Environmental notification form
Executive Office of Energy and Environmental Affairs · from the MEPA office · 4 pages · 607 KB
open the file ↗ · original at the source ↗
Commonwealth of Massachusetts Executive Office of Environmental Affairs §@ MEPA Office Environmental For Office Use Only Executive Office of Environmental Affairs BOEA No: Ach 7? OQ MEPA Analy) indhé Bockkey Phone: 617-626- JOH4Y Notification Form The information requested on this form must be completed to begin MEPA Review in accordance with the provisions of the Massachusetts Environmental Policy Act, 301 CMR 11.00. Project Name: Winthrop Ferry Project Street: Shirley Street Municipality: Winthrop Watershed: Boston Harbor Universal Tranverse Mercator Coordinates: 19 03 37582E 4692157N Latitude: 42° 2’ 00” Longitude: 70° 58’ 20” Estimated commencement date: 9/03 Estimated completion date: 5/04 Approximate cost: $2.5 million Status of project design: 35 Y%complete Proponent: Town of Winthrop Street: 1 Metcalf Square Municipality: Winthrop | State: MA | Zip Code: 02152 Martha Craig Rheinharat Name of Contact Person From Whom Copies of this ENF May Be Obtained: Firm/Agency: Vine Associates, Inc. Street: 18 Beach St., P.O. Box 555 Municipality: Monument Beach State: MA | Zip Code: 02553 Phone: 508-743-0390 Fax: 508-743-0391 E-mail: mrheinhardt@ vineassociates.net Does this project meet or exceed a mandatory EIR threshold (see 301 CMR 11.03)? LlYes Has this project been filed with MEPA before? LlYes (EOEA No. ) Has any project on this site been filed with MEPA before? L]Yes (EOEA No. ) Is this an Expanded ENF (see 301 CMR 11.05(7)) requesting: a Single EIR? (see 301 CMR 11.06(8)) LlYes a Special Review Procedure? (see 301CmR 11.09) LlYes a Waiver of mandatory EIR? (see 301 CMR 11.11) (Yes a Phase | Waiver? (see 301 CMR 11.11) LlYes [—XJNo KXINo EXINo IXINo IXINo XINo BXINo Identify any financial assistance or land transfer from an agency of the Commonwealth, including the agency name and the amount of funding or land area (in acres): ADAP-UDAG. Funding from EOTC and Are you requesting coordinated review with any other federal, state, regional, or local agency? L ]Yes(Specify ) KXINo List Local or Federal Permits and Approvals: local Order of Conditions; U.S.A.C.O.E Permit Which ENF or EIR review threshold(s) does the project meet or exceed (see 301 CMR 11.03):" [_] Land (_] Rare Species [X] Wetlands, Waterways, & Tidelands L_] Water _] Wastewater (_] Transportation (] Energy CJ Air L] Solid & Hazardous Waste (J ACEC C] Regulations L] Historical & Archaeological Resources Summary of Project Size Existing Change Total State Permits & & Environmental Impacts Approvals AND Order of Conditions : Superseding Order of 3.12 Total site acreage Conditions New acres of land altered 9 IX] Chapter 91 License Acres of impervious area 22 3 2.5 CL] 401 Water Quality Certification Square feet of new bordering 0 [-] MHD or MDC Access vegetated wetlands alteration Permit Square feet of new other ; [] Water Management wetland alteration “ sonee Act Permit 5820 SF [J New Source Approval (J DEP or MWRA 0 Sewer Connection/ Extension Permit (shading) Acres of new non-water dependent use of tidelands or waterways L] Other Permits R p (including Legislative ; Gross square footage 0 2550 SF 2550 SF Approvals) — Specify: Number of housing units 0 ) 0 Maximum height (in feet) 9 25 25 Vehicle trips per day <50 266 316 Parking spaces 137 35 192 WATER/WASTEWATER Gallons/day (GPD) of water use 0 200 200 GPD water withdrawal 0 200 200 GPD wastewater generation/ 0 200 200 treatment Length of water/sewer mains o0 0.09/0.09 0.09/0.09 (in miles) CONSERVATION LAND: Will the project involve the conversion of public parkland or other Article 97 public natural resources to any purpose not in accordance with Article 97? (les (Specify ) [INo Will it involve the release of any conservation restriction, preservation restriction, agricultural preservation restriction, or watershed preservation restriction? Ces (Specify ) BINo RARE SPECIES: Does the project site include Estimated Habitat of Rare Species, Vernal Pools, Priority Sites of Rare Species, or Exemplary Natural Communities? LYes (Specify ) EINo HISTORICAL /ARCHAEQLOGICAL RESOURCES: Does the project site include any structure, site or district listed in the State Register of Historic Place or the inventory of Historic and Archaeological Assets of the Commonwealth? (Yes (Specify ) EINo If yes, does the project involve any demolition or destruction of any listed or inventoried historic or archaeological resources? LlYes (Specify ) BINo AREAS OF CRITICAL ENVIRONMENTAL CONCERN: Is the project in or adjacent to an Area of Critical Environmental Concern? ClYes (Specify ) BINo PROJECT DESCRIPTION: The project description should include (a) a description of the project site, (b) a description of both on-site and off-site alternatives and the impacts associated with each alternative, and (c) potential on-site and off-site mitigation measures for each alternative (You may attach one additional page, if necessary.) The proposed project is the construction of a commuter ferry terminal at an existing public boat ramp facility at the ‘Town Landing off of Shirley Street in Winthrop, Massachusetts. The approximately three-acre property includes a state Public Access Board boat ramp, but no pier or other direct access structure for ferry vessel access. A parking area provides access to Boston Harbor for recreational and small commercial boats. As currently configured, the facility provides 87 boat trailer spaces and 50 automobile parking spaces. The site is a filled pier located on filled tidelands, constructed from materials dredged from adjacent areas of the harbor in order to construct the public boat launch facility. The site measures approximately 340 by 400 feet. The shorelines are comprised of sloped stone revetments. Waterside improvements for the proposed ferry service facility include the construction of a pier structure with accompanying gangways and floats, which extend to water deep enough to accommodate a ferry vessel. A 160- foot long by 16-foot-wide pile-supported timber pier will be constructed. While vehicle access is not proposed, the pier will be capable of light emergency vehicle loads. The pier will be provided with a handrail and be equipped with electrical and water utilities and lighting. The pier is proposed to terminate in a 24-foot by 24-foot head area, which will help alleviate congestion during times of boarding. In addition, this type of area can be provided with benches and used as a viewing platform. From the pier, two 45-foot long gangways provide connection to the ramps and platforms on the float. This ramp provides the required handicap access during both low and high tides, similar to other sites around Boston Harbor. A 30-foot by 75-foot float and a 12-foot by 60-foot float are proposed for vessel docking and passenger loading and unloading. A 24-inch wide detectable warning strip will be required along all edges of the float and platforms which do not have handrailings. The facility will be entirely handicap accessible. Planned landside improvements include a new building to house a passenger waiting area, harbormaster’s office, and public restrooms. Water and electricity will be extended to both the building and the pier from existing town facilities. Sewer will be extended to the building. Traffic circulation in and out of the parking lot will be improved by the installation of a second curb cut off Shirley Street. The parking lot will also be re-surfaced, re- striped, and landscaped. The interior paved area of the parking lot will also be expanded somewhat along Shirley Street. Development of a ferry terminal will enhance public access to the waterfront and use of the harbor, together with providing opportunities for enhancement of the adjacent Shirley Street commercial district and surrounding residential neighborhoods. Resource areas within the project site include Land Under the Ocean, Coastal Beach, Land Containing Shellfish and Land Subject to Coastal Storm Flowage. The Coastal Bank has been replaced by an existing stone revetment. Areas of Salt Marsh exist adjacent to the project site, but are outside the area of any proposed work. A small area of LUO would be impacted by the installation of piles for the proposed pier. Approximately four (4) 24-inch diameter and four (4) 16-inch diameter steel piles will be installed in LUO, displacing approximately 18 SF of bottom. Approximately 3900 SF of LUO would be shaded by the pier. No significant changes to water circulation are expected from the construction of the pier. Since this area is fairly deep and no eelgrass is present, there should be no significant adverse effects on the resource area due to the construction of the pier. A small area of Coastal Beach would be impacted by the installation of piles for the proposed pier. Approximately thirty-six (36) 12-inch diameter timber piles will be installed in the Coastal Beach, displacing approximately 28 SF. Approximately 1920 SF of Coastal Beach would be shaded by the pier. However, the pier will be high enough to allow plenty of sunlight to infiltrate and should have no significant adverse effects on the resource area. The assessment of potential sites included a review of all possible sites within the Town. The following seven locations were assessed: (1) Future Post Office/Pleasant Park/Atlantis Marina; (2) Cottage Park Yacht Club: (3) Elks; (4) RR Trestle/Pier”; (5) Crystal Cove Marina; (6) Public Landing/Public Access Board; (7) Deer Island. Each of these sites were reviewed based on the following criteria: (1)Location; (2) Landside Access; (3) Waterside Access; (4) Parking Availability; (5) Potential to Serve as Economic Development Catalyst; and (6) Site Availability. Several alternative locations for the pier and floats were considered at this site. The criteria considered in the development of alternative locations include the following: the location has to be operationally efficient for ease of use by the ferry vessel operators; the location has to be operationally efficient for ease of use by the passengers, and by vehicles dropping off passengers; the location should minimize negative impact on the adjacent boat ramp operations; the orientation of the float should minimize loads and movement due to wind and waves; a minimum float draft of 4 feet is needed; the float, ramps and gangways have to be handicap accessible and meet ADA guidelines; and the configuration has to be cost-effective. The approximately North ~ South orientation of the float is preferred for two reasons. First, the orientation of the float into the direction of the largest waves is preferred so to reduce pitch and roll of the float due to wave motion. Second, the float orientation parallel to the Federal Channel is thought to be the most efficient for side loading vessels. A more detailed description is contained in Attachment 3: Project Narrative.
related records
Records whose documents say similar things, nearest first.
- Flooding & resilienceTown of WinthropCoughlin Park coastal resilience feasibility study, 2016
- Flooding & resilienceTown of WinthropMVP action grant applications: Ingleside Park and Morton Street, 2018
- Air & noiseMassachusetts Port AuthorityLogan Airport Environmental Data Report, 2023 and 2024
- State environmental reviewExecutive Office of Energy and Environmental AffairsAtlantis Marina, environmental notification form (EEA 13299)
- Flooding & resilienceTown of WinthropMorton Street Resilience Project feasibility report, 2024