Summary sheet
Town of Winthrop · from the Town's website · 1 page · 1.7 MB
open the file ↗ · original at the source ↗
The aerial photograph on the left shows Coughlin Park, which is located on the western shores of Winthrop, MA. The shoreline and bank immediately north of the existing sea wall have been eroding at ~1.5 feet/year. The project goal was to increase coastal resiliency and mitigate shoreline erosion at this location. The chosen alternative consists of fiber rolls and regrading to stabilize the bank, as well as cobble bank nourishment. The illustration below shows the cobble bank nourishment, fiber rolls, and bank regrading proposed at the site. The fiber rolls and cobble bank nourishment will protect the bank and increase coastal resiliency at Coughlin Park. Below is a photo of the existing conditions (Before), as well as an artist’s rendition of the finalized project (After). The before photograph shows the undercut and eroding coastal bank, as well as the existing cobble beach. The after photograph shows the completed cobble bank and berm, which will dissipate wave energy and mitigate shoreline erosion, while also providing protection to the installed fiber rolls. Cobble Bank Nourishment Increases Resiliency INCREASING COASTAL RESILIENCY AT COUGHLIN PARK BEFORE AFTER
related records
Records whose documents say similar things, nearest first.
- Flooding & resilienceTown of WinthropMVP action grant applications: Ingleside Park and Morton Street, 2018
- Flooding & resilienceTown of WinthropCommunity Resilience Building workshop, 2018
- Flooding & resilienceTown of WinthropMorton Street Resilience Project feasibility report, 2024
- Flooding & resilienceMetropolitan Area Planning CouncilHazard Mitigation Plan, 2025 update (draft)
- Flooding & resilienceTown of WinthropHazard Mitigation Plan, 2014 update