projects. Therefore, the results of this project will benefit other stakeholders and coastal communities. Finally, the summary report and final visualizations will provide an ideal method to disseminate the results of this project to the general public, as well as to other coastal communities, and to demonstrate the viability of green infrastructure techniques within the Boston area. We will also encourage and assist our contractor, the Woods Hole Group, in presenting the results of this project at relevant conferences such as the Conference on Ecological and Ecosystem Restoration (CEER). e) Importance of Nature-based Solutions and Strategies The goal of the project is to increase the resiliency of Ingleside Park, the elementary school and businesses in the Central Business District. A meeting between the Town and CZM will be held to discuss possible strategies for increasing the resiliency of the shoreline. It is anticipated that various nature-based solution such as raising the marsh elevation, installing fiber rolls, installing a vegetated berm, and other nature-based solutions will be identified at this meeting. Once identified the potential nature-based solutions will be incorporated into an alternatives analysis to determine the viability of each potential solution identified . f) Timeline Assuming the contract award date is June 1, 2018, we anticipate that the project will be completed by May 1, 2019. The following is the schedule breakdown for the project. g) Budget A detailed project budget is included as Attachment A. The cover letter documents the 25% cash match - $52,265. h) Project Management J 9 Arthur D. Leventis, P.E., Arthur is a Project Manager with 20 years of experience in planning, design and construction of water and wastewater projects. His experience includes distribution system analysis, infrastructure planning, water main design, water main construction, infiltration/inflow analysis and mitigation, collection system design, sewer main construction, pump station design and upgrades, wastewater treatment facility design and improvements, drainage design and construction, permitting, public bidding and construction management. Arthur is also familiar with the MassDEP's State Revolving Fund (SRF) requirements and the MWRA Local Pipeline Assistance and Local Financial Assistance programs, with several of the projects listed below being funded by these programs. Michael Hansen , P.E., C.M.F., is a Project Engineer with 17 years' experience in the field of civil engineering with an emphasis in floodplain and stormwater management. His experience with floodplain management includes working with FEMA regulations and requirements to help offset adverse effects to work performed within the regulated floodway and 100-year floodplain as well as compiling NO-Rise certifications and Letter of Map Revisions(LOMR). He is also experienced in hydraulic river modeling, natural channel design, stormwater system design, wetland restorations, site plan reviews and designs, field inspections and construction oversight, sidewalk feasibility studies and multi-use trail design. Steven Calla – Steven Calla has been the Director of Public Works for the town of Winthrop since 2011. Prior to becoming the director of the department, Mr. Calla worked as the Operations Manager for Winthrop Public Works from 2007 to 2011. As Director, Mr. Calla has overseen millions of dollars of infrastructure improvements across the town, including roadway projects, water, sewer and drainage improvements, improvements to parks and improvements to other critical town facilities such as tide gates and pump stations. He has personally project managed most of those projects over the course of his tenure and is an expert in both the process for initiating and completing large scale public works projects and with the financial reporting and administration of those projects. In 2016, Mr. Calla project managed a major storm water drainage project in Winthrop’s Point Shirley neighborhood, which cost a total of $835,000 and included $500,000 in federal FEMA pre-disaster Mitigation funding. Mr. Calla has previously worked as an Environmental Engineer, Electrician’s apprentice and environmental and construction supervisor of his own construction and environmental services corporation. He earned a Bachelor Degree in Environmental Protection and Marine Safety from the Massachusetts Maritime Academy in 1996 and a Master in Public Administration at Suffolk University in 2017. Dr. Lee Weishar, Ph.D, M.S., B.S., P.W.S., is a Senior Scientist/Coastal Engineer at Woods Hole Group. Dr. Weishar has more than 25 years of experience in the fields of oceanography, coastal engineering, sediment transport, and nearshore processes. For the past 10 years, he has focused on coastal engineering and wetland/marsh restoration. His coastal engineering work includes beach nourishment, coastal structures, soft solutions for shoreline protection including living shorelines, as well as dredging and sediment management. Dr. Weishar also specializes in the integration of biological, ecological, and hydraulic data to develop wetland restoration designs and to ensure that the design will meet the restoration objectives. He has been involved in the design, permitting, and construction phases of restoration projects for more than two decades. During the design phases of large-scale projects, Dr. Weishar spear-heads the preliminary hydraulic design and hydrodynamic analyses that prove to the client that a large-scale restoration is feasible. Dr. Weishar has worked to perform critical examinations of the marsh restoration performance through frequent on-site visits and analytical analyses. Dr. Weishar helped pioneer the applications of Ecological Engineering and Adaptive Management in the field of marsh restoration. Additionally, Dr. Weishar has extensive experience in evaluating the potential impacts of proposed restoration projects on existing wetlands and adjacent transitional, buffer, and upland areas. Dr. Weishar has permitted a wide variety of projects that include beach nourishment, revetments, and wetland restoration. He is familiar with environmental policy at local, state, federal and international levels. Kirk F. Bosma, P.E., is a Senior Coastal Engineer and Team Leader of the Coastal Sciences, Engineering & Planning team at Woods Hole Group. He focuses on habitat restoration, shoreline protection, and climate change planning projects for a diverse client base. He specializes in applying numerical models to optimize engineering 10 designs and reduce overall project life cycle costs. This includes developing and employing numerical models for marsh restoration, sediment transport, near shore spectral wave transformation, particle transport, bathymetric evolution, and two- and three-dimensional hydrodynamic processes. He also applies the latest data and numerical methods toward capturing current and future flooding risk for climate change vulnerability assessments. Mr. Bosma has a Master's from the University of Delaware's Center for Applied Coastal Research. His areas of expertise include numerical modeling of coastal and estuarine processes, coastal engineering design for shore protection, wave propagation and transformation, sediment transport and littoral processes, hydraulics for marsh restoration, climate change vulnerability assessments and engineering adaptations, and data collection and implementation of coastal engineering projects. Mr. Bosma also designed and implemented technically advanced data collection programs and analysis techniques to assess the estuarine, coastal, and oceanographic environment and help develop engineering solutions. He has also designed a number of coastal engineering structures and erosion mitigation solutions. Mr. Bosma has been the project manager for both large coastal restoration and marsh restoration projects that have included implementation of a comprehensive data collection, physical processes modeling programs, evaluation of a variety of restoration alternatives, and engineering design. Elise Leduc, M.E.M. , is a coastal scientist with experience in coastal environmental management, geospatial analysis, shoreline change analysis, wetland and resource area delineation, environmental impact analyses, ecological risk assessment, conservation prioritizations, field and water quality sampling, and Massachusetts environmental regulations at Woods Hole Group. Ms. Leduc earned a Master's in Environmental Management from Duke University's Nicholas School of the Environment where she studied coastal environmental management, geospatial analysis, wetland ecology and restoration, and coastal and environmental law and policy. She has conducted multiple shoreline change analyses in support of regional coastal development and regional sediment management planning, and has worked on interdisciplinary coastal management projects, including compiling a Beach Management Plan for public beaches in one Cape Cod town. The key personnel who will be involved in the Morton Street Feasibility Study are listed in the table below and individual resumes are included in Attachment B. Project Team Name Affiliation/Title Role Arthur D. Leventis, P.E. Woodard & Curran – Project Manager Project Manager Michael Hansen, P.E., CFM Woodard & Curran – Technical Manager Technical Manager Steven Calla Town of Winthrop – Director of Public Works Local Project Manager Dr. Lee Weishar, Ph.D., M.S., B.S., P.W.S. Woods Hole Group – Woods Hole Group Team Leader/ Coastal Engineer Team Leader/Coastal Engineer Kirk F. Bosma, P.E., M.C.E Woods Hole Group – Coastal Engineer Coastal Engineer Elise Leduc, M.E.M. Woods Hole Group – Coastal Scientist Coastal Scientist Partners – Signed support letters from all relevant local boards, departments, commissions, and other partners with a commitment for these entities to participate, as necessary, in the project. Letters of support from all local partners are included in Attachment E. Attachments • Attachment A: Budget • Attachment B: Resumes 11 • Attachment C: Community Resiliency Building Workshop – Summary of Findings • Attachment D: Pictures of Ingleside Park During Winter 2017/2018 Flooding • Attachment E: Letters of Support ATTACHMENT A: BUDGET Project Task Description Deliverables Due Date Grant Match Total Task 1: Kickoff Metting/ Identify and Review Existing Information Kickoff Meeting Memorandum of Results 7/15/2018 $2,095 $0.00 $2,095 Review Data $0 $0.00 $0 Existing Conditions Review $0 $0.00 $0 Total Task 1 Cost $2,095 $0.00 $2,095 Task 2: Site Spot Evaluations Survey Upload Boundary RTK Site Topography Survey 8/30/2018 $5,510 $5.75 $5,516 Develop Plan $0 $1,000.00 $1,000 $0 $0.00 $0 Total Task 2 Cost $5,510 $1,005.75 $6,516 Task 3: Analysis of Coastal Process Assess Shoreline Change, Storm Surge and Sea Level Rise Memorandum of Results 10/15/2018 $13,850 $0.00 $13,850 Memorandum of Results $3,310 $0.00 $3,310 $0 $0.00 $0 Total Task 3 Cost $17,160 $0.00 $17,160 Task 4: Drainage Analysis Watershed Modeling Hydrologic/Hydraulic Model 12/30/2018 $8,352 $38,960.00 $47,312 $0 $0.00 $0 $0 $0.00 $0 Total Task 4 Cost $8,352 $38,960.00 $47,312 Task 5: Stormwater Management Alternative Analysis Identify Alternatives Alternatives Anaylsis - Memorandum of Results 1/30/2019 $0 $0.00 $0 Evaluate Performance $0 $11,000.00 $11,000 Memorandum of Results $0 $0.00 $0 Total Task 5 Cost $0 $11,000.00 $11,000 Task 6: Preliminary engineering design Preliminary Design Preliminary Design 3/30/2019 $70,886 $500.00 $71,386 Permitting Permitting $40,792 $0.00 $40,792 $0 $0.00 $0 Total Task 6 Cost $111,678 $500.00 $112,178 Task 7: Final documentation and visualizations Prepare Draft Report Draft Report 5/1/2019 $4,530 $800.00 $5,330 Prepare Final Report Final Report $0 $0.00 $0 Public Outreach $7,474 $0.00 $7,474 Total Task 7 Cost $12,004 $800.00 $12,804 TOTAL PROJECT COST $156,799 $52,266 $209,065 FY18 MVP Action Grant Scope - Ingleside Park Unit Quanity Unit Cost Total Hourly Rate X X X X Task 1: Kickoff Metting/ Identify and Review Existing Information Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Kickoff Meeting 6 $1,320.00 $0.00 6 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage 200 0.575 $115 $2,095 Review Data $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Existing Conditions Review $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Total Task 1 Cost $2,095 Task 2: Site Spot Evaluations Survey Upload Boundary RTK 16 $3,520.00 $0.00 16 $1,760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage 400 0.575 $230 $5,510 Develop Plan $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Total Task 2 Cost $5,510 Task 3: Analysis of Coastal Process Assess Shoreline Change, Storm Surge and Sea Level Rise 10 $2,200.00 $0.00 34 $3,740.00 18 $3,510.00 40 $4,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage 0 0.575 $0 $13,850 Memorandum of Results 8 $1,760.00 $0.00 7 $770.00 4 $780.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $3,310 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Total Task 3 Cost $17,160 Task 4: Drainage Analysis Watershed Modeling 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 8 $1,560.00 30 $5,160.00 0 $0.00 0 $0.00 8 $1,048.00 8 $584.00 $0 $8,352 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0 $0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0 $0 Total Task 4 Cost $8,352 Task 5: Stormwater Management Alternative Analysis Identify Alternatives $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage 0 0.575 $0 $0 Evaluate Performance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Memorandum of Results $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Total Task 5 Cost $0 Task 6: Preliminary engineering design Preliminary Design 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 40 $7,800.00 44 $7,568.00 60 $9,300.00 130 $18,850.00 200 $26,200.00 16 $1,168.00 $0 $70,886 Permitting 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 22 $4,290.00 40 $6,880.00 18 $2,790.00 120 $17,400.00 72 $9,432.00 0 $0.00 $0 $40,792 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0 $0 Total Task 6 Cost $111,678 Task 7: Final documentation and visualizations Prepare Draft Report 5 $1,100.00 $0.00 16 $1,760.00 4 $780.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Priniting 1 $890.00 $890 $4,530 Prepare Final Report $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 Public Outreach $0.00 $0.00 $0.00 $0.00 $0.00 16 $3,120.00 16 $2,752.00 0 $0.00 0 $0.00 10 $1,310.00 4 $292.00 $0 $7,474 Total Task 7 Cost $12,004 TOTAL PROJECT COST $156,799 $172.00 $155.00 $145.00 Designer $131.00 Project Team Hours Project Manager Technical Manager Project Engineer Engineer Administrative $165.00 $110.00 $195.00 Coastal Scientist - WH $110.00 $73.00 $195.00 FY18 MVP Action Grant Budget - Ingleside P Direct Costs GRANT Total Task (Grant) $220.00 Sr. Scientist -WH Coastal Geologist- WH Coastal Scientist - WH Coastal Engineer - WH Unit Quanity Unit Cost Total X X X X Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total Hours Total 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $2,095 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 $0.00 $2,095 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Mileage 10 0.575 $6 $5.75 $5,516 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 RTK Rental 1 $1,000.00 $1,000 $1,000.00 $1,000 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 $1,005.75 $6,516 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $13,850 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $3,310 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 $0.00 $17,160 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 68 $10,540.00 196 $28,420.00 0 $0.00 0 $0.00 $38,960.00 $47,312 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 $38,960.00 $47,312 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Wetlands 1 $11,000.00 $11,000 $11,000.00 $11,000 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 $11,000.00 $11,000 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Printing 1 $500.00 $500 $500.00 $71,386 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $40,792 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 $500.00 $112,178 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Printing 1 $800.00 $800 $800.00 $5,330 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00 $7,474 $800.00 $12,804 $52,266 $209,065 $73.00 $195.00 $172.00 $155.00 $145.00 $131.00 $220.00 $165.00 $110.00 $195.00 $110.00 Project Team Hours Sr. Scientist -WH Coastal Geologist- WH Coastal Scientist - WH Coastal Engineer - WH Coastal Scientist - WH Project Manager Technical Manager Project Engineer Engineer Designer Administrative ngleside Park Total Project Cost Direct Costs Total Task (Match) ATTACHMENT B: RESUMES woodardcurran.com | COMMITMENT & INTEGRITY DRIVE RESULTS ARTHUR LEVENTIS, PE PROJECT MANAGER Professional Profile Arthur is a Project Manager with over 20 years of experience in planning, design and construction of water and wastewater projects. His experience includes distribution sys- tem analysis, infrastructure planning, water main design, water main construction, infiltra- tion/inflow analysis and mitigation, collection system design, sewer main construction, pump station design and upgrades, wastewater treatment facility design and improve- ments, drainage design and construction, permitting, public bidding and construction management. Arthur is also familiar with the MassDEP’s State Revolving Fund (SRF) requirements and the MWRA Local Pipeline Assistance and Local Financial Assistance programs. Related Experience Town of Winthrop, MA– Sewer Infrastructure Improvements. Project Manager responsible for developing and managing sewer infrastructure improvements to evalu- ate and mitigate inflow/infiltration in the collection system. Assisted the Town in securing MWRA funding due to expire by developing a design that would immediately utilize funds and address inflow/infiltration through video inspection, joint sealing and pipe lining. Completed MWRA funding application to assist Town in funding the project, developed design and construction documents for project and provided construction administration. Based on video inspection information, provide Town with Sanitary Sewer Evaluation Report that identified critical collection system repairs and recommended a five-year plan for improvements. Woodard & Curran has continued to work with the Town to implement recommendations from the SSES report. Town of Winthrop, MA – Miller Field Athletic Facility Redevelopment. Project Manager for the Miller Field Athletic Field Redevelopment project. This project includes upgrades to the existing running track and athletic field, along with a new turf field, grandstand, press box, bleachers, lighting, scoreboard, concessions, restrooms, locker rooms, walkways, site utility infrastructure improvements, landscaping and site fencing. The project also included drainage improvements to an adjacent Town owned site to minimize historic flooding issues and public health and safety concerns related to recent Eastern Equine Encephalitis (EEE) identified at the site. Lowell Regional Water Utility, Lowell, MA – Water Main Replacement Program. Project Manager responsible for the replacement design and construction of over 8 miles of water mains ranging in size from 6-inch to 36-inch. These numerous projects have included slip lining of 20-inch and 12-inch water mains across bridges with HDPE pipe, as well as thousands of feet of water main replacement. These projects were designed to minimize disruption in water service to consumers, while improving the reliability and redundancy of the distribution system by replacing older mains and pipes in areas with historically high break histories. Hydraulic analyses were performed to identify those mains critical to the reliable operation of the system. In several cases, water main and valve replacement was performed to isolate service areas, or shift service area boundar- ies to increase energy efficiency of the distribution system. Education • Bachelors, Civil Engineering, Union College Registrations • Professional Engineer - MA, 45470 • Professional Engineer - CT, 31327 • Professional Engineer - RI, 11436 Professional Associations • American Society of Civil Engineers • American Water Works Association woodardcurran.com | COMMITMENT & INTEGRITY DRIVE RESULTS City of O’Fallon, MO – Main Street Water Main Improvements. Technical Lead responsible for design of over one mile of water distribution system improvements to improve water quality and fire protec- tion in the City’s main business district. The project includes water main design, permitting and design of a crossing for an active railroad, technical evaluation of on- site corrosive and contaminated soils, and construction phasing to minimize impacts of construction activities in the City’s main business district. City of Lawrence, MA – Water Main Replacement Project. Project Manager responsible for managing design, permit- ting, bidding, and construction oversight of 7.5 miles of 6-inch through 24-inch water main replacement and rehabilitation in a dense, urban environment funded by the Massachusetts DWSRF program. The project included working with the Department of Public Works and public safety officials to prioritize project work, coordinating work with on-going construc- tion activities of other local utilities, and construction phasing to maintain domestic service and fire protection during construc- tion of improvements on large diameter transmission mains. Town of Manchester-by-the-Sea, MA – Lincoln Street Well Serpentine Loop. Project Manager responsible for design and permitting of approximately 310 linear feet of 16-inch cement lined ductile iron pipe in a serpentine pattern to increase chlorine contact time. The project included a review of available reports, record drawings, and utility information, wetland delineation, site survey, design of piping modifications to increase CT between the existing chemical injection vault and connection to the distribution system, and permitting the project with MassDEP. Town of Manchester-by-the-Sea, MA – Pine Street Water Main Replacement. Project Manager responsible for manag- ing design, permitting and construction oversight of approximately 5,000 linear feet of water main installation and improve- ments on critical infrastructure. The project involved complex phasing and construction sequencing necessary to maintain water service to the Town. Lowell Regional Water Utility, Lowell, MA – Redundant Transmission Main Project. Project Manager responsible for design, permitting, bidding, and construc- tion oversight of approximately 7,000 linear feet of 36-inch through 16-inch transmis- sion main improvements. Project included site survey, wetlands permitting, MassDOT permitting, and design of complex con- struction phasing to maintain water service from the City’s water treatment facility to its storage tanks and distribution system. Lowell Regional Water Utility, Lowell, MA– Finished Water Main Improvements. Project Manager responsi- ble for design, permitting and construction oversight of $1.9 million in improvements to the finished water infrastructure at the City’s water treatment facility. The project included design of new redundant 30 and 36-inch ductile iron water mains, 16-inch HDPE bypass, line stops and wet taps on an existing 36-inch PCCP transmission main, and significant process piping within the treatment plant. Project challenges included design of complex construction phasing for high-risk construction activities to maintain delivery of finished water from the treatment facility to the distribution sys- tem through the City’s sole transmission main during construction. Lowell Regional Water Utility, Lowell, MA – Emergency Repairs to High Pressure Subaqueous Water Main. Project Manager responsible for design, permitting and construction administration of an emergency repair to a 12-inch sub- aqueous high pressure water main. A leak was discovered in a 12-inch high pressure water main (circa 1880) crossing under the Merrimack River that provides redundancy between the Stackpole Street and Beacon Street pump stations. The design included utilizing an adjacent existing reserve 24-inch subaqueous transmission main as a host pipe to slip line a new 16-inch HDPE high pressure water main to restore redundancy between the pump stations. Project challenges included identifying and locating existing valves to isolate the leak, identifying and locating the reserve transmission main for use as a host pipe, confirming integrity of the 24-inch host pipe which was the same vintage as the high pressure main and slip lining approximate- ly 600 linear feet of HDPE pipe over an elevation change of approximately 50 feet. Identification and utilization of this unused infrastructure (24-inch transmission main) to restore redundancy allowed service to be restored quickly and saved the City an estimated $500,000 in construction costs associated with a new subaqueous main. Town of Cumberland, RI – Asset Evaluation. Technical Lead responsible for working with the Town to provide asset valuation services and expert witness tes- timony related to the Town’s water system assets. The project included collecting available data including length, diameter, material and age of pipes, number of ser- vice connections and hydrants, physical geometry of dams and interviewing staff regarding infrastructure condition. The work included utilizing industry-published standard construction cost indices to adjust the single year valuation to the two prior years as required by the Town. The final report to the Town included a comprehen- sive valuation of the RCN less depreciation of each of the studied assets and became the basis for the Town’s tax determination. woodardcurran.com | COMMITMENT & INTEGRITY DRIVE RESULTS MICHAEL HANSEN, PE, CFM TECHNICAL MANAGER Professional Profile Michael is a Technical Manager with 17 years of experience in the field of civil engi- neering with an emphasis in floodplain and stormwater management. He is a Certified Floodplain Manager (CFM) and his experience with floodplain management includes working with FEMA regulations and requirements to help offset adverse effects to work performed within the regulated floodway and 100-year floodplain as well as compiling NO-Rise certifications and Letter of Map Revisions (LOMR). He is also experienced in hydraulic river modeling, natural channel design, stormwater system design, wetland restorations, site plan reviews and designs, field inspections and construction oversight, sidewalk feasibility studies and multi-use trail design. Related Experience University of New Hampshire, Durham, NH – Water Treatment Plant Design-Build. Technical Manager responsible for the site design and state and federal permitting of a new 2-MGD surface water treatment plant. The new water treatment plant is a conven- tional water treatment plant with rapid mix, flocculation, clarification utilizing plate settlers, multi-media filtration, and chlorination. Project includes three different source-waters and significant site constraints. Project is a design-build effort with Waterline Industries of Seabrook, New Hampshire. City of Salem, MA – Canal Street Flood Mitigation Project. Project Engineer for the mitigation of flooding in the Canal Street area of Salem. For more than a century chronic flooding had been an issue in Salem’s Canal Street area, which serves as one of the primary entry points into the City This problem has been exacerbated by recent develop- ment in the floodplain that has increased the rate of stormwater runoff in this centrally located portion of the City’s downtown business district. Worked with the City to design and permit a comprehensive stormwater management strategy and undertake measures that would maximize the capacity of the existing stormwater system, along with defining new drainage infrastructure options to mitigate chronic flooding. This resulted in a $23M flood mitigation and infrastructure improvement program that included reconstructing the City’s drainage collection system and constructing a new 10,000 gallons-per-minute pumping station and a new 4 million gallon underground stormwater storage facility. The project also included rehabilitation of existing municipally-owned sewer and water system infrastructure and privately owned infrastructure within the project area and reconstruc- tion of athletic fields/facilities at the drainage system outfall at Forest River Park located on Salem Harbor. A portion of the infrastructure improvements were constructed in 2014 with the remainder to occur in 2017. City of Salem, MA – Jefferson Flood Mitigation Project. Project Engineer for the mitigation of flooding in the Jefferson Avenue area of Salem. This project specifically focused on climate projections to increase the area’s ability to endure impacts associated with storms and the effects of flooding and sea level rise. The project includes public pre- Education • Bachelors, Civil Engineering, University of New Hampshire • Bachelors, Philosophy, University of New Hampshire • Rosgen Natural Channel Design Level I & II Registrations • Certified Floodplain Manager, US-11- 05949 • NCEES License - National, 41504 • OSHA 10 Hour Construction, 11899762 • Professional Engineer - MA, 51304 • Professional Engineer - ME, 12443 • Professional Engineer - NH, 12059 • Professional Engineer - VA, 0402048692 • Professional Engineer - VT, 9171 Professional Associations • Association of State Floodplain Managers • American Society of Civil Engineers • American Water Resources Association woodardcurran.com | COMMITMENT & INTEGRITY DRIVE RESULTS sentations and a workshop series. Involved in the design and permitting a compre- hensive stormwater management strategy consisting of rehabilitating and enhancing an existing flood berm/dike system in the area. Design and permitting activities were completed in 2015 and construction began in 2016. Newington/Dover, NH – Railway Brook Restoration. As part of a NHDOT proj- ect, developed restoration plans for approximately 3,100 linear feet of Railway brook that was straightened back in the 50s when Pease Air Force Base was constructed. The project provides restora- tion of stream morphology, including a variety of natural rock/boulder structures, adjacent wetlands and improved water quality. Performed all hydrologic/hydraulic modeling required to ensure proper design including: estimating the 1-, 2-, 10-, 25-, and 100-year frequency design flows using Technical Release (TR) 20; and modeled design flows to validate long and short term channel stability using HEC-RAS. Also responsible for the final stamped engineering plans. Town of Salem, NH – Policy Brook Restoration and Floodplain Mitigation. As part of a NHDOT project, developed a floodplain mitigation site to help offset impacts to floodplain associated with the expansion of I-93. The Town received a grant from the Federal Emergency Management Agency, allowing them to start buying the houses along Haigh Avenue, which have experienced periodic flood damage. Once these houses are removed, the area will be regraded to create additional flood storage and relo- cate Policy Brook, which was impacted by the original I-93 construction in the early 1960s. This relocation will allow for approximately 1,500 feet of Policy Brook to be reestablished into a more natural state. The project will proved restoration of stream morphology including a variety of grade control structures, adjacent wetlands and improved water quality. Performed all hydrologic/hydraulic modeling required to ensure proper design including: estimating the 1-, 2-, 10-, 25-, and 100-year frequen- cy design flows using Technical Release (TR) 20; and modeling design flows to vali- date long and short term channel stability using HEC-RAS. Also responsible for the final stamped engineering plans. Town of Exeter, NH – Great Dam Removal Feasibility and Impact Analysis. Senior Project Engineer for a feasibility study for the removal of the Great Dam in Exeter. The study supple- ments previous and on-going studies by others, providing additional information to facilitate the Town’s formulation of and consideration of alternatives. The scope of work included geomorphic analysis, hydrological and hydraulic analysis, water supply, fish passage, dam and structural engineering, recreation and impacts to natural resources. This project was funded through NOAA, USEPA, USFWS and NHDES. Town of Rye, NH – Eel Pond Restoration Hydrology and Hydraulics. Senior Project Engineer involved in a project for the Rye Beach Village District to perform a preliminary technical review of the hydrology and ecology of Eel Pond. Responsible for developing preliminary hydrology and analysis of existing culverts under Route 1. Brewster/Orleans, MA – Namskaket Marsh Restoration. Project Engineer for the development of restoration plans for Namskaket Marsh and Hurley’s Bog. The Cape Cod Rail Trail bisects the marsh. Down gradient of the rail trail crossing, Namskaket Marsh is a typical salt marsh with the interior mostly free of invasive plant species. Up gradient of the crossing, the marsh is dominated by Phragmites. The project consists of replacing the two culverts beneath the rail trail with larger culverts designed to provide enhanced tidal flushing to the up gradient marshes. A HydroCAD computer hydraulics model has been established to design the size of the culverts necessary to carry an average high tide into Namskaket Marsh. The intent of the proposed culverts is to restore as much tidal flow to the marshes are pos- sible without causing problematic upstream flooding and to reduce the area coverage of Phragmites. Responsible for analyz- ing the hydraulics in order to determine the size of the new culvert that would be placed under the trail. Also responsible for the preliminary cost analysis of the replacement of the culvert, and devel- oped the wetland restoration plans for Namskaket Marsh. Town of Hull, MA – Strait’s Pond Restoration. Project Engineer responsible for hydraulic modeling, utility coordina- tion, utility relocation design, and bridge replacement. Strait’s Pond is a 92-acre salt pond experiencing both water quality and habitat degradation as a result of poor flushing. Replacement of the existing state bridge will require extensive utility coordi- nation and will be outfitted with an auto- mated tide gate to reduce flooding impacts to low-lying properties. Tyngsboro/Chelmsford, MA - Route 3 Wetland Mitigation. Project engineer for this design/build highway project.. This project required coordination between sev- eral engineering firms and state regulatory officials. Responsibilities included coor- dinating with the other engineering firms in order to develop 4 wetland restoration plans for the Route 3 corridor widening in Tyngsboro and Chelmsford, MA, calculated the areas of impact that were needed to create these wetlands and determined the elevations in which the different wetland plants would exist. This was also done in coordination with a wetland scientist. Steven Calla – Steven Calla has been the Director of Public Works for the town of Winthrop since 2011. Prior to becoming the director of the department, Mr. Calla worked as the Operations Manager for Winthrop Public Works from 2007 to 2011. As Director, Mr. Calla has overseen millions of dollars of infrastructure improvements across the town, including roadway projects, water, sewer and drainage improvements, improvements to parks and improvements to other critical town facilities such as tide gates and pump stations. He has personally project managed most of those projects over the course of his tenure and is an expert in both the process for initiating and completing large scale public works projects and with the financial reporting and administration of those projects. In 2016, Mr. Calla project managed a major storm water drainage project in Winthrop’s Point Shirley neighborhood, which cost a total of $835,000 and included $500,000 in federal FEMA pre-disaster Mitigation funding. Mr. Calla has previously worked as an Environmental Engineer, Electrician’s apprentice and environmental and construction supervisor of his own construction and environmental services corporation. He earned a Bachelor Degree in Environmental Protection and Marine Safety from the Massachusetts Maritime Academy in 1996 and a Master in Public Administration at Suffolk University in 2017. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Education Ph.D., Physical Oceanography – 1982, Purdue University M.S., Geophysical Oceanography – 1976, Virginia Institute of Marine Science and College of William and Mary B.S., Mechanical Engineering – 1972, Michigan State Univ. Licenses and Registrations • Professional Wetlands Scientist (PWS) 2005 Publications and Presentations: 122 Work Experience 1989-Present Woods Hole Group, Inc. 1983-1989 U.S. Army Corps of Engineers 1973-1982 Purdue University (Research Coordinator, Research Fellow, Research Instructor) 1972-1973 F.W. Amend Company 1969-1972 Michigan State University (Research Assistant) Lee L. Weishar, Ph.D., M.S., B.S., P.W.S Senior Scientist/Coastal Engineer Expertise Dr. Lee Weishar has more than 30 years of experience in the fields of oceanography, coastal engineering, sediment transport, and nearshore processes. For the past 15 years, he has focused on developing resilient shoreline projects. These projects include developing soft engineering solutions to mitigate shoreline erosion such as sand filled tubes, coir bio- logs, beach nourishment, and other technologies that work with nature, mitigate erosion while allowing the shoreline respond to storms and hurricanes. He also has worked to develop fringe marsh projects to increase resiliency while stabilizing the shoreline. Dr. Weishar’s projects also include the design, permitting, and construction oversight of beach nourishment projects that increase shoreline resiliency by allowing the shoreline to respond naturally to incident storms. These efforts promote living shorelines that will be more resistant to the effects of sea level rise and the projected increased storm activity that the east coast is projected to experience over the next decade. Dr. Weishar also develops wetland restoration projects that specialize in the integration of biological, ecological, and hydraulic data to develop wetland restoration designs that allow Ecological Engineering to be successful and helps ensure that the project will meet the restoration objectives. Scientific consulting in marsh ecology and the tidal hydraulics of wetlands. Salt marsh restoration as mitigation for power plant intake impacts (e.g., 316(b) restoration measures), and NRDA. Engineering consulting on the effects of tidal inlet and shore protection structures, longshore sediment transport, shoreline response, marsh hydrology and restoration. Conducted numerical model studies of channel stability, shoaling, and tidal flushing at tidal inlets. Designed field studies and performed numerical and physical modeling of waves, currents, water levels, and suspended sediment transport at tidal inlets. Field collection of oceanographic and geotechnical data. Designed and supervised several large beach nourishment projects requiring dune and beach design, construction oversight, and field monitoring. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Qualification Summary • More than 30 years of experience in the fields of oceanography, coastal engineering, sediment transport, and nearshore processes • Salt marsh restoration, planning, design, monitoring/adaptive management • Ecological engineering for salt marsh/wetland habitat restoration • Specification of hydrodynamic regimes suitable for salt marsh restoration, including increased salt water flows balanced with fresh and storm water inputs • Specializes in developing and implementing complex data collection efforts, which require solving detailed and often-diverse logistic problems such as marsh restoration and sediment transport projects in MA, DE, NC, VA, FL, AL, NY, and Caribbean • Excellent project management skills. Excels at managing large projects with multi-discipline investigators • Managed projects which designed and completed investigations to determine the optimum offshore sand borrow site locations, which maximize grain size, and quantities of borrow material while minimizing project environmental impacts • Managed and completed longshore sediment transport and examined shoreline response at numerous tidal inlets along the eastern coast of the U.S. Designed and completed large- scale field investigations to examine wave interaction on ebb and flood tidal shoals Professional Affiliations Sigma Xi American Association for the Advancement of Science American Geophysical Union Society of Economic Paleontologists and Mineralogists American Society of Civil Engineers – Coastal Oceans, Ports & Rivers Institute Society of Wetland Scientist Estuarine Research Federation ASCE Wetlands & Sediment Management Committee Chairman of ASCE Wetlands Engineering Guidelines Subcommittee Certified as Professional Wetlands Scientist American Shore & Beach Preservation Association – Secretary & Board Member Coastal Zone Foundation – President Department of Homeland Security Coastal Resiliency Advisory Board Member Stevens Institute of Technology, Davidson Laboratory Advisory Board Member lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Key Projects Ninigret Pond Salt Marsh Restoration, Charlestown, RI The Ninigret Pond restoration project is a thin layer deposition project designed to aid the Ninigret Pond marshes become more resilient by helping the marshes respond to the future effects of sea level rise. Dr. Weishar was the professional wetlands scientist for this project a served as the Woods Hole Group’s project manager. The Woods Hole Group established the tidal datums for the Ninigret Pond estuary using data the Woods Hole Group had obtained for the Rhode Island Regional Sediment Management Project. These data were used to establish target elevations for the restoration of both high and low marsh. Additionally, the Woods Hole Group using a combination of GIS, LiDAR, and elevation data obtained with an RTK system within the marsh complex made recommendations for depth of fill and location of fill for the marsh restoration. This process established marsh diversity and allowed the project engineers to maximize the use and placement of dredged sediment on the marsh. The Woods Hole Group aided the agencies in formulating data collection, the location of reference marshes and the establishment of restoration goals and objectives. The goals and objectives were used to establish an adaptive management plan to monitor the restoration and to establish methodologies to determine if the marsh is restoring according to plan. Comprehensive Plan for Docks, North Haven, NY, Coastal Scientist Conducted field reconnaissance to characterize existing docks, public access, shoreline aesthetics and nearshore habitat. Wrote a Comprehensive Plan for Docks in North Haven, which highlighted existing dock policies, detailed the potential dock impacts on public access, aesthetics, water quality, and nearshore habitat, and documented the physical environment present along the coast of North Haven, including wave heights and flood elevations during storm conditions. Provided a series of recommendations for the Village to consider when approving new dock regulations. Attended a Village Meeting where the plan was presented to the public, approved and adopted by the Village. Dredge Disposal Analysis, Chatham, MA, Coastal Scientist Developed selection criteria to choose areas that are best suited for disposal of dredge material. Calculated fill capacity and designed potential nourishment templates for 14 potential disposal sites in Chatham, Harwich and Orleans. Potential dredge disposal site rankings were based on physical logistics (i.e. location, volume, equipment access, etc.), as well as each site’s potential benefits (i.e. erosion protection, habitat restoration, coastal resiliency, etc.) and potential permitting and regulatory constraints (i.e. shellfish resources, presence of salt marsh or eelgrass, etc.). Compiled final rankings, analyses, maps, and fill cross-sections into a final report for the Town. Monitoring Marsh Restoration in Delaware River Estuary, Public Service Electric and Gas Company Dr. Weishar is the adaptive management evaluation team leader responsible for an ongoing project evaluating restoration plans, developing and implementing corrective mitigation strategies, required to insure the successful restoration of 20,000 acres of salt marsh in the Delaware River Estuary. As head of the adaptive management team Dr. Weishar assists the client in evaluating the restoration goals, objectives, and restoration timeline as outlined in the adaptive management plan. This project requires evaluation and dissemination of complex data to the public regulatory community and scientists to evaluate the performance of the project. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Key Projects (continued) USACE IDIQ Task Order Contract – Program Manager Dr. Weishar was the program manager for a 5-million dollar US Army Corps of Engineers IDIQ task order contract with the US Army Corps of Engineers District New England. During the life of this contract, Dr. Weishar was responsible for all aspects of the contract. He performed as program manager, project manager, and acted as the liaison with the District personnel. As program manager, Dr. Weishar’s responsibilities included providing assistance to the Woods Hole Group project managers in developing contract cost estimates that provided a good value the USACE. Dr. Weishar also provided technical oversight for the projects and made sure the reports generated for the USACE. Occasionally the USACE would have a time sensitive project that just had to be completed. When this occurred, Dr. Weishar worked with both the USACE and the WHG project managers to expedite the project so that the time constraints were met without compromising the quality of the work product. As project manager on selected projects, Dr. Weishar worked helped generate Health and Safety Plans for many of the projects. Through his efforts, the IDIQ contract provided high quality products that helped the USACE complete its mission. Evaluation of Wetland Remediation Techniques in an Arid Environment - Project Manager Dr. Weishar was the project manager for this large remediation project and led the remediation efforts within the Kingdom of Saudi Arabia. This field study extends along the 750 Km of the Kingdom of Saudi Arabia Arabian Gulf shore from the Kuwait border to the industrial city of Al- Jubail. This complex shoreline is composed of an interlaced series of tide flats, beaches, embayments, lagoons, and salt marshes. Much of these ecosystems remain severely impacted from the oil spill. The year-long remediation demonstration project tested remediation technologies at the field scale for these arid ecosystems. The project demonstrated that large-scale marsh restoration was feasible through construction of a marsh remediation project. The project also demonstrated restoration of the other affected biotypes was feasible using indigenous equipment. Restoration of a Restricted Tidal Marsh: South Cape Beach, MA. - Project Manager South Cape Beach is a high marsh that has been isolated from the tidal source waters by culverts and artificial ditches. The installation of the ditches has muted the tidal range on the marsh plain and as a result Phragmites has begun to invade the marsh from the upland fringes. Dr. Weishar led the numerical modeling of the effort that formed the foundation for deriving marsh restoration designs that will help restore tidal circulation and prevent Phragmites encroachment onto the marsh plain. Restoration of a Restricted Tidal Marsh: Nonquitt, MA. - Project Manager Dr. Weishar was the project manager for this project and worked with the Woods Hole group team to develop restoration design alternatives. Nonquitt marsh has been isolated from tidal source waters of Buzzards Bay from approximately 40 years. The isolated pipe leading to the Bay mutes the tidal range from several feet to several inches. As a result the marsh sediments are highly saturated and a fresh water upland community has developed around the marsh perimeter. The preferred restoration alternative incorporated establishing a new tidal inlet in its historical footprint. Restoration design alternatives addressed large-scale marsh plain erosion, impacts to the adjacent wetlands, and increased flooding potential. Marsh Restoration and Estuary Enhancement in Southern New Jersey, Hancock’s Bridge, NJ, Public Service Electric and Gas Company - Oceanographer/Project Manager As part of permit-required mitigation for nuclear facility with a once-through cooling system, Dr. Weishar reviewed feasibility of a program to restore 10,000 acres of degraded salt marshes through lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Key Projects (continued) on-site visits and analytical analyses. Performed critical investigation using hydraulic modeling, resource area evaluations, design review of marsh channel and tidal inlet design, and investigation and quantification of restoration effects on ground water, septic systems, and private drinking wells. The success of this project required close interaction between Woods Hole Group, Inc., NJ State environmental agencies, NJ Attorney General’s Office, National Fish and Wildlife, US Army Corps of Engineers, National Marine Fisheries, and concerned citizens. Beach Nourishment Design for Spectacle Island Massachusetts, Boston Harbor, MA, Massachusetts Water Resources Authority - Oceanographer/Project Manager Completed a detailed beach nourishment design for the shorelines of Spectacle Island. Used refraction/diffraction model, REF/DIF1, to predict transformation of waves in areas where the bathymetry was irregular and diffraction was important. Used wave height results as input to longshore and cross-shore sediment transport models. These models were employed to simulate the performance of several different beach fill designs. Design and Environmental Permitting for Pier and Dock Reconstruction at US Coast Guard Facility, Provincetown, MA, United States Coast Guard - Oceanographer/Project Manager Performed coastal engineering analysis for the redesign and rehabilitation of a pier and dock facility and wave barrier for the US Coast Guard Station. Calculated design wave criteria for average and storm-induced conditions. Beach Nourishment Design and Monitoring for the Southern Shore of Cape Cod, Cape Cod, MA, Great Island, Long Beach, and Dead Neck Homeowners Associations - Oceanographer/Project Manager Performed shoreline change studies to evaluate rate of erosion and sediment loss for three different sites. Designed and participated in collection of high-resolution bathymetry, vibra cores, beach profiles, and sediment grain size data at each site. Developed and implemented beach nourishment plans for each site. Performed on-site topographic and bathymetric surveying before and after nourishment projects. Environmental Impact Report (EIR) for Shore Protection Structures Between Aunt Lydia’s Cove and Morris Island, Chatham, MA, Town of Chatham - Oceanographer/Project Manager Prepared EIR to address impacts of revetments and other shore protection structures built to protect the Chatham mainland following the formation of the new inlet through the Nauset barrier, January 1987. Analyzed geologic history of the area, and studied evolution of Nauset barrier and tidal inlet system using historical maps, charts, and aerial photographs. Used a combination of existing studies and numerical analysis to quantify wave, tidal, storm surge and sediment transport processes. Prepared a plan of short-term action, long-term action, and short-term optional management alternatives for the Town of Chatham, property owners, and permitting agencies. Numerical Model Analysis of Wave Climatology and Storm Surge for Seawall Design, Deer Island, MA, Massachusetts Water Resources Authority via Metcalf and Eddy, Inc. - Oceanography/Project Manager Conducted numerical and physical model analyses of wave climatology, storm water levels, and wave run-up so that an effective and cost efficient shore protection plan could be developed for the island. Results from models runs were used to predict nearshore wave heights and water levels for 5-, 10-, 25-, 50-, and 100-year storm events and to optimize seawall design specifications. Two- lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Key Projects (continued) dimensional physical modeling of the seawall design was performed using a test facility to evaluate the proposed structural design. Bathymetric and Side Scan Surveys of Fort Point Channel, Boston Harbor, MA, BSC Group, Oceanographer/Project Manager Performed bathymetric and side scan sonar survey for part of the Central Artery/Tunnel Project. Bathymetry was plotted on the area basemap to ensure water depths were adequate for floating construction barges into the channel. Side scan data were reviewed for possible bottom debris or hazards. During the survey, field operations were restricted due to bridges crossing the channel, and barge and boat activity within the channel. Despite the navigational problems, full coverage of the channel was obtained. Directional Wave and Current Meter Installation and Data Analysis, Townsend and Absecon Inlets, NJ, Offshore & Coastal Technologies, Inc. - Oceanographer/Project Manager Collected wave and current data at the entrances to and nearshore region downdrift of the Townsend and Absecon inlets. Analyzed data for directional spectral parameters including significant wave height, wave direction, mean water depth, and the variance of water surface elevation. Particle Tracking Analysis at the Salem Nuclear Generating Station, Hancock’s Bridge, NJ, Public Service Electric and Gas Company - Oceanographer/Project Manager Evaluated near- and far-field impacts to a nuclear generating station’s intake basin using a particle tracking numerical model. Identified portions of the estuary providing potential detritus sources to the intake basin and evaluated the migration of detritus cleaned from the intake screens and dumped back into the estuary. Results of the particle tracking were collected in an effort to design a program to reduce and eliminate the detritus problem. Bathymetry, Geophysical Survey, and Wave Refraction Analysis for Sand Borrow Site Analysis, Siasconset, MA, Town of Nantucket - Oceanographer/Project Manager Completed a reconnaissance survey and analysis of two offshore sand borrow sites for a proposed beach nourishment project. Collected regional bathymetry, coring, beach sediment sampling, side- scan sonar, sub-bottom profiling, and magnetometer surveys. Modeled the wave climatology using collected data. Used model results to calculate sediment transport potentials and gradients in sediment transport to determine dredging from the proposed borrow sites. Sub-bottom Investigations and Detrital Flux Analysis at the Salem and Hope Creek Nuclear Power Plant, Hancock’s Bridge, NJ, Public Service Electric and Gas Company - Oceanographer/Project Manager Designed a phased field data collection program to evaluate potential causes of detrital loading at the Salem and Hope Creek Nuclear Power Plant after detrital loading had forced the operating plant to shut down. Collected bathymetric data, conducted a sub-bottom survey, and monitored physical conditions: temperature, conductivity and current profile at the power plant. Conducted additional surveys to the north and south of the power plant to identify potential sources of the detritus. Data Collection and Analysis of Tidal Current Characteristics at St. Lucie Inlet and Adjacent Waterways, Martin County, FL, Coastal Technologies Corporation - Oceanographer/Project Manager Designed a survey to obtained high-resolution measurements of tidal current velocities and to map temporal variations in the spatial structure of flow through the Inlet and waterway cross sections. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Key Projects (continued) Calibrated a numerical model of Inlet dynamics using survey results. Quantified the effect of Inlet geometry on the spatial structure of tidal flow and explained sediment accretion/scour characteristics within the Inlet. Publications and Presentations Weishar, L.L. 2016. The Challenge of Constructing and Designing Living Shoreline Projects in the Northeast. 10-15 December 2016. New Orleans, LA. Weishar, L.L. 2016. The Development of Living Shoreline Projects in New England; Looking for the Better Mouse Trap. American Shore & Beach Preservation Association 2016 National Conference. 25-28 October 2016. Long Branch, NJ. Weishar, L.L. and E. Leduc. 2016. Protecting Salt Marshes and Eelgrass Beds in a Rapidly Changing Estuary. Society of Wetland Scientists Annual Meeting. 31 May-4 June 2016. Corpus Christi, TX. Weishar, L.L. 2015. Is Coastal Resiliency a New Buzz Word for Estuary and Coastal Restoration Established Best Management Practices? Coastal & Estuary Research Federation. 8-12 November 2015. Portland, OR. Weishar, L.L. 2015. Why Does the Definition of Resilient Coasts and Living Shorelines Vary Regionally? American Shore and Beach Preservation Association Fall National Conference. 14-16 October 2015. New Orleans, LA. Weishar, L.L. and E. Leduc. 2015. Can Coastal Resilient Shore Protection Projects and Nearshore Wetland Resources Co-Exist Within a Rapidly Changing Estuary? Society of Wetland Scientists 2015 Annual Meeting. May 31-June 4, 2015. Providence, RI. Weishar, L.L. and J.M. Teal. 2014. The Effect of Rapidly Changing Hydrology on Sheet Flow on a Marsh Restoration Project. Restore Americas Estuaries, 7th National Summit, 1-6 November 2014. National Harbor, MD. Weishar, L.L. and E. Leduc. 2014. Identifying Viable Beach Nourishment Sites on Sediment Starved Within an Estuary with Rapidly Developing Wetland Resources. American Shore & Beach Preservation Association, 2014 National Conference 15-17 October 2014. Virginia Beach, VA. Weishar, L.L. and J.M. Teal. 2014. A Novel Approach to Encouraging Sedimentation in a Large Scale Marsh Restoration Project. Society of Wetland Scientists. 18-23 May 2014. Portland, OR. Weishar, L.L. 2013. Can a Fringe Marsh and Eelgrass System Survive Changing Hydraulic and Anthropogenic Impacts without Intervention. Coastal and Estuarine Research Federation’s 22nd Biannual Conference. 3-7 November 2013, San Diego, CA. Weishar, L.L. 2013. Beach Nourishment and Wetlands Resources, A balancing Act. American Shore & Beach Preservation Association 2013 National Conference. 22-25 October 2013. South Padre Island, TX. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Weishar, L.L., J. Teal, K. Phillip, R. Hinkle, K. Strait, and B. Evans. 2013. The Impact of Physical Processes on Channel Development and Marsh Plain Vegetation. 2013 Annual Meeting of the Society of Wetland Scientists. 2-6 June 2013, Duluth, MN. Weishar, L.L., J. Teal, K. Phillip, R. Hinkle., K. Strait, and B. Evans. 2013. Large-Scale Wetlands Restoration: The Impacts of Physical Processes. Ecological Engineering. The Journal of Ecosystem Restoration. Submitted for Publication. Teal, J.M. and L.L. Weishar. 2013. Evolution of Salt Marsh Creek Bank Slopes after Removal of Phragmites Australis . Ecological Engineering, The Journal of Ecosystem Restoration. Submitted for Publication. Weishar, L.L. 2012. Stakeholder Interaction in Restoration Designs: Do the Positives Outweigh the Negatives. Restore Americas Estuaries. 20-25 October 2012. Tampa, FL. Weishar, L.L. 2012. The Role of Coastal Processes and Shoreline Geomorphology in the Design of Two Small Coastal Bank Restoration Projects. American Shore & Beach Preservation Association 2012 National conference. 10-12 October 2012. San Diego, CA. Weishar, L.L., J. Teal, K. Phillip, P. Hinkle, K. Strait, B. Evans. 2012. Large-Scale Wetlands Restoration: The Impacts of Physical Processes. EcoSummit 2012, 4th International Ecosumit, Ecological Sustainability, Restoring the Planets Ecosystem Services. 30 September-5 October 2012. Columbus, OH. Weishar, L.L. 2012. The Design for the Restoration of a Freshwater Cranberry Bog in New England. 9th Intecol International Wetlands Conference. 3-8 June 2012. Orlando, FL. Weishar, L.L. 2011. A Case Study in Sea Level Rise, Can Private Property Owners Protect Their Property Against Rising Tide Levels Without Hard Engineering Solutions. 21st Coastal and Estuarine Research Federation National Conference. 6-10 November 2011. Daytona Beach, FL. Weishar. L.L., T. Herrington, N. Elko, and T. Roberts. 2011. What is the State of U.S. Coastal Engineering & Science? American Shore & Beach Preservation Association. 2011 National Conference. 18-21 October 2011. New Orleans, LA. Simmons, H. and L.L. Weishar. 2011. What is the State of U.S. Coastal Engineering & Science? 88th Coastal Engineering Research Board. 26-28 July 2011. Buffalo, N.Y. Weishar, L.L., T. Keon, and Peter Markunas. 2011. Regional Sediment Management Combined with an Ecosystem Restoration Project in Chatham, MA; A Local Approach. Coastal Sediment 2-6 May 2011. Miami, FL pp. 2088-2101. Weishar, L.L. and J.M. Teal. 2010. Build It and They Will Come. Why Wetlands Form is Important in Restoring Wetlands. 6th National Conference on Coastal and Estuarine Habitat Restoration. 13-17 November. Galveston, TX. Weishar, L.L. and P. Markunas. 2010. Direct and indirect Impacts of the Formation of a New Inlet through Nauset Barrier Beach on Municipal and Private Properties. American Shore & Beach Preservation lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) 2010 National Conference. 12-15 October 2010. Charleston, S.C. Weishar, L.L. and P. Markunas. 2010. Should Restoration of a Small Estuarine Tidal Inlet and Wetlands System be Permitted. Society of Wetland Scientists, 2010 Annual Conference. 27 June-2 July 2010. Salt Lake City, UT. Weishar, L.L. and P. Markunas. 2009. When Sound Coastal Engineering and Wetlands Protections Regulations Collide. Coastal and Estuarine Research Federation National Conference. 1-5 November 2009. Portland, OR. Weishar, L.L. and J.M. Teal. 2009. Wetland Form vs. Function: Can We Incorporate Function into Wetland Success Criteria Without Killing Projects? 13-16 October 2009. St. Petersburg, FL. Weishar, L.L. and P. Markunas. 2009. Soft Engineering Solutions for Bank Stabilization; Do They Exist? Northeast Shore & Beach Preservation Association, Northeast Beaches Conference. 21-23 September 2009. Woods Hole, MA. Weishar, L.L. 2008. Can Ecological Engineering be Used to Restore Oil Contaminated Salt Marshes and Sand Beaches on Saudi Arabia’s Arabian Gulf Coast. 16-20 November 2008. Tampa, FL. Weishar, L.L. 2008. Ecosystem and Anthropogenic Effects Associated with the Formation of a New Inlet in Nauset Barrier Beach, Chatham, MA. 35th Annual Conference on Ecosystem Restoration and Creation. 6-7 November 2008. Plant City, FL. Weishar, L.L. 2008. Developing Guidelines for Restoring Wetlands; an ASCE Perspective. Restore Americas Estuaries, 4th National on Coastal and Estuarine Habitat Restoration. 13-15 October 2008. Providence, R.I. Weishar, L.L. 2008. The Ecological and Sociological Impacts Associated with the Formation of a New Inlet in Nauset Barrier Beach. 2008 Annual Conference of the Society of Wetland Scientists. 26-30 May 2008, Washington, DC. Weishar, L.L. 2008. Guidelines for Designing Wetlands. 9th Annual Coastal Inlets Research Program, Technology Transfer Workshop. 28-29 January 2008, Sarasota, FL. Weishar, L.L., I. Watt, D. Jones, and D. Aubrey. 2008. Evaluation of Arid Salt Marsh Restoration Techniques. Protecting the Gulf’s Marine Ecosystem from Pollution. Hans-Jorg Barth ed. Birkäuser /Springer, pp. 273-279. Jones, D. M. Hayes, F. Krupp, G. Sabatini, I. Watt and L. Weishar. 2008. The Impact of the Gulf War (1990-91) Oil Release Upon Intertidal Gulf Coastline of Saudi Arabia and Subsequent Recovery. Hans-Jorg Barth ed. Birkäuser/Springer, pp. 237-254. Peterson, Susan, J.M. Teal and L.L. Weishar. 2007. Natural Attenuation of Nitrogen in Wetlands and Waterbodies. Estuarine Research Federation 2007. Science and Management Observations/Syntheses/Solutions. 4-8 November 2007, Providence, RI. Teal, J.M. and L.L. Weishar. 2007. We Have Had an Effect. Estuarine Research Federation 2007. Science and Management Observations/Syntheses/Solutions. 4-8 November 2007, Providence, RI. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Weishar, L.L. 2007. Developing Restoration Alternatives for a Small Degraded Marsh System - Trying to Please Everyone. 34th Annual Conference on Ecosystem Restoration and Creation. 1-2 November 2007, Plant City, FL. Weishar, L.L. and J. M. Teal. 2007. The Role of Vegetation in Developing Creek Bank Morphology within Wetlands. 2007 SWS International Conference. Water, Wetlands, and Wildlife – Resolving Conflicts and Restoring Habitat, 10-15 June 2007, Sacramento, CA. Weishar L. T. Keon, and D. Stauble. 2007. Effects of Large Scale Morphological Changes to a Back-Bay System. Proceedings Coastal Sediments 2007, 13-17 May 2007, New Orleans, LA. American Society of Civil Engineers, pp. 814-827. Weishar, L.L. and J.M. Teal. 2006. The Engineering Approach and Challenges to the Delaware Bay Restorations. 3rd National Conference on Coastal and Estuarine Habitat Restoration. 9-13 December 2006. Weishar, L.L. and J.M. Teal. 2006. Ecosystem Biological Feedback Mechanisms Within Wetlands Restoration Projects: Implications to Success Criteria. 33rd Conference on Ecosystem Restoration and Creation. 2-3 November 2007, Tampa, FL. Weishar L.L. and J.M. Teal. 2006. The Development of Creek Bank Morphology Within a Restored Marsh. American Shore and Beach National Conference. 9-11 October 2006, Longbranch, NJ. Weishar, L.L. and K.F. Bosma. 2006. Numerical Models, A Tool for Balancing Regulatory and Stakeholder Concerns in the Restoration of Degraded Wetland Systems. Proceedings 30th International Conference on Coastal Engineering. 3-8 September 2006, San Diego, CA. World Scientific, pp. 2182-2193. Weishar, L.L., D. Jones, D. Aubrey and I. Watt. 2006. The Restoration of Oil Degraded Salt Marsh and Sand Beaches Within Saudi Arabia. The State of the Gulf Ecosystem: Future and Threats. 5-9 March 2006, Dubai, UAE. Weishar, L.L. and K.F. Bosma. 2005. Developing Design Alternatives for the Restoration of A Degraded Marsh System. 32nd Annual Conference on Ecosystems Restoration and Creation. 27-28 October 2005, Tampa, FL. Weishar, L.L., J.M. Teal, R. Hinkle, K. Strait and B. Evans. 2005. Embracing Change in the Wetlands Restoration Process Without Compromising Restoration Goals. 18th Biennial Conference of the Est. Res. Feder. 16-21 October 2005, Norfolk, VA. Weishar L.L., I. Watt. 2005. Restoration of Oil Contaminated Sand Beaches and Salt Marshes on Saudi Arabia’s Arabian Gulf Coast. 2005 Annual Conference, American Shore & Beach Association. 10- 12 October, San Francisco, CA. Weishar, L.L., I. Watt, and D. Jones. 2005. A Pilot Marsh Restoration Project in Arid climates. Society of Wetland Scientist 26th Annual International Meeting, Charleston, N.C. 6-10 June 2005. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Weishar, L.L., J. M. Teal, and R. Hinkle. 2005. Designing Large-Scale Wetland Restoration for Delaware Bay. J. Ecological Engineering, Vol. 25, Issue 3, pp 231-239. Weishar, L.L., J. M. Teal, and R. Hinkle. 2005. Stream Order Analysis in Marsh Restoration on Delaware Bay. J. Ecological Engineering, Vol. 25, Issue 3, pp 252-259 Teal, J.M. and L. Weishar. 2005. Ecological Engineering, Adaptive Management, and Restoration Management In Delaware Bay Salt Marsh Restoration. J. Ecological Engineering, Vol. 25, Issue 3, pp 304-314. Weishar, L.L., J.M. Teal, and R. Hinkle. 2004. Ecosystem Feedback Mechanisms within a Wetlands Restoration Project and their Relation to Project Success. 25th Annual Meeting, Soc. Wetland Scientist, Seattle, WA. Weishar, L.L., K. Bosma, and J.M. Teal. 2004. The Relationship Between Hydrodynamic Models and Adaptive Management in Marsh Restoration. First National Conference on Ecosystem Restoration. 6-10 December 2004, Orlando, FL. Weishar, L.L. and I. Watt. 2004. Evaluation of Arid Salt Marsh Restoration Techniques. 31st Annual Conference on Ecosystems Restoration and Creation. 28-29 October 2004, Tampa, FL. Weishar, L.L. and K. Bosma. 2004. Restoration of a Degraded Marsh System Located Behind a Barrier Island. America’s Shoreline: Beach and Ecosystem Restoration in the 21st Century. 2004 American Shore & Beach Annual Conference. 13-15 September 2004, New Orleans, LA. Weishar, L.L., J.M. Teal, and R. Hinkle. 2003. Channel Formation Process in Restored Salt Marshes. 17th Biannual Conf., Estuary Research Found, Seattle, WA. Weishar, L.L., J.M. Teal, and R. Hinkle. 2003. Tidal Channel Development in Two Salt Marsh Restoration Projects. 24th Annual Meeting, Soc. Wetland Scientist, New Orleans, LA. Teal, J.M., L.W. Weishar, and R. Hinkle. 2003. Phragmites Control with Reduced Herbicide Use. 24th Annual Meeting, Soc. Wetland Scientist. New Orleans, LA. Allen, S., P. Fairbairn, and L. Weishar. 2003. Preserving the Salinity Gradient during restoration of a Coastal Wetland on Cape Cod. Restore America’s Estuaries, Baltimore, MD. Weishar, L., J. Teal, and R. Hinkle. 2002. Methods for Assessing Success in the Early Stages of a Wetlands Restoration Project. 29th Annual Conference on Ecosystems Restoration and Creation. 9-10 May 2002, Tampa, FL. Weishar, Lee and Leslie Fields. 2002. Bioengineering for Coastal Bank Stabilization: Case Studies. Proceedings of a Workshop held at the Woods Hole Oceanographic Institution, Woods Hole, MA. Fairbairn, P.W., S.D. Allen, L.L. Weishar, and S. Block. 2002. Preserving Salinity Gradients During Restoration of a Coastal Wetland on Cape Cod. Society of Wetland Scientists New England Chapter, Conference, Worcester, MA. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Weishar, L., K. Bosma, B. Hamilton, S. Jachec, S. Allen, and P. Fairbairn. 2002. Restoration of Tidal Flows to Increase Biodiversity of Coastal Habitats. 5th Annual Conference of the Northeast Shore and Beach Preservation Association. 23-26 October 2002, Woods Hole, MA. Weishar, L., J. Teal, R. Hinkle, J. Balletto. 2002. Wetlands Restoration in the Delaware River Estuary: The Tale of Two Success Stories. Society of Wetland Scientists 23rd Annual Conference. 2-7 June 2002, Lake Placid, N.Y. Teal, J., L. Weishar, R. Hinkle, K. Strait, and B. Evans. 2002. The Role of Adaptive management in an Ongoing Wetlands Restoration Project. Society of Wetland Scientists 23rd Annual Conference. 2-7 June 2002, Lake Placid, N.Y. Weishar, L.L., J.M. Teal and R. Hinkle. 2001. “Design and Implementation of Experimental Phragmites Control Techniques.” Society of Wetland Scientist 22nd Annual Conference, Chicago, IL. Teal, J., L. Weishar and R. Hinkle. 2001. “Results of a 2-year Long Experiment in Phragmites Control.” Estuarine Research Federation. 16th Biennial Conference of the Estuarine Research Foundation, Tampa, FL. Weishar, L., J. Teal, and R. Hinkle. 2001. Development of Marsh Hydrogeomorphology and Marsh Vegetation within a Salt Hay Farm Wetland Restoration Site. Proceedings of the 27th Annual Conference on Ecosystems and Creation; Tampa, FL. p. 26-44. Weishar, L. J. Teal and R. Hinkle. 2000. “Development of Marsh Hydrogeomorphology and Marsh Vegetation within a Salt Hay Farm Wetland Restoration Site.” 27th Annual Conference on Ecosystems Restoration and Creation, Tampa, FL. Weinstein, M. and L. Weishar. 2000. “Beneficial Use of Dredged Materials to Enhance the Restoration Trajectories of Formerly Diked Lands.” Sea Grant Ecosystems and Habitats. National Workshop on the Use of Dredged Material for Wetlands Restoration and Erosion Control. M.I.T., Cambridge, MA. Weishar, L. and J. Teal. 2000. “The Use of Numerical Modeling to Optimize a Wetlands Restoration Design.” 21st Annual Conference of the Society of Wetlands Scientists, Quebec, Canada. Teal, J. and L. Weishar. 2000. “The Effects of Phragmites on Tidal Creek Banks.” 21st Annual Conference of the Society of Wetlands Scientists, Quebec, Canada. Weishar, L, J. Teal and R. Hinkle. 2000. “Non Herbicide Alternative for Controlling Phragmites.” 28th Annual Conference on Ecosystems Restoration and Creation. Tampa, FL., p. 1-16. Weishar, L., J. Teal and R. Hinkle. 2000. “Development of Marsh Hydrogeomorphology and Marsh Vegetation Within a Salt Hay Farm Wetland Restoration Site.” 27th Annual Conference on Ecosystems Restoration and Creation, Tampa, FL. Aubrey, D.G., L.L. Weishar, and A.M. Kornick. 1999. “Evolution of the Hydroperiod and Tidal Channels at Commercial Township, NJ.” Society of Wetlands Scientist. 20th Annual Meeting, Norfolk, VA. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Teal, J. and L.L. Weishar. 1999. “Development of Spartina Alterniflora Cover Within Restored Salt Hay Farm Sites in Southern NJ.” Society of Wetlands Scientist. 20th Annual Meeting, Norfolk, VA. Weishar, L.L., J. Teal, and R. Hinkle. 1999. ”An Evaluation of Stream Order Analysis in Marsh Restoration Projects.” Society of Wetlands Scientist. 20th Annual Meeting, Norfolk, VA. Weishar, L.L., J. Teal, and R. Hinkle. 1999. “The Design Process Used for Marsh Restoration in the Delaware River Estuary.” Society of Wetlands Scientist. 20th Annual Meeting, Norfolk, VA. Teal, J. and L.L. Weishar. 1999. “An Overview of Approaches to the Use of Ecological Engineering and Adaptive Management in a Delaware Bay Marsh Restoration Project.” Society of Wetlands Scientist. 20th Annual Meeting, Norfolk, VA. Weishar, L.L., J.M. Teal, R. Hinkle, and K. Philipp. 1998. A Comparison of Two Restoration Designs for Degraded New Jersey Salt Marshes. Proceedings of the 25th Annual Conference on Ecosystem Restoration and Creation; Tampa, FL., pp. 1-15. Teal, J.M. and L.L. Weishar. 1998. “Salt Hay Farm Restoration Design: Combining Biological and Engineering Objectives.” Proceedings of the American Society of Civil Engineers (ASCE) Wetlands Engineering & River Restoration Conference, Denver, CO. Weishar, L.L. and J.M. Teal. 1998. “The Role of Adaptive Management in the Restoration of Degraded Diked Salt Hay Farm Wetlands.” Proceedings of the ASCE Wetlands Engineering & River Restoration Conference, Denver, CO. Aubrey, D.G. and L.L. Weishar. 1998. “Hydrodynamic Controls on Hydroperiods in Marshes.” Proceedings of the ASCE Wetlands Engineering & River Restoration Conference, Denver, CO. Weishar L.L., J.M. Teal, J. Balletto. 1997. “Implementation of Adaptive Management to Restoration of Diked Salt hay Farms to Natural Marsh.” Proceedings of the 24th Annual Conference on Ecosystems Restoration and Creation, Tampa, FL., pp. 1-16. Weishar, L.L., J. Teal, and J. Balletto. 1996. “The Design Process Utilized to Restore Diked Salt Hay Farms to Natural Marshes . ” Proceedings of 23rd Annual Conference on Ecosystems Restoration and Creation, Tampa, FL., pp. 87-106. Wood, J.D., J.S. Ramsey, and L.L. Weishar. 1996. “Beach Nourishment along Nantucket Sound: A Tale of Two Beaches.” Proceedings of 9th Annual National Conference on Beach Preservation Technology. Florida Shore and Beach Preservation Association, Gainesville, FL . Weishar, L.L., W. Tiffney, Jr., N. DeKimpe, and M.L. Fields. 1991. “Shoreline Response to Offshore Shoals and Storms, Low Beach, Nantucket, MA.” Proceedings, Coastal Zone '91, Coastal and Ocean Management, Long Beach, CA. Meadows, G.A., L.A. Meadows and L.L. Weishar. 1990. “DARTS Application to Remote Incident Wave Mapping.” Technical Report OEL-9003-CERC, Ocean Engineering Laboratory, University of Michigan, Ann Arbor, MI. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Weishar, L.L., D. Stauble, and K. Gingerich. 1989. “Reconnaissance Report: A Study of the Effects of the New Breach at Chatham Massachusetts.” Tech Report CERC-89-(in publication), USACE Waterways Experiment Station, Vicksburg, MS. Weishar, L.L. and D.G. Aubrey. 1988. “Coastal Inlet Processes at Green Harbor, Massachusetts.” Technical Report, CERC-88-10, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Fields, M.L. and L.L. Weishar. 1988. “Analysis of Sediment Transport in the Brazos River Diversion Channel Entrance Region.” Miscellaneous Paper CERC-88-7, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Fields, M.L., J. Marino, and L.L. Weishar. 1988. “The Effects of Florida Tidal Inlets on Adjacent Shorelines.” Proceedings, Beach Preservation Technology Conference, Florida Shore and Beach Society, Gainesville, FL, pp. 383-393. Weishar, L.L. and G.A. Meadows. 1987. “Suspended Sediment Concentrations Outside the Surf Zone, DUCK 85.” Proceedings, Coastal Sediments '87, New Orleans, LA. Fields, M.L. and L.L. Weishar. 1987. “Distribution of Sediment Tracers Seaward of the Breaker Zone, DUCK 85.” Proceedings, Coastal Sediments '87, New Orleans, LA. Meadows, G.A., L.L. Weishar, L.P. Meadows, and M.L. Fields. 1987. “DUCK 85, The Response of the Exposed Coastal Boundary Layer to a Storm Forcing: A Description of a Coordinated East Coast Experiment.” Meadows, G.A., L.A. Meadows, L.L. Weishar, and M.L. Fields. 1987. “DARTS (Digital Automated Radar Tracking System) Applications to Tidal Inlet Hydrodynamic Studies.” Proceedings, Symposium of Applied Hydrodynamics and Sediment Transport of Tidal Inlets, Woods Hole, MA, Springer-Verlag. Byrne, R.J., J.D. Boone, A.Y. Kuo, N.J. Shi, D.L. Wright, and L.L. Weishar. 1987. “Coastal Processes at Tidal Inlets, A Review of the State-of-the-Art.” Technical Report, CERC-87- (OCE final pub approval), U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Schmaltz, R.A., L.L. Weishar, and M.L. Fields. 1987. In Preparation. “A Characterization of Open Water Disposal Sites For Sediment Transport Studies.” Miscellaneous Paper, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Weishar, L.L. and M.L. Fields. 1985. “Annotated Bibliography on Sediment Transport Occurring over Ebb- Tidal Deltas.” Miscellaneous Paper, CERC-85-11, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Weishar, L.L. 1984. “Tidal and Wave Induced Current Observations on the Virginia Inner-Shelf Region.” Proceedings, 11th Annual Shelf and Shore Workshop, Norfolk, VA. Wood, W.L. and L.L. Weishar. 1984. “Beach Response to Long Period Lake-Level Variation.” Proceedings, 19th International Conference on Coastal Engineering, Houston, TX. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Everts, C.H. and L.L. Weishar. 1984. “Predictions of Wind-Induced Currents Near the Coast.” Proceedings, 19th International Conference on Coastal Engineering, Houston, TX. Weishar, L.L. and M.J. Briggs. 1984. “Prototype Data Acquisition Program for a Proposed Dredged Material Offshore Bar, Virginia Beach, Virginia.” Technical Report CERC-84- (NOA final review), U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Dewall, A.E., J.A. Tarnowski, B. Danielson, and L.L. Weishar. 1984. “Inlet Processes at Eel Pond, Falmouth, Massachusetts.” Miscellaneous Paper, CERC-84-9, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Ferland, M. and L.L. Weishar. 1984. “Interpretative Analysis of Surficial Sediments as an Aid in Transport Studies of Dredged Material, Cape Canaveral, Florida.” Miscellaneous Paper CERC-84-3, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. Weishar, L.L. and W.L. Wood. 1983. “An Evaluation of Offshore and Beach Processes on a Tideless Coast.” J. of Sed. Pet., Vol. 53, No. 3. Wood, W.L. and L.L. Weishar. 1982. “Influence of Lake Level Variation and Storm Waves on Stability.” Proceedings, 3rd Workshop on Great Lake Coastal Erosion and Sedimentation, Burlington, Ontario, CANADA. Wood, W.L. and L.L. Weishar. 1982. “Influence of Seasonal Wind Variation on Coastal Stability in the Great Lakes.” (abs), Transactions, American Geophysical Union, EOS, Vol. 63, No. 3. Weishar, L.L. 1982. “A Statistical Study of Process-Response Systems on a Tideless Coast.” Dissertation presented to the Department of Geosciences, Purdue University, in partial fulfillment of the requirements for the degree of Doctor of Philosophy. Weishar, L.L. and W.L. Wood. 1982. “Impact of Long-term Water Level Fluctuations on Beach and Nearshore Changes in the Great Lakes.” (abs), Transactions, American Geophysical Union, EOS, Vol. 63, No. 3. Wood, W.L., S.E. Davis, and L.L. Weishar. 1981. “Indiana Dunes National Lakeshore Monitoring Program.” Interim Report No. 2, U.S. Army Engineer District, Chicago, IL. Davis, S.E., W.L. Wood, and L.L. Weishar. 1981. “Shoreline Situation Report, Laport County, Indiana.” Special Report To State Planning Services Agency, Coastal Zone Management Program. Wood, W.L., L.L. Weishar, and S. Davis. 1979. “Storm Impact Changes in Beach and Nearshore Topography.” Proceedings, Second Conference on Scientific Research in the National Parks, San Francisco, CA. Weishar, L.L. and W.L. Wood. 1979. “Systematic Changes in Beach and Nearshore Topography.” Proceedings, Second Conference on Scientific Research in the National Parks, San Francisco, CA. Wood, W.L., S.E. Davis, L.L. Weishar, and C.E. Price. 1979. “Indiana Dunes National Lakeshore Monitoring Program.” Technical Report No. 9, U.S. Army Engineer District, Chicago, IL. lweishar@whgrp.com Lee L. Weishar, Ph.D. 508.495.6221 Senior Scientist/Coastal Engineer www. whgrp .com Publications and Presentations (continued) Wood, W.L., S.E. Davis, L.L. Weishar, and C. Price. 1979. “Indiana Dunes National Lakeshore Monitoring Program.” Technical Report No. 10, U.S. Army Engineer District, Chicago, IL. Wood, W.L., S.E. Davis, and L.L. Weishar. 1979. “Potential Influence of Marquette Park Small Boat Harbor on Nearshore Hydromechanics and Sediment Transport.” Technical Paper No. 11, Great Lakes Coastal Research Laboratory. Weishar, L.L. and R.J. Byrne. 1978. “A Field Study of Breaking Wave Characteristics.” Proceedings, 16th International Conference on Coastal Engineering. Wood, W.L., K.R. Magnus, P.A. Thacker, and L.L. Weishar. 1978. “Indiana Dunes National Lakeshore Monitoring Program.” Technical Report Journal No. 5, U.S. Army Engineer District, Chicago, IL. Wood, W.L., K.R. Magnus, P.A. Thacker, and L.L. Weishar. 1978. “Indiana Dunes National Lakeshore Monitoring Program.” Technical Report No. 5, U.S. Army Engineer District, Chicago, IL. Wood, W.L., C.E. Price, and L.L. Weishar. 1978. “Indiana Dunes National Lakeshore Monitoring Program.” Technical Report No. 6, U.S. Army Engineer District, Chicago, IL. Wood, W.L., L.L. Weishar, and C.E. Price. 1978. “Indiana Dunes National Lakeshore Monitoring Program.” Technical Report No. 7, U.S. Army Engineer District, Chicago, IL. Wood, W.L., S.E. Davis, L.L. Weishar, and C.E. Price. 1978. “Indiana Dunes National Monitoring Program.” Technical Report No. 8, U.S. Army Engineer District, Chicago, IL. Weishar, L.L. 1978. “An Examination of Shoaling Wave Parameters.” Thesis presented to the Department of Geological Oceanography, Virginia Institute of Marine Science, in partial fulfillment of the requirements for the degree of Master of Arts, VA. Woods Hole Group PROFESSIONAL PROFILE KIRK F. BOSMA, M.C.E., B.S., P.E. Team Leader/Coastal Engineer Professional Affliations Member, Association of Coastal Engineers (ACE) Member, Coasts, Oceans, Ports, and Rivers Institute (COPRI) Associate Member, American Society of Civil Engineers (ASCE) Fields of Expertise Managing projects and developing engineered solutions related to coastal structure design, beach nourishment, beach management, inlet stabilization, water quality, environmental permitting, impacts of offshore dredging, marsh restoration, and wave, tide, and current data collection. Coordinating field data collection and numerical modeling projects. Numerical modeling and analyses of sediment transport, nearshore spectral wave transformation, particle transport, bathymetric evolution, two-and three-dimensional hydrodynamic processes, water quality, and mixing processes. Extensive experience utilizing software packages and programming languages to present, analyze, and solve engineering and scientific problems. Experienced in coastal engineering design and planning, coastal restoration, beach nourishment plans, wave, current, and sediment transport modeling, evaluation of a variety of coastal protection alternatives, beach nourishment design, marsh restoration projects, borrow site impact assessment, and implementation of a comprehensive data collection and wave and sediment transport modeling programs. Providing expert testimony for marine and coastal physical processes and numerical modeling. Higher Education M.C.E., Civil Engineering-University of Delaware (1996) B.S., Civil Engineering-Calvin College (1994) Professional Licensing P.E., Professional Engineer, Massachusetts License #45849 Qualifications Summary More than 19 years of diverse professional experience in the fields of coastal sciences and engineering, specializing in the areas of project management, numerical modeling, marsh restoration, field collection programs, sediment transport, and littoral processes Strong written and verbal communication skills Implemented technically advanced data collection, analysis, and numerical modeling techniques to assess marine, coastal and oceanographic environments Managed multi-disciplinary coastal and marine projects requiring team management, scientific analysis, environmental sensitivity, diverse coordination, and cost-effective solutions Developed various hydrodynamic and hydraulic models for water quality assessment, marsh restoration projects, discharge and mixing design, bridge scour, dredging impacts, and contaminated sediment fate and transport Managed and/or performed environmental impact studies for water resource projects, SUPERFUND sites, concentrate discharges into rivers and estuaries, and marine and coastal projects Numerical model experience with FVCOM, REF/DIF S, SWAN, STWAVE, BOUSS2D, GENESIS, RMA-Series of models, CMS- Flow/Wave, MIKE 21, EFDC, CGWAVE, SED-2D, ACES, CORMIX, SSTM, WAVAD, ADCIRC and EDUNE Wood Hole Group KIRK F. BOSMA Revised: 01/14 2 Employment History 2001-Present Coastal Engineer/Team Leader, Woods Hole Group 1997-2001 Coastal Engineer, Woods Hole Group 1994-1996 University of Delaware (Teaching and Research Assistant) 1992-1994 McNamee, Porter and Seeley, Inc. Key Projects MassDOT – FHWA Pilot Project for Climate Change and Extreme Weather Vulnerability Assessments and Adaptation Options of the Central Artery, Massachusetts Department of Transportation – Project Manager/Coastal Engineer and Modeler Was a key project member on a technically advanced, leading-edge pilot project for the Federal Highway Administration evaluating the vulnerability to sea level rise and extreme weather events for the Central Artery in Boston, MA. The project combines a vulnerability assessment by conducting a new systems-level assessment and evaluated adaptation options to reduce risk to specific assets. The project also is geared towards integrating climate change vulnerability into MassDOT and FHWA overall practices. A highly resolved, numerical processes model was developed to assess the combined impact of sea level rise, storm events (tropical and extra- tropical), winds, tides, and waves. Results from the model were used to assess risk for various assets throughout the City of Boston, and subsequently investigate adaption options to reduce the identified vulnerabilities and to establish an emergency response plan for tunnel protection and/or shutdown. The investigation also included a cost benefit analysis, which helped MassDOT select the most efficient method of protecting valuable existing assets against today’s weather events and future climate impacts. Climate scenarios and combined storm surge and sea level rise were developed for current day, as well as 2070 and 2100. Coastal Climate Change Adaption and Engineering Alternatives East Boston, Massachusetts, The Boston Harbor Association – Project Manager/Coastal Engineer Developed a range of engineering adaptation alternatives in response to potential sea level rise scenarios. The alternatives ranged from management approaches (e.g., evacuation, flood- proofing of structures, etc.), to soft-engineering options (e.g., beach nourishment, creation of wetlands, etc.). For each location, conceptual designs and associated cost estimates were developed and compared to the potential cost incurred by flooding and storm damages to the location without protective measures over a given time horizon. Saco River and Camp Ellis Beach Section 111 Project, Saco, ME, U.S. Army Corps of Engineers – Project Manager/Coastal Engineer Managed, coordinated, and conducted a comprehensive field data collection and numerical modeling scope of work for the Saco River and Saco Bay region. The field data collection effort consisted of a 2.5 month wave, current, and tidal observation deployment using two strategically located wave Acoustic Depth Current Profiler (ADCP) systems, a high resolution near shore bathymetric survey, and a ADCP current survey of the river hydrodynamics. The coastal monitoring data set is being utilized to calibrate and verify a series of state-of-the-art wave models ranging from generation scale (Atlantic Ocean), through transformation scale (regional), down to the local and near field scales. The advanced modeling effort includes spectrally based wind-generation (WAVAD), transformation (STWAVE and CGWAVE), and Boussinesq (MIKE 21BW) wave models. Model output is being used in sediment transport modeling on both a regional and local scale. The calibrated models are being used to assess a wide range of shore Wood Hole Group KIRK F. BOSMA Revised: 01/14 3 Key Projects (continued) protection alternatives aimed at mitigating the erosion caused by federally maintained coastal structures. The project involves a high level of coordination between regulatory agencies, the federal government, State of Maine senators, US army Corps of Engineers, Town officials, and the local community. Town of Palm Beach Technical Review of Proposed Coastal Management Program, Palm Beach, Florida - Coastal Engineer Provided technical review of the proposed coastal management program assembled by the Town of Palm Beach. The primary purpose of the project was to provide Town Council objective technical recommendations regarding next steps for the Town’s coastal program and specific projects. The scope of work focused on a truly unbiased analysis of the plan with a focus on the feasibility of potential recommendations while providing guidance on prioritizing funding for the recommended coastal projects. Relevant materials were reviewed, stakeholders were consulted, and supplemental technical analyses were performed to help assess the cost effectiveness of various recommendations. Throughout the review, considerations were given for both island wide approaches (e.g., inlet management, regional coastal processes, beach nourishment performance, sediment sources, coastal structures, hardbottom resources, dunes, and sea level rise planning), as well as project specific approaches. The technical evaluation also included preliminary engineering calculations of life cycle project performance for the various coastal projects within the Town. Ultimately, prioritized and phased recommendations were provided to the Town for consideration and that were intended to assist the Town in both the long- and shore-term planning of coastal management. Hydrodynamic Characterization And Sediment Transport Potential at The Former Callahan Mine Property, Brooksville, ME, Maine Department of Transportation – Project Manager/Coastal Engineer Managed and conducted a field data collection program, developed a numerical hydrodynamic model, and performed a sediment transport evaluation for a Superfund Site in Brooksville, ME. Goose Pond Estuary is a site of environmental concern and is classified as a Superfund site on the National Priorities List by the Environmental Protection Agency (EPA). The site is the former location of a zinc/copper open-pit mine where mining operations were conducted adjacent to and beneath the tidal estuary. When mining operations ceased, the property was flooded and it is now hydraulically influenced by the tides of Penobscot Bay, as well as a small upland stream. Phase I included the collection of field hydrodynamic data to help provide insight into the overall circulation within Goose Pond, and the exchange with Goose Cove and Penobscot Bay. Phase I also provided a basis for understanding potential transport processes between Goose Pond, Goose Cove, and Penobscot Bay. The field data collection program was also designed to provide input and calibration data for the subsequent numerical modeling tasks. Utilizing the data collected, a 3-D hydrodynamic model was implemented, calibrated, and verified to characterize the circulation within the Goose Pond Estuary system. The model was used to simulate a range of conditions, including spring and neap tidal conditions, high and low freshwater inflow conditions, as well as storm surge events within Goose Pond. Hydrodynamic model results were used to evaluate overall circulation patterns within Goose Pond under a range of environmental conditions in order to identify the water and volumetric exchange between Goose Pond and Penobscot Bay. Finally, a sediment transport model was developed to Wood Hole Group KIRK F. BOSMA Revised: 01/14 4 Key Projects (continued) determine the fate and transport of contaminated material within the estuarine system and Penobscot Bay. Coastal Climate Change Adaptation and Engineering Alternatives, Groton, Connecticut – Project Manager/Coastal Engineer Worked with Battelle Ocean Sciences and the University of Southern Maine on assessing the impacts of Climate Change on coastal communities of Groton, Connecticut. Specifically, the regions of Groton Long Point and the infrastructure surrounding the Mystic River were evaluated. The evaluation included the impacts of sea level rise and storm events on potential flooding. For each location, conceptual designs of engineering adaptation alternatives were developed. The alternatives ranged from management approaches (e.g., evacuation, flood- proofing of structures, etc.), to soft-engineering options (e.g., beach nourishment, creation of wetlands, etc.), to more significant hard engineering structures (e.g., modular seawalls, revetments, tide gates, hurricane barriers, etc.). The community recommended alternatives for which cost estimates were determined. Engineering adaptations and costs estimates were provided for high and low rates of projected sea level rise, coupled with various return period storm events (10-, 20-, 50-, and 100-year) projected to the year 2070. Coastal Climate Change Adaptation and Engineering Alternatives East Boston, Massachusetts - – Project Manager/Coastal Engineer Developed a range of engineering adaptation alternatives in response to potential sea level rise scenarios. The alternatives ranged from management approaches (e.g., evacuation, flood- proofing of structures, etc.), to soft-engineering options (e.g., beach nourishment, creation of wetlands, etc.), to more significant hard engineering structures (e.g., modular seawalls, revetments, etc.). For each location, conceptual designs and associated cost estimates were developed and compared to the potential cost incurred by flooding and storm damages to the location without protective measures over a given time horizon. Nantasket Beach Seawall Repair and Reservation Master Plan Services, Hull, MA, Massachusetts DCR - Project Manager/Coastal Engineer Led a project ream to assess the Nantasket Beach Reservation Property. The Reservation has been used as a recreational beach by Greater Boston residents since the 1800s and is currently owned and operated by the Massachusetts Department of Conservation and Recreation (DCR). Nantasket Beach serves as a valuable resource from both a commercial and recreational standpoint. The beach and the associated waterfront amenities serve as the defining feature for the Town of Hull and represent a significant draw for visitors and summer residents. Nantasket Beach has experienced ongoing erosion over the past 150 years, especially the public beach at the southern end of the system. Woods Hole Group conducted a detailed coastal processes study focused on determining potential alternatives to address the ongoing coastal erosion. The barrier beach system was simulated using state-of-the-art wave and sediment transport models to understand existing conditions, and assess potential alternatives. The project evaluated the performance of the existing seawall, as well as determined potential structural alternatives to enhance the beach and improve beach nourishment performance. The performance and lifetime of the beach nourishment were assessed in order to provide guidance on potential long-term solutions and future nourishment requirements. Wood Hole Group KIRK F. BOSMA Revised: 01/14 5 Key Projects (continued) Herring River Estuary Restoration Project, Wellfleet, MA, Town of Wellfleet – Project Manager Currently managing a project to restore the Herring River Estuary System, which represents a significant floodplain (the largest estuary on outer Cape Cod). The restoration is geared towards developing a plan to restore up to 1,000 acres of wetland area. Coordinating and developing a complex hydrodynamic numerical model that will address numerous concerns associated with re-establishing increased tidal exchange, as well as provide the necessary information to design an appropriate system of dikes, culverts, and road crossings. The modeling program involves evaluation and selection of the best model for application to the Herring River Estuary, model set-up, calibration, and verification, and simulation of a range of alternatives and physical conditions. The complex numerical modeling simulates both the hydraulics of the system and the salinity distribution throughout the estuary. The model results are used to design new engineering openings and water control structures. Mixing Zone Evaluation, Whiting, IN, BP Products North America - Project Manager Performed a third party peer review of an existing mixing zone submittal, including engineering design, confirmation of the mixing zone analysis (with specific evaluation of the implementation of the modeling), determination of the physical processes, and assessment of the diffuser design. The evaluation also included site-specific ambient water current measurements at the proposed discharge location to more accurately characterize the receiving waters. The water current observations were then used to develop more representative conditions and appropriate scenarios for modeling the dispersion and mixing zone. The distribution of water current observations and the percent occurrence of each mixing ratio were used to develop a probability density function of the dispersion ratios and provide design guidance/recommendations for diffuser orientation, design, and layout. Ballard Street Salt Marsh Restoration Project, Saugus, MA, Division of Ecological Restoration – Project Manager Managed a restoration and engineering assessment of the Ballard Street Salt Marsh system in Saugus, Massachusetts. The project evaluated the level of restoration potential in the Ballard Street marsh system through the observation of site-specific tide data, simulation of all the existing flow control structures in the system, verification of the proposed flow control structure design and necessary flood storage needs, and assessment of a number of approaches for modifying the hydraulic structures (as needed) in order to arrive at a conceptual design that meets the overarching goals of the project. A numerical model of the hydrodynamics and salinity throughout the system was developed and calibrated to measured field data. Model simulation were developed for normal tidal conditions, storm conditions (both rainfall and coastal storm surge), and sea level rise scenarios. Calibrated model results were subsequently used to evaluate proposed design conditions, including previous recommendations by scientific evaluations, as well as other potential design scenarios. Alternatives included: assessment of potential flow control structures that limited the amount of water directed to the northwest branch of the system (which is more densely populated and experience historic flooding issues), while allowing full tidal exchange to the southeast branch of the system, evaluation of potential flood storage increases through excavation of marsh plain area, and reconfiguration of the various culverts throughout the system. Wood Hole Group KIRK F. BOSMA Revised: 01/14 6 Key Projects (continued) Engineering Services and Environmental Impact Evaluation – Hammonasset State Park, Madison, CT, Connecticut DEP - Project Manager/Coastal Engineer Managed and performed an engineering assessment and environmental impact study/report for Hammonasset Beach in Madison, Connecticut. Hammonasset Beach State Park contains Connecticut’s largest public swimming beach and campground and is one of the region’s most valued recreational and natural resources. During the winter of 2004-2005, severe storms resulted in the loss of a ¼-mile section of the beach on the western end of the park and significant damage to the boardwalk. Despite ongoing stop-gap measures to address the erosion problem, the beach continues to experience significant erosion and the boardwalk and beach remain at risk. Consequently, the Connecticut Department of Environmental Protection (DEP) was concerned about the viability of the western portion of the beach and park for recreational use and was seeking to identify the most cost-effective and long-term course of action to remedy this urgent situation. Therefore, an Environmental Assessment and Impact Evaluation was conducted to study the shoreline erosion problem, identify and evaluate the feasibility of alternative solutions, evaluate the potential impacts on Hammonasset Beach and the surrounding environment, and make recommendations as to the preferred solution. The proposed project consists of three distinct, but related elements: (1) Compilation and review of existing data and studies, as well as collection of new baseline topographic, bathymetric, sediment, and wave data; (2) an engineering feasibility study to identify and analyze beach management alternatives; and (3) an Environmental Impact Evaluation (EIE) pursuant to the Connecticut Environmental Policy Act (CEPA) to further analyze alternatives, identify potential adverse impacts and any necessary mitigation, and ultimately to support the selection of a recommended course of action. Reverse Osmosis Concentrate Dilution Analysis and Ambient Water Characterization, Melbourne, FL, Reiss Environmental, Inc. - Project Manager and Coastal Engineer Led a team of engineers and scientists in an evaluation of an existing Reverse Osmosis (RO) discharge. The scope of work included the collection of field data and application of a model to characterize the dilution of the existing RO discharge. The purpose of the evaluation was to assess whether a mixing zone could be permitted within the existing water quality regulations at the State and Federal level. Observations included bathymetry, a full suite of water quality constituents, and long-term, tide, current, and salinity observations. These data were used to develop a mixing zone model for constituents of concern. Hydraulic Analysis of Flow Control Structures for Wetlands Restoration, Town Creek, Salisbury, MA - Project Manager and Coastal Engineer Assessed and designed a modification to an existing embankment that served to restore marsh habitat and more efficiently alleviate flooding concerns in Salisbuty, MA. Approximately 350 acres of tidal and formerly-tidal wetlands existed upstream of an abandoned railroad embankment. Tidal exchange was prevented from entering/exiting the marsh by a wooden flap gate on the downstream side of the railroad culvert. Hired by the MCZM Wetlands Restoration Program and US Fish and Wildlife, a hydraulic study and model of the Town Creek system was completed to assess potential restoration options. The hydraulic study evaluated a range of potential alternatives. The preferred culvert and tide control alternative: 1) increased the capacity of the marsh to drain during flood events; 2) provided the Town with a greater ability to preserve flood storage capacity by closing off the system prior to predicted storm events; and 3) Wood Hole Group KIRK F. BOSMA Revised: 01/14 7 Key Projects (continued) provided the means for small, incremental increases in tidal range over an extended time period as part of a well-monitored, risk-adverse, adaptive management approach to tidal restoration. Hydrodynamic Analysis and Engineering Design for the Restoration of the Bride Brook Estuary, Rocky Neck State Park, East Lyme, CT, Connecticut Fund for the Environment - Coastal Engineer Evaluated and designed a restoration project for the Bride Brook Estuary system in East Lyme Connecticut. The project investigated the hydrodynamic characteristics of the Bride Brook estuarine system and evaluated potential alternatives to restore more natural conditions to a system that has been structured since the early 20 th century. ). Historically, Bride Brook was one of the largest anadromous fish runs the state of Connecticut. However, since the construction of twin elliptical culverts at the mouth of the estuary in 1934, alewife numbers declined. This decrease has been attributed to the reduced tidal flow and water column light caused by the 200- foot long structure, which obscures the fish passage upstream. Therefore, the primary objective of this project was to determine an engineered alternative to the existing structure that could effectively restore the tidal regime and fish passage of the Bride Brook estuary. This project is composed of three separate tasks: 1) Data Observations, 2) Analysis and Conceptual Design, and 3) Final Design and Engineering. The design to restore the system removed the existing, undersized twin culverts and replaced them with an open channel and box culvert through the dune system. The design was successfully constructed and opened in the spring of 2010. Peer Review of the Florida Bay Hydrodynamic and Salinity Model, Florida, South Florida Water Management District – Coastal Engineer Served as an expert peer reviewer of the hydrodynamic modeling effort for the Florida Bay and Florida Keys Feasibility Study. The model is required to simulate circulation, salinity stratification and distribution, and water quality behavior in the Florida Bay and Reef Tract utilizing a standardized set of field data. Offered expert opinions based on knowledge, expertise, and practical experience in conducting, analyzing, and applying similar hydrodynamic modeling strategies. The peer review included assessment of the grid methods and optimization techniques to determine spatial density, scale, and distribution, the adequacy of calibration and verification, and the quality and extent of the input data and model parameters. Analysis of Shoreline Change for Western Beach, Scarborough, ME, U.S. Army Corps of Engineers - Project Manager Led the project that used a computer-based shoreline mapping methodology, within a Geographic Information System (GIS) framework, was used to compile and analyze changes in historical shoreline position between 1864 and 2003 for Western Beach, Saco Bay, Maine. The purpose of this task was to quantify changes in shoreline position for three (3) specific periods, (1864-1944, 1962-1977, and 1986-2003) using the most accurate data sources and compilation procedures available, and to characterize areas of erosion and accretion. This project’s overall goal was to evaluate changes in the coastline of Western Beach due to significant modifications to the Scarborough River Inlet and entrance region. In addition to evaluating the shoreline change data, a projected shoreline was produced using the shoreline movement rates of the pre- 1962 or pre-Scarborough River jetty construction time from 1864-1944. Using the rates prior to project construction, a projected shoreline position was estimated assuming no project had taken place and the rates continued to exist over the entire 139-year time span. The results indicated had the shoreline continued to erode at the same rates as seen from 1864-1944, the shoreline Wood Hole Group KIRK F. BOSMA Revised: 01/14 8 Key Projects (continued) would have retreated significantly on either end of Western each, while experiencing a slight advance in the center. Beach Nourishment and Inlet Stabilization at Sandwich Town Beaches and Dredging the East End of the Cape Cod Canal, Sandwich, MA, Town of Sandwich - Project Manager/Coastal Engineer Managed and performed comprehensive beach management plan for all Town of Sandwich beaches, including evaluation of the physical processes governing sediment transport, alternatives analysis for shore protection measures and inlet stabilization, and appropriate beach maintenance and usage. The project consisted of numerical modeling of alternatives and final design for establishing a long-term beach/dune restoration plan, as well as relocation and design of a jettied tidal inlet. Required excellent communication and close coordination with numerous agencies, local officials, sub-contractors, and multiple clients. The regulatory process is currently underway. Waquoit Bay Yacht Club Revetment Repair, Waquoit, MA, Waquoit Bay Yacht Club - Project Manager and Coastal Engineer Assessed and designed a repair to an existing revetment protecting the Waquoit Bay Yacht Club. Significant gaps in the toe of the structure had developed allowing for removal of the finer grain sediments from the core. In this region of revetment, which is most critical, there is significant washout of the backfill of the revetment. At Waquoit Bay Yacht Club, continued cavity formation and subsequent collapse of the existing revetment would present an immediate threat to the structural stability of the clubhouse. A wide range of alternatives were assessed and the preferred alternative was selected and designed that consisted of the installation of filter fabric behind the existing structure, the addition of a bedding and drainage stone layer behind the structure, the addition of a stormwater runoff trench at the crest of the existing structure, the addition of clean backfill material behind the structure as needed, and addition of compatible beach material in front of the structure planted with marsh species and encouraged to develop into salt marsh. Also provided construction oversight and permit compliance inspections. Nonquitt Salt Marsh Restoration, South Dartmouth, MA, EA Engineering – Project Manager Managed and performed a numerical circulation model directed at the restoration of the Nonquitt Salt marsh system. The project consisted of implementation of a field data collection program, development and calibration of a numerical circulation model (RMA-2), and the application of the calibrated model to determine the potential impact of design changes aimed at improving circulation. Working with the National Oceanic and Atmospheric Administration, and the U.S. Fish and Wildlife Service, the purpose of the study is to assess the effects of anthropogenic effects on the marsh ecosystem. Numerical Modeling of Storm Surge Induced Hydrodynamics and Pollutant Transport, New Bedford, MA, Confidential Client - Project Manager/Coastal Engineer Simulated the hydrodynamics and resulting pollutant transport due to the effects of a historical hurricane in the New Bedford Harbor Region, including the immense flooding of the upland due to the accompanying storm surge, and the release and transport of chemicals from a confidential entity. Through numerical modeling of this complex phenomena, hydrodynamic results, coupled with pollutant input data, pollutant mass rate, duration of release, and time of release, pollutants Wood Hole Group KIRK F. BOSMA Revised: 01/14 9 Key Projects (continued) were released from a single specific area to quantify the transport pathways and concentrations due to the storm surge caused by the hurricane. This project also requires expert testimony and technical analysis of wave energy, breaking, set-up, diffusivity, and mixing. Thermal Modeling Analysis for Proposed Cooling Plant on Lake Waban, Wellesley College, Wellesley, MA, Vanasse Hangen Brustlin, Inc. - Project Manager Performed thermal and analytical modeling of design alternatives for a proposed cooling water discharge plant on Lake Waban in Wellesley, MA. Two methods of analysis (analytical and computer model) were used to determine the mixing of temperature concentration, and the ability of the Lake to receive the discharged waters under peak demand (representing a worst-case scenario under August conditions). The purpose of this analysis was to simulate the mixing and dilution of the discharge waters with the ambient water of Lake Waban under worst-case conditions, discuss the results of the modeling effort, and provide recommendations related to potential design modifications. Characterization Study of Delaware River Detritus, Hancock’s Bridge, N.J., PSE&G, - Project Manager Conducted an assessment of the ability of hydroacoustic technology to detect detrital material throughout the water column. Never utilized for this specific application, use of the innovative technology saved the client from other costly alternatives. Phase I of the study consisted of controlled laboratory testing in an enclosed basin and was performed with samples taken from the Delaware Bay Estuary. The results indicated that hydroacoustic technology could be utilized for identifying detritus within the Delaware Bay Estuary. Phase II of the study consisted of implementation of the hydroacoustic technology in the Delaware Bay Estuary. Field sampling also included Acoustic Doppler Current Profiler (ADCP) measurements, net captures, Conductivity Temperature Depth (CTD) casts, and Optical Backscatter Sensor (OBS) profiles. Responsible for project management, analysis and interpretation of the acoustic return signals, and reporting. Biomass estimates were determined from the measured currents and captured detrital material and compared to the integrated hydroacoustic signal. Future phases consist of detailed field measurements, 3-dimensional detrital transport modeling, and evaluation of mitigation oriented engineered solutions and management strategies. 3 Related Studies: a) Environmental Studies Relative to Potential Sand Mining on the Continental Shelf for Beach Replenishment, Offshore Alabama, Alabama, U.S. Mineral Management Service. b) Environmental Survey of Potential Sand Resource Sites: Offshore New Jersey, NJ, U.S. Mineral Management Service. c) Collection of Environmental Data within Sand Resource Areas Offshore North Carolina and the Environmental Implications of Sand Removal for Coastal and Beach Restoration, North Carolina, U.S. Mineral Management Service - Coastal Engineer/Numerical Modeler The following is a description of projects a, b, and c: Key member of a vast multi-disciplinary team conducting large-scale studies to address environmental issues raised by the potential dredging of sand from the inner continental shelf offshore New Jersey, Alabama, and North Carolina. Quantified the potential modifications to waves that cross within identified borrow areas due to offshore dredging. Determined the impacts of offshore dredging and subsequent beach nourishment on local and regional sediment Wood Hole Group KIRK F. BOSMA Revised: 01/14 10 Key Projects (continued) transport patterns, coastal and nearshore sedimentary environments, and local shoreline processes. Performed state-of-the-art spectral wave modeling for assessing modifications to the wave field and input into nearshore circulation and offshore and nearshore sediment transport models. The results of the ongoing studies will enable Minerals Management Service to monitor Key Projects (continued) and assess the potential impacts of offshore dredging activities and to identify ways in which dredging operations can be conducted to minimize or preclude long-term adverse impacts to the environment. Observations of Ocean Wave, Tide, and Current Processes Offshore of Little Bay, Montserrat, Montserrat, U.K., Mouchel Consulting, Ltd. - Project Manager/Coastal Engineer/Field Data Collection Installation and monitoring of a real-time data acquisition system connected via a cable link to the shoreline in Little Bay, Island of Montserrat. Ocean wave, tide, and current data were collected and analyzed. Responsible for QA/QC of collected data. Observations from the one- year deployment will be utilized to develop and design a new harbor on the Island. San Francisco Airport Expansion Project, San Francisco, CA, URS Corp. - Coastal Engineer Served as a Team Engineer working on the preparation of an Environmental Impact Report/Environmental Statement (EIR/EIS) for the San Francisco Airport Expansion Project. WHG has deployed a suite of Sediment Transport Monitoring Systems (STMS) to collect seasonal current, wave, and suspended sediment concentration measurements in each of the Bay’s characteristic environments. Responsible for analysis and interpretation of hydrodynamic and sediment dynamic measurements, estimation of sediment flux, modeling of sediment transport, and report generation. Physical Sampling and Sediment Transport Analysis at Weymouth Neck, Weymouth, MA, Massachusetts DEP - Project Manager/Coastal Engineer In this region, concerns have been raised that the metals (arsenic, copper, lead, and zinc) found in upland areas may have migrated into the sub-tidal area surrounding the peninsula. As a precursor to the chemical sampling, developed an analytical sediment transport model that was geared towards assisting in defining appropriate areas to perform sub-tidal chemical sampling. The model required a field investigation in order to determine the physical characteristics of the sub-tidal sediment within the Weymouth Neck region (including Upper Neck Cove, Lower Neck Cove, and Weymouth Back River), as well as generation of local physical processes (winds, waves, tides, and currents) in the vicinity of Weymouth Neck Peninsula. The analytical model was used to identify areas of erosion and deposition in the sub-tidal regions surrounding the peninsula. The results of the model are used as a tool to assess, justify, and bound the chemical sampling locations around the peninsula. Evaluation of the Great Creek Outlet Structure, Milford, CT., Fuss & O’Neill, Inc. - Project Manager/Coastal Engineer In an ongoing project, provided coastal processes analysis, analytical modeling, outlet structure assessment, and design support services for evaluating the impact of an outlet structure on downdrift erosion. Engineering alternatives are being evaluated through sediment transport analytical modeling to determine potential mitigation measures. Wave transformation modeling and sediment transport modeling are focused to assess the parameters of the outlet structure (e.g., Wood Hole Group KIRK F. BOSMA Revised: 01/14 11 Key Projects (continued) height, length, culvert depth, etc.) and provide design guidance for corrective action and potential nourishment. Hydrodynamic Modeling and Sediment Transport Analysis During Temporary Tunnel Storage in Fort Point Channel, Boston, MA, Gannett Fleming, Inc. - Coastal Engineer/Project Manager Conducted a hydrodynamic and sediment transport modeling study of Fort Point Channel, MA to determine the impact caused by temporary storage of floating tunnel sections on existing conditions and industrial water usage. Completed technical report presenting the hydrodynamic and potential sediment transport results, which was utilized to assist in engineering methodology and design. Analysis and Design of Revetment Structures at Hingham Shipyard, Hingham, MA, Sea Chain, L.L.C. - Coastal Engineer Completed a fast-track study and design of revetment structures at Hingham Shipyard on Weymouth Back River. The study focused on analyzing the relevant coastal processes, and optimizing the design to gain the most upland area, while minimizing adverse impacts to the nearby salt marsh and other nearshore wetland resource areas. Analysis for the design included wave modeling, storm surge analysis, extremal analysis, wave reflection analysis, wave runup and overtopping analysis, revetment design and stone sizing, and sediment transport analysis. Power Plant Effluent Mixing Zone, FL, Confidential Client - Coastal Engineer Project Engineer involved in the investigation of the discharge from a once-through cooling system at a coastal power plant. The cooling water effluent at this station was found to have seasonally low dissolved oxygen. Woods Hole Group’s investigation sought to identify the source of the dissolved oxygen depression, investigate regulatory issues, and to examine potential technologies for increasing effluent dissolved oxygen. Specifically, performed numerical particle tracking simulations in order to identify water pathways to the intakes. Additionally, a review of existing data and previous work was conducted. This revealed that the seasonally low dissolved oxygen was a widespread phenomenon in ambient waters. Because the station was not responsible for the overall dissolved oxygen depression, a mixing zone was identified as a potential regulatory solution to any minor impacts from the discharge. Engineering alternatives to raise the effluent’s oxygen content were also investigated. Particle Tracking Analysis and Improvements to the Near-Field Boundary Condition, Hancock’s Bridge, NJ, Public Service Electric and Gas Company - Coastal Engineer Completed a numerically driven particle tracking study for the Delaware Bay and estuary system to identify detrimental sources of detritus within the system. The particle tracking model, utilized in concert with a validated hydrodynamic model, was utilized to statistically evaluate near- and far-field impacts to a cooling water intake. Recommendations were provided to improve management and recycling practices, as well as provide future steps for numerical modeling of appropriate engineered solutions, which would result in safer and more cost- effective operations. Ocean Currents Offshore Eastern Trinidad, Trinidad, Amoco Production Company - Coastal Engineer Developed and performed in-depth data analysis of ocean conditions off the eastern coast of Trinidad based on data collected during recent measurement programs in the area. Observations Wood Hole Group KIRK F. BOSMA Revised: 01/14 12 Key Projects (continued) were utilized to investigate coastal ocean processes active at the site and extrapolate the observations to predict future extremal and operational conditions. Conducted a detailed literature review, assessed the structure and variability of the observed currents, separated the current into specific process components using advanced numerical analysis techniques, formulated an extremal value analysis, and completed technical writing of a final report. Results of the study provided recommendations for design criteria and operational procedures. Historical Shoreline Change Analysis: Western Town Line to Horton Point, Southold, NY, Town of Southold - Coastal Engineer Conducted an assessment of the history of storm activity in Long Island Sound. Wind and tide records were analyzed and Generalized Extremal Value (GEV) calculations were completed to determine the historical behavior and return periods of major storm events. Results of the analysis were correlated to historical shoreline change and incorporated to determine the rate and extent of erosion and accretion along the Southold coastline. Tidal Current Characteristics of St. Lucie Inlet, St. Lucie, FL, Coastal Technologies Corporation - Coastal Engineer Performed data analysis of observations of tidal currents in the St. Lucie Inlet to map the temporal variation in the spatial structure of flow through several Inlet cross-sections. These high-resolution measurements of tidal current velocities were obtained using a vessel-mounted Acoustic Doppler Current Profiler (ADCP) coupled with a GPS-based integrated navigation (IN) system. Results of the surveys show current energy focused in the deeper southern and center channels of the Inlet. The south channel was characterized as 'flood dominant', with stronger flood currents than ebb currents, which tend to transport sediments into the Inlet interior. The center channel was characterized as 'ebb dominant', with stronger ebb currents than flood currents, tending to move sediments out of the Inlet to form an ebb tide shoal. The geometry of the waterway, hard structures, and the alongshore coastal currents appeared to modify the spatial structure of the tidal currents through the Inlet cross section. Coastal Flood Protection Structure Evaluation, Chatham, MA, Coastal Engineering, Inc. – Coastal Engineer Completed an independent review of an existing coastal revetment in Chatham, MA to determine structural integrity related to wave forces. The existing stone revetment structure was evaluated to ensure that adequate design, construction, and maintenance have been undertaken to provide reasonable assurance that the structure can provide durable protection during the 100-yr (base) flood. The analysis included development of the physical parameters that represent the 100-yr flooding event and then evaluated the structural design against the 100-yr flooding physical parameters, including toe protection, backfill protection, pressure distribution and wave forces, structural stability at the minimum and critical water levels, material adequacy, etc. Wood Hole Group KIRK F. BOSMA Revised: 01/14 13 Publications and Presentations 25 Other NOAA Planning for Sea Level Rise in the Northeast: Considerations for the Implementation of Tidal Wetland Habitat Restoration Projects – Steering Committee Member. eleduc@whgrp.com Elise Leduc 508.495.6234 Coastal Scientist www. whgrp .com Education M.E.M., Coastal Environmental Management - 2011 Duke University B.A., Biology – 2006 Williams College Certificates of Training OSHA 40-Hour HAZWOPER Wetland Delineator Certification Publications and Presentation 6 Elise Leduc, M.E.M. Coastal Scientist Expertise Coastal environmental management, wetland delineation and restoration, shellfish and eelgrass surveys, coastal planning, geospatial analysis, shoreline change analysis, environmental impact analyses, ecological risk assessment, conservation prioritizations, field and water quality sampling, Massachusetts environmental regulations. Qualification Summary Adept at spatial data acquisition and geospatial analysis using ESRI’s ArcGIS to analyze and display data for coastal and marine projects. Experience conducting shoreline change analyses. Experience with wetland delineation, shellfish and eelgrass surveys, and field data collection of sediments, water, and invertebrates for environmental studies. Experience with local, state, and federal permitting of coastal and environmental projects. Experience developing beach management plans, and coastal management and conservation documents. Strong written and verbal communication skills, and the ability to engage diverse groups of stakeholders. ESRI ArcGIS; ETGeowizards; MATLAB; Microsoft Office; Adobe Photoshop and Illustrator Work Experience 2012-Present Coastal Scientist, Woods Hole Group, Inc. 2011-2012 Watershed Management Fellow, Charles River Watershed Association 2011 Coastal Conservation Planner, North Carolina Division of Coastal Management 2010 Conservation GIS Analyst, Great Land Trust 2009-2010 Wetland Laboratory Technician, Duke University Wetland Center 2006-2008 Rural Aquaculture Extension Agent, Peace Corps Zambia eleduc@whgrp.com Elise Leduc 508.495.6234 Coastal Scientist www. whgrp .com Key Projects Ninigret Pond Salt Marsh Restoration, Charlestown, RI, Coastal Scientist Conducted a wetland evaluation and provided restoration planning guidance for a large scale (~40 acre) salt marsh restoration project using thin layer sediment deposition. Selected targeted restoration areas based on level of existing vegetation degradation and elevation. Compiled and analyzed tidal, salinity, vegetation, soil core, and elevation data to develop a restoration plan and target marsh platform elevations. Developed adaptive management guidelines for moving forward with maintenance and monitoring of the project in the future. Flood Mitigation and Ecological Resilience Project, Weymouth, MA, Coastal Scientist Conducted a site evaluation and wetland delineation of a salt marsh wetland, which is currently tidally restricted due to an improperly sized and poorly maintained culvert. Performed vegetative community assessments, an evaluation of hydrology, and a hydric soils assessment. Reconnaissance level assessments were also conducted at two reference wetlands to identify opportunities for function improvement and restoration design. Based on the wetland survey and evaluation of the site, the results of the hydrodynamic modeling, and the information obtained from the two reference areas, a permit level restoration plan will be developed. Evaluation and Restoration Plan for Whidah Road Salt Pond, Chatham, MA, Coastal Scientist Served as project manager for a salt pond evaluation to determine the best course of management for the pond, which was experiencing frequent inlet closures. Conducted an elevation survey of the salt pond, salt marsh, inlet, coastal beach and nearshore area, collected water quality measurements, and performed a vegetation and habitat assessment for the pond and marsh. Combined an analysis of historical aerial photos to determine the frequency of inlet closure, with an assessment of the hydraulics at the site to determine at what tidal elevations and for how long during the daily tidal cycle water would flow between the pond and the bay, to evaluate the need and the feasibility of opening the inlet. Prepared a summary report and graphics detailing the findings of our study. Dredge Disposal Analysis, Chatham, MA, Coastal Scientist Developed selection criteria to choose areas that are best suited for disposal of dredge material. Calculated fill capacity and designed potential nourishment templates for 14 potential disposal sites in Chatham, Harwich and Orleans. Potential dredge disposal site rankings were based on physical logistics (i.e. location, volume, equipment access, etc.), as well as each site’s potential benefits (i.e. erosion protection, habitat restoration, coastal resiliency, etc.) and potential permitting and regulatory constraints (i.e. shellfish resources, presence of salt marsh or eelgrass, etc.). Compiled final rankings, analyses, maps, and fill cross-sections into a final report for the Town. Town of Sandwich Beach Management Plan, Coastal Scientist Conducted a review of historical documents, maps, and existing data for Sandwich public beaches. Reviewed, mapped and described existing conditions and historical shoreline change through site visits and geospatial analysis. Performed historical shoreline change analysis for Sandwich public beaches. Documented existing activities being undertaken by the Town as on-going management of the public beaches. Identified and proposed new management activities that could improve the recreational or conservation functions of the public beaches. Compiled all existing management practices and new recommendations into a final Beach Management Plan document. Comprehensive Plan for Docks, North Haven, NY, Coastal Scientist Conducted field reconnaissance to characterize existing docks, public access, shoreline aesthetics and nearshore habitat. Wrote a Comprehensive Plan for Docks in North Haven, which highlighted existing dock policies, detailed the potential dock impacts on public access, aesthetics, water quality, and nearshore habitat, and documented the physical environment present along the coast of North Haven, including wave heights and flood elevations during storm conditions. Provided a series of recommendations for the Village to eleduc@whgrp.com Elise Leduc 508.495.6234 Coastal Scientist www. whgrp .com Key Projects (continued) consider when approving new dock regulations. Attended a Village Meeting where the plan was presented to the public, approved and adopted by the Village. Modeling the Effects of Sea Level Rise on Coastal Wetlands, MA, Coastal Scientist Worked for the Massachusetts Office of Coastal Zone Management to model the effects of sea level rise on coastal wetlands statewide. Data inputs required by SLAMM, such as topographic data, mapped wetlands, accretion and erosion rates, salinity, tide levels and ranges, percent imperviousness, and freshwater inputs, were identified, compiled and processed in order to run the model. The North Shore’s Great Marsh was chosen as a sub-site for pilot testing and sensitivity analysis due to the amount of data available for the system. Final model simulations were be run for both the sub-site, as well as state-wide simulations involving 18 regionals panels, for three out-year scenarios and four projected sea level rise rates based on IPCC predictions. These results will aid CZM in identifying areas along the Massachusetts coast where wetlands can and cannot migrate and adapt to sea level rise, given current elevations and development. Shellfish Survey, Chatham, MA, Coastal Scientist Conducted a shellfish survey in Pleasant Bay consisting of 9 transects and 162 sampling stations, in response to a proposed pier development. Utilized a 12-inch modified bullrake to collect samples. Identified and recorded all live animals. Reported information on sediment type and grain size from each sample. Summarized resulting data in tabular form and wrote a final summary report detailing findings from the survey. Newtown Creek CERCLA Environmental Risk Assessment, New York City, NY, Coastal Scientist Review and comment on ecological risk documents, such as the RI/FS Work Plan, Screening Level Ecological Risk Assessment (SLERA), Baseline Ecological Risk Assessment (BERA), Risk Analysis Plan (RAP), etc. Conduct data synthesis and analysis, calculations and research to support CERCLA comments and recommendations. Provide technical review and recommendations on toxicity tests, site selection, benthic community analysis, weight-of-evidence method, and technical documents. Create presentations, figures, maps and comments to submit to EPA on behalf of the City. Chilmark Pond Property Evaluation, Chilmark, MA, Coastal Scientist Served as project manager for a coastal property evaluation along the southern coast of Martha’s Vineyard. Researched and investigated the historic and potential future shoreline changes, and how they might impact a new house to be built on site. Conducted a site visit to evaluate the existing conditions at the site. Acquired and georeferenced historical aerial photographs and charts from the 1800s to the present, and utilized these to document the location of mean high water over time along 2 miles of the southern Martha’s Vineyard coastline. Performed a shoreline change analysis using the digitized shorelines to compute a historical shoreline change rate, and help inform projections of future shoreline change rates. Compiled data and wrote a summary report of findings to provide guidance for future planning and construction on the property. Status and Resilience of the Westport Harbor Barrier Beach, Westport, MA, Coastal Scientist Compiled and georeferenced aerial photography and historical charts to perform a shoreline change analysis for the Westport Harbor Barrier Beach system. Used the data generated through the shoreline change analysis to projected future shoreline change with and without sea level rise. To incorporate sea level rise into future estimates, LiDAR elevation data in conjunction with the predicted sea level rise scenarios in Global Sea Level Rise Scenarios for the United States National Climate Assessment were used. Developed projections for 25, 50 and 100 years into the future. eleduc@whgrp.com Elise Leduc 508.495.6234 Coastal Scientist www. whgrp .com Key Projects (continued) Coastal Pond Management Plan, Chilmark, MA, Coastal Scientist Managed a project for a private client to develop a comprehensive pond management plan for a coastal salt pond on Martha’s Vineyard. Conducted a site visit to evaluate existing conditions, investigate pond depth and sediment type, and make observations about the stability of the nearby barrier beach. Performed a shoreline change analysis for the southern barrier beach, a critical component to the future management of the pond and the rest of the property. Gathered background information on past and current practices for Phragmites control and pond management activities, as well as on general geology and soil conditions in the area, flood zone designations, and ecology of the pond to accurately identify and understand the problems facing the pond, and to develop alternatives for managing the pond. The Pond Management Plan will address preserving and/or restoring the open water pond habitat, and minimizing erosion on the barrier beach, which is necessary for the longevity of the pond. Alternatives considered for preserving and/or restoring the open water pond habitat included mechanical Phragmites removal, seasonal targeted herbicide use, and dredging to increase the depth of the pond. Alternatives considered for reducing erosion along the barrier beach included installation of sand fencing, localized dune restoration or reconstruction after major storms, and restoration of current dune footpaths. The plan provided background and reasoning, estimated effectiveness, estimated cost, and projected time frame for each proposed alternative. Technical Evaluation of Preliminary 2013 FEMA FIRMs for the Towns of Scituate, Marshfield, and Duxbury, MA, Coastal Scientist Evaluated draft FEMA maps, and identified errors and inconsistencies in FEMA’s analyses, such as oversights along a particular transect or a flawed assumption. Reanalyzed flood area delineations along FEMA’s existing transects, and created additional transects to document and accurately map the flooding potential around location-specific topography. Utilized a geographic information system (ArcMap) to adjust and reclassify mapped flood zones and Base Flood Elevations (BFEs) to reflect updated modeling. Produced updated flood maps. Shoreline Change Analysis for Saco Bay, ME, Coastal Scientist Acquired and georeferenced historical aerial photographs and maps for use in project analyses. Analyzed multiple historical aerial photographs to digitize the shoreline and to calculate long-term rates of shoreline change along transects through the beach and dune. Utilized MATLAB to compute annual rates of shoreline change between all available time periods between 1864 to 2010 using the end point method, as well as the linear regression method. Contoured LiDAR data from three time periods to compare to contemporary shoreline positions and incorporate into the shoreline change analysis. Performed error analyses for shorelines derived from aerial photos and LiDAR data. Publications and Presentations Cura, J.J., E. Leduc, C. Prabhu, and E. Mahoney. 2015. “Sediment Toxicity in Different Classes of Reference Area and in the Newtown Creek Superfund Site.” Poster Presentation at the Society of Environmental Toxicology and Chemistry (SETAC), Salt Lake City, UT, November 2015. Leduc, E. 2011. “An Evaluation of GIS Prioritizations for Selecting Wetland Mitigation Sites: Cook Inlet Case Study” Master’s Project, Duke University’s Nicholas School of the Environment, Durham, NC. Leduc, E., K. Price, and T. Miller. 2011. “State of North Carolina 2011 Coastal and Estuarine Land Conservation Program (CELCP) Plan” NC Department of Environment and Natural Resources, Division of Coastal Management. “A Prioritization of Land Parcels for Wetland Mitigation around Knik Arm” prepared for Great Land Trust, Anchorage, AK. 2011. eleduc@whgrp.com Elise Leduc 508.495.6234 Coastal Scientist www. whgrp .com Publications and Presentations (continued) “A Prioritization of Land Parcels for Conservation in the Matanuska-Susitna Borough” prepared for Great Land Trust, Anchorage, AK. 2010. Leduc, E. 2006. “Effects of the invasive ant, Myrmica rubra, on the local ant-treehopper mutualism” Senior Thesis, Williams College Biology Department, Williamstown, MA. ATTACHMENT C: COMMUNITY RESILIENCY BUILDING WORKSHOP – SUMMARY OF FINDINGS Town of Winthrop, MA May 2018 (Funding for this project was provided by EEA’s Municipal Vulnerability Preparedness Planning Grant Program) Community Resiliency Building Workshop Summary of Findings Winthrop, MA (0231471.00) i Woodard & Curran CRB – Summary of Findings May 2018 TABLE OF CONTENTS SECTION PAGE NO. EXECUTIVE SUMMARY ......................................................................................................................................... ES-1 1. OVERVIEW ...................................................................................................................................................... 1-1 1.1 Workshop Core Team .................................................................................................................... 1-1 1.2 Workshop Objectives ...................................................................................................................... 1-2 1.3 Acknowledgements ........................................................................................................................1-2 2. SUMMARY OF FINDINGS............................................................................................................................... 2-1 2.1 Top Natural Hazards for Winthrop, MA...........................................................................................2-1 2.2 Identified Vulnerable Areas in the Community................................................................................ 2-2 2.3 Current Concerns & Challenges Presented by Hazards ................................................................ 2-4 2.3.1 Road Network Vulnerability & Isolation........................................................................................... 2-4 2.3.2 Proximity to MWRA Deer Island Treatment Plant & MassPort’s Logan International Airport ......... 2-4 2.3.3 Water, Wastewater & Drainage System ......................................................................................... 2-5 2.3.4 Shoreline Structures ....................................................................................................................... 2-5 2.3.5 Local Capacity, Communication, Emergency Management ........................................................... 2-6 2.3.6 Condition and Functioning of Natural Barriers ................................................................................ 2-7 2.4 Current Strengths & Assets ............................................................................................................ 2-7 3. RECOMMENDATIONS TO IMPROVE WINTHROP’S RESILIENCY .............................................................. 3-1 TABLES Table 2-1: Natural Hazards Identified By CRB Participants Table 3-1: Top Six Recommendations to Improve Resiliency FIGURES Figure 1: Winthrop, MA Shoreline Structures APPENDICES Appendix A: Event Announcement, Agenda & Sign-In Sheets Appendix B: Community Challenges & Goals Appendix C: Community Resiliency Building Workshop Presentations Winthrop, MA (0231471.00) 1-1 Woodard & Curran CRB – Summary of Findings May 2018 1. OVERVIEW A coastal community, the Town of Winthrop, Massachusetts has a unique perspective on planning for climate change and preparing for a sustainable future. The evidence for the need to further address resiliency and adaptation to natural hazard events continues to become more evident each year. While several larger storm events have received much notoriety in recent years (Tropical Storm Irene, Tropical Storm Sandy, Nor’easter NEMO), in the first quarter of 2018 alone, two major coastal storm events pounded communities throughout Massachusetts causing coastal flooding, heavy-rain induced inland flooding, wind damage, power outages, coastal erosion and damage to property, including the Town of Winthrop. Some areas where Winthrop has been particularly hard hit in recent years include: Flooding at Jefferson Street/Putnam Street Intersection – Flooding has occurred in this location on a frequent basis. Ingleside Park/Walden Street – This area of Winthrop floods when intense storm events coincide with rising tides. Flooding Continues at the Winthrop Golf Course Morton Street, Pico Avenue, Washington Avenue and Shirley Street - Significant flooding has occurred in these areas during recent storms. Coughlin Park Shoreline - Significant erosion continues to occur along this shoreline and the Town is working on a shoreline stabilization concept. In June 2017, the Baker-Polito Administration announced over $1 million in grant funding to 71 cities and towns throughout Massachusetts for the Municipal Vulnerability Preparedness (MVP) program. The MVP Planning Grant Program was designed to provide support for communities to plan for climate change resiliency and implement priority projects. Upon completion of the MVP program, communities can become certified as an MVP Community and become eligible for MVP Action Grant funding and other opportunities in the future. The Town of Winthrop applied for a MVP Planning grant and was successful. In April 2018, Winthrop undertook the Community Resiliency Building (CRB) Workshop process, a requirement of receiving MVP funding and this report serves as the Summary of Findings for that planning process. The CRB workshop process is based on a risk matrix exercise while also utilizing current information regarding natural hazard events, understanding the latest climate change projections, evaluationg information on Town efforts to address resiliency and reviewing recent action items and projects to address resiliency issues. 1.1 Workshop Core Team The Winthrop Community Resiliency Building Workshop was led by a local Core Team which included the following individuals and Town departments: Joseph Domelowicz, Assistant Town Manager | Lead Project Manager for MVP/CRB Laurisa Wojcik, Administrative Secretary Kara Campbell, Conservation Agent Steve Calla, DPW Director Norman Hyett, Conservation Commission Chief Paul Flanagan, Fire Department Police Department Winthrop, MA (0231471.00) 1-2 Woodard & Curran CRB – Summary of Findings May 2018 In addition to staff participants, the Core Team involved residents and local business owners who participated in both the MVP Kick-Off Meeting and the CRB Workshop. Sign in sheets for the kick off meeting and workshop have been included in Appendix A . Together, Winthrop’s Lead Project Manager and Woodard & Curran (hired MVP Technical Services provider) formed the project team responsible for directing, preparing for and ensuring the success of the CRB Workshop. 1.2 Workshop Objectives The Town of Winthrop held its Community Resiliency Building Workshop on April 6, 2018 at the Deer Island Wastewater Treatment Plant Training Room. Partners for the CRB Workshop included technical services provider Woodard & Curran, the Massachusetts Water Resource Authority (MWRA), The Nature Conservancy and MassAudubon. The workshop’s central objectives were to: Define extreme weather and natural and climate related hazards impacting Winthrop, Identify existing and future vulnerabilities and strengths, Develop and prioritize actions for the community and broader stakeholder networks, and Identify opportunities for the community to advance actions to reduce risks and build resilience. The focus of the workshop was to educate participants and increase awareness of risks facing the Town of Winthrop from natural and climate-related hazards. Identifying vulnerabilities and strengths in Winthrop from an infrastructure, societal and environmental perspective would serve as the foundation for discussion. Prior to the workshop, outreach to key municipal staff, residents, businesses and organizations was conducted through the kick-off meeting. 1.3 Acknowledgements The Winthrop Community Resiliency Building Workshop was managed by the Winthrop, MA Core Team in partnership with Woodard & Curran. The Core Team guided the work throughout the project and numerous public officials and industry professionals provided leadership, technical expertise, ideas and insight during workshop planning and execution. Special thanks to the MWRA, The Nature Conservancy and MassAudubon for their participation and support during Winthrop’s CRB Workshop. Winthrop, MA (0231471.00) 2-1 Woodard & Curran CRB – Summary of Findings May 2018 2. SUMMARY OF FINDINGS The purpose of the Community Resiliency Building Workshop Summary of Findings is to develop a comprehensive summary of the event with the goal of Winthrop using this information to continue its focus on reducing vulnerabilities, reinforcing strengths and continuing on the path toward greater community resilience. Winthrop’s CRB was held on Friday, April 6, 2018 at the Deer Island Wastewater Treatment Plant Training Room. In total, there were 53 attendees who were present for the daylong event. With the goal of the workshop being to listen and learn from attendees on how to meet the overall workshop objectives, prior to starting the formal CRB agenda, participants were asked to think about and write down on a note card answers to the following two questions: 1) What are Winthrop’s biggest challenges? (think infrastructure, societal, environment) 2) What are your goals for the day and what do you hope to gain from your participation in the workshop? Participants provided feedback for both of these questions which is summarized in Appendix B . 2.1 Top Natural Hazards for Winthrop, MA Prior to discussing the top natural hazards faced by Winthrop, MA, participants in the CRB workshop listened to two presentations that included background information about Winthrop and up to date information regarding Climate Change and its impact to the community and surrounding area (see Appendix C ). Upon completion of these two presentations, attendees were asked to work with the other participants at their table to define and characterize the top natural hazards being faced by Winthrop. In total, there were six separate tables working on this task and participants were encouraged to come up with their own list of natural hazards that they felt to be the most relevant and pressing to the community. Photo: April 6, 2018 Winthrop CRB Challenge and Goal Comment Cards Winthrop, MA (0231471.00) 2-2 Woodard & Curran CRB – Summary of Findings May 2018 Winthrop is a densely developed coastal town with a population of approximately 18,000. Located on a peninsula (approximately 1.6 square miles) with a seven-mile shoreline, the majority of the flooding experienced by Winthrop is related to its coastal location due to impacts from coastal storms, waves, storm surge and sea level rise. The natural hazards facing Winthrop that were identified at the CRB workshop include: Sea Level Rise Flooding Hurricanes/Wind/Extreme Storms Wave Action/Storm Surge Extreme Heat Fire Erosion Increasing Precipitation Isolation Sea level rise was identified by all of the tables as one of the top natural hazards while flooding was identified by five of the six tables. Table 2-1 indicates the top natural hazards that were identified by each table of CRB participants. Table 2-1: Natural Hazards Identified By CRB Participants Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Flooding Wind/Storms Wave Action Sea Level Rise Flooding Sea Level Rise Hurricane Heat or Extreme Weather Flooding Sea Level Rise Wind Isolation Flooding Wind/Storms Wave Action Sea Level Rise Flooding Sea Level Rise Heat Wave Fire Sea Level Rise Increased Precipitation Heat or Extreme Weather Wind 2.2 Identified Vulnerable Areas in the Community During the CRB process, the entire Town was highlighted as being vulnerable to natural hazard events due to its location and the fact that it is surrounded by the ocean – not just a specific neighborhood. There were specific areas mentioned by attendees at the workshop as being vulnerable and those include: Neighborhoods: o Morton Street/Belle Isle Marsh – Low lying area, coastal surge and flooding. o Pico Avenue/Fisherman’s Bend – Experiences flooding during storm events. o Ingleside Park – Backup and flooding due to lack of stormwater storage capacity and undersized drains. Floods during coastal storm/precipitation events. o Point Shirley/Shirley Street – Low-lying street and adjacent seawall experience wave overtopping and flooding during storm events. Winthrop, MA (0231471.00) 2-3 Woodard & Curran CRB – Summary of Findings May 2018 o Lewis Lake – Serves as a drainage area for part of the downtown area – lake overflows during storm events and causes localized flooding in adjacent areas. o Yirrell Beach – Coastal surge and flooding o Lower Nahant Avenue – Coastal surge, high tide and high precipitation events all cause backup in undersized drain lines and flooding within adjacent neighborhood. o Coughlin Park – Coastal erosion and flooding during coastal storms. o Bayou Street Neighborhood – Flooding due to undersized drainage line that backs up during high precipitation events. Ecosystems: Belle Isle Marsh, Coughlin Park, Yirrell Beach, Ingleside Park, Lewis Lake, Beaches Transportation: Route 145 and Winthrop Parkway (also evacuation routes), Shore Drive, Morton Street, bridges, all roads in Town Infrastructure: Drainage system, Water/Sewer Infrastructure, Pump Stations, Sea Walls, Utility Power, Public Safety Building, Culverts, MWRA Deer Island Treatment Plant, Municipal Services (police, fire, emergency, shelters), Existing Buildings, Proximity to MassPort/Logan International Airport Winthrop, MA (0231471.00) 2-4 Woodard & Curran CRB – Summary of Findings May 2018 2.3 Current Concerns & Challenges Presented by Hazards The Town of Winthrop faces numerous challenges and has major concerns related to the impacts of natural hazard weather events from the past and those that will occur in the future and be further exacerbated by climate change. In the first quarter of 2018 alone, Winthrop was severely impacted by two large coastal storm events in January and March which caused coastal flooding, heavy-rain induced inland flooding, wind damage, power outages, unpassable streets, coastal erosion and damage to residential homes and businesses. In prior years, Winthrop has suffered from similar coastal storms in addition to Tropical Storm Irene (August 2011), Tropical Storm Sandy (October 2012) and a Nor’easter referred to as NEMO (February 2013). In general, Winthrop is subjected to three types of flooding – coastal, inland/riverine and urban. The FEMA Flood Insurance Rate Maps (FIRM) issued in 2016 for Winthrop indicate that approximately 45% of the town is within the 1% annual chance flood (also known as the 100-year storm). The impacts from the 2018 storm events to date as well as previous storms have made the topic of natural hazards and climate change in Winthrop of high importance. Improving the community’s ability to be resilient before, during and after a storm event was discussed in detail at the Community Resiliency Building workshop. 2.3.1 Road Network Vulnerability & Isolation Access to the Town of Winthrop is primarily along Route 145, Winthrop Parkway or across the Belle Isle Bridge (Main Street). Winthrop Parkway connects the town to Revere along a narrow strip of land and this connection has been closed by the Town of Revere in the past due to storm conditions resulting in unsafe passage. With only two main roadways to access Winthrop, managing this infrastructure is critical for emergency evacuation and response. Or, if evacuation and response is not possible, managing isolation and sheltering in place becomes critical. Discussion included the town’s preparedness to remain isolated for a period of time and successfully shelter in place. CRB attendees expressed their concern over the need to be better prepared for this type of situation. 2.3.2 Proximity to MWRA Deer Island Treatment Plant & MassPort’s Logan International Airport The enormity of the road network vulnerability issue is raised even further since the primary travel route to MWRA’s Deer Island Sewage Treatment Plant (which treats wastewater from 2.5 million people in Greater Boston) is located in Winthrop and can be compromised. In addition, concern was raised over the potential for a major incident to occur at the treatment plant or nearby Logan International Airport which could impact Winthrop and/or require the evacuation of the community. Photo: Pico Avenue, March 3, 2018 Photo: Morton Street at Banks, March 3, 2018 Winthrop, MA (0231471.00) 2-5 Woodard & Curran CRB – Summary of Findings May 2018 2.3.3 Water, Wastewater & Drainage System During a coastal storm or heavy precipitation event, Winthrop’s drainage system can become overwhelmed and cause flooding at the street level. Future climate change impacts, sea level rise and more sever storms will continue to exacerbate the conditions that the community has seen repeatedly in the past. This combined with the age of the drainage system and changing underground conditions can cause additional damage – the magnitude which may currently be unknown. The water and wastewater systems in Winthrop are owned by the Department of Public Works and the Massachusetts Water Resources Authority (MWRA). Sewer pump stations are located at Revere Street, Pico Avenue and Pleasant Court. Winthrop’s stormwater system has over 20 miles of underground piping, outfalls, catch basins and manholes. Approximately 115 outfalls are installed throughout Town in low-lying areas to help with some of the inland flooding during certain types of storm events. Many of these outfalls do not have check valves to prevent coastal flooding from entering the system. Workshop participants discussed the need for drainage system upgrades and cleaning and education about how the drainage system functions in Winthrop. Other suggestions include identifying a local staff person to work with DPW and other Town departments on increasing the visibility of this infrastructure and developing Low Impact Development/Green Infrastructure solutions that would improve their function and condition along with funding opportunities to pay for the projects. Starting programs such as adopt a drain, using artwork to better identify location and seeking out funding opportunities for upgrades are all suggestions for improving this critical infrastructure. 2.3.4 Shoreline Structures The Town of Winthrop has a variety of shoreline structures in place that offer a barrier between the built environment and the ocean. Some of the infrastructure includes stone revetments, concrete seawalls, bulkheads and breakwaters. According to data managed by the Massachusetts Office of Coastal Zone Management (CZM) regarding coastal infrastructure, Winthrop has six structures owned by DCR and 27 town owned structures in varying condition. Half of the public shoreline structures need moderate to significant levels of repair (see Figure 1 ). Photo: April 6, 2018 Winthrop CRB Workshop Winthrop, MA (0231471.00) 2-6 Woodard & Curran CRB – Summary of Findings May 2018 Figure 1: Winthrop, MA Shoreline Structures At the CRB workshop, participants expressed the need to preserve and maintain existing and exposed seawalls so they continue to function and provide protection for the built environment. Suggestions included making the existing seawalls higher, expandable (or flexible) or investigating floating dams. 2.3.5 Local Capacity, Communication, Emergency Management During the Community Resiliency Building process, the topic of local capacity, communication and emergency management was discussed. Concern was raised about the use of the Senior Center as a shelter and accepting residents who need to be evacuated from their homes during severe weather. Currently there is no back up power or generator at the Senior Center should a power outage occur during a storm event. Another issue identified by the Housing Authority was that in the past, some of their senior housing developments have lost power, but it is difficult to get their tenants to evacuate. More communication is needed about how to manage these types of situations in the community. Winthrop, MA (0231471.00) 2-7 Woodard & Curran CRB – Summary of Findings May 2018 In addition, a more clear, defined means of communication was indicated as an area of improvement during emergencies. Currently information is shared via phone but continuing to use resources like Facebook and Twitter will be beneficial. There was also a discussion of creating a formal Emergency Manager position (even part time) who helps manage current emergencies including operations, but also the recovery. Documentation and photographs are all necessary to obtain and manage for proper recovery and reimbursement depending on the severity of the event. Currently, Winthrop does this on an as needed, informal basis. Having designated staff for residents and businesses to call would allow for other departments like Police, Fire and DPW to focus on their roles during an emergency event. An Emergency Manager could also oversee operations during an emergency, manage a command center, help deploy/manage town staff and work with other towns and regional dispatch to provide the best service possible. The need for a consolidated, updated Public Safety Building was identified during the CRB workshop as one of Winthrop’s biggest challenges. 2.3.6 Condition and Functioning of Natural Barriers Winthrop is fortunate to have numerous beaches, conservation areas and places of recreation to offer residents and visitors in the community. They include: Winthrop Beach Yirrell Beach Donovan’s Beach Pico Playground & Beach Fisherman’s Bend Belle Isle Marsh Coughlin Park Lewis Lake/Winthrop Golf Club Ingleside Park One of the key issues raised during the CRB was the need to preserve, maintain and enhance natural infrastructure in Winthrop so that it can continue to function as a natural barrier for the community. Ideas include dune enhancement, building additional trees to lessen heat island impact, add more natural vegetation where it is needed, develop an overall Town wide natural barrier enhancement plan and conducting feasibility studies to determine what types of enhancement will make sense and their anticipated impact. Additional education regarding the benefits and importance of natural resource areas including regulations was also identified as important so that the value in helping reduce risk and improve resilience is better understood. 2.4 Current Strengths & Assets Winthrop has had the opportunity during recent storm events to see how the community functions and identify areas of strength. The presence of natural barriers for residential neighborhoods in Winthrop was recognized as beneficial to the community in addition to existing seawalls and other barriers. Other strengths identified during the CRB include: The local conservation commission has been working with homeowners to provide information about natural resources, building code requirements and homeowner incentives. Wetland restoration, floodplain and open space and enhancement through various projects in the community were recognized as a strength and continuing to support these projects and find funding for next phases is critical – Coughlin Park is an example where the Town has been investigation the feasibility of mitigating Winthrop, MA (0231471.00) 2-8 Woodard & Curran CRB – Summary of Findings May 2018 shoreline erosion using living shoreline techniques to increase coastal resiliency. A plan was prepared that quantified sea level rise for the location, assessed existing conditions, performed an alternatives analysis and identified an appropriate living shoreline project. CRB attendees expressed their support for the Town to continue doing this type of work (specifically this project) and reach the implementation phase. Winthrop has dedicated Police, Fire and DPW personnel who respond during natural hazard events. The existing reverse 911 system was recognized for the role it plays during emergency events and continuing to maintain and advertise the availability of this system will be key for future emergencies. Winthrop’s existing water, wastewater and drainage infrastructure was identified as a strength. The need to keep this updated, maintained and managed was recognized. Recent upgrades to some of the sewer pumping stations such as elevating them, installing water resistant panels and emergency generators was recognized as a strength. Other recent infrastructure improvements include: o Sewer improvements on Putnam Street, Putnam Place and Walden Street. o Water main replacement on Jefferson Street and Fremont Street and upgrades to a section of the drainage system at the intersection of Jefferson Street and Putnam Street. o Sewer, water, drain and sidewalk improvements on Walden Street, Lincoln Street, Read Street, Walden Place and Jerald Street. o Water main, drain and sewer improvements on Bellevue Avenue, Prescott Street, Somerset Avenue, Nahant Avenue and Sewall Avenue. o Water main improvements with some sewer repairs on Plummer Ave., Woodside Ave, Woodside Park, Frances St., Sunnyside Ave, Pico Ave, Corinha Beach Rd. and throughout the neighborhoods surrounding the water tower. o Sewer and water main improvements on Franklin Street and Harvard Street. o Lewis Lake Tide Gate project included replacement of existing failed automated tide gate with new automated tide gate. o Miller Field/Lewis Lake Drainage and Site Improvements included a complete renovation of Miller Field including site drainage improvements and improvements to swales along the Veterans Road and Cross Street at the Winthrop Golf Club. Supportive social services such as the local health center, Senior Center, Senior Housing and Housing Authority. Proximity to MWRA Deer Island Treatment Plant & MassPort’s Logan International Airport was identified as a challenge but also a strength. The Town of Winthrop acts as a natural buffer to both of these key regional economic and environmental resources. Photo: MWRA Deer Island Wastewater Treatment Plant Winthrop, MA (0231471.00) 2-9 Woodard & Curran CRB – Summary of Findings May 2018 Photo: April 6, 2018 Winthrop CRB Workshop Matrix Board Winthrop, MA (0231471.00) 3-1 Woodard & Curran CRB – Summary of Findings May 2018 3. RECOMMENDATIONS TO IMPROVE WINTHROP’S RESILIENCY Improving Winthrop’s resiliency was discussed by each individual group at the CRB based on the natural hazards, strengths, vulnerabilities and actions that they defined. At the end of the CRB workshop, each group presented their findings on key actions the community should focus on to improve overall resiliency and they were asked to identify their top three. Upon completion of each group’s presentation, each attendee was given six dots to identify of all the key actions each group mentioned, which is the most critical/most important for the community. Table 3-1 is a summary of the dot exercise. Table 3-1: Top Six Recommendations to Improve Resiliency Rank Action Notes 1 Sewer & Drainage Infrastructure Clean, maintain and upgrade (particularly in the Town Center and low-lying areas) sewer and drainage infrastructure. Seek funding for repair and replacement, design additional storage capacity and modify bylaws and incentives that would support improved conditions for projects. Work would also include flood control projects. 2 Maintain, Replace, Upgrade Seawalls Various existing infrastructure is in place throughout Winthrop and is in need of repair and upgrade. 3 Natural and Green Infrastructure Solutions, Low Impact Development To support or enhance the functioning of seawalls and the shoreline as a barrier and for improved stormwater management. Work would also include flood control projects. 4 Develop or redevelop a new public safety building (police, fire, ambulance) This includes finding a site, designing the building, securing funding and completing construction of a new facility. 5 Maintain and protect Belle Isle Marsh, Coughlin Park and beaches as assets to the community for both recreation and resiliency support. Work for areas of the community that act as natural barriers includes dune enhancement, plantings, berms, etc. 6 Identify funding for projects to increase resilience This includes further developing the tax base to increase reve
The text goes on. The rest is in the file.
related records
Records whose documents say similar things, nearest first.
- Flooding & resilienceTown of WinthropCoughlin Park coastal resilience feasibility study, 2016
- Flooding & resilienceFederal Emergency Management AgencyFlood Insurance Study, Suffolk County
- Flooding & resilienceTown of WinthropResilient Winthrop: coastal infrastructure and climate change, 2017
- Flooding & resilienceTown of WinthropCommunity Resilience Building workshop, 2018
- Flooding & resilienceTown of WinthropHazard Mitigation Plan, 2014 update