Certificate on the 2005 data report, February 2007
Executive Office of Energy and Environmental Affairs · from the MEPA office · 6 pages · 490 KB
open the file ↗ · original at the source ↗
Deval L. Patrick GOVERNOR Timothy P. ~Murray LIEUTENANT GOVERNOR Ian A. Bowles SECRETARY 17ie ~ommonwealth o f Massachusetts Eecutive Offi of Environmental-Affairs 100 Cambridge street, Suite 900 Boston, 5k@ 02114 Tel: (61 7) 626-1000 Fax: (6 17) 626- 1 18 1 http:Nwww.rnass.gov/envir February 15,2007 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE 2005 LOGAN AIRPORT ENVIRONMENTAL DATA REPORT PROJECT NAME : 2005 Environmental Data Report PROJECT MUNICIPALITY : Boston / Winthrop PROJECT WATERSHED : Boston Harbor EOEA NUMBER : 3247 PROJECT PROPONENT : Massachusetts Port Authority DATE NOTICED IN MONITOR : December 23,2006 As Secretary of Environmental Affairs, I hereby determine that the Environmental Data Report submitted on this project adequately and properly complies with the Massachusetts Environmental Policy Act (G. L. c. 30, ss. 6 1-62H) and with its implementing regulations (301 CMR 1 1.00). The environmental review process at Logan Airport has been structured to occur on two levels: airport-wide and project-specific. The Environmental Status and Planning Report (ESPR) has evolved from a largely retrospective status report on airport operations to a broader analysis that also provides a prospective assessment of long-range plans. It has thus become (consistent with the objectives of the MEPA regulations) part of Massachusetts Port Authority's (Massport) long range planning. The ESPR provides a "big picture" analysis of environmental impacts associated with current and anticipated levels of activities, and presents an overall mitigation strategy aimed at avoiding increases in such impacts. The ESPR analysis is supplemented by (and ultimately incorporates) the detailed analyses and mitigation commitments of project-specific EIRs. The ESPR is currently updated on a five-year basis, with much less detailed Environmental Data Reports (EDR) filed in the years between submission of the ESPRs. The 2005 EDR is the subject of this Certificate. EDR Certificate Background In 1979, the Secretary of the Executive Office of Environmental Affairs (EOEA) issued a Certificate requiring Massport to define, evaluate, and disclose, every three years, the impact of long-term growth at the airport through a Generic Environmental Impact Report (GEIR). The Certificate also required the submission of interim Annual Updates to provide data on conditions for the years between the GEIRs. The GEIR provided projections of environmental conditions where the cumulative effects of individual projects could be understood. The Secretary's Certificate on the 1997 Annual Upckite proposed a revised environmental review process for Logan Airport. As a result, Massport evaluates the cumulative impacts associated with airport activities through preparation of an ESPR every five years and provides data updates annually through the EDRs. Review of the 2005 EDR In general, the EDR has fulfilled its purpose of providing a "snapshot" of year 2005 passenger and impact levels at Logan Airport. Most environmental parameters showed significant improvement in calendar year 2005. In particular, the technical studies in the 2005 EDR included reporting on and analysis of key indicators of airport activity levels, airport planning, the regional transportation system, ground access, noise, air quality, environmental management, and project mitigation tracking. As always, EOEA remains committed to evaluating and addressing the cumulative impacts of airport operations on the nearby communities. In June 2001, Massport agreed to work with EOEA on structuring a proposed Air Quality Initiative (AQI). The Certificate indicated that Massport was "to solicit project submissions from local governments and community groups, which will be reviewed in an objective, science-based process by a neutral organization such as NESCAUM." The 2005 EDR reiterates that Massport has committed to the Air Quality Initiative, a key program designed to mitigate the cumulative air quality impacts of airport operations. The 2005 EDR details how Massport is meeting this commitment. The 2006 EDR should continue to report on the details of Massport's committment. In addition to the environmental issues listed below, the 2006 EDR should address all of the air quality and noise related issues raised by the commenters during the review of the 2005 EDR. Follow-up Massport should file the next EDR (covering operations for the 2006 calendar year) in calendar year 2007. The EDR should provide more of a "snapshot" of the 2006 operations and impacts, with more substantial analysis awaiting the.next GEIR. Massport should also address the comments received on the current EDR when developing its 2006 EDR. Responses to Comments The next EDR must include Responses to Comments which addresses all of the substantive comments from the letters listed at the end of this Certificate. The Response to Comments EOEA# 3247 EDR Certificate 021 14/07 included in this EDR is well-constructed and cross-referenced. Massport may follow the same format in addressing comments in the next EDR, although the Responses to Comments should pay particular attention to increased specificity, where necessary. The majority of comments received on the 2005 EDR focused on air quality and noise related issues, including measurement of noise, modeling of noise contours, and noise abatement. In addition to responding to these comments, the 2006 EDR and future EDRs should also continue to report on the refinements to noise tracking and abatement efforts. Activity Levels The Activity Levels chapter presents aviation activity statistics for Logan Airport in 2005 and compares activity levels to the prior year including air passengers, aircraft operations, fleet mix, and cargolmail volumes. Air passenger traffic at Logan Airport continued to rebound in 2005, but remained below the peak year level reached in 2000. Specifically, the total number of passengers using Logan Airport in 2005 increased by 3.6 percent over the prior year to 27.1 million passengers. In 2005, total aircraft operations (409,066 operations) at Logan Airport increased by 0.9 percent over 2004 levels. While 2005 passenger traffic at Logan Airport was approximately equal to I999 levels, in 2005 these passengers were being carried on approximately 86,000 fewer flights (495,000 flights in 1999 versus 409,066 flights in 2005). Several commenters raised concerns with the increase in passenger levels requesting long-term solutions to meeting demand which do not include expansion of Logan Airport's capacity or footprint. I advise Massport to consider and attempt to address these comments in the next 20006 EDR. Planning The Airport Planning chapter provides an overview of planning, construction, and permitting activities that occurred at Logan Airport in 2005. It also describes known future planning, construction, and permitting activities. Specifically, several projects were completed in 2005 including the majority of construction of the main terminal and satellite concourse of Delta Air Lines' Replacement. Terminal A Project was completed in 2004, with final fit up and commissioning in 2005. Massport also launched Exit Express as part of an on-going program to improve parking facilities and improve air quality through enhanced circulation and reduced idling at the toll booths. In addition, as part of a cooperative venture between the Massachusetts Bay Transportation Authority (MBTA) and Massport, initial Silver Line service to the airport began in December 2004. Full Silver Line service to Logan Airport began on June 1,2005. The chapter also includes future planning including: ongoing expansion and upgrade of Terminal E and completion of West Garage Phase II(Centra1 Garage Expansion); more efficient ways of using the limited land resources in the service areas; airside improvements include upgrades and improvements to the airfield to enhance the operations, efficiency and safety of Logan Airport; In addition, buffer areas are being designed in consultation with Logan Airport's neighbors and other interested parties in a community planning process. Massport is also considering a parking strategy to address future on-airport parking demands. Some ongoing and future parking projects and planning concepts include redeveloping three parcels into a combined economy parking EOEA# 3247 EDR Certificate 021 14/07 facility with the capacity for up to 1,750 vehicles and a new consolidated facility for all car rental operations. Regional Transpol-tation This chapter des'cribes activity levels at New England's regional airports in 2005 and updates recent planning activities. Overall, the number of air passengers utilizing New England's primary commercial service airports in 2005 rose by 5.3 percent over 2004. When measured by aircraft operations, however, activity levels fell by 0.6 percent. This reflects sweeping changes in both the commercial aviation and general aviation (GA) sectors of the industry. Passenger numbers rose despite capacity reductions as airlines operated at higher load factors. Carriers flew fewer flights to the regional airports than in 2004, but used larger aircraft on average in 2005, and carried more passengers. GA operations at New England airports declined by 3.8 percent from the 2004 levels. The Boston Transportation Department has raised a number of suggestions related to the Regional Transportation that Massport should consider in the 2006 EDR. Ground Transportation This chapter reports on transit ridership, roadways, traffic volumes, and parking for 2005. Specifically, ground transportation activity levels increased from 2004 to 2005 as a result of a 3.6 percent increase in the number of air passengers. In addition, traffic volumes on airport roadways increased by 5.8 percent, while the vehicle miles traveled (VMT) on the airport increased by 4.2 percent. The lower VMT growth when compared to overall traffic volume growth suggests that more direct connections over shorter roadway distances are provided. The facilities at the MBTA Blue Line Airport Station were also substantially improved in 2005, including the conversion from a manual to an automated fare collection system. In addition, full MBTA Silver Line service to Logan Airport began on June 1,2005. In 2005, Terminal A and its associated access roadways were fully opened for operation. There were no other roadway modifications completed in 2005. In addition, contract negotiations began between Massport and the C & J Bus Company in New Hampshire to expand early morning transportation between New Hampshire and Logan Airport. This service began in 2006. Massport also re-bid its Logan Airport Transportation Management Association (Logan TMA) contract with the Executive Office of Transportation (EOT) through the MassRIDES program. Noise The Noise Abatement chapter updates the status of the noise environment at Logan Airport in 2005, and describes Massport's efforts to reduce noise levels. In 2005, the number of people exposed to Day-Night Sound Level (DNL) values greater than 65 decibels (dB) decreased compared to 2004. An estimated 6,477 people were exposed to DNL levels greater than 65 dB in 2005, compared to 9,438 in 2004, and 7,183 in 2003. The total count of people exposed to 65 dB Day-Night Sound Level (DNL) and above was 55 percent lower than in 200 1. Winthrop, which has always experienced the highest levels of noise exposure of any community around Logan Airport, continued its decline in the number of people exposed to levels greater than 65 DNL. This number has dropped 8 1 percent since reaching its peak in 1998. The number of residents EOEA# 3247 EDR Certificate 021 14/07 exposed to noise over 75 DNL increased from 2004 but still remained below 200 1 levels. The 2005 Cumulative Noise Index (CNI) of 153.2 Effective Perceived Noise Level (EPNdB) remained well below the cap of 156.5 EPNdB. The CNI decreased slightly compared to 2004 even with a slight increase in the number of operations in 2005. This decrease is primarily due to decreased use of recertified aircraft by cargo operators. Massport provided sound insulation for 47 1 residential dwelling units in 2005. Since the program's inception, Massport has sound insulated a total of 9,086 dwelling units. The majority of the units insulated in 2005 were in Winthrop. The information in this chapter is very informative and I encourage Massport to continue with its updates in the 2006 EDR. I also strongly advise Massport to consider and address the numerous comments received that have raised noise related concerns in comments. Air Oualitv The Air Quality/Emissions Reduction chapter provides an overview of airport-related air quality issues in 2005 and efforts to reduce emissions. The 2005 emissions inventory results are driven by the small increase in aircraft operations at Logan Airport compared to 2004 levels. Compared to 2004 levels, total emissions of volatile organic compounds (VOCs) are estimated to have decreased by approximately 6 percent to 1,285 kilograms per day (kglday). In 2005, total emissions of oxides of nitrogen (NOx) were estimated to be 4,187 kglday, which is a 2 percent decrease from 2004 levels. Total emissions of carbon monoxide (CO) in 2005 were 9,556 kglday, or 3 percent lower than 2004 levels. For the first time, estimates of particulate matter emissions associated with Logan Airport are reported in this 2005 EDR in response to the recent availability of an FAA-approved method for computing particulate matter emission factors for aircraft. Total emissions of particulate matter (PM2.5) at Logan Airport in 2005 were approximately 83 kglday [33 tonslyear (tpy)]. NOx emissions at Logan Airport in 2005 were approximately 662 tpy lower than 1999 levels-a 28 percent decrease. It appears that there is an ongoing trend of decreasing nitrogen dioxide (N02) concentrations at both the Massport and Massachusetts Department of Environmental Protection (MassDEP) monitoring sites located in the general vicinity of Logan Airport. In addition, annual NO2 concentrations at all monitoring locations were well below the NO2 air quality standards in 2005. The 2006 EDR should continue updates on the information presented in the 2005 EDR. Water Qualitv/Environmental Compliance This chapter describes Massport's ongoing environmental management activities including NPDES compliance, stormwater, fuel spills, activities under the Massachusetts Contingency Plan, and tank management. Specifically, of the 97 spills reported in 2005, 15 (15 percent) were ten gallons or greater in quantity. Jet fuel spills accounted for 66 (68 percent) of the total spills, 12 of the jet fuel spills (18 percent) were ten gallons or greater in quantity. The remaining 3 1 spills involved gasoline, hydraulic oil, diesel fuel, and other substances. Of these spills, only EOEA# 3247 EDR Certificate 021 14/07 three (10 percent) were ten gallons or greater. In 2005, only eight samples exceeded the regulatory limits. The North Outfall had two samples which exceeded the 15 milligrams per liter ( m g k ) National Pollutant Discharge Elimination System (NPDES) limit for oil and grease, and the Porter Street Outfall had one sample exceed this limit. The North Outfall had two samples which exceeded the 0.3 milliliters per liter (mlL) daily maximum limit for settable solids, and the West Outfall had three samples exceed this limit. No other exceedances occurred. In accordance with the Massachusetts Contingency Plan (MCP), Massport should continue to report in the 2006 EDR how Massport will assess, remediate, and bring to regulatory closure areas of subsurface contamination. Sustainability at Logan Airport This chapter describes Massport's airport wide sustainability goals. In October 2000, the Massport Board approved an Authority-wide Environmental Management Policy, which articulates Massport's commitment to protect the environment and to implement sustainable design principles. In October 2004, the Massport Sustainability Team produced the Massach~isetts Port Authority Sustaincrhility Plan (Sustainability Plan). The Environmental Management Policy is incorporated in the Sustainability Plan as Massport's long-term sustainability goal or vision. This chapter describes Massport's continued efforts. As I stated at the beginning of this Certificate, the 2006 EDR must provide responses to the issues raised in comments received. The 2006 EDR must include a copy of this Certificate and a copy of each comment letter received on the 2005 EDR. In particular, Massport should provide a thorough examination of issues raised regarding individual noise monitoring locations, noise measurement and modeling, and noise abatement. Massport should consult directly with individual commentors where necessary. A distribution list for the 2006 EDR (indicating those receiving documents, CDs, or Notices of Availability) should be provided in the document. This section must also include copies of all GEIRlAnnual Update Certificates issued since 1995 to provide context for reviewers. Supporting technical appendices should be provided as necessar February 15,2007 Date Ian A. Bowles Comments Received: 0 1/30/07 State Representative Robert A. DeLeo 0113 1/07 Joseph Felzani 02/05/07 Boston Transportation Department 02/06/07 Nancy Timmerman 02/07/07 Stephen Kaiser 021 13/07 City of Boston Environment Department
related records
Records whose documents say similar things, nearest first.
- Air & noiseMassachusetts Department of Public HealthLogan Airport Health Study, 2014
- Air & noiseMassachusetts Port AuthorityLogan Airport Environmental Data Report, 2016
- Air & noiseMassachusetts Port AuthorityLogan Airport Environmental Status and Planning Report, 2017
- Air & noiseMassachusetts Port AuthorityLogan Airport Environmental Data Report, 2020 and 2021
- Air & noiseMassachusetts Port AuthorityLogan Airport Environmental Data Report, 2018 and 2019